Loading...
13110094 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10668 CARVER DR CONTRACTOR:HIGHLIGHT SOLAR PERMIT NO: 13110094 OWNER'S NAME: BARNIV ZURI M AND MICHAL 3554 PARKLAND AVE DATE ISSUED:11/14/2013 OWNER'S PHONE: SAN JOSE,CA 95117 PHONE NO:(408)489-9273 ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL COMMERCIAL[] License Class Lic.# (7903 INSTALL PV SYSTEM ON ROOFTOP 16 PANELS,4KW Contractora Date I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$16750 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:37532016.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAY R M LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: f with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. RE-ROOFS: Signature _ Date All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of Signature of Applicant: Date: the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(See.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this � Owner or authorized agent: Date: permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date ALTERNATIVE ENERGY PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 A��� (408)777-3228•FAX(408)777-3333•building(r1cupertino.org CUPERTINO If�✓g PROJECT ADDRESS 10668 Carver Dr, Cupertino, CA, 95014 APN#_:�)75-3Z ®' (9 OWNERNAME Zuri Barniv PHONE STREET ADDRESS 10668 Carver Dr CITY,STATE,ZIP Cupertino, CA, 95014 FAX -7 CONTACT NAME Khaled Elsheref PHONE 408-856-8198 E-mAiLkelsheref@highlightsolar.c Dm STREET ADDRESS 3554 Parkland Ave CITY,STATE,ZIP San Jose, CA, 95117 FAX ❑OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT ❑ CONTRACTOR 1XCONTRACTORAGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT CONTRACTOR NAME Mehyeddine Alayleh LICENSE NUMBER 960376 LICENSE TYPE C46 BUS.LIC# COMPANY NAME Highlight Solar, Inc E-MAILmalayleh@highlightsolar.com FAX STREET ADDRESS 3554 Parkland Ave CITY,STATE,ZIP San Jose, CA, 95117 PHONE 866-926-9997 ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF Ix SFD Or Duplex ❑ Multi-Family PROJECT IN WILDLAND PROJECT IN STRUCTURE: ❑ Commercial URBAN INTERFACE AREA ❑ Yes ❑ NO FLOOD ZONE ❑ Yes ❑ NO IX SOLAR PANELS ❑ ELECTRIC VEHICLE CHARGING STATION ❑ SOLAR WATER HEATING ❑ OTHER: FOR SOLAR PANELS. NUMBER OF PANELS/UNITS: 16 #KILOWATTS: 4.kW p TOTAL VALUATION: $16,750 DESCRIPTION OF WORK Installing a 4kWp PV system on rooftop RECEIVED B By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the prop owner's behalf. I have read this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I aWee to comply with all applicable local ordinances and state laws relating to building construction. I authorize representatives of Cupertino to enter the above-identified property for inspection purposes. Signature of Applicant/Agent: Date: 11/14/13 SUPPLEMENTAL INFORMATION QUIRED =E E USE ONLY w OVER-THE-COUNTER F ❑ EXPRESS I ❑ STANDARD U ❑ LARGE s>a- ❑ MAJOR PVApp_2012.doc revised 06/20/12 CITY OF CUPERTINO FEE ESTIMATOR-BUILDING DIVISION W�PERMIT DDRESS: 10668 carver dr DATE: 11/14/2013 REVIEWED BY: mendez PN: BP#: *VALUATION: $16,750 PE: Building Permit PLAN CHECK TYPE: Alteration/ Repair PRIMARY SFD or Duplex PENTAMATION SOLAR-RES USE: PERMIT TYPE: WORK install v system on rooftop 16 panels, 4kw SCOPE cc:h. plop Plua Chec`) flee.Clan Check tech. Perrr,!it F'ee: Piu b.Pe!r it Fee: rlec.Per7oi!Fee: L .1lech-Insp. C)yher Phl'-fil!Insp. Li I Utlser Bloc.Insp, .Cusp. e: Nz m). his"). Fee. Elec.Insp, NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc). Thesefees are based on the prelimina information available and are only an estimate. Contact the De t or addn'l info. FEE ITEMS (Fee Resolution 11-053 E . 