Loading...
CC Resolution No. 05-056 RESOLUTION NO. 05-056 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO RESCINDING RESOLUTION NO. 04-291 AND ESTABLISHING USER FEES WHEREAS, the State of California requires fees charged for service rendered not to exceed the cost of delivering said services; and WHEREAS, a public hearing has been held to review user fees; and WHEREAS, the City Council of the City of Cupertino has established guidelines for setting user fees; NOW, THEREFORE, BE IT RESOLVED that: 1. User fees are established per attachments A through E. 2. All user fees previously established by Council action or resolution are hereby superseded. 3. User fees are effective July 1,2005. PASSED AND ADOPTED at a special meeting of the City Council of the City of Cupertino this 5th day of April 2005 by the following vote: Vote Members of the City Council AYES: NOES: ABSENT: ABSTAIN: Lowenthal, Sandoval, Wang Kwok James None , A~ Mayor, City of Cupertino ATTEST: t4~Ú¡~ Jm.-t,{ City Clerk CITY OF CUPERTINO SUMMARY OF USER FEES Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Department Schedule General A Engineering B Planning C Building D Recreation E CITY OF CUPERTINO Resolution 05-056/April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule A - General Photocopies - per sheet Microfilm/Microfiche Printout Budget Documents Comprehensive Annual Financial Reports (cAFR) Returned Check Charge Late Payment on 30 Day Delinquent City Invoices Property Liens Administrative Fee Municipal Code Book Williamson Act Filings Candidate Statement Fee Tape Dubbing - Audio, Video, DVD, CD VHS DVD CD Webcast/cD Audio DV cAM/BETA cAM U-Matic MiniDV Audio Cassette Notary Fee Fingerprinting Processing Handbill Permit Renewals Solicitor Permit (Includes fingerprinting) Renewals Massage Establishment Fee (Includes fmgerprinting/background check and business start-up inspection) Establishment with Therapist Permit Renewals (Includes two inspections per year) Massage Therapist Fee (Includes fingerprinting/background check) Therapist with Managing Employee Renewals $0.20 $0.50/ftame $50.00 $30.00 $25.00 12% per annum $30 per book/blocklparcel lien $77.00 $105.00 $2,474.00 $12.00/tape $20.00/DVD $12.00/cD $50.00/tape $25.00/tape $30.00/DV $1. OO/tape $10.00/signature State Fee $32.00 Plus $12.00 City Admin. Fee $93.00 $26.00 $140.00 $26.00 $274.00 $320.00 $136.00 $184.00 $230.00 $46.00 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1,2005 Schedule A - General (continued) Massage Managing Employee (Includes fingerprinting/background check) Managing Employee with Therapist Permit Renewals Massage Permit Appeal (Denial/Revocation) Taxi Driver Permits (Includes fingerprinting and background check) Renewals All Municipal Code Parking Violations eve Parking Citation Dismissals Administrative Fee Noise Variances Duplicate Business Licenses Business License Exemption Administrative Fee Business License Database New Business Monthly Reports Community Festivals Farmers Market Flea Markets Sign Removal (Public Right-of-Way) Dangerous Dog Annual Registration Fee Internet Processing Fee False Alarms Police Disturbances Abatement Fee Compilation of New Records (For information requests greater than 1/2 hour.) Graffiti Cleanup 2 $184.00 $230.00 $46.00 $145.00 $184.00 $46.00 $35.00 $25.00 $140.00 $20.00 $60.00 $100.00 20.00/month $8.00/day/vendor $2.00/weeklvendor $8.50/month/vendor $15.00/sign $177.00 $2.00/transaction $130.00 Actual Cost · Actual Cost · Actual Cost · Actual Cost · CITY OF CUPERTINO Resolution 05-056/April5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule A - General (Continued) Damage to City Property Grounds, Streets, Facilities Traffic - Engineering Traffic - Maintenance Code Enforcement Public Requests for GIS Printed Maps Standard pre-formatted maps Plotted maps Printed maps Custom request maps For prints or plots of aerial photography, see Engineering fees Public Requests for GIS Data Digital data layers for GIS Data Custom request data layers on CDROM Ortho-rectified aerial photography Actual Cost - Actual Cost - $25.00 $2.00 Actual Cost- $25.00/1ayer $200.00 for all city layers Actual Cost- $25.00/tile $300.00 full City of Cupertino (15 3 tiles) - Actual cost is: 1) Employee hourly rate plus 40% for benefits and overhead, and 2) cost of materials, contractors and supplies. 