97-050 Ken Leek Storm drain installation Homestead & De Anza Project 97-104CONTRACT FOR PUBLIC WORKS
This CONTRACT made on September 3, 1997 by the CITY OF CUPERTINO, a municipal
corporation of the State of California, hereinafter called CITY, and KEN LEEK COMPANY hereinafter
called CONTRACTOR.
IT IS HEREBY AGREED by CITY and CONTRACTOR as follows:
1. THE CONTRACT DOCUMENTS. The complete contract consists of the following contract
documents:
a. Notice to Contractors, Proposal, Time of Completion, Estimated Quantities, Noncollusion Affidavit,
Bidder Qualification Form, Subcontractors Form and Signature Form.
b. Standard Specifications, General Provisions and Special Provisions.
c. Plans and Specifications for STORM DRAIN INSTALLATION -HOMESTEAD ROAD
@ DE ANZA BL VD., PROJECT NO. 9 7-104.
d. Faithful Performance Bond and Materials Bond.
e. Insurance Agreement, Certificate of Insurance, Endorsement of Primary Insurance, Additional Insured
Endorsement, Endorsement of Aggregate Limits of Insurance per Project, Waiver of Subrogation
Endorsement Worker's Compensation Insurance and Notice of Policy Cancellation Endorsement.
f This Contract for Public Works.
All of the above documents are intended to cooperate so that any work called for in one and not mentioned
in the other, or vice versa, is to be executed the same as if mentioned un all of said documents. The
documents comprising the complete contract are sometimes hereinafter referred to as the Contract
Documents. In case of conflict between the Plans and the Specifications on the one hand, and this Contract
on the other, the Plans and Specifications shall prevail.
2. THE WORK. CONTRACTOR agrees to furnish all of the tools, equipment, apparatus,
facilities, labor, transportation and materials necessary to perform and complete in a good and working
order, the work of STORM DRAIN INSTALLATION, as called for, and in the manner designated in, and
in strict conformity with, the Plans and Specifications prepared by the Engineer and adopted by CITY,
which Plans and Specifications are entitled, respectively, STORM DRAIN INSTALLATION -
HOMESTEAD ROAD @ DE ANZA BLVD., PROJECT 97-101, and which Plans and Specifications are
identified by the signatures of the parties to this Contract. It is understood and agreed that said tools,
equipment, apparatus, facilities, labor, transportation and materials shall be furnished, and that said work
shall be performed and completed as required in said Plans and Specifications under the sole direction of
CONTRACTOR, but subject to the inspection and approval of CITY, or its representative. CITY hereby
designates as its representative for the purpose of this Contract the Engineer, Mr. Bert J. Viskovich.
3. CONTRACT PRICE. CITY agrees to pay, and CONTRACTOR agrees to accept, in full
payment for the work above agreed to be done, the sum of $116,281.00 (ONE HUNDRED SIXTEEN
THOUSAND, TWO HUNDRED EIGHTY ONE DOLLARS AND NO CENTS) subject to additions
and/or deductions as provided in the Contract Documents, per Exhibit A attached hereto.
CONTRACT PAGE 1 OF 6
4. DISPUTES PERTAINING TO PAYMENT FOR WORK. Should any dispute arise
respecting the true value of the work done, or any work omitted, or any extra work which
CONTRACTOR may be required to do, or respecting the size of any payment to
CONTRACTOR during the performance of this Contract, said dispute shall be determined either
by reference to the Unit Prices bid, if applicable, or in accordance with agreement of prices, if
applicable, or in accordance with the agreement of the parties, or in accordance with Section 6,
paragraph "f' of the General Provisions.
5. PERMITS, COMPLIANCE WITH LAW. CONTRACTOR shall obtain and bear all
expense for all necessary permits, licenses and easements for the construction of the project, give
all necessary notices, pay all fees required by law, and comply with the laws, ordinances and
regulations relating to the work and to the preservation of the public health and safety.