7/1/13) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 # Alternative Energy System Suppl.PC Fee: Q Reg. Q OT0.0 hrs $0.00 $229.00 1PHOTOVRES Photovoltaic System PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp.Fee:(F) Reg. Q OT0 0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 consirucrion Fax: rninistf-ati ve A ee: Work Without Permit? 0 Yes (j) No $0.00 E) Advanced Planning Fee: $0.00 Select a Non-Residential G Tra >e/I�oe�.:rncniuc>rr Fees: Building or Structure 0 Strong Motion Fee: IBSEISMICR $1.68 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $1.00 1 1 SUBTOTALS: $2.68 $229.00 TOTAL FEE: 1 $231.68 Revised: 10/01/2013 CanadianSolar Iltllllllllll�� Ali 1111111111 ® CS6P ®11 nblllllll11M14 U0101111111111111 llllNE1111111 CS6P is a robust solar module with 60 solar cells. 11�1IIIII10Eu111111 1�u��11���1� These modules can be used for on-grid solar applications.Our meticulous design and production 001111techniques techniques ensure ahigh-yield,long-term performance for every module produced. Our rigorous quality control and in-house testing facilities guarantee Canadian Solar's modules meet the highest quality standards possible. Best Quality • 235 quality control points in module production • EL screening to eliminate product defects Key Features • Current binning to improve system performance • High PID Resistance • High module efficiency up to 15.85% • Accredited Salt mist/Ammons�ia��re/�s,�istance • Top performance by PVUS�JtJ .onditions • Positive power tolerance:0--+5W (PTC)rating Dopar"en: • Robustframeto upto5400 Pa load Best Warranty Insurance • Self-cleaning surface • 25 years worldwide coverage • 100%warranty term coverage • Outstanding performance at low irradiance • Providing third party bankruptcy rights • Non-cancellable • High energy yield at Low NOCT • Immediate coverage • Insured by 2 world top insurance companies • Backed By Our New 10/25 Linear Power Warranty Comprehensive Certificates Plus our added 25 year insurance coverage • IEC 61215, IEC 61730, IEC61701 ED2, UL1703, 1007 Ad IEC 62716, KEMCO, CEC Listed, CE,JET and MCS ded Value Fro • IS09001:2008: Quality Management System 90% ^'�/arranty • ISO/TS16949:2009:The automotive quality 80% management system 0% • IS014001:2004:Standards for Environmental 5 10 15 20 25 management system • 10 year product warranty on materials and workmanship • QC080000 HSPM:The Certification for 25 year linear power output warranty Hazardous Substances Regulations • OHSAS 18001:2007 International standards for occupational health and safety V ;'� c S _\ \ �.^ .._...._ NRE - ..-..- www.canadiansolar.com CS6P-235/240/245/250/255P Electrical Data STC CS6P-235P CS6P-240P CS6P-245P CS6P-250P CS6P-255P Nominal Maximum Power (Pmax) 235W 240W 245W 25OW 255W Temperature Characteristics Optimum Operating Voltage(Vmp) 29.8V 29.9V 30.OV 30.1V 30.2V Pmax -0.43%/°C Optimum Operating Current(Imp) 7.90A 8.03A 8.17A 8.30A 8.43A Temperature Coefficient Voc -0.34%/°C Open Circuit Voltage(Voc) 36.9V 37.OV 37.1V 37.2V 37.4V Isc 0.065%/°C Short Circuit Current(Isc) 8.46A 8.59A 8.74A 8.87A 9.00A Normal Operating Cell Temperature 45±2°C Module Efficiency 14.61% 14.92% 15.23% 15.54% 15.85% Operating Temperature -40°C—+85°C Performance at Low Irradiance Maximum System Voltage 1000V(IEC)/600V(UL) Industry leading performance at low irradiation Maximum Series Fuse Rating 15A environment,+95.5%module efficiency from an Application Classification ClassA