Loading...
11110048 CITY OF CUPERTINO FEE ESTIMATOR—BUILDING DIVISION ADDRESS: esults way bldg 14 DATE: 11/09/2011 REVIEWED BY: bobs. APN: BP#: 00 "VALUATION: 1$500,000 rPERMIT TYPE: Building Permit PLAN CHECK TYPE: Tenant Improvement PRIMARY Commercial Building PENTAMATION 1 B TI USE: PERMIT TYPE: WORK 16681 core and shell renovation to include 8 new exterior openings SCOPE OCCUPANCY TYPE: TYPE OF FLR AREA PC FEES PC FEE ID BP FEES BP FEE ID CONSTR. s.f. B(Tenant Improvements) II-B,111-B,IV,V-B 16,681 $2,755.88 IBTIPLNCK $8,068.76 IBTIINSP TOTALS: 16,681 $2,755.88 $8,068.76 MECH,HOURLY 0 Yes G No PLUMB,HOURLY 0 Yes Q No ELEC,HOURLY 0 Yes G No NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc. . Theseees are based on the prelinina information available and are only an estimate. Contact the De t or addn'l info. FEE ITEMS (Fee Resolution 11-053Iff T1,11) FEE QTY/FEE MISC ITEMS Plan Check Fee: $2,755.88 = # Window/Sliding Glass Door Suppl.PC Fee: (F) Reg. 0 OT 0.0 1 hrs $0.00 $6,264.00 1WINMEWSTR New(Shearwall/Masonrv) PME Plan Check: $0.00 Permit Fee: $8,068.76 Suppl.Insp.FeeQ Reg. Q OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Work Without Permit? Yes (F) No $0.00 E) !Advanced Planning l=ee: $0.00 Select a Non-Residential E) Building or Structure Q Strong Motion Fee: 1BSEISMICO $105.00 Select an Administrative Item Bldg Stds Commission Fee: 1BCBSC $20.00 SUBTOTALS: 10,949.64 $6,264.00 TOTAL FEE: 1 $17,213.64 Revised: 10101/2011