3 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1,2005 Schedule B - Engineering Street Cuts Miscellaneous Cost of Improvements $10,000 or under Cost of Improvements between $10,001 and $15,000 Cost of Improvements $15,001 and over Utility, greater of $1 ,303 minimum or 5% of cost of improvement Grading permit; greater of $2,000 minimum or 6% of cost of improvements Prace1 Map/Tract Map Parcel Map (1-4 lots) Tract Map (> 41ots) Plan Check & Inspection Review of Building Permit Only Review ofPubliclPrivate Improvement Plans: Residential; greater of $2, 130 minimum or 5% of cost of improvements Commercial; greater of $3,440 minimum or 6% of cost of improvements Annexation (plus county filing fee) Certificates of Compliance Encroachment Permits Residential Non-Residential Annual Utility Company Pool Permit Lot Line Adjustment Soil & Geo Reports (plus any materiaVservice fees) Short Report Long Report Geo Report Deposit Engineering Copies Micro fiche Improvement Plans Traffic ReportslPlans Microfilm Transportation Permit (Per Department of Transportation) Single Annual Utility Company Additional Engineering Investigation or Coordination * Price is for first sheet only. Each additional sheet is $10.00. 4 $200.00 $300.00 5% of cost $1,303.00 minimum $2,000.00 minimum $3,250.00 $6,750.00 $500.00 $2,130.00 minimum $3,440.00 minimum $1,400.00 $1,200.00 $200.00 $200.00 $350.00 $500.00 $2,300.00 $600.00 $600.00 $7,150.00 $20.00/sheet* $20.00/sheet* $20.00/sheet* $0.50/frame* $16.00 $90.00 $50.00/hr CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule B - Engineering (continued) Telecommunications Facility Fee (5% increase per year) Installation Rate Occupancy Rate $1.75/lineal ft. of conduit/yr $0.90/lineal ft. ofleased conduit/yr Banners Large Banners Across Stevens Creek Boulevard Small Banner on Light Poles (for 20 poles) $320.00 $630.00 Aerial Photo Custom Work 24" x 36" 8 ~"x II" $50.00/sheet $lO.OO/sheet Soil/Geo Report Research $1,200.00 Special Events $1,090.00 $1,230.00 Schools - Traffic Request Insurance Review $315.00 Block PartyIParade ($950.00) No Charge Vacation of Public Street ROW $460.00 Small Traffic Calming Request $890.00 RuraVSemi-Rural Classification Application $600.00 Comprehensive Neighborhood Traffic Request $1,720.00 Certificate of Correction $130.00 Floodplain Evaluation $50.00 Permit Parking Study $880.00 Permit Parking Issuance (per household) $45.00 Research $170.00/hr. 5 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule C - Definition of Planning Fee Services Maior Five thousand or more square feet commercial; 10,000 or more square feet office/industrial; eight or more residential units. Minor Less than 5,000 square feet commercial; less than 10,000 square feet office/industrial; less than eight residential units. Appeal A request from the project applicant or interested party to reverse or amend a decision made by staff or an advisory body. An appointed public official serving on the board that made the decision subject to the appeal, an appointed public official serving on a board that is directly affected by the decision and the City Council members are exempted from the fee requirement. Directors Application An application that receives fmal approval by staff either via an advertised public hearing or non-hearing format. The application may involve a pre-application meeting and/or Environmental Review committee review. Temporary Sign Permit A staff review of a temporary sign application that includes an evaluation of the sign request, the entry into the temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the submittal of a deposit to guarantee removal of the sign upon expiration of the temporary permit. Tentative Map Five or more parcels. Parcel Map Four or less parcels. Housing Mitigation Fee Fee collected is used to construct new affordable residential units for Cupertino residents and employees. The fees mitigate the need for affordable units caused by expanding offices creating new jobs and new residential development, office, R&D, industrial and residential development. NOTES: Mixed use applications wiU be classified based upon the highest intensity and review process. The Director of Community Development will have discretion to classify projects based upon the above criteria. 6 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-0'72/May 3, 2005 Fees Effective July 1, 2005 Schedule C - Planning General Plan Amendment Authorization - Major $3,590.00 General Plan Amendment Authorization - Minor $1,795.00 Study Session $3,590.00 General Plan Amendment - Major $11,185.00 General Plan Amendment - Minor $5,593.00 Development Agreement $14,789.00 Zoning - Minor $2,770.00 Zoning < one acre $5,539.00 Zoning one to five acres $8,420.00 $11,473.00 $12,206.00 Zoning> five acres Tentative Map Use Permit - Major $12,206.00 Exception (per exception) $2,150.00 Amendment to Development Approval $3,260.00 Hillside Exception $5,407.00 Parcel Map $5,701.00 Use Permit - Minor $5,701.00 Planning Commission - Architectural and Site Approval $5,701.00 Planning Commission Interpretation $2,849.00 Planning Commission - Tree Removal $2,462.00 Environmental Impact Report $21,353.00 Negative Declaration - Major $3,285.00 Negative Declaration - Minor $1,643.00 For all projects requiring more than 48 hours of staff time, applicants will be charged at the hourly rate of $110.00 per hour, which includes staff time, overhead and administrative oversight. 