6. INSPECTION BY THE CITY. CONTRACTOR shall at all times maintain proper
facilities and provide safe access for inspection by CITY to all parts of the work, and to the shops
wherein the work is in preparation. Where the Specifications require work to be specially tested
or approved, it shall not be tested or covered up without timely notice to CITY of its readiness
for inspection and without the approval thereof or consent thereto by CITY. Should any such
work be covered up without such notice, approval, or consent, it must, if required by CITY, be
uncovered for examination at CONTRACTOR'S expense.
7. EXTRA OR ADDITIONAL WORK AND CHANGES. Should CITY at any time
during the progress of the work require any alterations, deviations, additions or omissions from
the Plans and Specifications or the Contract Documents, CITY shall have the right to do so, and
the same shall in no way affect or make void the Contract, but the cost or value thereof will be
added to, or deducted from, the amount of the Contract price, as the case may be, by a fair and
reasonable valuation, which shall be determined either by reference to the Unit Prices bid, if
applicable, the Standard Specifications, or in accordance with the agreement of the parties. No
extra work shall be performed or change be made except by a written order from CITY, duly
authorized by resolution of the City Council, and by all agencies whose approval is required by
law, stating that the extra work or change is authorized, and no claim for an addition to the
Contract sum shall be valid unless so ordered.
8. CHANGES TO MEET ENVIRONMENTAL REQUIREMENTS. CITY shall have the
right to make changes in this Contract during the course of construction to bring the completed
improvements into compliance with environmental requirements or standards established by State
and Federal statutes and regulations after the Contract has been awarded or entered into.
CONTRACTOR shall be paid for such changes either by reference to the Unit Prices bid, if
applicable, or in accordance with the agreement of the parties.
9. TERMINATION, AMENDMENT OR MODIFICATION. This Contract may be
terminated, amended or modified, with the mutual consent of the parties. The compensation
payable, if any, for such termination, amendment or modification, shall be determined either by
reference to the. Unit Price bid, if applicable, the Standard Specifications, or in accordance with
the agreement of the parties.
CONTRACT PAGE 2 OF 6
10. TIME FOR COMPLETION. All work under this Contract shall be completed in
accordance with the Time for Completion section in the Proposal and the Specifications of this
project. If CONTRACTOR shall be delayed in the work by the acts or neglect of CITY, or its
employees, or those under it by contract or otherwise, or by changes ordered in the work, or by
strikes, lockouts by others, fire, unusual delay in transportation, unavoidable casualties or any
causes beyond CONTRACTOR'S control, or by delay authorized by CITY, or by any cause
which CITY shall determine justifies the delay, then the time of completion shall be extended
accordingly. This paragraph does not exclude the recovery of damages for delay by either party
under other provisions in the Contract Documents.
11. INSPECTION AND TESTING OF MATERIALS. CONTRACTOR shall notify CITY
a sufficient time in advance of the manufacture, production or testing of materials to be supplied
under this Contract, in order that CITY may arrange for mill, factory or laboratory inspection and
testing of same.
12. TERMINATION FOR BREACH OR INSOLVENCY. If CONTRACTOR should be
adjudged a bankrupt, or should make a general assignment for the benefit of creditors, or if a
receiver should be appointed on account of insolvency, or if CONTRACTOR or any
subcontractor should violate any of the provisions of the Contract, CITY may serve written notice
upon CONTRACTOR and CONTRACTOR'S surety of its intention to terminate the Contract.
Such notice shall contain the reasons for CITY'S intention to terminate the Contract, and unless
within ten (10) days after serving of such notice, such violation shall cease and satisfactory
arrangements for corrections thereof be made, the Contract shall, upon the expiration of said ten
(10) days, cease and terminate. In the event of any such termination, CITY shall immediately
serve notice thereof upon CONTRACTOR'S surety and CONTRACTOR, and the surety shall
have the right to take over and perform the Contract; provided, however, that, if the surety within
fifteen (15) days after the serving upon it of notice of termination does not give CITY written
notice of its intention to take over and perform the Contract, or does not commence performance
thereof within thirty (30) days from the date of the serving of such notice, CITY may take over
the work and prosecute the same to completion by contract, or by any other method it may deem
advisable, for the account and at the expense of CONTRACTOR, and CONTRACTOR AND
CONTRACTOR'S surety shall be liable to CITY for any excess cost occasioned by CITY
thereby, and in such event CITY may, without liability for so doing, take possession of, and utilize
in completing the work, such materials, appliances, plant and other property belonging to
CONTRACTOR as may be on the site of the work and necessary therefor.