irradiance of 1000w/m2 to 200w/m2 Power Tolerance 0-+5W (AM 1.5,25'C) Under Standard Test Conditions(STC)of irradiance of 1000W/m',spectrum AM 1.5 and cell temperature of 25'C NOCT CS6P-235P CS6P-240P CS6P-245P CS6P-250P CS6P-255P Engineering Drawings Nominal Maximum Power (Pmax) 170W 174W 178W 181W 185W Optimum Operating Voltage(Vmp) 27.2V 27.3V 27.4V 27.5V 27.5V Optimum Operating Current(Imp) 6.27A 6.38A 6.49A 6.60A 6.71A Open Circuit Voltage(Voc) 33.9V 34.OV 34.1 V 34.2V 34.4V Short Circuit Current(Isc) 6.86A 6.96A 7.08A 7.19A 7.29A Under Normal Operating Cell Temperature,Irradiance of 800 W/m',spectrum AM 1.5,ambient temperature 20V, wind speed 1 m/s Mechanical Data Cell Type Poly-crystalline 156 x 156mm,3 or 4 Busbars Cell Arrangement 60(6 x 10) Dimensions 1638 x 982 x 40mm(64.5 x 38.7 x 1.57in) Weight 19kg(41.9 lbs) Front Cover 3.2mm Tempered glass Frame Material Anodized aluminium alloy J-BOX IP65 or IP67,3 diodes Cable 4mm'(IEC)/12AWG(UL),1000mm s� Connectors MC4 or MC4 Comparable i Standard Packaging(Modules per Pallet) 24pcs _ Module Pieces per container(40 ft.Container) 672pcs(40'HO) I IN Curves (CS6P-255P) i i i Section A-A 350 I � 4-Pw1 'Specifications included in this datasheet are subject to change without prior notice. About Canadian Solar Canadian Solar Inc. is one of the world's largest solar Canadian Solar was founded in Canada in 2001 and was companies. As a leading vertically-integrated successfully listed on NASDAQ Exchange (symbol: CSIQ) in manufacturer of ingots,wafers,cells,solar modules and November 2006.Canadian Solar has cell manufacturing capacity solar systems, Canadian Solar delivers solar power of 1.5GW and module manufacturing capacity of 2.3GW. products of uncompromising quality to worldwide customers. Canadian Solar's world class team of professionals works closely with our customers to provide them with solutions for all their solar needs. Headquarters __ Guelph I Ontario N I K 1 E6 I Canada Tel:+1 519 837 1881 Fax:+1 519 837 2550 _ _ . Enphase®Microinverters Enphase@M215 [e] enphase F=9 ENERGY The sricr;Ese" r�� .r���ti �7�r S s-Larr, improves energy harvest, increases reliability, and dramatically simplifies design, installation, and management of solar power systems. The Enphase System includes the microinverter, the Envoy® Communications Gat TM Enlighten,° Enphase's monitoring and analysis software. Building Department WOO 2013 P A 0 D U C T I V E SMART )EC.OMPLIANCE - Maximum energy production - Quick and simple design, installation,, - Resilient to dust, debris and shading and management,z vievvea 6Y - Performance monitoring -24/7 monitoring and analysis RELIABLE SAFE -System availability greater than 99.8% - Low-voltage DC - No single point of system failure - Reduced fire risk enphase® s�® E N E R G Y C US Enphasem M215 Microinverter//DATA INPUT DATA(DC) M215-60-2LL-S22/S23 and M215-60-2LL-S22-NA/S23-NA(Ontario) Recommended input power(STC) 190-270 W Maximum input DC voltage 45 V Peak power tracking voltage 22-36 V Operating range 16-36 V Min./Max.start voltage 22 V/45 V Max. DC short circuit current 15 A Max.input current 10.5 A OUTPUT DATA(AC) @208 VAC @240 VAC Rated (continuous)output power 215 W 215 W Nominal output current 1.0 A (Arms at nominal duration) 0.9 A(Arms at nominal duration) Nominal voltage/range 208/183-229 V 240/211-264 V Extended voltage/range 179-232 V 206-269 V Nominal frequency/range 60.0/59.3-60.5 Hz 60.0/59.3-60.5 Hz Extended frequency range 57-60.5 Hz 57-60.5 Hz Power factor >0.95 >0.95 Maximum units per 20 A branch