7 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule C - Planning (Continued) Categorical Exemption $191.00 Design Review Committee - Architectural and Site Approval $2,757.00 R-l Design Review $1,915.00 R-I Exception Sign Exception $2,150.00 $1,612.00 $549.00 Fence Exception Director - Variance $1.377.00 Director - Minor Modification $963.00 Director - Tree Removal $795.00 Minor Residential Permit $963.00 Temporary Use Permit $1,100.00 Temporary Sign Permit $161.00 Sign Program $551.00 Appeal $145.00 Zoning, Planning, Municipal Code (Building Permit Fees) CommerciaVMulti-Family Residential Single Family $0.21/sq. ft. $0.1 1/sq. ft. Wireless Master Plan Fee: Equipment Mount on Existing Light Standard or Utility Pole $5.00/mount Wireless Master Plan Fee: Other Personal Wireless Facility $1,OOO.OO/facility Housing Mitigation In-Lieu Fees Residential Office/IndustriaVR&D $1.1 5/sq. ft. $2.25/sq. ft. Stevens Creek Blvd. Specific Plan Fee $.044/sq. ft. For an projects requiring more than 48 hours of staff time, applicants will be charged at the hourly rate of $110.00 per hour, which includes staff time, overhead and administrative oversight. 8 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1,2005 Schedule D - Building Valuation Schedule OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SO. FT. 1. APARTMENT HOUSES *Type I or II F.R. $121.61 $253.34 Type V - Masonry or Type ill 98.78 205.78 Type V - Wood Frame 91.32 190.24 Type I - Basement Garage 41.65 86.77 2. AUDITORIUM Type I or II F.R. $128.86 $243.14 Type II - I-Hour 93.33 176.09 TypelI-N 88.29 166.58 Type III - I -Hour 98.12 185.14 Type III - N 93.08 175.62 Type V -I-Hour 93.82 177.02 Type V - N 87.55 165.18 3. BANKS *Type I or II F.R. $188.98 $343.59 Type II - I -Hour 139.21 253.11 Type II - N 134.75 244.99 Type III -I-Hour 153.63 279.33 Type III - N 148.14 269.35 Type V - I -Hour 139.21 253.11 Type V - N 133.34 242.44 4. BOWLING ALLEYS Type II-I-Hour $80.46 $118.32 TypelI-N 75.09 110.43 Type III - I -Hour 87.56 128.76 TypeIII-N 81.88 120.41 Type V - I-I Hour 59.00 86.77 5. CHURCHES Type I or II F .R. $105.87 $230.14 Type II - I -Hour 79.51 172.84 Type II - N 75.56 164.26 Type III - I-Hour 86.44 187.92 Type III - N 82.60 179.57 Type V -I-Hour 80.79 175.62 * Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouses ***Deduct 20 percent for "shell only" buildings 9 CITY OF CUPERTINO Resolution 05-056/ AprilS, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building Valuation Schedule OCCUPANCY AND TYPE REMODEL COST PER SO. FT. 6. CONVALESCENT HOSPITALS ·Type I or II F.R. Type II I -Hour Type III - I -Hour Type V - I-Hour 7. DWELLINGS Type V - Masonry Type V - Wood Frame Basements Semi-Finished Unfinished 8. FIRE STATIONS Type I or II F.R. Type II - I -Hour Type II - N Type III - I-Hour Type III - N Type V - I -Hour Type V - N 9. HOMES FOR THE ELDERLY Type I or II F.R. Type II - I-Hour Type II- N Typeill-1-Hour Type III - N Type V - I-Hour Type V - N 10. HOSPITALS ·Type I or II F.R. Type III - I-Hour Type V - I-Hour · Add 0.5 percent to total cost for each story over three ··Deduct 1 I percent for mini-warehouse .. ·Deduct 20 percent for "shell only" buildings .... Add 25% for hazardous occupancy or high tech COST PER NEW SO. FT. $153.01 107.57 110.25 103.90 $322.94 224.11 229.68 216.46 $105.33 100.75 $224.11 214.37 $25.30 $53.82 19.30 41.06 $140.67 $265.41 92.59 174.70 87.30 164.72 101.32 191.17 97.02 183.05 95.05 179.34 90.13 170.06 $115.48 $240.58 93.77 195.34 89.76 186.99 97.66 203.46 93.65 195.1 I 94.32 196.50 91.09 189.78 $185.53 $378.62 153.58 313 .43 146.53 299.05 10 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building Valuation Schedule OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SO. FT. 11. HOTELS AND MOTELS ·Type I or II F .R. Type III - I -Hour TypeIII-N Type V - I-Hour Type V - N 12. INDUSTRIAL PLANTS **** Type I or II F.R. Type II - I-Hour Type II - (Stock) Type III - I -Hour Type III - N Tilt-Up Type V - I -Hour TypeV-N 13. JAILS Type I or II F .R. Type III - I -Hour Type V - I -Hour 14. LmRARIES Type I or II F.R. Type II - I-Hour Type II- N Type III - I-I-Hour Type III - N Type V -I-Hour TypeV-N 15. MEDICAL OFFICES **** Type I or II F.R. Type II-I-Hour Type II - N Type III - I -Hour Type III - N Type V -I-Hour Type V-N · Add 0.5 percent to total cost for each story over three ··Deduct 11 percent for mini-warehouse ···Deduct 20 percent for "shell only" buildings .... Add 25% for hazardous or high tech occupancies $117.16 $234.32 101.50 203.00 96.74 193.49 88.39 176.78 86.65 173.30 $93.73 $132.01 65.23 91.87 59.96 84.45 71.82 101.15 67.70 95.35 49.42 69.60 67.70 95.35 61.93 87.23 $210.39 $369.1 1 192.41 337.56 144.27 253.1 1 $137.72 $270.05 100.81 197.66 95.84 187.92 106.49 208.80 10 1.16 198.36 99.98 196.04 95.84 187.92 $144.16 $277.24 111.23 213.90 105.68 203.23 120.64 232.00 112.32 215.99 108.82 209.26 104.96 201.84 II CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building Valuation Schedule OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SO. FT. 16. OFFICES Type I or II F .R. Type II-I-Hour TypeII-N Type III - I -Hour Type III - N Type V - I-Hour TypeV-N 17. PRIVATE GARAGES Wood Frame Masonry Öpen carports/covered decks/patios Uncovered decks 18. PUBLIC BUILDINGS Type I or II F .R. Type II - I -Hour Type II - N Type III - I-Hour Type III - N Type V - I-Hour Type V - N 19. PUBLIC GARAGES Type I or II F .R. Type I or II Open Parking Type II - N Type III - I-Hour Type III - N Type V - I -Hour 20. RESTAURANTS ·Type III - I-Hour Type III - N Type V - I -Hour TypeV-N · Add 0.5 percent to total cost for each story over three ··Deduct 11 percent for mini-warehouse ···Deduct 20 percent for "shell only" buildings .... Add 25% for hazardous or high tech occupancies $148.67 99.53 94.80 107.46 102.73 100.64 94.80 $37.21 41.95 25.42 25.22 $143.14 11 6.00 110.90 120.41 116.23 110.20 106.26 $80.55 60.45 46.12 60.95 54.19 55.51 $167.22 161.55 153.14 147.13 12 $247.78 165.88 157.99 179.10 171.22 167.74 157.99 $56.38 63.57 38.51 32.37 $286.29 232.00 221.79 240.82 232.46 220.40 212.51 $113.45 85.14 64.96 85.84 76.33 78.18 $225.97 218.31 206.94 198.82 CITY OF CUPERTINO Resolution 05-0~61 April 5, 200~ and O~-072IMt\y 3, 2005 Fees Effective July 1,2005 Schedule D - Building Valuation Schedule OCCUPANCY AND TYPE REMODEL COST PER SO. FT. COST PER NEW SO. FT. 21. SCHOOLS Type I or II F.R. $162.53 $257.98 Type II - I-Hour 110.94 176.09 Type III - I-Hour 118.68 188.38 Type III - N 114.15 181.19 Type V -I-Hour 111.23 176.55 Type V-N 106.11 168.43 22. SERVICE STATIONS Type II - N $87.31 $155.90 Type III - I-Hour 91.07 162.63 Type V - I-Hour 77.56 138.50 Canopies 36.38 64.96 23. STORES ·Type I or II F .R. $145.29 $191.17 Type II-I-Hour 88.87 116.93 TypeII-N 86.93 114.38 Type III - I-Hour 108.08 142.22 Type III - N 101.38 13 3.40 Type V - I-Hour 90.98 119.71 Type V - N 84.10 110.66 24. THEATERS Type I or II F.R. $145.20 $254.74 Type III - I -Hour 105.79 185.60 Type III - N 100.77 176.78 Type V -I-Hour 99.58 174.70 Type V - N 94.15 165.18 25. WAREHOUSES** Type I or II F.R. $72.20 $114.61 Type II or V-I-Hour 42.82 67.98 Type II or V-N 40.19 63.80 Type III - I -Hour 48.53 77.02 Type III - N 46.19 73.31 · Add 0.5 percent to total cost for each story over three ··Deduct 1 I percent for mini-warehouse ···Deduct 20 percent for "shell only" buildings .... Add 25% for hazardous or high tech occupancies 13 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building Valuation Schedule EOUIPMENT AND AIR CONDITIONING Commercial Residential Sprinkler Systems $ 5.26 $ 4.39 $ 3.25 RETAINING WALLS. PER SO. FT. (HEIGHT X LENGTH) AREA ABOVE GRADE Masonry Concrete $ 30.07 $ 26.46 ............................................................................... Address Changes $268.92 14 CITY OF CUPERTINO Resolution 05-056/April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building Permit Permit Valuation $1 - $3,000 $83.16 $3,001 - 25,000 $93.96 for the first $3,000 plus $10.80 for each additional $1,000 or fraction thereof, to and including $25,000. $25,001 - 50,000 $324.00 for the first $25,000 plus $8.64 for each additional $1,000 or fraction thereof, to and including $50,000. $50,001 - 100,000 $540.00 for the first $50,000 plus $6.48 for each additional $1,000 or traction thereof, to and including $100,000. $100,001 - 500,000 $851.04 for the first $100,000 plus $4.32 for each additional $1,000 or traction thereof, to and including $500,000. $500,001 -1,000,000 $2.817.72 for the first $500,000 plus $3.24 for each additional $1,000 or fraction thereof, to and including $1,000,000. $1,000,001 - $4.795.20 for the first $1,000,000 and up plus $2.16 for each additional $1,000 or fraction thereof. PLAN CHECKING Structural and Non-Structural 1.3345% of building permit fee for each plan submitted. Each additional identical repeat plan for multi-unit residential developments wil! be assessed at $34.86 each unit. Energy 48% of building permit fee for each plan submitted. Each additional identical repeat plan for multi-unit residential developments wil! be assessed at $34.86 each unit. Repeat plan checks that exceed 2 reviews wil! be charged an hourly rate at $87.14 per hour. 15 CITY OF CUPERTINO Resolution 05-056/ AprilS, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building - Electrical Fees New Residential Buildings and Remodels tbat add additional square footage The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. Permit Fee $38.37 New multi-familv residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot $.07 New single and two-familv residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $.08 For other types of residential occupancies and alterations, additions and modifications to existing residential buildings, use the UNIT FEE SCHEDULE New commercial