Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
14110009
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 22590 VOSS AVE CONTRACTOR:' PERMIT NO: 14110009 L,t*A,tY V%Wl,4A snV(` C-HV-ea Y OWNER'S NAME: ALOMIA VINCENT TRUSTEE S:rr—&\ac .S 11JG DATE ISSUED: 11/03/2014 OWNER'S PHONE: PHONE NO: LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL E] COMMERCIAL ❑ CUPERTINO HEALTH CARE-REPLACE(E)WATER License Class G-41 20 t jG is# S�� 2 HEATER, Contractor ?�• Date SAME LOCATION I here6. that 1 a lice sed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: 1 have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$26500 1 have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number;34229044.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMTT EXPIRES IF WORK IS NOT STARTED correct t agree tocomply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF I NCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FR ST C INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, '— costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will coIs ate mp : with all non-point source regulations per the Cupertino Municipal Co( Sect 9.18. RE-ROOFS: Signature Date �( All roofs shall be inspected or to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION Signature of Applicant: Date: 1 hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER 1,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will 1 hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(x)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code;for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Muni ipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533, td 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: `— Date: permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,1 CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date MEP ,�Q,�7y� , _ _ _ _COMMUNI7� D=V�LOPIVEEN i D;=PP,. NDN 1 ' BUILDING DIVISIC'I O 10300 i 0RRC J^.VcNU=' CUPER I INO,CA 95014-3255 40B l7-322B' r'."n(LOB)777-3333c Wifkt I 1�o m I %i G 'Sl]IIOIf1G CIJDBilf10.0i0 ,� LL'I TG ❑]�Crr-?�iC?Z ❑ EC1 IC" ( 1lzs=u-A2s�OUs PRO=� DF.ss Z2�q �<oss �A� �?K O'v? i Aw, 744,T71(.��C/v v �'1�� V�� I •'l�ti s�pc,. I Z^ -•-=,E>0?.mss aw'a� cam, s-,�- -:1. - 52S 820 fst 3B :�✓k^c� i�teda� c 'recl�a�• ow, 3 Lad C RCS) Cau-7G+>PL_ QTC q I[) "Www CA `2 4583 ON-Na ❑ umjZ ='=Ek ❑ 0v,T-,cosi ❑ COCT0EL7 COTS+,CTOE R. i ❑ �?.� ::'.CT EI iE:vF-0?7P ❑ K" T CO?� SC OR]kip b•N L �Sa4 L;052? u,.�=� .I cJ2'Z �vs is • I G-4,C-20 3G LeC*^CY 1A"ECjk j4tCAL I ��C�G+� �teClno'N:(b.�. 012IC $70�cZSQ3 srti ,foDF25s3134 i?,%OaGa�+Yi PL SMd� 's'h ``pe AV4A*%p,J Cbl 0(4583 =NISSINMIS_R. MY, F,zT? 'USS C ❑-�'D w Dip TT- :0 MJL,7•r�11D Y I ?EO^CT N W J:T X0.7 ❑ 1-s I PItoj=IN ❑Y:S I is. 3LDG l.N ❑ 1:S B'U=lPIG. �COi pCILT 'v^rB�?a7T=oFhC3�3 .4 ❑ h0 FLOOD ZO3 E3\.o FiC�1tHOMM ❑ @0 a7- CPTT-i0N OF rvo.0 QE!p LA cr-*vzTr- LSP Soc> s : s I&3 uJ_W 71,Y 0'Mtr Oi_�ru�1DiiZ`•d^�' 2C` r '0 9J_ �T 2i I z -ad yn-S .UaiIG LiDi'i�-Id Lri.�.IP.. .'dation Ih?--,t.Ci Ov;de'd:s cc-.•.^•L I haat i..�.�.he Desuipi;n cl WOik G:Jd�'�l:�' Lis G cz i Pa.P.. •1T. JL. LDiic_�1e local O:Ginn--"-s 2-'1d si=:B 1'is ie1 IDo b 'IC-Q CC?'. _C➢OiL. i5�i•-. iC 'Cs=iJ*_iilJ�s DI CL�B ii?O`0..:i:.. w.- 0\'�!G'^ii'Cd'' DB:;y for L579CT110I1 LtrTE?�r1iTf i ?�rORAf i10?� .QI�?=D � CITY OF CUPERTINO FEE ESTIMATOR- BUILDING DIVISION ADDRESS: 22590 VOSS AVE DATE: 11/03/2014 REVIEWED BY: MELISSA APN: 342 29 044 BP#: C/C `VALUATION: 1$26,500 PERMIT TYPE: Plumbing Permit PLAN CHECK TYPE: Alteration /Addition / Repair PRIMARY PENTAMATION USE: Commercial Building PERMIT TYPE: PCWHEAT WORK C7TINO HEALTH CARE- REPLACE E WATER HEATER SAME LOCATION SCOPE APPLIANCE/EQUIP TYPE FEE ID QTY UNITS BP FEES Water Heater 1PCWHEATR 1 # $29 TOTALS: $29.00 Plumb. Plan Check 0.0 hrs $0.00 , Plumb.Permit Fee: 1PPERMIT Other Plumb Insp. 0.0 hrs $48.00 NOTE. This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc. . These ees are based on the reliminar information available and are only an estimate. Contact the De t or addn'l info. FEE ITEMS (Fee Resolution 11-05 Lff 711;,731 FEE QTY/FEE MISC ITEMS PME Plan Check: $0.00 PME Unit Fee: $29.00 PME Permit Fee: $48.00 Administrative Fee: IADMIN $45.00 Work Without Permit? 0 Yes (j) No $0.00 Travel Documentation Fee: ITRA VDOC $48.00 StronP Motion Fee: 1BSEISMICO $7.42 Select an Administrative Item Bldg Stds Commission Fee: 18CBSC $2.00 SUBTOTALS: $179.42 $0.00 TOTAL FEE: $179.42 Revised: 10/01/2014 SEISMIC ATTACHMENT CALCULATIONS FOR WATER HEATER UNIT REPLACEMENT PROJECT: NATER HEATER REPLACEMENT NOV 032014 LOCATION: 22590 VOSS AVENUE CUPERTINO, CALIFORNIA CUPERTINO FSuilding Department s M_, 0 J 414 Aft REVIEWED t:Uk CODE COMPLIANCE DATE: Reviewea By � "� �'� OCTOBER 31, 20146 Rco�py 00ESS/av B. P//� Fyc' � OP 9 i No. C78052 . 