circuit 25(three phase) 17(single phase) Maximum output fault current 1.05 Arms,over 3 cycles; 1.04 Arms over 5 cycles EFFICIENCY CEC weighted efficiency 96.0% Peak inverter efficiency 96.3% Static MPPT efficiency(weighted, reference EN50530) 99.6% Dynamic MPPT efficiency(fast irradiation changes, reference EN50530) 99.3% Night time power consumption 46 mW MECHANICAL DATA Ambient temperature range -40°C to+65°C Operating temperature range(internal) -40°C to+85°C Dimensions(WxHxD) 173 cm x 16.4 cm x 2.5 cm(6.8"x 6.45"x 1.0")without mounting bracket Weight 1.6 kg (3.5 lbs) Cooling Natural convection-No fans Enclosure environmental rating Outdoor-NEMA 6 FEATURES Compatibility Pairs with most 60-cell PV modules Communication Power line Monitoring Free lifetime monitoring via Enlighten software Compliance UL1741/IEEE1547, FCC Part 15 Class B CAN/CSA-C22.2 NO.0-M91,0.4-04,and 107.1-01 To learn more about Enphase Microinverter technology, enphaSe® visit a n pI—L''-ass.cc e- E N E R G Y ©2013 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. - PROJECT DESIGNER: TIM""ANI —7 ENERAL NOTES 6.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF IIIFORTUNE ENERGY INC. 1.ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND LISTED PULL BOXES OF JUNCTION BOXES/COMBINER BOXES PER APPROPRIATE z 1 ATS ITASCA C BUILDING A e CHATSWORTH , CA 9 7 3 7 1 BY RECOGNIZED ELECTRICAL TESTING LABORATORY. NEC REQUIREMENTS. _ -- ---�"" OFFICE: (s 1 a) 67s-9699 EXT.BO 7 CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA WES: WWW.FORTUNEENERGY.NET SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY. 7.SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT PHOTOVOLTAIC SYSTEM SUMMARY f SPECIFICATIONS. I 2.NO PIPING,DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL SYSTEM SIZE:4.0 NA DC MODULES:(16)CANADIAN SOLAR CS6-250OW P NOV1 2O1 EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE DEDICATED 8.WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND NO y 4 PROJECT TEAM Fortune Energy SPACE ABOVE THE ELECTRICAL EQUIPMENT. WET LOCATIONS.FIELD APPLIED PROTECTIVE COATINGS ARE NOT MODULE MAX POWER SE M21):25-2 INVERTER:(16)ENPHASE M215-60-2LLS221S23 ;-3�rn)�' SOLAR SYSTEM COORDINATOR �_ ACCEPTABLE FORTUNE ENERGY INC, 3.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED. 21029 ITASCA STREET,BUILDING A-B, 9.JUNCTION,PULL AND OUTLET LOCATED BEHIND MODULES SHALL BE SO RECOMMENDED MOUNTING SYSTEM:FORTUNE ENERGY r--I 4.ALL METALLIC EQUIPMENT SHALL BE GROUNDED. INSTALLED THAT WIRING CONTAINED IN THEM CAN BE RENDERED DUAL RAIL CHATSWORTH CA,91311 0 OFFICE:818-678-9699 ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF MODULE(S)SECURE BY " 5.ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER. REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WIRING ARRAY TILT:1815 and specifications MUST be kept at the ENGINEERS ^ SYSTEM. I--•I AZIMUTH:196°,_;construction. It is unlawful to make any FORTUNE ENERGY INC,DESIGN DEP. 6.DO NOT SCALE DRAWINGS.IF UNABLE TO LOCATE DIMENSIONS FOR ANY (NEC 690.34) ITEM OF WORK,CONSULT ARCHITECT/ENGINEER FOR DIRECTIONS BEFORE C r iii S Ui alteratlans on same,or to deviate CHAT ITASCA STREET,BUILDING A-B, PROCEEDING.THE DRAWING ARE BASED ON GOOGLE MAP,AND THEREFORE 10.IN AN UNGROUNDED PHOTOVOLTAIC SYSTEM,THE POWER SOURCE ` OFFICE:818-678-9699 Val from the Building Official. CHAT CA,9 E �LECTl21CAL INFORMATION EXT 801 THE ROOF SLOPE DIMENSIONS MAY NOT ACCURACY.CONTRACTOR TO SITE SHALL BE LABELED WITH THE FOLLOWING WARNING AT EACH JUNCTION UTILITY COMPANY:PG&E �, O