13. THE CITY'S RIGHT TO WITHHOLD CERTAIN AMOUNTS AND MAKE
APPLICATION THEREOF. In addition to amounts which CITY may retain under other
provisions of the Specifications until final completion and acceptance of all work covered by the
Contract, CITY may withhold from payment to CONTRACTOR such an amount or amounts as
in its judgment may be necessary to pay just claims against CONTRACTOR or subcontractors for
labor and services rendered and materials furnished in and about the work.
CONTRACT PAGE 3 OF 6
City may apply such withheld amount or amounts to the payment of such claims in its discretion.
In doing so, CITY shall be deemed the agent of CONTRACTOR, and any payment so made by
CITY shall be considered as a payment made under the Contract by CITY to CONTRACTOR,
and CITY shall not be liable to CONTRACTOR for any payment made in good faith. Such
payment may be made without prior judicial determination of the claim or claims. With respect to
any retention of payment by CITY to ensure performance of the Contract, CONTRACTOR will
be entitled to substitute securities as provided in Section 4590 of the California Government Code
as more fully described in CITY'S Notice to Contractors.
14. NOTICE AND SERVICE THEREOF. Any notice from one party to the other under
this Contract shall be in writing, and shall be dated and signed either by the party giving such
notice, or by a duly authorized representative of such party. Any such notice shall not be effective
for any purpose whatsoever unless served in the following manner: (a) if the notice is given to
CITY, either by personal delivery thereof to the Engineer of CITY, or by depositing same in the
United States mails, enclosed in a sealed envelope, addressed to CITY OF CUPERTINO; 10300
TORRE AVENUE; CUPERTINO, CA 95014; postage prepaid and certified; (b) if the notice is
given to CONTRACTOR, either by personal delivery thereof to CONTRACTOR, or to
CONTRACTOR'S duly authorized representative at the site of the project, or by depositing same
in the United States mails enclosed in a sealed envelope, addressed to 1973 CORDILLERAS
COURT, REDWOOD CITY, CA 94062, postage prepaid and certified; and (c) if notice is given
to CONTRACTOR'S surety or any other person, either by personal delivery thereof to
CONTRACTOR'S surety or other person, or by depositing same in the United States mails,
enclosed in a sealed envelope, addressed to CONTRACTOR'S surety or person, as the case may
be, at the address of CONTRACTOR'S surety or the address of the person last communicated by
such person to the party giving the notice, postage prepaid and certified.
15. ASSIGNMENT OF CONTRACT. Neither the Contract, nor any part thereof, nor
moneys due or to become due thereunder, shall be assigned by CONTRACTOR without the prior
written approval of CITY.
16. COMPLIANCE WITH SPECIFICATIONS OF MATERIALS. Whenever in the
Specifications, any material or process is indicated or specified by patent or proprietary name, or
by name of manufacturer, such Specifications must be met by CONTRACTOR, unless CITY
agrees in writing to some other material, process or article offered by CONTRACTOR which is
equal in all respects to the one specified. It shall be CONTRACTOR'S responsibility to prove
equality of any such material, process or article offered as a substitution to the one(s) specified.
17. WORKER'S COMPENSATION INSURANCE AND EMPLOYER'S LIABILITY
INSURANCE. CONTRACTOR shall take out and maintain during the life of this Contract
Worker's Compensation Insurance and Employer's Liability Insurance for all of
CONTRACTOR'S employees employed at the site of the project. In case any work is sublet,
CONTRACTOR shall require any and all subcontractors similarly to provide Worker's
Compensation and Employer's Liability Insurance for all of the latter's employees unless such
employees are covered by the protection afforded to the CONTRACTOR.
