Loading...
B-2018-1337 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO:13-2018-1337 5 RESULTS WAY CUPERTINO,CA 95014(357 20 042) SHAH&ASSOCIATES INC POWAY,CA 92064 OWNER'S NAME: DATE ISSUED:01/24/2019 OWNER'S PHONE: PHONE NO:(858)668-2828 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class a Lie.#920446 Contractor SHAH&ASSOCIATES INC Date 02/28/2019 X BLDG _ELECT _PLUMB I hereby affirm that I am licensed under the provisions of Chapter 9(commencing —MECH—RESIDENTIAL X COMMERCIAL with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. JOB DESCRIPTION: AT&T-CELL MODIFICATION-REMOVE AND REPLACE(3) I hereby affirm under penalty of perjury one of the following two declarations: ANTENNAS;REMOVE AND REPLACE(6)RRU'S;INSTALL(3)NEW i. I have and will maintain a certificate of consent to self'-insure for Worker's RRU'S;REMOVE AND REPLACE EQUIPMENT WITHIN EXISTING Compensation,as provided for by Section 3700 of the Labor Code,for the SHELTER. performance of the work for which this permit is issued. /, ! have read this application and state that the above information is correct.I agree to comply with all city and county ordinances APN Number: Occupancy Type: and state laws relating to building construction,and hereby authorize 357 20 042 A(Tenant Improvements) representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save indemnify and-keep harmless the City of Cupertino against liabilities,judgments,costs,and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue the apt said City in consequence the comply ing this permit. intWITHIN 180 DAYS OF PERMIT ISSUANCE OR Additionally,the applicant understands.and will comply with all non-point source regulations per the Cgino Municipal Code,Section 9,18. 180 DAYS FROM LAST CALLED INSPECTION. Sign- Date 01/24/2019 Issued by:Jasmine Archbold Date:01/24/2019 OWNER-BUILDER DEC '• ' ON I hereby affirm that I am exempt from the Contractor's License Law for one of the RE-ROOFS: following two reasons: All roofs shall be inspected prior to any roofing material being installed.If a roof is i. I,as owner of the property,or my employees with wages as their sole installed without first obtaining an inspection,I agree to remove all new materials for compensation,will do the work,and the structure is not intended or offered for inspection. sale(Sec.7044,Business&Professions Code) z. I,as owner of the property,am exclusively contracting with licensed Signature of Applicant: contractors to construct the project(Sec.7044,Business&Professions Code), Date:01/24/2019 • I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER 1. 1 have and will maintain a Certificate of Consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance,as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code,for the performance of the work for which this California Health&Safety Cade,Sections 25505,25533,and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the 3. I certify that in the performance of the work for which this permit is issued,l Health&Safety Code,Section 25532(a)should I store or handle hazardous shall not employ any person in any manner so as to become subject to the material. Additionally,should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I Worker's Compensation laws of California. If,after making this certificate of will maintain compliance with the Cupertino Munici,,,,.. Code,Chapter 9.12 and exemption,I become subject to the Worker's Compensation provisions of the the Health&Safety � APPLICANT CERTIFICATION Date:01/24/2019 ` I certify that I have read this application and state that the above information is COS i .CTION LENDINGNCY correct.I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lendi g agency for the performance relating to building construction,and hereby authorize representatives of this city of work's for which this permit is issued(Sec.3097,Civ C.) to enter upon the above mentioned property for inspection purposes. (We)agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments,costs,and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally,the applicant understands and will comply with all-non-point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code,Section 9.18. I understand my plans shall be used as public records, ° Licensed Signature Date 01/24/2019 Professional