VERIFY ALL ROOF OBSTACLES AND ALL REQUIRED CLEARANCES WITH AHJ(S) BOX,COMBINER BOX,DISCONNECT AND DEVICE WHERE THE oecifications SHALL NOT PRIOR UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE:"WARNING MAIN SERVICE AMPERAGE:200A" TO INSTALLATION. ELECTRIC SHOCK HAZARD.THE CURRENT CIRCUIT CONDUCTORS OF THIS BUILDING INFORMATION I- OVaI Of the violation Law. SHEET INDEX ion n/ PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT MAY BE n BnCe OC State IU 7.DIMENTIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL ROOF ENERGIZED WITH RESPECT TO GROUND DUE TO LEAKAGE PATHS AND CONSTRUCTION:TYPE V, 1 STORY T1 TITLE PLAN,GENERAL NOTES LU OCCUPANCY:RESIDENTIAL PV SYSTEM SUMMARY DIMENSION ON THIS DRAWING SET MAY NOT BE TO ACCURACY AND MAY /OR GROUND FAULTS." W W NEED TO CHANGE THE NUMBER OF PV MODULES,AND LAYOUT (NEC 690.35(F)) ROOF:CONCRETE FLAT TILE ROOF `– Al SITE PLAN CONFIGURATION UPON SITE VERIFICATION. SUPPORT BEAM:2X10 @ 16"O.0 A2 PANEL AND RACKING LAYOUT OO 11.ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND E1 SINGLE LINE DIAGRAM W `O I� 8.CONTRACTORS SHALL OBTAIN ELECTRICAL PERMITS AND SHALL WIRING MATERIAL SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. E2 LABELS AND SPEC SHEETS O COORDINATE ALL INSPECTIONS,TESTING COMMISSIONING AND n Z O `./ ACCEPTANCE WITH THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS ADDITIONAL REQUIREMENTS NOTE: PLOT PLANS � O NEEDED.CALL INSPECTIONS UPON INSTALL RACKING SYSTEM. THIS DRAWINGS ARE SUBJECT TO AN APPROVAL OF THE BUILDING 1.SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DEPARTMENT,FIRE MARSHAL,UTILITY COMPANY AND OTHER AGENCIES CHECKED SY m \ 9.THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF DISCONNECTING MEANS THAT PREVENTS ANTI-ISLANDING I ( I ' of SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY (PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE) AUTHORITY HAVING JURISDICTION(AHJ). Z) \ AND COMPLY WITH ALL THE UTILITY COMPANIES REQUIREMENTS.IF THE BY THE ACT OF SUBMITTING A BID PROPOSAL FOR WORK,THE N SOLAR BACK FED BREAKER IS OVER THE BUS SIZE 20%LIMIT,CONTRACTOR 2.OVERCURRENT PROTECTION FOR BOTH ALTERNATING AND DIRECT CONTRACTOR HAVE REVIEWED THE PLANS THOROUGHLY AND ACCEPTBAf�E SHALL INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE THE CURRENT MUST BE INSTALLED IN THE INVERTER OR FIELD INSTALLED AT FULL RESPONSIBILITY OF PLAN CORRECTIONS AND ASSOCIATED (�/� THE TIME OF THE INSTALLATION. CONSTRUCTION COSTS REQUIRED BY AHJ. PLA ING DEPT• `V J\ MAIN CAPACITY. (( iighlight Sol ai CODE SUMMARY 10.DRAWINGS ARE DIAGRAMMATIC ONLY,ROUTING OF RACEWAYS SHALL BE 3.MAIN SERVICE PANEL MUST HAVE PERMANENT PLAQUE INDICATING A THIS PROJECT SHALL COMPLY WITH THE FOLLOWING CODES: 6 t` AT THE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SECOND POWER SOURCE IS INSTALLED,AND A DISCONNECTING MEANS 2010 CALIFORNIA BUILDING CODE DATE ? o SHALL BE COORDINATED WITH OTHER TRADES.IF THE ROOF MATERIAL OR MUST BE FIELD INSTALLED IN ALL UNGROUNDED CONDUCTORS AT THE 2010 CALIFORNIA ELECTRICAL CODE Ix Q ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION,CALL ENGINEER MAIN SERVICE PANEL 2008 NATIONAL ELECTRICAL CODE N N PRIOR TO INSTALL. ALL OTHER ORDINANCES ADOPTED BY THE LOCAL GOVERNING AGENCIES. BLDG. DEPT. orn m o N m 11.IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN,THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE U I WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED ASI II­ Sra 0 `� C1 APPROPRIATE. 7- 12. 