CONTRACT PAGE 4 OF 6
In signing this Contract CONTRACTOR makes the following certification, required by Section
1861 of the Labor Code: "I am aware of the provisions of Section 3700 of the Labor Code which
requires every employer to be insured against liability for worker's compensation or to undertake
self insurance in accordance with the provisions of the Labor Code, and I will comply with such
provisions before commencing the performance of the work of this Contract."
18. ACCIDENT PREVENTION. Precaution shall be exercised at all times for the protection
of persons (including employees) and property. The safety provisions of applicable laws, building
codes and construction codes shall be observed. Machinery, equipment and other hazards shall be
guarded or eliminated in accordance with the safety provisions of the Construction and Safety
Orders issued by the Industrial Accident Commission of the State of California.
19. CONTRACTOR'S RESPONSIBILITY FOR THE WORK. CONTRACTOR shall
not be responsible for the cost of repairing or restoring damage to the work caused by Acts of
God. NEVERTHELESS, CONTRACTOR shall, if the insurance premium is a separate bid item,
obtain the insurance to indemnify CITY for any damage to the work caused by Acts of God.
"Acts of God" shall include only the following occurrences or conditions and effects: earthquakes
and tidal waves, when such occurrences or conditions and effects have been proclaimed a disaster
or state of emergency by the President of the United States or by the Governor of the State of
California, or were of a magnitude at the site of the work sufficient to have caused a proclamation
of disaster or state of emergency having occurred in a populated area. Subject to the foregoing,
CITY shall not, in any way or manner, be answerable or suffer loss, damage, expense or liability
for any loss or damage that may happen to said building, work, or equipment or any part thereof,
or in, on, or about the same during its construction and before acceptance.
20. CONTRACTOR'S GUARANTEE. CONTRACTOR unqualifiedly guarantees the
first-class quality of all work and of all materials, apparatus and equipment used or installed by
CONTRACTOR or by any subcontractor or supplier in the project which is the subject of this
Contract, unless a lesser quality is expressly authorized in the Plans and Specifications, in which
event CONTRACTOR unqualifiedly guarantees such lesser quality; and that the work as
performed by CONTRACTOR will conform with the Plans and Specifications or any written
authorized deviations therefrom. In case of any defect in the work, materials, apparatus or
equipment, whether latent or patent, revealed to CITY within one (1) year of the date of
acceptance of completion of this Contract by CITY, CONTRACTOR will forthwith remedy such
defects without cost to CITY.
CONTRACT PAGE 5 OF 6
P.O. No.
21. DEFERRED ALTERNATE SELECTION. The City reserves the right for the term of
the Contract, the deferred selection of none, any or all alternate bid items at the bid price. The
alternates chosen would be for any sites currently under construction or to be constructed in the
future.
IN WITNESS WHEREOF, the parties have executed this Contract, in duplicate, the day and
year first hereinabove written.
CITY OF CUPERTINO:
By: KA, � 4, 4 0 �g7, �7/,,7y
61�11 fu Yo
Attest:
City CIA
Date: �, 7` , 1997
City Clerk
APPROVED AS%fO FO
CONTRACTOR:
J
By:
Notary acknowledgment is required. If a
corporation, corporate seal and corporate
notary acknowledgment and Federal Tax
I.D. are required. If not a corporation a
Social Security No. is required.
-50-m 33z� 7
Social Security #
q43Jg6107
Federal Tax I.D. #
Contractor's License No. y - Ll
/ DONNA P. LEEK
r '
City Attorney ''nn s`�� a Comm, # 1103664 ►r�n
NOTARY PUBIIC•CAUIFbRNIA UI
San Mateo County
My Comm Expires June 30; 2000
PROJECT NAME & NUMBER: STORM DRAIN INSTALLATION— HOMESTEAD ROAD @
DE ANZA BL VD., PROJECT # 97-104.
CONTRACTOR'S NAME & ADDRESS:
CONTRACT AMOUNT: $116,281.00
ACCOUNT NUMBER: 215-9620-953-003
FILE NO: 97,556
KEN LEEK COMPANY
1973 CORDILLERAS COURT
REDWOOD CITY, CA 94062
CONTRACT PAGE 6OF6
ALL-PURPOSE ACKNOWLEDGMENT
F• State of California
•
' County of 01 &i -t✓ u SS.
