Loading...
CC 04-17-2018 Exhibit Item No. 17 FY 2018-19 Fee Schedule Update1 Schedule B -Engineering Fees Schedule C -Planning Fees Schedule D -Building Fees Public Works -Engineering Design and Inspection Services Community Development -Planning Current Planning and Mid and Long Range Planning Community Development -Building General Building, Construction Plan Check and Building Code Enforcement 2 Cost Increase 3.t14% CP! 11.1.5~ Estima•ed I J. !6~ Estirna'ad 11.16% Est'~.a•ed Leber Cost Increase Labor Cost Increase Labor Cost Increase Varied and Varied and Varted and Vaned and comprehensive comprehensive comprehensive comprehensive changes due Jo Fee changas due to Fee changes dve to Fee changes due to Fea Study Stud'( Study Study No changes due to No changes due to No changes due to No changes due to anticipated Fee Study an!icipaled Fee Study anticipated Fee Study anticipated Fee Study 2.6% CPI 3.0% Estimated labor 3.0% Estimated Labor 3.0% Estimated Labor Cosf Increase Cost Increase Cos! Increase 2.6% CPI 2.4% CPI. plus 2.0% for 2.4% CPi. plus 2.0% for 2.4% CPI. plus 2.0% for increased costs increased costs Increased costs '$" 2.4% CPI 2 .4% Cfl 2.4% CPI 2.4% CPI 2.4% CPI 2.4% CPI 2.4% CPI 2.4% CPI No Change No Chongoe No Change ~lo Change Minimoi Chang~ 3.5% CPI 3.5% CPI 3.5% CPI 3 4 Schedule A- General Schedule B -$147,000 4.10% for labor Engineering costs, 3.5% CCI Schedule C -$98,000 4.10% for labor Planning costs Schedule D -$103,000 4.10% for labor Building costs Schedule E -$0 Market Driven 5 ' 6