12.WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT ARISES ON THE z k 3 DRAWING OR SPECIFICATIONS,THE CONTRACTOR SHALL BE RESPONSIBLE Pu"de`g'""'E U = d li FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED dyg. D, a d ggeA- BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF ; ' ° THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. o ._ P-"' 611r 13.ALL BROCHURES,OPERATION MANUALS,CATALOGS,SHOP DRAWINGS, t 'l ETC.SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE '"" e TAMP. COMPLETION OF WORK. ge ed n� °� Na""��` NeSrs"n, PHOTOVOLTAIC NOTES o e°IGn9er Rd „an��", GJPER INO 1.AN INVERTER OR A MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM =y F'j J;�r�l!1 Department SHALL AUTOMATICALLY DE-ENERGIZEITS ITS OUTPUT TO THE CONNECTED g ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOST OF `a"a"°D, y' G,eenoak k a VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE o, am+noun = —� ,• . . n ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS N s N 2013 BEEN RESTORED.(NEC 690.61) �` ppoogftN 2.ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING I l I f r SHALL BE RAIN-TIGHT THREADLESS COMPRESSION TYPE. s s _ 2 x f 3.MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. t�F 3t3 D� ✓� , nor VICINITY MAP FRONT VI` C%AAEcRIAL VIEW ,,,o • 4.NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE SCALE: NTS DISTRIBUTION AND POWER DISTRIBUTION SWITCH BOARDS,PANEL BOARDS, SCALE: NTS SCALE: NTS (6WG JOB # 40MC–MR20–MW DISCONNECTING SWITCHES,TERMINAL CABINETS,ETC.ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF SUFFICIENT CAPACITY TO T 1 PREPARED 1 1/7 3/13 T. ALYMANI WITHSTAND THE WEATHER. CHECKED 5.JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN APPROVED RELIEF POSITIONED FOR APPROPRIATE WATER RUN OFF. SHEET TITLE: TITLE SHEET PROJECT DESIGNFR: T""ALYMANI L21,.2 TUNE ENERGY INC. 9 ITASCA ST. BUILDING A-B 1 SITE PLAN TS: (BIB) 7 91371 CE: (BIB)H) 678-9699 EXT.BD 1 WWW.FORTUNEENERGY.NET SCALE: 3/32" = 1' PROPERTY LINE Fortune Energy N MAIN UTILITY PANEL W E O s NEO-1130a Q Q� W u w oc0 V DRIVEWAY a z U i 44/co m Q / �Q N RIDGE / kQ� �`Hiyh!idh mol<r co N Q J N � N Q N T 0 a 2 M Q V ZZ Lq 2 I Z C) 2 IQ3 U a Q V r' NF�Gye 80 ® I `.UPERTIN „MP. X32, .;1mg Depa M c"-)DE cC)MPLLlA' E PrCv� • PROPERTY LINE WG. Joe # 40MC—MR20—MW AlPREPARED 11/]3/]3T. ALYMANI SCALE:CHECKED APPROVED SHEET TITLE: PANEL/RACK/NG LAYOUT PROJECT DESIGNER: TlM ALYMANI 2 1029FORTUNE ENERGY INC. Fn RACKING LAYOUT 2 RACKING COMPONENTS CHATS ORTH C 9131BUILDINGAB CHATSWORTH , CA 9 7 3 1 7 OFFICE: (BIB) 67B-9699 EXT.BD I SCALE: 1/10" - 1' SCALE: NTS WEB: WWW.FORTUNEENERGY.NET Attachmen N Point /// For;une Energy \� Dual Rai W E / PV Modul E -----------------------------------------------------I MldClam /�// r l I je End Clam //// k \f`d I / o W I ///// O I / oncrete Flat U �r �lI TILe Roof w V 10•s4pA01 ui I Q I m END CLAMP N 4'Max. CHANNEL STRUT PV MODULE �r J, A ARRAY TILT loKlighlight Solar ® RAIL 18 DEGREES 3/8'-16 FLAG NUT® ®! I I CONCRETE FLAT TILE Q 'D M r^ T�II 0El Ld \ Z I I0 EPDM WASHER O) 2 = a 3 RAFTER �` 3 5/16' 0 LAG SCREWS I I I I I I I I I I I I I 25' MIN. EMBED© �UPE RE I I I I I I I I I I I I I I I I I I I I I j I i I [±]TIGHTEN THE ALLEN BOLT (TIGHTENING TORQUE 6FT-LBS (8NMA A10dinq DEumtme I I ® M, TIGHTLY ATTACH RAIL TO THE L-FOOT (TIGHTENING TORQUE 6FT-LBS (8N ©PRESS THE SEALING WASHER ONTO THE DRILL HOLE AND SECURE IT WITH THE NUT. TIGHTENING 2"X10" RAFTERS @ 16" 0.0 TORQUE IS DEPENDENT ON THE ROOF MATERIAL. TAKE CARE NOT TO WARP DAMAGE THE ROOF IANCE DUAL RAIL CLAP OOK LEGEND STANDOFF SUPPORTS MODULE 