CC Exhibit 02-06-2018 Item No. 1 Bicycle Blvd Project Presentation1February 6, 2018City of CupertinoBicycle Boulevard Project 2February 6, 2018Background• Bicycle Transportation Plan adopted June, 2016• Identified Network of Bike Boulevards throughout city• Class III bike routes• Low-volume, low-speed residential streets• Improved w/ traffic calming featuresand wayfinding signage• Provide connectivity between local neighborhood destinations and arterial corridors• $1.4M allocated for “first-phase” rollout • Bike Boulevards grouped by geographic location into one of seven neighborhoods• Public workshops held within each neighborhood to solicit feedback on proposed improvements 3February 6, 2018Tool KitSpeed HumpBulb-outBike ChannelizerTruck ApronTraffic Circle 4Neighborhood #1Merritt Dr / N Portal AveINITIAL RECOMMENDATIONSMerritt Dr• Install speed tables• Remove existing parking to provide bike lanes OR install traffic circle and truck apronsN Portal Ave• Install speed tables, truck aprons, bulb-outs• Remove stop signs, existing center divider, existing parking to provide bike lanesWHAT WE HEARD• Speed tables are OK• No parking removal or traffic circles on Merritt• Remove center divider and improve ped crossing at Amherst• Retain the 4-way stop at Portal & Wheaton but consider removing the existing traffic circle• Removal of parking on Portal between Wheaton & Stevens Creek to provide bike lanes is OK 5N BLANEY AVEN PORTAL AVESTEVENS CREEK BLVDWHEATON DRAMHERST DRMERRITT DRVISTA DRREVISED RECOMMENDATIONSMerritt Dr• Install raised crosswalk at Vista• Install 1 speed table between Vista & Blaney• Install 2 speed tables between Blaney & Portal• Install sharrows & wayfinding signsN Portal Ave• Install 1 speed table between Merritt & Amherst• Remove existing center divider at Bright Horizons driveway• Install raised crosswalk at Portal & Amherst• Install 1 speed table between Amherst & Wheaton• Remove existing traffic circle and retain 4-way stop at Wheaton• Remove existing chokers and parking between Stevens Creek & Wheaton and install new bike lanes• Install sharrows & wayfinding signsLAWSONMIDDLESCHOOLCOLLINSELEMENTARYSCHOOLWILSONPARKBRIGHTHORIZONSNeighborhood #1Merritt Dr / N Portal Ave 6Neighborhood #2Calle de Barcelona/ Finch Ave / Tilson Ave / Wunderlich Dr / Barnhart AveINITIAL RECOMMENDATIONS• Install truck aprons, bike channelizationsWHAT WE HEARD• Consider further safety improvements to Miller & Calle de Barcelona• Proposed recommendations were generally supported 7FINCH AVES TANTAU AVECALLE DE BARCELONATILSON AVEMILLER AVEREVISED RECOMMENDATIONS• Further study is needed at Miller & Calle de Barcelona• Install bulb-outs at Tilson & Tantau• Install bulb-outs at Tilson & Stern• Install bike channelization at SW corner of Tilson & Wunderlich and NE corner of Barnhart & Wunderlich to improve right-turn bike movements• Install sharrows & wayfinding signsCUPERTINOHIGHSCHOOLSEDGWICKELEMENTARYSCHOOLCREEKSIDEPARKNeighborhood #2Calle de Barcelona/ Finch Ave / Tilson Ave / Wunderlich Dr / Barnhart AveWUNDERLICH DRBARNHART AVESTERN AVE 8Neighborhood #3Torre Ave / Pacifica Dr / Farallone Dr / Suisun Dr / Clifford Dr / E Estates Dr / Vicksburg Dr / Cold Harbor Ave / Wintergreen Dr / S Portal AveINITIAL RECOMMENDATIONS• Remove existing parking to install bike lanes • Install crosswalkWHAT WE HEARD• Consider further safety improvements at existing trailhead on E Estates• Proposed improvements were generally supported 9FARALLONE DRS BLANEY AVESTEVENS CREEK BLVDPACIFICA DRTORRE AVEREVISED RECOMMENDATIONS• Remove parking on eastside of E Estates at existing trailhead• Install modified striping on E Estates between Vicksburg & La Mar to direct bikes to the existing trailhead• Remove parking on Portal between Stevens Creek Blvd & end of The Marketplace property and install bike lanes• Install sharrows & wayfinding signsWILSONPARKCIVICCENTERCREEKSIDEPARKSUISUN DRNeighborhood #3Torre Ave / Pacifica Dr / Farallone Dr / Suisun Dr / Clifford Dr / E Estates Dr / Vicksburg Dr / Cold Harbor Ave / Wintergreen Dr / S Portal AveEATONELEMENTARYSCHOOLS PORTAL AVEWINTER-GREEN DRRODRIGUES AVETHE MARKETPLACE 10Neighborhood #4Orange Ave / Mann DrINITIAL RECOMMENDATIONS• Install traffic circlesWHAT WE HEARD• Speed tables are preferred 11ORANGE AVEBYRNE AVEMCCLELLAN