Loading...
CC 01-15-2019 Item No. 16 Storm Drain Ballot Initiative - PresentationCC 01-15-2019 Item No. 16 1 CC 01-15-2019 Item No . 16 Why This Initiative Needs to Continue Now • It 's about the money -1992 level revenues vs 2019 and beyond needs Resources Required for Storm Water O&M • Labor ($179,000) • Supervision -25% of a position • MW 1/11-95% of a position • MW I PT -50% of a position • Other ($297,000) 2 CC 01-15-2019 Item No . 16 Resources Required for Storm Clean Water • Labor ($317,000) • Supervision -1 .45 positions • Staff /Inspection -45% of a position • Other ($404,000) 3 CC 01-15-2019 Item No. 16 Why SCI Consulting Group • Thorough understanding of storm water and funding challenges • 130 successful ballot measures with 94% success rate 4 CC 01 -15-2019 Item No. 16 Recommendation: • Proceed with the next steps needed to bring a fee study back to Council of < $48/yr Questions? 5