I°
On q/'7 m before me, h rl q Z. eek' '
(DATE) NOTARY)
I personally appeared
SIGNER(S)
10 --personally known to me - OR- ❑ proved to me on the basis of satisfactory 1
evidence to be the person(s) whose name(s) •
is/are subscribed to the within instrument and f
• acknowledged to me that he/she/they executed •
' the same in his/her/their authorized I
I capacity(ies), and that by his/her/their •
signature(s) on the instrument the person(s), I
• or the entity upon behalf of which the •
Iperson(s) acted, executed the instrument. I
° WITNESS my hand and official seal. •
DONNA P, LEEK
Comm, # 1103664 r�ryry •
NOTARY PUBLIC • CALIFORNIA UI u
• s ,. San Mateo County
I� M� CBmfn. Ex Iles June 30, 2000 � NOTARY'S SIGNATURE •
° INFORMATION
OPTI NAL
O O NATION
The information below is not required by law. However, it could prevent fraudulent attachment of this acknowl-
edgment to an unauthorized document. •
CAPACITY CLAIMED BY SIGNER (PRINCIPAL) DESCRIPTION OF ATTACHED DOCUMENT
e i
❑ INDIVIDUAL
❑ CORPORATE OFFICER °
I
TITLE(S) TITLE OR TYPE OF DOCUMENT
° ❑
PARTNER(S) °
❑ ATTORNEY-IN-FACT
• ❑ TRUSTEE(S) •
NUMBER OF PAGES
• ❑ GUARDIAN/CONSERVATOR •
❑ OTHER:
DATE OF DOCUMENT
SIGNER IS REPRESENTING:
° NAME OF PERSON(S) OR ENTITY(IES) °
OTHER f
•
�•®oma•®•s•�••o•�• �•�o�o�o-•®s.�•®• ®•�•�
APA 1/94 VALLEY -SIERRA, 800-362-3369
SII T
STORM DRAIN INSTALLATION - HOMESTEAD ROAD @ DE ANZA BLVD.
PROJECT 97-104
TO: THE DIRECTOR OF PUBLIC WORKS, CITY OF CUPERTINO, STATE OF CALIFORNIA
Dear Sir:
In compliance with the plans and specifications furnished for the work of the STORM DRAIN
INSTALLATION - HOMESTEAD ROAD @ DE ANZA BLVD. in the City of Cupertino,
PROJECT NO. 97-104, the undersigned, hereby declare that I have read the proposal
requirement, visited the sites, and examined the specifications. I, the undersigned, hereby propose
to do all work required to complete the work in accordance with the plans and specifications for
the prices set forth in the following schedule. I further understand that said prices include all
costs including, but not limited to, local, state and federal taxes, and transportation costs.
I, the undersigned, also understand that the quantities shown below are estimates only, being
given as a basis for comparison of bids. The City of Cupertino does not state that the actual
amount of work will correspond but reserves the right to increase or decrease the amount of any
class or portion of the work or to omit items or portions of work deemed unnecessary by the
Engineer.
The City of Cupertino reserves the right to unilaterally determine and award the contract to any
qualified bidder based on the most advantageous proposal, to reject any or all bids, or to waive
any irregularities in the procedures.
The work to be done consists of furnishing all labor, methods of process, tools, machinery and
material required to complete the STORM DRAIN INSTALLATION - HOMESTEAD ROAD
@ DE ANZA -BL VD., PROJECT 97-104 as described in the Special Provisions.
I, the undersigned, shall diligently prosecute the work to completion as scheduled. I further
understand that I shall pay to the City of Cupertino the sum of One Hundred Fifty Dollars
($150.00) per day, for each and every day services are not completed as scheduled and/or
specified.
In the event of discrepancies between the written unit price and the numerical unit price, the
written price shall govern.
BID PROPOSAL PAGE 1 OF 8
Bid
Est.Qty.