9-30-15A �q civ OF A-\F REV. 0 Project Name = 22590 VOSS AVE. CUPERTINO Conterminous 48 States 2005 ASCE 7 Standard Latitude = 37.31751 Longitude = -122.06996000000001 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B - Fa = 1.0 ,Fv = 1 .0 Data are based on a 0.01 deg grid spacing Period Sa (sec) (g) 0.2 2.423 (Ss, Site Class B) 1.0 0.868 (S1, Site Class B) Conterminous 48 States 2005 ASCE 7 Standard Latitude = 37.31751 Longitude = -122.06996000000001 Spectral Response Accelerations SMs and SM1 SMs = Fa x Ss and SM1 = Fv x S1 Site Class B - Fa = 1.0 ,Fv = 1.0 Period Sa (sec) (g) 0.2 2.423 (SMs, Site Class B) 1 .0 0.868 (SM1, Site Class B) Conterminous 48 States 2005 ASCE 7 Standard Latitude = 37.31751 Longitude = -122.06996000000001 Design Spectral Response Accelerations SDs and SD1 SDs = 2/3xSMs and SD1 = 2/3xSM1 Site Class B - Fa = 1.0 ,Fv = 1 .0 Period Sa (sec) (g) 0.2 1.615 (SDs, Site Class B) 1 .0 0.579 (SD1, Site Class B) SEISMIC ANCHORAGE CALCULATIONS FOR BOILER REPLACEMENT LONGITUDE: -122.06996 ° LATITUDE: 37.31751 ° SDS= 1.615 ar,= 1.0 Rp= 2.5 Ip= 1.5 z= 1 h = I Wp= 8004 Fp=0.4 ap SDS W 1 +2 z/h Eq. 13.3-1 Rplp Fp= 930# GOVERNS! FP,„aX= 1.6 SDS Wp Ip Eq. 13.3-2 F p,,,a„=3101 # Fp,,,;,,=0.3 SDS Wp Ip Eq. 13.3-3 Fp,,,;,, = 581 # :. FPH=930# Fpv=f 0.2 SDS Wp :. Fpv=258# CHECK FOR MOMENT MOT=FpH' dl MOT=22785 in-# MR=(WP- FPv) - d2 MR=8401 in-# MOT> MR, :. UPLIFT FORCE ON ANCHORS CHECK TENSION LOAD,T ASSUME(1)ANCHOR @ EACH CORNER T=MOT/(d3- N) T=438# CHECK SHEAR LOAD, V ASSUME(1)ANCHOR @ EACH CORNER V —FPH 4 V=234# CONSIDER USING ''/z" �HILTI KB-TZ EXPANSION ANCHORS WITH MIN 2.5" EMBEDMENT Tall"w= 1128# > T=438# OK! Vall"w= 1050# > V =234# OK! COMBINING THE LOADS FOR UNITY CHECK —(T/Ta11ow)5/3+(V/Va1 1 ow)5/3 =0.2890< 1.0 OK! REAR 4� �3 PLAN VIEW 1 � 2 FRONT ANCHOR LOCATIONS _...............................................___.__.__..__....._....J ', UNIT BASE RAIL UNIT MOUNTING CLIP FRONT OF BOILER r _-- (E) CONCRETE SLAB :-2 1/2"0 HII_TI KB-TZ SS304 WITH 2.5" MIN. EMBEDMENT. MINIMUM 5" EDGE DISTANCE. (TYPICAL OF 4) WATER HEATER ATTACHMENT DETAIL www.hilti.us _ Profs Anchor 2.4.7 Company: Metro Engineering Page: 1 Specifier: Project: 22590 Voss Ave.Cuper Address: Sub-Project I Pos.No.: Phone I Fax: Date: 10/31/2014 E-Mail: Specifier's comments: 1 Input data Anchor type and diameter: Kwik Bolt TZ-SS 304 112(2) " Effective embedment depth: haf=2.000 in.,hnom=2.375 in. Material: AISI 304 Evaluation Service Report: ESR-1917 Issued I Valid: 5/1/2013 15/1/2015 Proof: design method ACI 318/ACI 93 Stand-off installation: -(Recommended plate thickness:not calculated) Profile: no profile Base material: cracked concrete,2500,f,'=2500 psi;h=4.000 in. Reinforcement: tension:condition B,shear:condition B;no supplemental splitting reinforcement present edge reinforcement:none or<No.4 bar Seismic loads(cat.C,D,E,or F) yes(D.3.3.6) Geometry[in.]&Loading[lb,in.lb] Z wtcv 4 . , x Input data and results must be checked for agreement with the existing conditions and for plausibility! PROPS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hilti.us Profis Anchor 2.4.7 Company: Metro Engineering Page: 2 Specifier: Project: 22590 Voss Ave.Cuper Address: Sub-Project I Pos.No.: Phone I Fax: Date: 10/31/2014 E-Mail: 2 Proof I Utilization (Governing Cases) Design values[lb] Utilization Loading Proof Load Capacity ON I[iv[%] Status Tension Pullout Strength 438 1128 39/- OK Shear Concrete edge failure in direction x- 233 1050 -/23 OK Loading N pv C Utilization j3N,v["/o] Status Combined tension and shear loads 0.388 0.222 5/3 29 OK 3 Warnings • Please consider all details and hints/warnings given in the detailed report! Fastening meets the design criteria! 4 Remarks; Your Cooperation Duties • Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles,formulas and security regulations in accordance with Hilti's technical directions and operating,mounting and assembly instructions,etc.,that must be strictly complied with by the user. All figures contained therein are average figures,and therefore use-specific tests are to be conducted prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in. Therefore,you bear the sole responsibility for the absence of errors,the completeness and the relevance of the data to be put in by you. Moreover,you bear sole responsibility for having the results of the calculation checked and cleared by an expert,particularly with regard to compliance with applicable norms and permits,prior to using them for your specific facility. The Software serves only as an aid to interpret norms and permits without any guarantee as to the absence of errors,the correctness and the relevance of the results or suitability for a specific application. • You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular,you must arrange for the regular backup of programs and data and,if applicable,carry out the updates of the Software offered by Hilti on a regular basis.If you do not use the AutoUpdate function of the Software,you must ensure that you are using the current and thus up-to-date version of the Software in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences,such as the recovery of lost or damaged data or programs,arising from a culpable breach of duty by you. Input data and results must be checked for agreement with the existing conditions and for plausibility' PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan ABBREVIATIONS A AMPS INS INSULATION SYMBOLS LEGEND SYMBOLS LEGEND AAV AUTOMATIC AIR VENT AC AIR CONDITIONER L LONG (DIM) SYMBOL ABBREV. DESCRIPTION SYMBOL ABBREV. DESCRIPTION `x ACH AIR CHANGES PER HOUR LAB LABORATORY AD ACCESS DOOR, AUTOMATIC DAMPER LBS POUNDS 4 AFCT AIR