R-2018-17 Action Letter.pdfCUPERTINO
June 5, 2018
HMC Associates
Attn: Mike Chen
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • plan ninq(a_)_cupertino.orq
12280 Saratoga -Sunnyvale Road, Suite 209
Saratoga, CA 95070
SUBJECT: TWO STORY PERMIT ACTION LETTER - Application R-2018-17
This letter confirms the decision of the Director of Community Development, given on June 5, 2018;
approving a Two Story Permit (R-2018-17) to allow the construction of a new 3,561 SF two story single
family residence and a new detached 656 SF accessory dwelling unit, at 10675 Flora Vista Avenue, with
the following conditions:
APPROVED PROJECT
The approval is based on a plan set entitled "Mahamongkol Residence", consisting of seven (7) sheets
labeled "A-1.0, A-1.1, A-2.0, A-3.0, A-4.0, A-6.0, and C-0.0" except as may be amended by conditions
in this resolution.
2. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the building plans.
3. ACCURACY OF THE PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including but not
limited to property boundary locations, building setbacks, property size, building square footage, any
relevant easements and/or construction records. Any misrepresentation of any property data may
invalidate this approval and may require additional review.
4. PRIVACY PLANTING
The final privacy planting plan shall be reviewed and approved by the Planning Division prior to
issuance of building permits. The variety, size, and planting distance shall be consistent with the City's
requirements.
5. PRIVACY PROTECTION COVENANT
The property owner shall record a covenant on this property to inform future property owners of the
privacy protection measure and tree protection requirements consistent with the R-1 Ordinance, for
all windows with views into neighboring yards and a sill height that is 5 feet or less from the second
story finished floor. The precise language will be subject to approval by the Director of Community
Development. Proof of recordation must be submitted to the Community Development Department
prior to final occupancy of the residence.
Two -Story Permit Action Letter
R-2018-17
Page 2
6. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard to the
proposed project for additional conditions and requirements. Any misrepresentation of any submitted
data may invalidate an approval by the Community Development Department.
7. EXTERIOR BUILDING MATERIALS/TREATMENTS
Final building exterior treatment plan (including but not limited to details on exterior color, material,
architectural treatments and/or embellishments) shall be reviewed and approved by the Director of
Community Development prior to issuance of building permits. The final building exterior plan shall
closely resemble the details shown on the original approved plans. Any exterior changes determined
to be substantial by the Director of Community Development shall require a minor modification
approval with neighborhood input.
8. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its
City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and
against any claim, action, or proceeding brought by a third party against one or more of
the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside,
or void this Resolution or any permit or approval authorized hereby for the project, including (without
limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation.
The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices
from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise
employed as City staff and shall include City Attorney time and overhead costs and other City staff
overhead costs and any costs directly related to the litigation reasonably incurred by City.
9. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication requirements,
reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1),
these Conditions constitute written notice of a statement of the amount of such fees, and a description
of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and other exactions,
pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -
day period complying with all of the requirements of Section 66020, you will be legally barred from
later challenging such exactions.
Staff has made all the findings that are required for approval of a Two -Story Permit as required and no
additional conditions were placed as a condition for approval by Cupertino's Municipal Code, Chapter
19.28.140 (B).
1. The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinances
and the purposes of this title.
The proposed project is consistent with the General Plan as the project is within the Low
Density land use area. There are no applicable specific plans that affect the project. The project
has been found to be consistent with the requirements of Cupertino Municipal Code Chapter
19.28 Single Family (R-1) Residential.
Two -Story Permit Action Letter
R-2018-17
Page 3
2. The granting of the permit will not result in a condition that is detrimental or injurious to property
improvements in the vicinity, and will not be detrimental to the public health, safety or welfare.
The granting of the permit will not result in a condition that is detrimental or injurious to
property improvements in the vicinity, and will not be detrimental to the public health, safety
or welfare as the projects is located within the R1-10 (Single Family Residential) zoning
district, and will be compatible with the surrounding uses of the neighborhood.
3. The proposed project is harmonious in scale and design with the general neighborhood.
The proposed project is located in a residential area consisting of single family homes. The
proposed project maintains the single family home scale found compatible with the general
neighborhood.
4. Adverse visual impacts on adjoining properties have been reasonably mitigated.
Any potential adverse impacts on adjoining properties have been reasonably mitigated
through the privacy protection plantings and installation of a front -yard tree as required.
Please note that if this permit is not vested within a year, it shall expire on June 5, 2019.
Also, please note that an appeal of this decision can be made within 14 calendar days from the date of
this letter. If this happens, you will be notified of a public hearing, which will be scheduled before the
Planning Commission.
Sincerely,
Gian Paolo Martire
Associate Planner
City of Cupertino
Enclosures:
Approved Plan Set
CC: Hatthaya and Ampon Mahamongkol,10675 Flora Vista Ave., Cupertino, CA 95014-1610