Loading...
R-2018-22 Action Letter.pdfCUPERTINO August 31, 2018 OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning(a cupertino.org Mike Chen 12280 Saratoga -Sunnyvale Rd. #209 Saratoga, CA 95070 SUBJECT: TWO STORY PERMIT ACTION LETTER— Applications R-2018-22 This letter confirms the decision of the Director of Community Development, given on August 31, 2018; approving a Two Story Permit (R-2018-22) to allow the construction of a new 4,216 square foot single- family residence at 10109 Judy Ave, with the following conditions: 1. APPROVED PROJECT The approval is based on a plan set entitled "Han Residence 10109 Judy Ave. Cupertino, CA. 95014", consisting of seven (7) sheets labeled "A-1.0, A-1.1, A-2.0, A-3.0, A-4.0, C-0.0 and L- 1.0,"except as may be amended by conditions in this resolution. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3. ACCURACY OF THE PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of property data may invalidate this approval and may require additional review. 4. PRIVACY PLANTING The final privacy planting plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. The variety, size, and planting distance shall be consistent with the City's requirements. 5. FRONT YARD TREE The applicant shall indicate on site and landscape plans the location of a front yard tree to be located within the front yard setback area in order to screen the massing of the second story. The front yard tree shall be a minimum 24 -inch box and six (6) feet planted height and otherwise be consistent with the City's requirements. 6. PRIVACY PROTECTION AND FRONT YARD TREE COVENANT The property owner shall record a covenant on this property to inform future property owners of the privacy protection measures and tree protection requirements consistent with the R-1 Ordinance, for all windows with views into neighboring yards and a sill height that is five (5) feet Two -Story Permit Action Letter R-2018-22 Page 2 or less from the second story finished floor. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 7. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 8. FENCES The location of all fences on the site shall be indicated on building permit plans, comply with Chapter 19.48, Fences, of the Cupertino Municipal Code, and must be reviewed and approved prior to issuance of building permits. 9. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 10. COMPLIANCE WITH PUBLIC WORKS CONFIRMATION FORM The project shall comply with the requirements indicated on the Public Works Confirmation form dated February 1, 2018, including, but not limited to, dedications, easements, off-site improvements, undergrounding of utilities, all necessary agreements, and utility installations/relocations as deemed necessary by the Director of Public Works and required for public health and safety. The Public Works Confirmation is a preliminary review, and is not an exhaustive review of the subject development. Additional requirements may be established and implemented during the construction permitting process. The project construction plans shall address these requirements with the construction permit submittal, and all required improvements shall be completed to the satisfaction of the Director of Public Works prior to final occupancy. 11. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 12. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: Two -Story Permit Action Letter R-2018-22 Page 3 a. Water all active construction areas at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c. Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. d. Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e. The applicant shall incorporate the City's construction best management practices into the building permit plan set. 13. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated 14. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 15. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of Two -Story Permit Action Letter R-2018-22 Page 4 the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 16. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Staff received comments from adjacent property owners regarding privacy impacts from the proposed two-story home, concerns regarding the removal of a pine tree, and construction noise. In regards to the privacy impacts, the project incorporates required privacy plantings. The north and south elevations do not require privacy plantings because the window sills are more than five (5) feet above the finished second floor, see Cupertino Municipal Code (CMC) Section 19.28.120 (A) (1) (b). Along the west elevation, where the window sills are below five (5) feet, the project has incorporated required privacy plantings consistent with CMC Section 19.28.120 (C) (2). The proposed privacy plantings are a mixture of 24 -inch box Arbutus Marina trees and 15 -gallon Laurus Nobilis shrubs. In additional to the privacy plantings, the two-story portion of the home is located more than 48 feet from the rear property line, further reducing potential privacy impacts. Additionally, all privacy planting trees are considered protected trees, and are further protected through a covenant on the property, see Condition of Approval #6. No additional conditions of approval are required. Comments were also received regarding an existing pine tree. The Applicant intends to remove the pine tree, and because the pine trees is not considered a protected species per CMC Section 14.18.050 (B), no Tree Removal Permit is required. No additional conditions of approval are required. Comments were also received regarding potential construction noise. A Condition of Approval, condition #13, is included in the action letter that details grading, construction hours, and noise limitations. Additionally, CMC Section 10.48.053 further details grading, construction, and demolition noise limitation. No additional conditions of approval are required. Please note that if this permit is not vested within a year, it shall expire on August 31, 2019. Staff has made all the findings that are required for approval of a Two -Story Permit and Residential Design Review as required for approval by Cupertino's Municipal Code, Chapter 19.28.140 (A) and (B). Two -Story Permit Action Letter R-2018-22 Page 5 1. The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinances and the purposes of this title. The proposed project is consistent with the General Plan as the project is within the Low Density land use area. There are no applicable specific plans that affect the project. The project has been found to be consistent with the requirements of Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential. 2. The granting of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity, and will not be detrimental to the public health, safety or welfare. The granting of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity, and will not be detrimental to the public health, safety or welfare as the project is located within the R1-6 zoning district, and will be compatible with the surrounding uses of the neighborhood. 3. The proposed project is harmonious in scale and design with the general neighborhood. The proposed project is located in a residential area consisting of single-family homes. The proposed project maintains the single-family home scale found compatible with the general neighborhood. 4. Adverse visual impacts on adjoining properties have been reasonably mitigated. Any potential adverse impacts on adjoining properties have been reasonably mitigated through the planting of privacy mitigation trees and the installation of a front -yard tree as required. Also, please note that an appeal of this decision can be made within fourteen (14) calendar days from the date of this letter. If this happens, you will be notified of a public hearing, which will be scheduled before the Planning Commission. Sincerely, Erick Serrano Associate Planner City of Cupertino Enclosures: Approved Plan Set CC: Urs Mader 10122 S. Tantau Ave. Cupertino, CA 95014 Stephen Wu, 10108 S. Tantau Ave. Cupertino, CA 95014 Cynthia Liu and Weishan, 10095 Judy Ave. Cupertino, CA 95014