FLOW CONTROL TERMINAL LDB LEAVING DRY BULB TEMPERATURE NEW PIPING ® CD CEILING DIFFUSER LegAc Y AFF ABOVE FINISHED FLOOR LWB LEAVING WET BULB TEMPERATURE -- EXISTING PIPING RA RETURN GRILLE Mechanical&Energy Services, Inc. AP ACCESS PANEL LWT LEAVING WATER TEMPERATURE APPROX APPROXIMATE MAX MAXIMUM ® 3130 Crow Canyon Place ARCH ARCHITECTURAL MBH 1000 BTUH -- DEMO PIPING EG, ER EXHAUST GRILLE OR REGISTER Suite 140 AUTO AUTOMATIC MCV MOTORIZED CONTROL VALVE NEW GAS LINE LSD LINEAR SLOT DIFFUSER San Ramon, CA. 94583 MD MOTORIZED DAMPER B BOILER MECH MECHANICAL Phone - 925.820.6938 BAL BALANCING MFCB MAXIMUM FUSE OR CIRCUIT 13REAKER GATE VALVE (� T'STAT THERMOSTAT, MOUNT AT +48"t� '' Fax - 925.820.6258 BC BALANCING COCK SIZE � California License - 808022 BD BACKDRAFT DAMPER MFR MANUFACTURER C�4 BALL VALVE Q FAN SPEED SWITCH z, BHP BRAKE HORSEPOWER MIN MINIMUM BLDG BUILDING MISC MISCELLANEOUS `I BUTTERFLY VALVE JV* LOW PRESSURE FLEXIBLE DUCT BOD BOTTOM OF DUCT BOP BOTTOM OF PIPE NC NORMALLY CLOSED �J -- CHECK VALVE x*x*X*X- (D) DEMO PERMIT SET BTU BRITISH THERMAL UNIT NIC NOT IN CONTRACT k-I -- STRAINER (N) NEW WORK BTUH BRITISH THERMAL UNIT/HOUR NO NORMALLY OPEN, NUMBER r BV BALANCING VALVE, BALL VALVE NTS NOT TO SCALE t�--D4- -- GAUGE W/ COCK ----- (E) EXISTING California License - 808022 C CONVECTOR, CONDENSATE OAD OUTSIDE AIR DAMPER _ THERMOMETER �� (R) RELOCATE CAP CAPACITY OA OUTSIDE AIR SIGNATURE CB CIRCUIT BREAKER OBD OPPOSED BLADE DAMPER 2-WAY CONTROL VALVE F.S.D. FIRE/SMOKE DAMPER CC COOLING COIL OC ON CENTER LI CD CONDENSATE DRAIN, CEILING DIFFUSER OD OUTSIDE DIAMETER CFM CUBIC FEET PER MINUTE OS&Y OUTSIDE SCREW & YOKE 10 3-WAY CONTROL VALVE � F.D. FIRE DAMPER CH CHILLER III -- UNION ® DAP DUCT ACCESS DOOR �a CHWR HVAC CHILLED WATER RETURN P PUMP, PRESSURE CHWS HVAC CHILLED WATER SUPPLY PA PIPE ANCHOR CLG CEILING PCR PUMPED CONDENSATE RETURN U11 — FLEX CONNECTION AD ARCH. CEILING ACCESS DOOR CLR CLEAR PCWR PROCESS CHILLED WATER RETURN Cr REDUCER —� V.D. VOLUME DAMPER CONC CONCRETE PCWS PROCESS CHILLED WATER SUPPLY COND CONDENSATE PHWP PRIMARY HOT WATER PUMP CONN CONNECTION PD PRESSURE DROP WATER FLOW ACOUSTICALLY LINED DUCT CONT CONTINUOUS/CONTINUE PLUMB PLUMBING (��}—•- P.O.C. POINT OF CONNECTION ® SQUARE TO ROUND AERIAL VIEW CONTR CONTRACTOR POC POINT OF CONNECTION CT COOLING TOWER PRV PRESSURE REDUCING VALVE -L1- — SENSOR WELL -�- P.O.C. POINT OF CONNECTION 22590 VOSS AVENUE, CUPERTINO, CALIFORNIA CU COPPER (PIPE), CONDENSING UNIT PSI POUNDS PER SQUARE INCH CV CONSTANT VOLUME, CHECK VALVE PSIG POUNDS PER SQUARE INCH (GAUGE) — CIRCUIT SETTER DUCT REDUCER �'� Cv FLOW COEFFICIENT PV PLUG VALVE NOV 0 2014 CW COLD WATER _� PETE'S PLUG --� AIRFLOW DIRECTION CWP CHILLED WATER PUMP R RADIUS, RISER, RADIANT HEATER CWR CONDENSER WATER RETURN RA REVERSE ACTING, RETURN AIR 10"OCD-1 NECK SIZE & GRILLE TAG CWS CONDENSER WATER SUPPLY RAV RADIANT HEATER, OR RETURN/RELIEF 6a TDV TRIPLE DUTY VALVE 300 AIR QUANTITY (CFM) W AIR DAMPER 1 DETAIL NUMBER e DETAIL NUMBER DA DIRECT ACTING REQD REQUIRED DRAWING NUMBER DETAIL REFERENCE DRAWING NUMBER DETAIL REFERENCE w DET DETAIL RHC REHEAT COIL EQUIPMENT IDENTIFICATION iC EQUIPMENT IDENTIFICATION DIAG DIAGRAM RHHW REHEAT HEATING HOT WATER SCOPE OF WORK MECHANICAL GENERAL NOTES W DIM DIMENSION RM ROOM DN DOWN RPM REVOLUTIONS PER MINUTE p-+ ``' DP DIFFERENTIAL PRESSURE E BY ELECTRICAL CONTRACTOR 1. ALL CONSTRUCTION SHALL BE PERFORMED IN DPS DIFFERENTIAL PRESSURE SWITCH s sample Q 1. WATER HEATER AND HOT WATER PUMP REPLACEMENT. ACCORDANCE WITH ALL APPLICABLE CODES AND ORDINANCES o DWG DRAWING SA SUPPLY AIR NO NEW ENERGY. SAD SEE ARCHITECTURAL DRAWING LU ® BY MECHANICAL CONTRACTOR INCLUDING: W o L N EA EACH OR EXHAUST AIR SCW SOFT COLD WATER ® PROVIDED BY MECHANICAL CONTRACTOR 2013 CALIFORNIA MECHANICAL CODE, CALIFORNIA CODE rn M EAD EXHAUST AIR DAMPER SD STORM DRAIN, SMOKE DETECTOR AND WIRED BY ELECTRICAL CONTRACTOR OF REGULATIONS TITLE 24 - PART 4. � N " LATEST SMACNA DUCT CONSTRUCTION STANDARDS. EDB ENTERING DRY BULB TEMPERATURE SF SUPPLY FAN, SQUARE FEET FACTORY WIRED W EF EXHAUST FAN SHWP SECONDARY HOT WATER PUMP EL ELEVATION SIM SIMILAR 2. WHEN APPLICABLE, DUCT INSULATION AND FLEXIBLE DUCT ELEC ELECTRICAL SM SHEEP METAL SHALL BE JPL INSULATED FLEXIBLE (OR EQUIVALENT) UL-181 CLASS 1 AIR DUCT WITH A FLAME SPREAD INDEX NOT GREATER ELEV ELEVATOR/ELEVATION SPEC SPECIFICATIONS EP ELEVATOR SHAFT PRESSURIZATION SP STATIC PRESSURE, STAIR THAN 25 AND A SMOKE DEVELOPED INDEX NOT GREATER THAN E PT EQUIPMENT PRESSURIZATION 50 PER 2013 CMC 605.0. � Q Q ET EXPANSION TANK SQ SQUARE 3.3. WHEN APPLICABLE, ALL DUCTWORK SHALL BE r� EWB ENTERING WET BULB TEMPERATURE SS STAINLESS STEEL CONSTRUCTED, ERECTED AND TESTED IN ACCORDANCE WITH r;. Uuildirlg iDepe:ment EWT ENTERING WATER TEMPERATURE ST SOUND TRAP, STEAM TRAP THE STANDARDS ADOPTED BY SMACNA AND CHAPTER 6 OF EXH EXHAUST STD STANDARD THE CMC. EXIST EXISTING STL STEEL 4. WHEN APPLICABLE, ALL PIPES AND CONDUITS SHALL BE EVIEV.ED voR (300 C �I�R LIMN EXP EXPOSED STP STAIRWELL PRESSURIZATION SUPPORTED AND BRACED PER LATEST SMACNA SEISMIC STM STEAM VV RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEM. Kevievieu By. F FILTERS, FAHRENHEIT, FUTURE STR STARTER DRAWING INDEX FC FLEXIBLE CONNECTION, FAN