Loading...
CC 09-16-60 P. O. Box 597 AL 2-4505 ..... ~ ~ - = 162 C I T Y 0 Feu PER TIN 0 CUPERTINO, CALIFORNIA MINUTES OF THE ADJOURNED REGULAR MEETING OF THE CITY COUNCIL SEPTEMBER 16, 1960 Place: 10321 S. Saratoga-Sunnyvale Road Time: 8:00 P.M. I SALUTE TO THE FLAG II ROLL CALL Councilmen Present: Councilmen Absent; Others Present: ~enetti, Jewett, Lazaneo, Pelosi, Saich one City, Manager City Attorney, City Engineer, Ci ty Clerk III Oath of office and appointment of Verne H. Jewett to the office of Councilman, City of Cupertino was administ~red. IV Storm Drainage at Highway 9 and Rodrigues Avenue. Moved by Councilman Saich that the City Manager check with Rodrigues and Allario and Dr. Kelly to determine the date at which they intend to install the improvements on and near the subject corner; Seconded by Councilman Benetti. AYES: Councilmen: Benetti, Jewett, Lazaneo, Pelosi, Saich NAYS: Councilmen: None ABSENT: Councilmen: None MOTION CARRIED: 5-0 Moved by Councilman Saich that the City Engineer be authorized to prepare a Storm Drain Master Plan, with suggested charges against the various types of property and zones, such as resi- dential, industrial, commercial, and multiple, also including the feasibility of charging for school sites, the study to be presented at the earliest opportunity; Seconded by Councilman Benetti. AYES: Councilmen: NAYS: Councilmen: ABSENT: Councilmen: MOTION CARRIED: Benetti, None None 5-0 Jewett, Lazaneo, Pelosi, Saich V Storm Drain Fees from School Districts. Moved by Councilman Lazaneo that the City Manager contact the three local school districts concerning storm drain fees so that school authorities understand the City policy and in- tentions, and further to learn the position of the school districts concerning storm drain fees to the City, with a meeting to be scheduled between each district and the City; Seconded by Councilman Saich. AYES: Councilmen: Benetti, Jewett, Lazaneo, Pelosi, Saich NAYS: Councilmen: None ABSENT: Councilmen: None MOTION CARRIED: 5-0 VI CIVIL DEFENSE COMMITTEE - APPOINTMENT Postponed to September 19, 1960 VII COST OF CULVERTS -Financial participation by Sub-dividers. To be considered in connection with the Storm Drainage Plans. VIII AUDIT - Checking and Inspection Func. The audit was reviewed. IX Miscellaneous A. SaturdBlf, September 24th, 9:00 A. M. was scheduled for the second reading of the Ordinance annexing Bubb-3 to the City of Cupertino. Ordinance 149 B. Tuesday, September 27th, 7:30 P.M. was scheduled for the: 163 1. City Engineers report to the City Council relative to Storm Drainage and 2. Further discussion of the Audit. C. Moved by Councilman Saich that the Bank Official, namely Walter Field be asked by the City Manager to appear at the City Council meeting September 19th in order to discuss the Bank Parking Lot Problem in an attempt to reach a suitable solution; Seconded by Councilman Benetti. AYES: Councilmen: Benetti, Jewett, Lazaneo, Pelosi, Saich NAYS: Councilmen: None ABSENT: Councilmen: None MOTION CARRIED: 5-0 X SWIMMING POOL ORDINANCES 139 and 145. Postponed until September 19th, 1960 XI Meeting adjourned at 11:15 P.M. APPROVED: Ma{kim£ g/¿f~no ATTEST: ~I~~C City Clerk