buildings and completelv remodeled spaces not including the Area of garages, per square foot $.13 Commercial alterations and modifications to existing buildings, use the Unit fee schedule 16 CITY OF CUPERTINO Resolution 05-056/April 5, 2005 and 05-0'72/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building - Electrical UNIT FEE SCHEDULE Remodel - No additional square footage Permit Fee Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens; counter mounted cooking tops; electric ranges, self-contained room console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers washing machines; water heaters; clothes dryers; or other motor operated appliances not exceeding one horsepower (HP) in rating each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Non-Residential Appliances For residential appliances and self-contained factory-wired, non-residential appliances non exceeding one horsepower (HP), kilowatt (KW), or kilovotampere (KV A) in rating including medical and dental devices; food, beverage, and ice cream cabinets; i!1uminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Services For services of 600 volts or less and not over 200 amperes in rating, each For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each For services over 600 volts over 1,000 amperes in rating, each 17 $ 38.37 $ 4.80 $ 4.80 $ 29.43 $ 59.94 $119.88 CITY OF CUPERTINO Resolution 05-056/Apri15, 2005 and 05-0'71IMay 3, 1005 Fees Effective July 1, 2005 Schedule D - Building - Electrical USER FEE SCHEDULE (continued) Remodel- No additional square footage Signs, Outline Lighting and Marquees For signs, outline lighting systems or marquees supplied from one branch circuit, each For additional branch circuits within the same sign, outline lighting system or marquee, each Misce!1aneous Apparatus, Conduits, Conductors, and Special Circuits For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth Power Device/Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatuses, as fo!1ows: Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes (KV A), or kilovolt-amperes-reactive (KV AR): 1 unit 2 through 5 units, each additional 6 and over, each additional NOTE: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. 2. These fees include a!1 switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. 18 $23.98 $ 4.80 $27.58 $47.96 $17.99 $11.99 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building - Electrical UNIT FEE SCHEDULE (continued) Remodel- No additional square footage Busways For trolley and plug-in-type busways, each 100 feet or fraction thereof Note: An additional fee wiU be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in-type busways. No fee is required for portable tools. Receptacle, Switch and Lighting Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters. First 20 each Additional outlets, each NOTE: For multi-outlet assemblies, each 5 feet or fraction thereof may be considered as one outlet. Lighting Fixtures For lighting fixtures, sockets or other lamp holding devices First 20 each Additional fixtures, each For pole or platform-mounted lighting fixtures each For theatrical-type lighting fixtures or assemblies each 19 $7.02 $1.20 $0.73 $ 1.20 $0.73 $1.20 $1.20 CITY OF CUPERTINO Resolution 05-056/ AprilS, 2005 and 05-072lMay 3, 2005 Fees Effective July 1,2005 Schedule D - Building - Mechanical Fees New Residential Buildings and Remodels that add additional square footage. The following fees shall include all mechanical equipment in or on each building, or other mechanical equipment on the same premised constructed at the same time. New multi-familv residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot $0.07 New and single and two-familv residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $0.08 For other types of residential occupancies and alterations and modifications To existing building, use the unit fee schedule New commercial buildings and completelv remodeled spaces not including The area of garages, per square foot $0.13 Commercial alterations and modifications to existing buildings, use the unit Fee schedule 20 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005 Fees Effective July 1, 2005 Schedule D - Building - Mechanical Fees UNIT FEE SCHEDULE Remodels - No additional Square Footage Permit Fee For the repair of alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, V A V boxes, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this Code. For each air-handling unit, Ale units, heat pumps to and including 10,000 cubic feet per minute, including ducts attached thereto. Does not apply to central type. NOTE: This fee shall not apply to an air-handling unit that is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a pennit is required elsewhere in this Code. For each air-handling unit Ale unit, heat pump over 10,000 cfm For the installation or relocation of each commercial or industrial-type