Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
85-013 Jennings-McDermott-Heiss Engineering Services Median on Foothill Blvd. between Stevens Creek Blvd. and Cristo Rey Dr
RESOLUTION NO. 6522 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AUTHORIZING EXECUTION OF AGREEMENT WITH JENNINGS-MCDERMOTT-HEISS, INC. PROVIDING FOR ENGINEERING SERVICES FOR THE PLANS AND SPECIFICATIONS FOR MEDIAN DESIGN ON FOOTHILL BOULEVARD BETWEEN STEVENS CREEK BOULEVARD AND CRISTO REY DRIVE WHEREAS, the City is desirous of engaging the services of a consultant to prepare the plans and specifications for the median design on Foothill Boulevard between Stevens Creek Boulevard and Cristo Rey Drive; and WHEREAS, the firm of Jennings-McDermott-Heiss, Inc. is qualified and willing to provide the necessary services; and WHEREAS, an agreement between the City of Cupertino and Jennings-McDermott-Heiss, Inc. outlining the terms and conditions of the required services, has been presented to the City Council; and said agreement having been approved by the Director of Public Works and the City Attorney; NOW, THEREFORE, BE IT RESOLVED, that the Mayor and the City Clerk are hereby authorized to execute the agreement herein referred to in behalf of the City of Cupertino. PASSED AND ADOPTED at a regular meeting of City of Cupertino this 18th day of _ following vote: Vote Members of the City Council AYES: Gatto, Plungy, Sparks, Johnson NOES: None ABSENT: Rogers ABSTAIN: None APPROVED: the City March /s/ Phil N. Johnson _ Mayor, City of Cupertino ATTEST: /s/ Allison Villarante Deputy City Clerk Council of the , 1985 by the California Council of Civil Enginew &L and Sumeyoa (For Office 400 Capitol Mall, Suite 232, Sacramento, CA (916) 444-3060 Form BM 82-1A © 1973 by California Council of Civil Engineers and Land Surveyors J.M.H. #2659 STANDARD FORM OF AGREEMENT BETWEEN CLIENT AND CONSULTANT AGREEMENT entered into at Cupertino, California made this day of , 19 , by and between City -of Cupertino hereinafter called "client," 925 Reqeft Street, San Jose hereinafter called "consultant." Client intends to Improve Foothi 11 B1 vd . from Stevens Creek Blvd, to Cristo Rey Drive with a new median island including certain drainage improvements and street widening at Poppy. hereinafter called "project." The present record owner is: Name: City of Cupertino Address: The lender is (if, none, state below): Name: none Address-. Client and consultant for mutual consideration hereinafter set forth, agree as follows: A. Consultant agrees to perform the following services: Prepare plans per letter proposal to City Dated March 5, 1985 B. Client agrees to compensate consultant for such services as follows: $18,000.00 plus cost for prints Costs for Cartwright Aerial Survey of $3050-00 and for Terratec , Inc of $2500.00 C. Client has read and understands all the standard Provisions of Agreement set forth on the reverse hereof and the Exhibits hereto, and agrees all Standard Provisions and Exhibits are a part [ of this Agreement and are binding on client. client's initials D. Client and consultant agree that the late payment charge provided for in Paragraph 33 of the Standard Provisions of Agreement shall be 1% per month [ client's initials IN WITNESS WHEREOF, the parties hereto have accepted, made and executed this agreeme n the terms, conditions, and provisions above stated, the day and year first above written. / CONSULTANT: V By (Si ature Name WILLIAM E. HEISS (Print) Title Vice President ATTEST: Name Phil X�Xncnn (Print) Title Mayor / JMH Civil Engineering City Engineer's Office City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 Dear Travice: JENNINGS - McDERMOTT - HEISS, INC. SUITE 200 286-4555 925 REGENT STREET -SAN JOSE, CA. 95110 Land Planning Land Surveying March 5, 1985 circ PUL -u; V1. �0--\ Attn: Mr. Travice Whitten Re: Our #2659 Foothill Blvd. Medians We appreciate the City providing us the opportunity to submit a proposal for the median design work on Foothill Blvd. from Stevens Creek Blvd. to Cristo Rey Drive. We have examined the site in the field and reviewed the City's aerial maps wherein you have delineated the proposed median system. We propose the following scope of work in order to complete the necessary plans and special provisions for the project. A new topographic base map would be prepared based upon an aerial photo- grammetric flight. These drawings would consist of plan profile sheets at 1" = 40' scale with one foot contours. This should provide sufficient data to study the drainage on Foothill Blvd. and design the necessary street widening in the vicinity of Poppy, both on the East and West side. Where additional spot grades are necessary, our field crew will complete this work. The aerial flight would be done by Cartwright Aerial Surveys with field control by our own crew. Since the amount of asphalt to be removed represents a significant amount of the cost for the project, it is felt a detailed boring log would be important. Terratech, Inc. has been contacted and would provide the necessary boring services with one hole every 100 feet at the price if $2,500.00. Our office would complete the design work and prepare the improvement plans utilizing both the City's aerial photos and the above photogrammetric maps. The medians would be designed per the City criteria as outlined on the referenced photo maps. Our work would also include preparation of street widening plans on the west side of Foothill Blvd. at Poppy. We understand that the City will be acquiring the two lots necessary for the widening operation. In examining the property in the field, we feel the City may have to provide for the additional street work on Poppy to insure a reasonable grade and transition for the new widening. We feel it may also be necessary to re -construct a portion of the driveway entrances to both of these lots. Obviously, this connot be determined until the detailed survey has been completed. The widening on the East side of Poppy would also be incorporated into the plans, if the parties there agreed to providing the necessary right-of-way. Our costs do not include preparation of the right-of-way documents but, would do so at an additional fee of $300.00 if required. In the event a retaining wall is necessary in order to permit this widening, a retaining wall design would be required unless the City has a "boiler plate" design that could be utilized. March 5, 1985 Page 2 If not, an additional $500.00 could be necessary for the retaining wall design. In conjunction with the median work, we would complete a drainage design for the island. Incorporated into this design would be evaluation of possible modifications in the drainage system along Foothill Blvd. in order to divert water to Foothill Blvd. which presently drains into the Sunnyview Manor project. It would be understood that the City would provide our office with improvement plans and record maps for all projects abutting the project. This information would be necessary in order to complete our horizontal and vertical control work for the aerial flight and for the median design. It would also be very important in evaluating the drainage of the area. Our fee for providing the above scope of work would be $18,000.00. In addition to this amount, an additional $3,050.00 must be budgeted for Cartwright Aerial Surveys and $2,500.00 to Terratech, Inc. Thank you again for considering us for this work. We look forward to working with the City on this project. Very truly yours, ROBERT G. McDERMOTT 114, C/U/40- WILLIAM E. HEISS RGM W EH/nr JENNINGS - McDERMOTT - HEISS, INC. CIVIL ENGINEERING - LAND PLANNING