COIL STRUCT STRUCTURAL FD FIRE DAMPER, FLOOR DRAIN FE FUME EXHAUST TC TEMPERATURE CONTROL MO.00 - COVER SHEET Revisions FE-SS FUME EXHAUST-STAINLESS STEEL TCP TEMPERATURE CONTROL PANEL AREA OF WORK No. Date Description By FH FUME HOOD TD TRANSFER DUCT -----------i M1.01 — DEMOLITION PLAN FIN FINISHED TEMP TEMPERATURE, TEMPORARY - � FLA FULL LOAD AMPS THRU THROUGH i i't M2.01 - CONSTRUCTION PLAN © 0/31/14 ISSUE FOR PERMIT FLEX FLEXIBLE TON 12,000 BTUH OF COOLING M4 01 DETAILS AND DIAGRAMS TYP TYPICAL '' DETAILS FLOOR � ' FM FLOW METER, FORCE MAIN i 0 _ FPHF FAN POWERED HEPA FILTER UA UTILITY ACCESS M8.01 EQUIPMENT SCHEDULES r _ o LION UNLESS OTHERWISE NOTED OFFICE FPM FEET PER MINUTE COPY FS FLOW SWITCH, FLOOR SINK UTR UP THROUGH ROOF MT.24 — MECHANICAL TITLE 34 FSD FIRE/SMOKE COMBINATION DAMPER V VENT FT (') FOOT OR FEET, FLOAT & THERMOSTATIC VAV VARIABLE AIR VOLUME t ;v.t VD VOLUME DAMPER G GAS VERT VERTICAL VFD VARIABLE FREQUENCY DRIVE GA GAUGE - _ 9 property s � � This drawing is the exclusiveof VIB VIBRATIONLegacy GALV GALVANIZED �..r COMUFITY DEC Cao} fkrT r fti??TErkrl Nouse,Mpublication,lexhibition,ervi Services, Inc GE GENERAL EXHAUST VOL VOLUME BUILDING [Dl)li&"N -CUw<✓, owing ;.., GLV GLOBE VALVE r WATTS = �, � � 7l d without the written W WIDTH, WASTE, �- �� This of plans a �Hifi may be Legacy Mechanical & Ener ermission GPM GALLONS PER MINUTE P ca"cns BUST be kept at the lob site during construction. it is un!aw1 , to make any GR GRAVITY CONDENSATE RETURN WF WIDE FLANGE BEAM _.-� � Services Inc. q X _ qV WFS WATER FLAW SWITCH ��-�/ 1/ changes or alterations on sari A, or to r,o jaip GV GATE VALVE WG WATER GAUGE GYP BD GYPSUM BOARD therefrom without a the ��s .� WT WEIGHT, WATER TREATMENT �*d � �Ga��®� �� approval srof �i Bui! irg C i;cial. GWE GLASS WASH EXHAUST /' The Stamping of this plan and spec ificatiar,s ;,l;t DRAWN: CHECKED: W/ WITH be held to permit or to be an a of an .;, }, 1 NJT CARD DP H, HT HEIGHT, HOOD W/0 WITHOUT .�. 7 !/� ®s /�'�i�®I�. eel 0i t „ 10ci von HB HOSE BIBB NC HEATING COIL (E) EXISTING BY +an e or Stage _G DATE REVIEWED: HD HEAD (FEET OF WATER) (F) FUTURE �; 1U.17.14 CE PERMIT NO. r � HHW HEATING HOT WATER (N) NEW -- SCALE: AS SHOWN HP HORSEPOWER, HEAT PUMP (R) RELCOATE HRC HEAT RECOVERY COIL p AT HRR HEAT RECOVERY RETURN HRS HEAT RECOVERY SUPPLY CENTER LINE # NUMBER HWP HOT WATER PUMP & AND JOB No: HVAC HEATING, VENTILATING AND AIR 142143 CONDITIONING R PLATE HX HEAT EXCHANGER 0 DIAMETER, PHASE Hz HERTZ (CYCLES PER SEC) 2P 2 POSITION 2W 2 WAY SHE IB INVERTED BUCKET 3W 3 WAY ID INSIDE DIAMETER 'F DEGREE FAHRENHEIT M0 . 01 IN O INCH OR INCHES Origingal Drawing Size 36x24 LegAcy Mechanical&Energy Services, Inc. 3 Crow e Canyon Place Suit140 San Ramon, CA. 94583 * e ** Phone - 925.820.6938 Fax - 925.820.6258 California License — 808022 _ _r.�... 2" HWS PERMIT SET „ I �' ,� i r-----------------2-HWR---------------------------------------------------------------- -----------------------� I I California License — 808022 SIGNATURE: f y ***x-xx >i` I t I I ,ex*MW I I I * �x,€xxxxxxw I I I 1 x x LiA I I I I I (E) STORAGE TO KITCHEN TANK � * * xx�cc (c�cxx�cxxxxxx�cxac------J * (D) HOT I * (D) WATER * ** WATER PUMP i i ; �7 ; ---- -► * -DQ- � TO CLOTHES WASHER HEATER I I x LrJ t * t --►--� --i--� - --•-i------------+ (E) CW SUPPLY �. .r I rxxx xx•xxxxxxxxx * 1 ---------- ------------- X --------- I �x-xx-x�aFx-xx-x-�x-xxx-x-x-x-x-x-x-x-------------� X '�5txx I I 11 L—_- LJ L.J (D)1" G w w � W DEMOLITION - SCHEMATIC PIPING 2 � Z O EW-+ E3 � W Q N� W (E)2.4xl 6 (E)24xl 6 E"+ COMBUSTION COMBUSTION LOUVER LOUVERTINOCUPER Budding Deps�mert (E) GAS MITER (E)2" HWS/R 1v II 1. I r---t I I------ �--1 r---- --------------------------- OF -------------------- ------- I--------------------- ----------------------------------------------------+------� \.ii V�: i 1 i Q' t, _',h11W C-0!0,P' I a 1 ' --------------- ------------- - Revisions -------------------------- __._ _...._ _._.... ......... _ I'I kkkk* I 1 (D) 12"0 VENT evlsl I � D)HWP-1 1 No. Date Description By I QO 0/31/14 ISSUE FOR PERMIT I � I; * �Fxx-X•% SE�X-X� 40 (E)WH-1 y —�-- ---- f—�\ I I+ (D)WH-2 t --- I — -- {�— 1---- ---� I � 1 1 I I (E) STORAGE TANK __.._ __ _. ; i (E)1.5" G ; r This drawing is the exclusive property of Leaacy Mechanical & Energy Services, Inc. No use, publication, exhibition, reproduction or duplication of this drawing T — may be made without the written permission of Legacy Mechanical & Enerav Services, Inc. DRAWN: CHECKED: CADD DP DATE: REVIEWED: 10.17.14 CE CALF S AS SHOWN JOB No: - - 14x143 SHEET DEMOLITION PLAN M 1 . 01 Origingat Drawing Size 36x24 LegAcy Mechanical&Energy Services, Inc. 3130 Crow Canyon Place APPROVED Suite 140 TERMINATION San Ramon, CA. 94583 NOTES: CAP Phone - 925.820.6938 Fax - 925.820.6258 z 1. THE VENT SHALL TERNIATE A MIN, 12" ABOVE THE SYSTEM SENSOR California License — 808022 ROOF THROUGH FLASHING AT THE ROOF AND d TERMINATE IN A LISTED AND APPROVED VENT CAP. --- `v AAV-1 2. P/T VALVE SHALL BE DRAINED TO THE EXTERIOR AND _L _____ ____ TERMINATE TOWARD THE GROUND MAINTAINED BETWEEN _ 2 HWS ------ ----_------------------------------�-------------------------------------------� PERMIT SET 6" AND 24" OF CLEARANCE FROM THE GROUND AND I AAV-2 POINTING DOWNWARD. THE DIAMETER OF THE VALVE OPENING MUST BE MAINTAINED TO THE TERMINATIONI 2" HWR - OF THE DRAIN. NO PART OF SUCH DRAIN SHALL BE ' I - ------ I I I I I California License 808022 TRAPPED AND THE TERMINAL END OF THE DRAIN , — SHALL NOT BE THREADED. 