Hood For the installation of each residential hood that is served by a mechanical exhaust, including the ducts for such hood For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit For each ventilation fan connected to a single duct For the installation or relocation of each forced air or gravity type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h 21 $ 38.37 $ 13.19 $ 10.26 $ 17.82 $137.87 $ 10.26 $ 14.31 $10.26 $ 7.02 $ 17.55 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005 Fees Effective July 1, 2005 Schedule D - Building - Mechanical Fees UNIT FEE SCHEDULE (continued) Remodels - No additional Square Footage For the installation or relocation of each floor furnace, including vent For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h (29.3 kw) For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu/h For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h For each appliance or piece of equipment regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this Code 22 $ 14.31 $ 14.31 $ 7.02 $ 14.31 $ 26.19 $ 35.91 $ 53.46 $89.37 $ 10.26 CITY OF CUPERTINO Resolution 05-056/ApriI5, 2005 and 05-072lMay 3, 2005 Fees Effective July 1, 2005 Schedule D - Building - Plumbing Fees New Residential Buildings and Remodels that add additional square footage The following fees shall include all plumbing equipment in or on each building, or other plumbing equipment on the same premises constructed at the same time. New multi-familv residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same, per square foot $0.07 New single and two-familv residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $0.08 For other types of residential occupancies and alterations and modifications To existing building, use the unit fee schedule New commercial buildings and completely remodeled spaces not including The area of garages, per square foot $0.13 Commercial alterations and modifications to existing buildings, use the unit fee schedule 23 CITY OF CUPERTINO Resolution 05-0561 AprilS, 2005 and 05-0721May 3, 2005 Fees Effective July 1, 2005 Schedule D - Building - Plnmbing Fees UNIT FEE SCHEDULE Remodel- No additional Square Footage Permit Fee $38.37 For instaUation, alteration or repair of water piping water treating equipment $ 9.00 For repair or alteration of drainage or vent piping, floor, area, condensate piping $ 9.00 For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection therefor) $ 9.00 For each gas piping system of one (!) to four (4) outlets $ 5.40 For each gas piping system of five (5) or more, per outlet $ 1.20 For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen type grease traps functioning as fixture traps For each building sewer, sanitary sewer, and each trailer park sewer $17.99 $ 9.00 $21.58 Kitchen type trap and/or system Stonn/rainwater systems per drain $ 9.00 $10.79 For each water heater and/or vent Water service $ 9.00 $ 9.00 Re-pipe per fixture 24 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005 Fees Effective July 1,2005 Schedule D - Building - Plumbing Fees UNITS FEE SCHEDULE Remodel- No additional Square Footage (continued) For each lawn sprinkler system on anyone meter, including backflow protection devices therefor $13.19 Five (5) or more, each $ 1.08 For atmospheric type vacuum breakers/backflow not included in item 1 I to 5 over 5 each additional $10.79 $ 2.16 For each cesspool $67.14 $33.57 For each private sewage disposal system 25 CITY OF CUPERTINO Resolution 05-056/Apri15, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule D OTHER BUILDING INSPECTION FEES Private Swimming Pools For new private, residential, in-ground, swimming pools for single-family and multi-family occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each including plan check and energy. For other types of swimming pools, therapeutic whirlpools, spas and alterations to existing swimming pools, use the UNIT FEE SCHEDULE Temporary Power Service For a temporary service power pole or pedestal including all pole or pedestal-mounted receptacle outlets and appurtenances, each. For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas tree sales lots, fireworks stands, etc. each. Inspection outside of the normal business hours (minimum charge two hours) Inspection for which no fee is specifically established (minimum charge one hour) Re-inspection - A fee may be assessed for each inspection or re-inspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. 26 $540.00 $62.1 0 $11.88 $90.72/hr. $68.04/hr. $176.18 CITY OF CUPERTINO Resolution 05-056/ AprilS, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation Recreation classes and excursion fees shall be determined as follows: Classes 1. Determine the maximum hourly rate paid to instructor. 2. Multiply the instructor's hourly rate by the number of class meetings. 3. Determine the minimum number of participants and divide into the instructor's cost. 4. Add indirect overhead percent - 32%. 