Unit
Item
Unit
Item
Price
Total
1
254 L. F.
Install 36" R.C.P. Storm Line
$ > > o /L.F.
$
Per L.F.
2
40 L.F.
Install 15" RCP Storm Line
$ G l /L. F.
$ S;G 0 C� • C U
Per L.F.
3
3 ea
Storm Drain Manhole
$ �} , G>C L U �% /EA
$
Per EA.
4
1 ea
Rebuild/Modify Catch Basin
S Z� -0 /EA
$ 2� ''Soo , On
Per EA.
5
2 ea
P1ug.Existing 15" R.C.P.
Per EA.
Total Bid
$
ALTERNATIVE BID:
1
155 L.F.
Install 36" R.C.P. Storm Line
by boring
$ /L. F.
S
Per L. F.
BID PROPOSAL PAGE 2 OF 9
I, the undersigned, agree that if this proposal is accepted, I will enter into a contract with the City
of Cupertino to provide all necessary machinery, tools, apparatus, and other means of
construction and to do all the work specified in the contract in the manner and time specified.
I, the undersigned, declare that this bid is made without connection with any person, firm, or
corporation making a bid for the same work, and is in all respects fair, and without collusion or
fraud.
I, the undersigned, recognize that the Director of Public Works of the City of Cupertino will
reserve the right to establish the priority of one job over another and each starting date where
conflict of construction schedules occur.
Attached hereto is the required certified check or bid bond in the amount of $ (�, (e�'� u , as
required by law and the Notice to Bidders. (10% of bid amount)
BID PROPOSAL PAGE 3 OF 8
NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY
BIDDER AND SUBMITTED WITH BID
I, the undersigned, being first duly sworn, depose and say that I am
of k 11 / —e -?,k ro -
(Business Title) (Business Name)
the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any
undisclosed person, partnership, company, association, organization, or corporation. The bid is
genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited
any other bidder to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone
shall refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the bidder or any
other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other bidder, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract. All statements contained in the bid are true and, further, the
bidder has not, directly or indirectly, submitted the bid price or any breakdown thereof, or
contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any
fee to any corporation, partnership, company, association, organization, bid depository, or to any
member or agent thereof to effectuate a collusive or sham bid.
BID PROPOSAL PAGE 4 OF 8
BIDDER QUALIFICATION FORM
In further compliance with the specifications furnished, I, the undersigned, submit the following
statements as to my experience and qualifications to perform this work as a part of this proposal.
We have been in business under the present name for / �7 years.
Our experience in work comparable with that required by the proposal contract is 5
years operating under the following different name(s).
iCi D,\ E -r f tiJo rr �,�
My California Contractor's License Number is '� ,� y �"I
The classification of my Contractor's License is A 4 C 1 -1 1
The expiration date for my Contractor's License is 4 ` 3 0 — I
(This Section for City use only) y�
The abovp inf lation has been verified by
on
1-71
G
Contractors State License Board (800) 321-2752 or (408) 277-1244.
******************************************************************************
Where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder
to be licensed in accordance with the laws of the State of California, however, at the time the
contract is awarded the contractor shall be properly licensed.
BID PROPOSAL PAGE 5 OF 8
BIDDER HISTORY OF WORT{
The following is an example of work similar in character to that required in the proposed contract
which our organization or personnel in our organization has completed within the past three (3)
years.
For Whom Contact
Year Location Type of Work Performed Phone No. Amount
jT/G% 62'
1 76 0
f�I L f O �
5a Cf ocy/al
61
-110f
Jc d Vii/ OfliicC/Z i ?i 7� 6P>, 7G' S`' oU
r1�
i/U 6/
hu les,
G -e) 17 ► f��
/'1 a rl
C�iroh✓� ��C�<-c
BID PROPOSAL PAGE 6 OF 8
SUBCONTRACTOR'S FORM
The subcontractor(s), as defined in the General Provisions and in Section 7026 of the California
Business and Professions Code, that I propose to hire to perform any of the work for this project
in an amount in excess of one-half of one percent (0.5%) of the total bid are listed below. Only
those listed below shall perform work on this project and each of them has been provided with a
full and complete set of plans and specifications for this project by the bidder.