10"0 TYPE o a B—VENT I I I SIGNATURE: - 3. THE FIRST 5' OF THE HOT AND COLD WATER PIPES I , CONNECTED TO THE WATER HEATER SHALL BE ' , I I INSULATED WITH FOAM PLASTIC PIPE INSULATION. THE (E)2' G (N)2" , I f INSULATION SHALL BE INSTALLED SO THAT IT IS AT �--- _ LEAST 6" FROM THE SHEET METAL FLUE PIPE. x x� I � �,� � I I I I 4. A SEDIMENT TRAP SHALL BE INSTALLED DOWNSTREAM � a W (E) STORAGE i i -----pa -► TO KITCHEN OF THE APPLIANCE SHUTOFF VALVE AS CLOSE TO __ � � 1 THE INLET OF THE APPLIANCE A PRACTICAL AT THE i WH N N (N)2' I i TANK '- I I I I I -----pQ -►� TO CLOTHES WASHER TIME OF APPLIANCE INSTALLATION. I 2 I a I ", I I w I X WS --.-- — ----II-- I ---"'� (E) CW SUPPLY ®-1 -------- _ I ....... ... I vy I I I I --FULL PORT P/T RELIEF LINE (N)1° G H SEDIMENT TRAP �4 w � w � — Cn 2 CONSTRUCTION SCHEMATIC PIPING Cn _ S! f 1L) Co V 1 H (E)24xl6 (E)24xl6 COMBUSTION T GUETl LOUVER f.it�ild ng bepartt ner COMI3USTION LOUVER (E) GAS METER I�f , (E)2" HWS/R t l it v'tCf� F t 'E CO)APIIANC ec . Ij r ------------- ------------------------ ---- -------- -- ----- ---- I__I P/T RELIEF LINE 10" TYPE B VENT UP TO ROOF. Revisions I ` 1 1� �RE-USE (E) ROOF OPENING. I No. Date Description By QO 10/31/14 ISSUE FOR PERMIT WH j l 2 +i (E)WH-1 iI (y �.�� i (E)1 G (N)1G t --�------t I \ rn 4D 1 1 ter--- ------- --------i> 1------------------ (E) STORAGE TANK E 1.5" G This drawing is the exclusive p roperty of I O ; Legacy.Mechanical & Energy Services. Inc. �---- _ �(E)2" O No use, publication, exhibition, I E 2" G reproduction or duplication of this drawing may be made without the written L___7-7_-___j permission of Legacy Mechanical & Enerav Services, Inc. DRAWN: CHECKED: CARD DP DATE: REVIEWED: - 10.17.14 CE SCALE: AS SHOWN JOB No: 14x143 SHEET CONSTRUCTION PLAN M2 . 01 Origingal Drawing Size 36x24 B—LINE PIPE CLAMP, SIZE PER LINE SIZE AND SECURE WITH 1/4- MACHINE BOLT DRAINAGE Leg#cy PIPING, SLOPE TO DRAIN 2" B—BLINE B22 CHANNEL, CUT Mechanical&Energy Services, Inc. TO LENGTH (GRIND EDGES SMOOTH) 3130 Crow Canyon Place Suite 140 ---- ----------------- San Ramon, CA. 94583 --- ----------------- ADJUST HEIGHT OF STAND—OFF TO Phone - 925.820.6938 --- MAINTAIN 1/8" / FT. SLOPE Fax - 925.820.6258 FLOOR California License — 808022 d a-0 ' v v 4 .. d 4 d C d SECURE CHANNEL TO SLAB —132EMBEDMENT 8" ANCHOR OLTS, MINIMUM PERMIT SET DRAIN PIPE SUPPORT DETAIL California License — 808022 4 SIGNATURE: SCALE: NTS TO BOILER FROM GAS SUPPLY LINE H L[4:T� w NIPPLE ' a � H W a U GAS SEDIMENT TRAP DETAIL 5 SCALE: NTS a N REAR w PLAN VIEW E.. 'Q CUPERTPO J` t FSuiidirlg Depnt FRONT ANCHOR LOCATIONS .........................................__.._............. .._---___......._..._... UNIT BASE RAIL UNIT MOUNTING CLIP i I FRONT OF BOILER Revisions 120V-10-60HZ I .__._..__., �__ t_ ____. ____---__ _ _ __._ L-,_ — No. L1 N GND Date Description By 2 —(E) CONCRETE PAD QO 10/31/14 ISSUE FOR PERMIT 30A DISCONNECT SWITCH ® i SEISMIC ATTACHMENT CALC'S ON SEPARATE SHEETS. 1/2"0 HILTI KB—TZ SS304 WITH 2.5" MIN. EMBEDMENT. MINIMUM 5" EDGE DISTANCE. (TYPICAL OF 4) 2 SCALE: NTS BOILER ATTACHMENT DETAIL 1 2 3 ® O 1 2 3 4 5 6 This drawing is the exclusive property of Legacy Mechanical & Energy Services, Inc. J No use, publication, exhibition, reproduction or duplication of this drawing may be made without the written 18 AWG permission of Legacy Mechanical & Energv CONTROL WIRING 1" MIN. Services. Inc. i R DRAWN: CHECKED: T REAR1" MIN. CADD DP b DATE: REVIEWED: 0 10" TOP o 10.17.14 CE SCALE: HWS 2 2 HWS FIELD T131 SYSTEM SENSOR. WH r FRONT 0.5 HP LOCATE 0 STORAGE 2 1 / TANK JOB No: HWP-1 IS FACTORY � � %` .j%% f (,; M 14x143 WIRED AND PROVIDED BY EQUIP'T MANF R ---1 �__�__'�_ SHEET WH-2 AND HWP- 1 WIRING DIAGRAM BOILER MINIMUM SERVICE CLEARANCE M4 , 01 5 N.T.S. 1 SCALE: NTS Origingal Drawing Size 36x24 WATER HEATEXPER SCHEDULE HOT WATER DATA Leg#cy EQUIPMENT STATUS LOCATION SERVICE BOILER DATA BURNER DATA IN ES MARK MANUFACTURER MODEL DESIGN CONST INPUT OUTPUT EFFWA GAS GAS FUEL BURNER STAGING/ GAS BOILER HW FLOW COLD MAX 1 DESIGN NEW DESIGN DESIGN PRESS VALVE WATER TANK BRANCH CONN TYPE TYPE TURNDOWN PRESS MIN/ MAX INLET & TYPE START DESIGN LWT I SETTING SETTING SETTING Mechanical&Energy Services, Inc. GAS OUTLET TD PRESS CONN FLOW o NAT GAS ATMOSPHERIC, STAGES, IN WC IN WC IN PRI, NIA, GPM / FT WC F / F l F F PSIG PSIG PSIG PSIG 3130 Crow Canyon Place {N), (R), GOND, INDOOR, MBH MBH /o IN IN SEC 3-W VALVE, GPM / Suite 140 (E), (D) NON-GOND OUTDOOR PROP FORCED DRAFT, MOD/ San Ramon, CA. 94583 POWER BURNER RATIO PUMP GPM 50/ 7.8 601 235 160 125 18 Phone 925.820.6938 WH7-754A NON-GOND INDOOR 750 630 84 1 1 NAT GAS ATMOSPHERIC MOD/ 10.5 4300/ 2" NPT PRI 901 180/ WH-2 (N) GROUND DOMESTIC HOT RAYPAK 1 7:1 Fax - aLice925.820.6258 - FLOOR WATER 73 120 California License - 808022 'R SCHEDULE CONTROL DATA SERVICE CLEARANCE PHYSICAL DATA NOTES WATER HEATS. EQUIPMENT FLUE DATA BOILER ELECTRICAL DATA H SHIPPING GOND BOILER/ COMB V HZ PH POWER MAX STOP/ LEADI OSA INTERLOCK FRONT REAR TOP SIDE RSGDET L W OPERATING SET MARK GAS GAS CAT/ FLUE DRAFT DRAFT FUSE START LAG RESET WT PERMIT PRESS PRESS CONST MAIN/ DIVERTER RANGE NEUT/ FLUE AIR REG REG BRANCH/ READ MIN/ PUMP GOND CONN VALVE VENTING CONN MAX REQ'D CONN _ TYPE TYPE TYPE TYPE IN IN IN IN IN IN IN IN LB/ Y, N NA, 1, I1, IN/ IN/IN Y, N IN WC/ Y, N/ IN I IN IN - - A A LB OUTDOOR, IV / IN WC Y,N California License - 808022 VENTED In, SIGNATURE ° SS NOTE 1 NA NA NOTE 1 24 24 10 1 1 30 26 49 6701 B-1 (EXISTING) NA TYPE B/ 10/ N NA N/ NA NA 120 60 1 12 30 870 GALV 101 N 10 NOTE NO. NOTE NO. NOTES 6 1 STAND ALONE 7 2 8 3 9 4 10 5 PUMP SCHEDULEPhysical Data Notes Symbol Location Manufacturer Pump Type Pump Capacity Piping Data Isolation Data Motor Data Electrical Data Control Data Modell Service Fluid Temp Config Desrgn Location Max Flow Head Eff. Impeller Piping Balance Strainer Pump Piping Const Speed Voltage Phase Power Fuse MOCP Starpt vin�etr Outlet Length Width Height Weight Number Press Type Valve Isolation Isolation o E or N E or N E or N E or N ODP I RPM Voltage Phase HP A A Type IN IN IN IN IN LB Type HW/ F Type Type indoor/ PSI GPM TDH FT /o IN Copper, ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) CHW Outdoor Threaded Mfg / Mdl/ No Mfg / Mdl/ No Mfg/ Mdl/ Mfg / Mdl/ TEFC M--� or Grooved No No w v ED N B&G (N) NA NA TEFC 1750 120 1 0.5 NOTE 1 NOTE 1 BOILER 2 2 13.5 13.5 22 60 OILER MANFiRUAL PUMP PROVIDED BY HWP-1 WH ROOM TACO PRIMARY HOT HW 180 INLINE CENTRIFUGAL INDOOR 175 73 13 64/0 4.9 FLANGED ( 2 CS METRAFLEX/TF INTERLOCK w F� 1630 WATER LOOPP.4 E_ W W NOTES: w z 1. PUMP POWER FROM BOILER, PUMP IS FACTORY MOUNTEDCD a N W PIPING SPECIALTIES SCHEDULE w DESCRIPTION SYSTEM MANUFACTURER MODEL NOTES PIPING SCHEDULE SERVICE OPERATING PIPE PIPE PIPE PRESSURE JOINT SUPPORT PIPE INSULATION INSULATION INSULATION NOTES EQUIPMENT STATUS LOCATION SERVICE � F---1 SERVED TYPE PRESSURE SIZE SCHEDULE MATERIAL CLASS TYPE SPACING LOCATION TYPE THICKNESS JACKET (N), (R), w FT - IN (E), (D) PSIG IN WH-2 BOILER FLUE & FITTINGS CAL HYDRO TYPE B 10" DIAM CAT I VENT SILVER SOLDER 8 INDOOR FIBERGLASS 2 KRAFT BF1 (N) WATER HTR ROOM � ? ' 0 HOT WATER - 2 TO 4 40 COPPER - _ - _ tis 1~ a WH-2 _ SOLDER 8 INDOOR/OUTDOOR COPPER S-3 N WATER HTR ROOM WH-2 SYSTEM SENSOR RAYPAK (10K OHM) SENSOR PROVIDED BY BOILER MANFR. SHIPPED LOOSE +�rt. .`,i"} FSut(dit1CJ Depatmer�t WH-2 DRAIN - 314 TO 2 40 CO _ _ _ ( ) - 3/4 TO 1-112 40 COPPER - SOLDE:R 8 INDOOR a f WH-2 RELIEF _ - - GAS - 314 TO 2 40 STEEL - THREADED 8 INDOOR WS (N} WATER HTR ROOM WH-2 WYE STRAINER METRAFLEX TF 2" INLETX2" OUTLET FLANGED CONNECTION h j1`' Ir WH-2 �1H_2 BRAIDED FLEX CONN. METRAFLEX SLP 2" INLET X 2" OUTLET FLANGED CONNECTION, SS PUMP CONNECTOR t f FC-1, 2 (N) WATER HTR ROOM TDV (N) WATER HTR ROOM WH-2 TRIPLE DUTY VALVE B&G 3DV-2NMF 2" NPT MALE YCi �t F_tlir4�(; t C�R COIDE C,i3t� r"�!.I, s�` Revteti+;su Ey: NOTE NO. NOTES 1 2 PP-1, 2 (N) WATER HTR ROOM WH-2 PIETIES PLUG PETES PLUG No. 10 T-1, 2 (N) WATER HTR ROOM WH-2 THERMOMETER WEISS 9VU35 WITH ER6-75BS WELL, 30-240 DEG F 3 PG-1 (N} WATER HTR ROOM WH-2 PRESSURE GAGE WEISS LF25 2.5" DIAL, 1!4" CONNECTION, WITH 24NVR NEEDLE VALVERevisions 4 5 AAV1, 2 (N) WATER HTR ROOM WH-2 AUTOMATIC AIR VENT B & G NO. 87 AUTOMATIC AIR VENT No. Date Description By A0 10/31/14 ISSUE FOR PERMIT PIPE INSULATION R VALUES PIPE INSULATION REQUIREMENTS FLUID INSULATION THICKNESS FOR FLUID TEMPERATURE R VALUES FOR NOMINAL PIPE DIAMETER(INCHES) TEMPERATURE NOMINAL PIPE DIAMETER(INCHES) (F) 1 AND LESS 1.25-2 2.5.4 5-6 >= 3 UP TO 1.25" 1.5"-3.5" 4" .611 SPACE HEATING SYSTEMS (HOT WATER, STEAM, STEAM CONDENSATE) (F) 1.5" 2.0" 2.0" 350 2,5 2.5 3 3.5 3.5 141 -200 251-350 2 2.5 2.5 3.5 3.5 40-60 0.5" 1.0" 1.0" 201-250 1.5 1.5 2 2 3.5 141-200 1.5 1.5 1.5 1.5 1.5 105-140 1 1 1 1.5 1.5of SPACE COOLING SYSTEM (CHILLED WATER, REFRIGERANT AND BRINE) This drawing is the exclusive property In 40-60 0.5 0.5 1 5 Legacy Mechanical & Energy Services. c. 0.5 1 1 < 40 1 1.5 1.5 No use, publication, exhibition, reproduction or duplication of this drawing may be made without the written permission of Legacy Mechanical & Enerav Services, Inc. DRAWN: CHECKED: CARD DP DATE: REVIEWED: 10.17.14 CP SCALE: JOB No: 14x143 SHEET M8 . 01 Origingat Drawing Size 36x24 ILL STATE OF CALIFORNIA STATE OF CALIFORNIA MECHANICAL SYSTEMS MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E Revised 06114 CALIFORNIA ENERGY COMMISSION " CEC-NRCC-MCH-01-E Revised 06/14) CALIFORNIA ENERGY COMMISSIOt` Lg#cy e CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 1 of 3) Mechanical Systems (Page 2 of 3) Project Name: WATER HEATER REPLACEMENT Date Prepared: 10/31/14 Project Name: WATER HEATER REPLACEMENT Date Prepared: 10/31/14 Mechanical&Energy Services, Inc. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms) 3130 Crow Canyon Place MECHANICAL COMPLIANCE FORMS&WORKSHEETS(check box if worksheet is included) Designer: 140 This form is to be used by the designer and attached to the plans. Listed below area//the acceptance tests for HVAC systems.The designer is required to check the applicable boxes for all Suite For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms,refer to the 2013 Nonresidential Manual acceptance tests that apply and list all equipment that requires an acceptance test.All equipment of the same type that requires a test,list the equipment description and the number of systems. San Ramon, CA. 94583 Note:The Enforcement Agency may require all forms to be incorporated onto the building plans. YES NO Form/Worksheet# Title Installing Contractor: Phone - 925.820.6938 The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has Fax - 925.820.6258 ❑ NRCC-MCH-01-E(Part 1 of 3) Certificate of Compliance, Declaration.Required on plans for all submittals. ❑ NRCC-MCH-01-E(Fart 2 of 3) Certificate of Compliance, Required Acceptance Tests(MCH•02A to 11A).Required on plans for all submittals. responsibility for the acceptance testing,each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. California License - 808022 The following tests require a ❑ NRCGMCH-0I-E(Part 3 of 3) Certificate of Compliance, Required Acceptance Tests(MCH-12A to 18A). Required on plans where applicable. ❑ NRCC-MCH-02-E(Part 1 of 2) Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans. Enforcement agency: ❑ INRCC-MCH-02-E(Part 2 of 2) Mechanical Wet Equipment Summary is required for all submittals with chilled water,hot water or condenser water Plancheck-The NRCC-MCN-01-E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. systems. It is optional on plans. inspector-Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations. 0 NRCC-MCH-03-E Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is Test Description MCH-12A MCH-13A MCH-14A MCH-15A MCH 16A MCH-17A MCH-18A PERMIT SE T optional on plans. Equipment #of Fault Detection& Automatic Fault Distributed Energy Thermal Energy Supply Air Condenser Water ECMS 11NRCC-MCH-07-E(Part 1 of 2) Power Consumption of Fans. Required on plans where applicable Requiring Testing units Diagnostics for DX Detection& Storage DX AC Storage(TES) Temperature Reset Reset Controls or Verification Units Diagnostics for Air& Systems Systems Controls ❑ 5f NRCC-MCH-07-E(Part 2 of 2) IPower Consumption of Fans, Declaration. Required on plans where applicable Zone California License - 808022 N/A ❑ ❑ ❑ ❑ ❑ ❑ ❑ MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms) ❑ ❑ ❑ ❑ ❑ ❑ ❑ SIGNATURE: 0 P�a Designer: ❑ ❑ ❑ ❑ ❑ ❑ ❑ 11 This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems.The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test.All equipment of the some type that requires a test list the equipment description and the number of systems. ❑ ❑ ❑ ❑ ❑ ❑ ❑ Installing Contractor: ❑ ❑ ❑ ❑ ❑ ❑ ❑ The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing,each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. ❑ ❑ ❑ ❑ ❑ ❑ ❑ Enforcement Agency: ❑ ❑ ❑ ❑ © ❑ ❑ Plancheck-The NRCC-MCH-01-E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. inspector-Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations. ❑ [3 ❑ [3 E3 ❑ ❑ ❑ ❑ ❑ ❑ © El [3Test Description MCH-02A MCH-03A MCH-04A MCH-05A MCH-06A MCH-07A MCH-08A MCH-09A MCH-10A MCH-11A Equipment #of Outdoor Single Zone Air Economizer Demand Supply Fan Valve Leakage Supply Water Hydronic Automatic ❑ ❑ ❑ ❑ ❑ ❑ ❑ Requiring Testing units Air Unitary Distribution Controls Control VAV Test Temp.Reset System Demand Shed or Verification Ducts Ventilation Variable Flow Control (DCV) Control NA ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ CA Building Energy Efficiency Standards-2013 Nonresidential Compliance June 2014 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance June 2014 E-i W W STATE OF CALIFORNIA ^ MECHANICAL SYSTEMS rr W CEC-NRCGMCH-01-E Revised 06/14 CALIFORNIA ENERGY COMMISSIOi` ` _7� �„� 0-4 CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E 11-4 Mechanical Systems (Page 3 of 3) a w Project Name; WATER HEATER REPLACEMENT Date Prepared: 10/31/14 z a a 0 Nz DOCUMENTATION AUTHOR'S DECLARATION STATEMENT STATE OF CALIFORNIA STATE OF CALIFORNIA 1. 1 certify that this Certificate of Compliance documentation;s accurate and complete. LLJ FWD o HVAC SYSTEM REQUIREMENTS t Documentation DAN PINEDA Documentation Author Signature: C" HVAC WET SYSTEM REQUIREMENTS CALIFORNIA ENERGY COMMISSION N U CEC-NRCC-MCN-02-E Revised 06/14 CALIFORNIA ENERGY COMMISSION CEC-NRCC-MCH-02-E Revised 06114 CERTIFICATE OF COMPLIANCE. NRCC-MCH-02-E b CERTIFICATE OF COMPLIANCE Company: Signature Date: W ev NRCC-MCH-02-E LEGACY MECHANICAL & ENERGY SVS. INC. 10/31/14 HVAC Wet System Requirements (Page 2 of 3) HVAC Wet System Requirements (Page 3 of 3) Address' 3130 CROW CANYON PL CEA/HERS Certification identification(if applicable): Date Prepared' 10 31 14 Project WATER HEATER REPLACEMENT Date Prepared: 10/31/14 CityjState/Zip: - - Phone: Project Name; WATER HEATER REPLACEMENT SAN RAMON, CA 94583 925 820 6938 � RESPONSIBLE PERSON'S DECLARATION STATEMENT W Equipment Tags and System Description WH-2 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT ? 1. I certify that this Certificate of Compliance documentation is accurate and complete. 