318" OMT zx 3or8//i6IILAC;SCREW RAIL SPLICE ^ ' AT PROPERTY LINEMOUNTING SYS. MFR. FORTUNE ENERGY p SP SUB PANEL MOUNTING SYS, NAME DUAL RACK 1 SUPPORT BEAM TOTAL SYS.WEIGHT 856.112 LBS - 4 RAIL J1 JUNCTION BOX #ON ATTACHMENT POINT 50 WEIGHT/ATTACHMENT 17.122 LBS/aft. r ------------ EMT CONDUIT V INVERTER INTOTAL SURFACE AREA 277.280 Sq.ft ROOF ABSTRACTIONS DISTRIBUTED WEIGHT 3.088 Psf ® o we JOB # 40MC-MR20-MW AC AC DISCONNECT MODULE WEIGHT 41.900 LBS 0 A2PREPARED I ]/73/73 T. ALYMANI ® CHIMNEY RACKING WEIGHT 17.330 LBS SCALE:CHECKED ❑ MODULE T MAIN SERVICE PANEL INVERTER WEIGHT 3.500 LBSGROUNDING LUG APPROVED MID CLAMP �7 SHEET TITLE: CLAMP STRUT 318" BOLT PANEL/RACK/NG LAYDI T PROJECT DESIGNER: TIM ALYMANI FORTUNE ENERGY INC. EXISTING MAIN SERVICE PANEL 27D29 ITASCA ST. BUILDING A-B 1 SINGLE LINE DIAGRAM 200A MAIN BREAKER /� CHATSWO RTH , CA 9 19 71 2OOA BUS M WEB: WWW. ORT678-969 N E NERG9Y NEraD I SCALE: NTS . - F_orhine Energy (e) 200A 2P d' ® 'MSB" 0 GROUNDING LUG BARE CU #6 JUNCTION BOX l� MODULE/RACKING NEMA 4R Q DC EGC CONDUIT 1 <16 VUSTRING A CU#6_ _ _ DC GEC 20A/2P w ENPHASE ENGAGE CABLE w a/ TERMINATOR 240(L1,L2,N&GND) G z a PV MODULE RATINGS @ STC JUNCTION BOX - - - - MODULE MFR: CANADIAN SOLAR ? O U TRANSITION FROM MODEL: CS61P - 250P #12 TRUNK CABLE TO#10 THWN-2 N Voc = 37.2V #6 EGC BARE, CU TO#6 STRANDED GEC 1 C- VMP = 30.1V USING IRREVERSIBLE SPLICE C-1#4 ISc = 8.87A IMP = 8.30A 'JUNCTION BOX TO MAIN PANEL= 60' G /; 2#10 (L1, L2) + 1 #10 NEUTRAL, #8 GEC PV ARRAY INFORMATION #10 RATE 90°C =40A rn o TEMPERATURE DERATING @ 50°C =0.82 Note : "Typical Wire Size" provided includes ambient temperature and rx STRING A: 40A* 0.82 = 32A > 18Aro N g #OF MODULES IN STRING: 16 V DROP @ 60' - 1.2% conduit fill, adjustment only. Additional derating may be needed based Voc PER STRING = 37.2V* 1.14 =42.41VOK TO INSTALL THWN-2#10 on t m VMP PER STRING = 30.1V actual conditions of use; conduit location, etc.OA, 10AWG = 30A Technical notes (as applicable): z = z i TRUNK CABLE MAIN PANEL RATING [1] Circuit breakers without "Line" and "Load" markings are generally o 2 = Q ENPHASE TO JUNCTION BOX=40' BUS BAR RATING =200A appropriate for backfed applications per NEC 2010-690.64(B)(5). a `` (L1,L2,N,GND)#12 RATE 90°C =30A MAIN SERVICE BREAKER = 200A TOP LOCATED TEMPERATURE DERATING @ 60°C -0.71 ° [2] Module wiring ampacity based on conductor in free air per 120% RULE: / 30A x 0.71 = 21.3A> 16.88A (NEC 2010-Table 310.17) * CUPERTI Yo V_drop @ 50' = 0.63% MAX ALLOWED FEED - 1.2 200A= [3] Minimum bus or conductor sized based on sum of ratings of all ACTUAL FEED = 200A MSB + 20A"SOLAR" g RL"Id'o9 Dena OK TO INSTALL"THHN/THWN-2"#12 =220A< 240A MAX source srAMP: TRUNK CABLE OK TO ADD SOLAR BREAKER @ THE OPPOSITE over current devices per NEC 2010-690.64(B)(2). X013 END OF THE BUS AWAY FROM THE MAIN BREAKER. [4] Breaker to be located at opposite end of bus from supply feed and INVERTER RATING requires "Do Not Relocate" marking per NEC 2010-690.64(B)(7). '�OUE c;OMPLI wC& INVERTER MFR: ENPHASE OUTPUT CALCULATIONS [5] Maximum string current with (17) 60-cell modules is 15.3A. ,,J sy 5�, INVERTER MODEL: M215-60-2LL-S22/S23 PV SYSTEM MAX DC OUTPUT=250* 16 =4.0 kW (15.3 x 1.25 = 19.13A) maximum AC current. pomm• DC VOLT RATING = 45V [6] String voltage: (Nmodules X Voc X (lowtemp correction (690.7 ,C' M RM DC MAX INPUT CURRENT = 10.5A PV SYSTEM MAX AC OUTPUT: CEC)) `kQ�'� n Id ,2o'-2�FLP(16) ENPHASE M215-60-2LL-S22/S23 [7]CEC (705.12(D)(2)) - Supply OCPD less or equal to120% of bus rc,- n Elmer AC MAX OUTPUT