5. Add 20% to establish non-resident fee. 6. Add cost for specialized equipment or supplies. Special conditions: For classes taught by contract instructors, the indirect overhead is only added to the City's percentage. Excursions 1. Transportation cost divided by the number of participants plus overhead transfer. 2. Add 20% to establish non-resident fee. 3. Add any admission cost, supplies or leadership cost. Additional factors that mav be used to determine the class or excursion user fee: The total number of participants in a given activity may generate additional revenue whereby the total program cost may be reduced. Classes that traditionally have waiting lists may have the user fee increased. Programs in competition with adjacent cities or the private sector may require fees to be increased or decreased to remain competitive. 27 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-0nlMay 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation Facility Use Fee Schedule (Staff Use Only) CLASSIFICATIONS: Group I: City of Cupertino activities that are open to the public. Official city sponsored programs. Group II: Clubs with 5 I % resident membership, recreation programs and events with full or affiliated city co-sponsorship and open to the public. Group III: Programs and events sponsored by Cupertino based non-profit recreation, education or community service organization with 5 I % resident participation. These organizations must show an official structure and status. Group IV: Private, special interest or business groups for functions not open to the public. These functions would include parties, banquets, receptions, industrial conferences, seminars, trade shows, etc. Group V: Programs and events sponsored by non-resident non-profit recreation, education or community service organization. These organizations must show official structure and status. Group VI: Cupertino Businesses using the Cupertino Room of the Quinlan Community Center for promotional and business related purposes other than negotiation or direct sale. 28 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005 Fees Effective July 1,2005 Schedule E - Recreation Quinlan Commnnity Center ROOM RENTAL SCHEDULE PER HOUR Cupertino Room Group II Group III Group IV Group V Group VI Mondav - Thursdav N/A $30 $140 $50 $265 Fridav - Sundav $17 $80 $230 $140 $265 Classroom Group II Group III Group IV Group V N/A $20 $45 $25 $12 $60 $90 $75 Conference Room Group II Group III Group IV Group V N/A $10 $40 $25 $12 $25 $60 $50 Security Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Securitv Deposit A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. Quinlan Community Center Cupertino Room - Groups IV, VI $750 All Other Rooms - Group IV $300 Group II, II, V - All Rooms $300 29 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072lMay 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation Monta Vista Recreation Center Creekside Park Building Room Rental Schedule Per Hour Monta Vista Recreation Center Creekside Park Building Multi-Purpose Group ill Group IV Group V N/A N/A N/A N/A N/A N/A Classroom Group II Group III Group IV Group V $15 $15 $30 $20 $15 $15 $30 $20 Conference Room/Kitchen Group II Group ill Group IV Group V $15 $15 $25 $20 N/A N/A N/A N/A Securitv Staff Security staffis required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Securitv Deposit A security deposit shall be required for Groups ill, IV, V, and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. 30 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation Senior Center Annual Mernbership Newsletter - Mailed Resident $22 $5.00 Non-Resident $27 $5.00 Room Rental Schedule Per Hour Reception Room Evenings and Weekends - Group II Group III Group IV Group V $12 $80 $230 $140 Classroom. Conference Room. Arts & Crafts Room. Bav Room Group II Group III Group IV Group V $12 $60 $90 $75 - Senior Center rooms are not available for rental Monday through Thursday 8:00 a.m. to 10:00 p.m. and Friday, 8:00 a.m. to 5:00 p.m. Securitv Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Securitv Deposit A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. Cupertino Senior Center Reception Hall- Group IV $750 All Other Rooms - Group IV $300 Group II, III, V - All Rooms $300 31 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-071lMay 3, 2005 Fees Effective July 1,2005 Schedule E - Recreation OUTDOOR F AClLITlES Memorial SoftbaU Field Cupertino residents/businesses only Non-Residents Field can be reserved for a maximum of 2 hours THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING IN CUPERTINO LEAGUES $25.00 $40.00 Field preparation (includes dragging, watering, chalking, and bases) $36.50 Field Attendant (2 hour minimum) Field Attendant is required any time lights or field preparation is requested. $ 8.25/hr. Lights (in the evening) $ 