1 certify the following under penalty of perjury,under the laws of the State of California: T-24 Sections Reference to the Requirements in the Contract Documents 1. The information provided on this Certificate of Compliance is true and correct. MANDATORY MEASURES f Documentation author Name: Documentation author Signature: 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance(responsible ._._ � �- No - Heating Hot Water Equipment Efficiency3 110.1 SEE M8.01 DAN PINEDA e 4 `: is signature Date: designer). ` A",W,a� l Cooling Chilled and Condenser Water 110.1, 140.4(i) A Company: LEGACY MECHANICAL & ENERGY SVS. INC. g 10/31/ 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this Certificate of Compliance ^r '`p' �� ! €lulle#Ing te�i3rTPler'X Equipment Efficiency3 Address CEA/HERS certification Identification(if applicable): conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of Regulations. 3130 CROW CANYON PL g k open and Closed Circuit Coolie Towers 110.2(e) 1 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, `ib p g NA conductivity or flow-based controls City/State/Zip: SAN RAMON, CA 94583 Phone: 925 820 6938 worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application. y 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available to the enforcement !�--�) i.:Gr,� CC?!1r COMlaLlANt,:�- Open and Closed Circuit Cooling Towers 110.2(e)2 RESPONSIBLE PERSON'S DECLARATION STATEMENT Maximum Achievable Cycles of NA agency for all applicable inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the I certify the following under penalty of perjury,under the laws of the State of California: building owner at occupancy. tevic4v.'d >y v Concentration(LSI)6 1. The information provided on this Certificate of Compliance is true and correct. Responsible Designer Name: DAN PINEDA Responsible Designer Signature: Open and Closed Circuit Cooling Towers 110.2(e)3 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design Flow Meter with analog output NA identified on this Certificate of Compliance(responsible designer), company: Date signed: Open and Closed Circuit Cooling Towers 110.2(e)4 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system 3130 CROW CANYON PL 808022 LEGACY MECHANICAL & ENERGY SVS. INC. 10/31/14 Revisions NA Address: License: Overflow Alarm design identified on this Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of Open and Closed Circuit Cooling Towers 110.2(e)5 Regulations. City/State/Zip: Phone: 925 820 6938 No. Date Description By NA 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information SAN RAMON, CA 94583 Efficient Drift Eliminators provided on other applicable compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement Pipe Insulation 120.3 Y agency for approval with this building permit application. 0 0/31/14 ISSUE FOR PERMIT PRESCRIPTIVE MEASURES 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the Cooling Tower Fan Controls 140.4(h)2, 140.4(h)5 Y N Y/N Y/N building,and made available to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this Cooling Tower Flow Controls 140.4 h 3 NA Certificate of Compliance is required to be included with the documentation the builder provides to uilding owner ccupa cy. ( ) Responsible Designer Name: DAN PINEDA Responsible Designer Signature: ` Centrifugal Fan Cooling Towers4 140.4(h)4 NA ° Air-Cooled Chiller Limitations 140.4(1) NA Company; LEGACY MECHANICAL & ENERGY SVS. INC. Datestgned: 10/31T14 Variable Flow System Design 140.4(k) N Address` 3130 CROW CANYON PL License: 808022 Chiller and Boiler Isolation 140.4(k) Y City/State/Zip: Phone: CHW and HHW Reset Controls 140.4(k) NA SAN RAMON, CA 94583 925 820 6938 WLHP Isolation Valves 140.4(k) NA VSD on CHW,CW&WLHP Pumps>5HP 140.4(k) NA DP Sensor Location 140.4(k) Notes: CA Building Energy Efficiency Standards-2013 Nonresidential Compliance June 2014 This drawing is the exclusive property of Legacy Manical & Energy Services. Inc. 1. Provide equipment tags(e.g. CH 1 to 3)orsystem description(e.g. CHW loop)as appropriate. Multiple units with common ech No use, publication, exhibition, requirements can be grouped together. 2. Provide references to plans(i.e.Drawing Sheet Numbers)and/or specifications(including Section name/number and relevant reproduction or duplication this drawing where each requirement is specified. Enter"N/A"if the requirement is not applicable to this system. may made without the written 3. The referenced plans and specifications must include all of the following information:equipment tag,equipment nominal permission of Legacy Mechanical & Energy Services. Inc. capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable(e.g.full-and part-load)include all.For chillers operating at non-standard efficiencies provide the Kadj values. For chillers also note whether the efficiencies are Path A or Path B. DRAWN: CHECKED- 4. Identify if cooling towers have propeller fans. if towers use centrifugal fans document which exception is used. CARD D 5, if air-cooled chillers are used,document which exceptions have been used to comply with 140.46)and the total installed design DAiS: REVIEWED- capacity of the air-cooled chillers in the chilled water plant. 6. identify the existence of a completed MCH-06-E(when open or closed circuit cooling towers are specified to be installed, 10.17.14 CE otherwise enter"NIA". SCALE: JOB No: 142143 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance lune 2014 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance June 2014 SHEET MT924 Origingal Drawing Size 36x24