RDSTEVENS CREEK BLVDMANN DRREVISED RECOMMENDATIONS• Install 3 speed tables between McClellan & Granada • Install sharrows & wayfinding signsBLACKBERRYFARMMONTA VISTAHIGH SCHOOLLINCOLNELEMENTARYSCHOOLNeighborhood #4Orange Ave / Mann DrIMPERIAL AVEGRANADA AVE 12Neighborhood #5Meteor Dr/ Castine Ave / Greenleaf Dr / Beardon Dr / Greenleaf DrINITIAL RECOMMENDATIONSInstall the following:• Speed tables, concrete median, curb ramps• Improvements to the following:• Existing median at Meteor & Mary• Existing intersection at Beardon & Greenleaf• Existing wall at Greenleaf & BandleyWHAT WE HEARD• Consider improvements at Meteor & Nathanson to encourage vehicle compliance with stop sign• The proposed median on Beardon was not generally supported but there was general agreement this location needed improvement. 13NATHANSON AVECASTINE AVEMETEOR DRMARY AVEREVISED RECOMMENDATIONS• Modify existing median and NB bike lane at Mary & Meteor• Install 3 speed tables on Meteor between Nathanson & Castine• Install 3 speed tables on Greenleaf between Stelling & Beardon• Further study is needed at Beardon & Greenleaf• Modify existing wall by adding 2ndopening to better facilitate bike movements• Install bulb-outs at Bandley & Mariani• Install sharrows & wayfinding signsGARDEN GATEELEMENTARYSCHOOLBEARDON DRGREENLEAF DRN STELLING RDNeighborhood #5Meteor Dr/ Castine Ave / Greenleaf Dr / Beardon Dr / Greenleaf DrGREENLEAF DRBANDLEY DRMARIANI AVE 14Neighborhood #6Linda Vista Dr/ Hyannisport Dr / Santa Teresa Dr / Terrace Dr / Fort Baker DrINITIAL RECOMMENDATIONS• Install bulb-outs, speed tables, traffic circles• Remove stop signs• Install raised crosswalk OR raised median at Fort Baker & Presidio intersectionWHAT WE HEARD• Improvements are needed at Linda Vista & McClellan to enhance access and visibility• There is a large volume of cut-through traffic on Linda Vista• Consider removing one crosswalk at Hyannisport& Fort Baker• Traffic circles and removing stop signs on Terrace and Santa Teresa are not supported 15FORT BAKER DRLINDA VISTA DRREVISED RECOMMENDATIONS• Install raised median at Fort Baker & Presidio• Remove 1 crosswalk at Hyannisport & Fort Baker• Remove existing slip lane and install bulb-out at Hyannisport & Fort Baker• Further study is needed along Linda Vista, Hyannisport, Santa Teresa & Terrace• Install sharrows & wayfinding signsMONTA VISTAHIGH SCHOOLSANTA TERESA DRPRESIDIO DRBUBB RDHYANNISPORT DRTERRACE DRNeighborhood #6Linda Vista Dr/ Hyannisport Dr / Santa Teresa Dr / Terrace Dr / Fort Baker DrKENNEDYMIDDLE SCHOOL 16Neighborhood #7Rodrigues Ave/ Terry Wy / Shelly Dr / Westacres Dr / Kim St / Bollinger Rd / De Foe DrINITIAL RECOMMENDATIONS• Install bulb-outs, bike lanes approaching De Anza intersectionWHAT WE HEARD• The proposed improvements were generally supported• The intersection where Westacres & Kim meet McClellan is difficult to negotiate and needs attention 17TERRY WYDE FOE DRREVISED RECOMMENDATIONS• Install Class IV separated bikeway on Rodrigues between De Anza & Terry• Further study is needed where Westacres & Kim meet McClellan• Install bulb-outs & slip lane at Kim & Kirwin• Install sharrows & wayfinding signsJOLLYMANPARKWESTACRES DRRODRIGUES AVEDE ANZA BLVDSHELLY DRKIRWIN LNMCCLELLAN RDBOLLINGER RDKIM STNeighborhood #7Rodrigues Ave/ Terry Wy / Shelly Dr / Westacres Dr / Kim St / Bollinger Rd / De Foe Dr 18February 6, 2018Bike Plan UpdateMcClellan Road Class IV (Separated) Bike Lanes• 35% design completed on whole corridor• Design and construction split into three phases:1. Imperial to Stelling2. Stelling to Torre3. Byrne to Imperial• 100% design proceeding on first segment• Right-of-way discussions with property owners ongoingStevens Creek Blvd Class IV Bike Lanes• Conceptual designs completed• RFP for Wolfe-to-Tantau segment this month• Pursuing grant fundingfor De Anza-to-Wolfe 19February 6, 2018Bike Plan UpdateJunipero Serra Trail• Feasibility study in progress•2ndpublic meetings – Feb 20 & Feb 26• Study completion – End of 2018Regnart Creek Trail• Feasibility study in progress• “Walkshop” and 2ndpublic meeting completed• Study completion – Summer/Fall 2018 20February 6, 2018Bike Plan UpdateWayfinding Signage Program• Branding scheme and destination list completed• Draft plan completed• Final plan anticipated Spring 2018