POWER @ 240V = 215W (16) CANADIAN SOLAR CS6P-250P rating. AC NOMINAL OUTPUT CURRENT = 0.9 A PMAx (PTC RATING) PER MODULE = 227.6 W WG JOB # 40MC-MR20-MW MIN WIRE AMPACITY 227.6 W* 16 = 3.64 kW E1 PREPARED 1 1/13/73 T. AL YMAN/ = 0.9 * 1.25 * 16 PANELS = 18A 3.64 kW*96% INVERTER = 3.49 kW SCALE:CHECKED MIN (OCPD) = 20A WIRING LOSS = 1.92% < 2% REQUIRED BY ENPHASE APPROVED SHEET TITLE: SINGLE LINE DIAGRAM - --_— — -- -__-- --------- __-- --- PROJECT DESIGNER: TIM ALYMANI FORTUNE ENERGY INC. 27029 ITASCA ST. BUILDING A-B III SEEN CHATSWO RTH CA 9 13 1 1 OFFICE: (818) 678-9699 EXT.B01 WEB: WWW.FDRTUNEENERGY.NET �II�IIIIIII I'II'�' Folcu"e Energy CONTENT: CONTENT: � "SOLAR PV SYSTEM POINT OF CONNECTION" "PHOTOVOLTAIC SYSTEM" " AC INPUT AMPS" "DO NOT RELOCATE THIS BREAKER" "NOMINAL VOLTAGE 240VAC" LOCATION: Q ' POINT OF CONNECTION PANEL.LOCATION: W n POINT OF CONNECTION PANEL. '�) �I�■I�� NEC 690.64 (B)(4) Uj U W� CONTENT: CONTENT: LU00 a Electrical Data > F STC Nominal Maximum Power(Pmax) CSZPof30PCS235235PICS6P-240PICS2P5W5P CSZPO-25O "THIS PANEL FED BY MULTIPLE SOURCES" z U CAUTION SOLAR CIRCUIT ~_Optimum Operating Voltage(Vmp) 29.6V 29.8V --29.9V 30.0V -30-IV "UTILITY AND SOLAR PV" m Optimum Operating Current(Imp) 7.78A 7.90A 8.03A 8A7A 8.30A Open Circuit Voltage(Voc) 36,8V 36.9V 37.OV 37AV 37.2V ShortCircuilCurrenl(Isc) 8.34A 8.46A 8.69A e.74A 8.87A LOCATION: LOCATION: N Module Efficiency 14.30% 1 14.61% 1 14.92% 1 15.23% 15.54°f, Operating Temperature -401;-+85'C ALL PANELS: SUB PANELS AND MAIN ON ALL INTERIOR AND EXTERIOR PV Maximum System Voltage 1000V(IEC)I60OV(UL) Maximum Series Fuse Rating 15A 690.64 (B)(4) CONDUIT � , RACEWAYS, ENCLOSURES, (I"HighiightSok--i _Application Classification Class CABLE ASSEMBLIES AND JUNCTION Power Tolerance 0-+5W Under Standard Teel Conditions(STC)of irradiance of1000WIm'.spectiumAM 1.5 and cell temperature of25t BOXES PLACED EVERY 10 U "(1.1.2 OCFA) ? n � N N NOTES: `! CUPERTINO o BN N N Enphase-M215 uilding Department < T iii i 1 .BACKGROUND: RED. NOV 3 4 2011'."N o � 0 x 3 2. LETTERS: WHITE. RE.r=ro.a: 3 leenphase 3.FONT: ARIAL OR SIMILAR NON-BOLD. wiFv. E(_, ! OR CODE COMPLIANCE 4. ALL LABELS SHALL HAVE CAPITAL LETTERS. :evlewed By INPUT DATA(DC) M215.60-21.1.-S22/S23 and M216.60.21.11.-S22-NA/S23-NA(Ontario) 5.M I N I M U M HEIGHT: 1-1/2" . M-knmendetDC-1tvrer($IC) 450-277w 6. ALL LABELS SHALL BE WEATHER RESISTANT MATERIAL (E.G UV RESISTANT VINYL ) Mox&rxmr input OC voltago f5 V Peak ope,p w rwgeicimg vo9age 22-36V REFLECTIVE SURFACE AND MATERIAL SUITABLE FOR EXTERIOR USE. Operating range 16-36V "ax.Msha'�"� 22V/45VMax.pC stprl drwa cwrenl 15A 7. PV BREAKER WILL BE PLACED FURTHEST AWAY FROM THE MAIN BREAKER. oTTTA8UDAC) 020VAC 9240 VAC 8. DC PHOTOVOLTAIC ARRAYS SHALL BE PROVIDED WITH DC GROUND FAULT PROTECTION IN Nommioutpuoua)outputpM�a 215 1.OA 2,5w ACCORDANCE WITH ART 690.5(A) THRU (C) Nominal output currant 1.0 A(Arms at norrdnal du.atlon) 0.9 A(Nms al norrxnal Wration) Nominal voltaWrange 206/183-229V 240/211-264V fnended%vItagWrwVe 179-232V 206-20V 9. REFER TO GENERAL NOTE ON SHEET T-1 FOR BACKFEED BREAKER SPEC. ���® Nominal irequ—y/range 60.0/59.3-60-5Hz 60.0/693-rr05W Z f [xlerreatl lrequancy range 57-605 He 57.605 Hz Power Mmum un ador 2 (it 17.95 Maximwn its per 20 A hmnch cirwit 255 0hee phase) 171sirgle phpso) Maximum m1put fau t current 1.05 Arms,over 3 cycIm I.04 Amu i a fi cycles EFFICIENCYwe JOB # 40MC—MR20—MW f k CEC weighted oion y 88-0% E2 PREPARED 1 1/7,311 3 T. ALYMANI SCALE:CHECKED APPROVED SHEET TITLE: LABELS/SPEC SHEETS