5.00/hr. Memorial Park Amphitheater Cupertino residentIResident business Non-resident/Non-resident business $55.00 $75.00 Memorial Park Gazebo Cupertino residentIResident business Non-resident/Non-resident business $55.00 $75.00 Picnic Areas (Daily Rate) Cupertino residents Cupertino business Non-residents Non-resident business Electricity at Memorial or Linda Vista Park $ 55.00 $ 75.00 $ 80.00 $100.00 $ 25.00 Sports Field Fees Adult Leagues (two hour minimum) Deposit $50.00/hr $600.00 Youth Leagues (Participant/Season) $11.00 R $22.00NR 32 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation BLACKBERRY FARM PICNIC GROUNDS General Admission: Weekends & Holidavs Weekdavs ADULT (13 years and over) Resident $8.00 Non-Resident $9.00 Resident $5.00 Non-Resident $6.00 CHILD (6 through 12) $5.00 $6.00 $4.00 $5.00 Group Rates: Weekends & Holidavs Weekdavs Adult (13 & Older) Child (6-12) Adult (13 & Older) Child (6-12) 100-500 persons $8.50 $6.50 $5.75 $4.75 501-1,000 $8.00 $6.00 $5.50 $4.50 1,001 or more $7.50 $5.50 $5.25 $4.25 Full Summer Pass Available any day the park is open: Resident Non-Resident Adult (13 & Up) $85.00 $110.00 Child (6 to 12 years old) $60.00 $70.00 Family Pass (2 people) $140.00 $170.00 Family Pass (3 people) $150.00 $180.00 Family Pass (4 people) $160.00 $190.00 Family Pass (5 people) $170.00 $200.00 Family Pass (6 people) $180.00 $210.00 33 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation to-Day Pass Available any 10 days the park is open: Resident Non-Resident Adult (13 and older) $40.00 $45.00 Child (6 to 12 years old) $32.50 $36.00 Children under 6 are free when accompanied by their parents BLACKBERRY FARM GOLF COURSE Weekends Weekdavs Resident Non-Resident Resident Non-Resident 9-Holes $14.00 $16.00 $12.00 $14.00 Junior & Senior $14.00 $16.00 $ 11.00 $13.00 Second 9 Holes (an $12.00 $14.00 $11.00 $13.00 players) An groups and tournaments pay the full rate (Cupertino resident stin applies). Staff is authorized to set merchandise fees according to current cost. BLACKBERRY FARM RETREAT CENTER Conference Room (9:00 a.m. to 5:00 p.m., with meals) $69.95/person 34 CITY OF CUPERTINO Resolution 05-0561 April 5, 2005 and 05-0'72/May 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation BLACKBERRY FARM GOLF COURSE Annual Rate (Weekdays Only) Adults (17-61) Cupertino Residents Non-Residents $850 $1,000 Semi-Annual Rate (Weekdays Only) Cupertino Residents Non-Residents $455 $540 Super-Annual Rates (Good on Weekends & Holidays) Cupertino Residents Non-Residents $1,000 $1,125 Super-Semi Annual Rates (Good on Weekends & Holidays) Cupertino Residents Non-Residents $500 $600 Quick Passes (Ten-play card for tbe price of nine) Cupertino Resident Weekday Cupertino Resident Weekend $99 $117 Non-Resident Weekday Non-Resident Weekend $117 $135 Green Fees Cupertino Resident Weekday Cupertino Resident Weekend $12 $14 Non-Resident Weekday Non-Resident Weekend $14 $16 35 Jr/Sr $775 $925 $415 $495 $1,000 $1,125 $500 $600 $90 $117 $108 $135 $11 $14 $13 $16 CITY OF CUPERTINO Resolution 05-056/ April 5, 2005 and 05-072/May 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation Sports Center Day Passes ~ Resident Non-Resident $7.00 $10.00 Monthly Passes One Month Single $55.00 $65.00 One Month Couple $75.00 $90.00 One Month Family $95.00 $115.00 Annual Passes One Year Juniors «17) $300.00 $330.00 One Year Single $425.00 $455.00 One Year Couple $810.00 $880.00 One Year Family $905.00 $980.00 One Year Senior $380.00 $405.00 EnroUment Fee AU $50.00 $50.00 ADDITIONAL CONDITIONS I. The Cupertino Tennis Club wi!1 be charged $10.00/hour during primetime and $6.00/hour per court during non-primetime for aU C.T.C. sponsored activities other than U.S.T.A.leagues and practices. 2. AU competitors in C.T.C./U.S.T.A. leagues participating at the Sports Center must purchase an annual pass. 3. Individuals may purchase a ten pack of day passes, $60.00 Resident, $90.00 Non-Resident. 4. Specials wi!1 be offered on an on-going basis. Child Watcb Fees One visit: Ten visits: One Month Pass: $5.00 $45.00 $100.00 Teen Center Rental Rate Deposit $100.00 $750.00 Overtime Rate $200.00 first hour; $100.00 each half hour after Residents: Daily Pass Annual Pass $.00 $.00 Non-Residents: Daily Pass $5.00 36 CITY OF CUPERTINO Resolution 05-0561 April 5, 2005 and 05-072lMay 3, 2005 Fees Effective July 1, 2005 Schedule E - Recreation Community Hall ROOM RENTAL SCHEDULE PER HOUR Group II Group III Group IV Group V Group VI Mondav - Thursdav $40 $40 $150 $60 $275 Fridav - Sunday $90 $90 $240 $150 $275 Security Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter. This charge wil! be deducted from the security deposit. This applies to all City facilities. Securitv Deposit A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit wil! be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time. Community Hall Groups IV, VI Groups II, III, V $750 $300 37