14110136 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 21885 GARDENVIEW LN CONTRACTOR:SOLAR UNIVERSE PERMIT NO: 14110136
OWNER'S NAME:
JOB DESCRIPTION:RESIDENTIAL E] COMMERCIAL 0
��}}u/� INSTALLATION OF ROOF MOUNTER SOLAR(24
License Class C" Lic.# -/1 12 2-61 MODULES)
�� � � (6.72 KW).
Contract Date
I hereby fi hat I am licensed under the provision of Chapter 9
(commen ng with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
1 hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$25000
Shave and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:32619088.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
c ify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FROM LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the Y Date;
Issued b /�� ��"
granting of this permit. Additionally,the applicant understands and will comply l�
with all non-point source re ations per the Cupertino Municipal Code,Section
9.18.
RE-ROOFS:
Signature Date All roofs shall be inspected prior to any rooting material being installed. If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
Signature of Applicant Date'
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. 1 will
1 hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(x)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District
performance of the work for which this permit is issued, will maintain compliance with the Cupertin unicipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Cod ectio 25505 33,and 25534.
Section 3700 of the Labor Code,for the performance of the work for which this
Owner or authorized
permit is issued.
certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
- Date
CITY OF CUPERTINO
FEE ESTIMATOR- BUILDING DIVISION
ADDRESS: 21885 Gardenview Lane DATE: 11/24/2014 REVIEWED BY: sean
APN: BP#: / `VALUATION; $25,000
°PERMIT TY
PE:: Building Permit PLAN CHECK TYPE: Alteration / Repair
PRIMARY SFD or Duplex PENTAMATION SOLAR-RES
USE: PERMIT TYPE:
WORK Installation of roof mounter solar 24 modules 6.72 kW); Install new 100 amp subpanel.
SCOPE
Elec. Plan Check 0.0 1 hrs $0.00
Elec.Permit Fee: [SPERM/T
Other Elec. Insp. 0.0 hrs $48.00
NOTE: This estimate does not include fees due to other Departments(i.e.Planning,Public Works, Fire,Sanitary Sewer District,School
District,etc.). Thesefees are based on the preliminary information availahle and are only an estimate. Contact the Dept/or addn'1 info.
FEE ITEMS QLee 1Zesolution 11-053 Eff 7/1;13) FEE QTY/FEE MISC ITEMS
Plan Check Fee: $0.00 = # Alternative Energy System
Suppl. PC Fee: 0 Reg. 0 OT 1 0.0 1 hrs $0.00 $236.00 IPHOTOVRES Photovoltaic System
PME Plan Check: $0.00 100 amps Electrical
Permit Fee: $0.00 $48.001 IBELEC200 Services
Suppl. Insp. Fee-E) Reg. 0 OT0.Q hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: $48.00
Administrative Fee: IADMIN $45.00 0
Work Without Permit? 0 Yes (j) No $0.00
Advanced Planning Fee: $0.00 Select a Non-Residential E)
Travel Documentation Fee: ITRA VDOC $48.00 Building or Structure 0
Strom Motion Fee: IBSEISMICR $3.25 Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC $1.00
SUBTOTALS: $145.25 $284.00 TOTAL FEE: $429.25
Revised: 10/01/2014