1. Name rC 1^,-�-- Contractor's License No.
Address & phone no.
Work to be Performed
2. Name
Address & phone no.
Work to be performed
3. Name
Address & phone no.
Work to be performed
4. Name
Address & phone no.
Work to be performed
5. Name
Address & phone no.
Work to be performed
6. Name
Address & phone no.
Work to be performed
Contractor's License No.
Contractor's License No.
Contractor's License No.
Contractor's License No.
Contractor's License No.
BID PROPOSAL PAGE 7 OF 8
BIDDER'S SIGNATURE FORM
IF YOU ARE AN INDIVIDUAL, SO STATE. IF YOU ARE A COMPANY OR A CO-
PARTNERSHIP, STATE THE COMPANY NAME AND LIST THE NAMES OF ALL
INDIVIDUAL CO-PARTNERS COMPOSING THE COMPANY. IF YOU ARE A
CORPORATION, STATE THE LEGAL NAME OF THE CORPORATION AND THE
NAMES OF THE PRESIDENT, SECRETARY -TREASURER, AND MANAGER. THE
CORPORATE SEAL MUST BE AFFIXED TO THIS FORM. ENTER THE NAME OF YOUR
BUSINESS ON THE LINE OPPOSITE THE APPROPRIATE BUSINESS TYPE.
PE
NAME OF
BUSINESS U ffA- k C "'1 �i r X'� �� f 1�iC�C� r8USINESSS
CORPORATION:
CO -PARTNERSHIP:
INDIVIDUAL: �- fqr6, 1 f:7 U-ck 7 r.
JOINT VENTURE:
Name and Shmature of Bidder:
(Describe)
q_
(Print or type name)
Date:
Address (mailing & location): l rcl rI I UAco C+
I�0w0o d CA Co
Telephone Number:
Acknowledgment of all addenda received is required by circling each addendum number.
1 2 31 4 5 6 7 8 9 10
A5 •,� —ncnE, '�Re r Hc'rrnic i�ccJ)
SID PROPOSAL PAGE 8 OF 8
RECORDING REQUESTED BY
\IAO, \�
':
City of Cupertino
WHEN RECORDED MAIL TO
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
DOCUMENT: 14087649
111111111111111111111111
Titles:l / Pages: 3
Fees—.+ No Fees
Taxes...
Copies..
AMT PAID
BRENDA DAVIS RDE # 008
SANTA CLARA COUNTY RECORDER 3/09/1998
Recorded at the request of 2:38 PM
City
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
CERTIFICATE OF COMPLETION AND NOTICE OF ACCEPTANCE OF COMPLETION,
STORM DRAIN, HOMESTEAD/DE ANZA, PROJECT 97-104
SEPARATE PAGE PURSUANT TO GOVT. CODE 27316.6
City of
Cupertino
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
PUBLIC WORKS DEPARTMENT
CERTIFICATE OF COMPLETION
F.11011
NOTICE OF ACCEPTANCE OF COMPLETION
STORM DRAIN, HOMESTEAD/DE ANZA, PROJECT 97-104
NOTICE IS HEREBY GIVEN THAT I, Bert J. Viskovich, Director of Public Works and City
Engineer of the City of Cupertino, California, do hereby certify that the work and improvements
hereinafter described, the contract for doing which was entered into by and between the City of
Cupertino and Ken Leek Company on September 3, 1997, in accordance with the plans and
specifications for said work, have been completed to my satisfaction and acceptance is made as of
March 6, 1998.
That said work and improvements consisted of furnishing all labor,' materials, tools, and
equipment required to complete said project, all as more particularly described in the plans and
specifications for said project.
Date: March 6, 1998
Printed on Recycled Paper
VERIFICATION
I have reviewed this Certificate of Completion and to the best of my knowledge, the
information contained herein is true and complete.
I verify under penalty of perjury under the laws of the State of California, that the
foregoing is true and correct.
Executed on the 9th day of March 1998 at Cupertino, California.
Deputy City Clerk
City of Cupertino