Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
85-021 Kier & Wright Civil Engineers - Widening of De Anza Blvd. between Stevens Creek and Bollinger
Out of cupertino 10300 Torre Avenue Cupertino, California 95014 Telephone: (408) 252-4505 OFFICE OF THE CITY CLERK May 20, 1985 Kier_ and Wright Civil Engineer and Surveyors, Inc. 3350 Scott Boulevard, Building 22 Santa. Clara, CA 95051 P.O. Box 580 Cupertino, California 95015 AGREEMENT ENGINEERING SERVICES FOR DE ANZA BOULEVARD WIDENING BETWEEN STEVENS CREEK BOULEVARD AND BOLLINGER We are enclosing to you one (1) copy of the Agreement by and between the City of Cupertino and Kier and Wright Civil Engineer and Surveyors, Inc., which has been fully executed by City Officials, along with one (1) copy of,Resolution No. 6562, which was enacted by the City Council of the City of Cupertino, at their regular meeting of Monday, May 6, 1985. Since y,) DOROCORNEL US CITY CLERK CITY OF CUPERTINO DC/so encl. cc: Department of Public Works RESOLUTION NO. 6562 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AUTHORIZING EXECUTION OF AGREEMENT WITH KIER AND WRIGHT PROVIDING FOR ENGINEERING SERVICES FOR THE WIDENING OF DE ANZA BOULEVARD BETWEEN STEVENS CREEK BOULEVARD AND BOLLINGER ROAD WHEREAS, the City is desirous of engaging the services of a consultant to prepare the plans and specifications for the widening of De Anza Boulevard between Stevens Creek Boulevard and Bollinger Road; and WHEREAS, the firm of Kier and Wright is qualified and willing to provide the necessary services; and WHEREAS, an agreement between the City of Cupertino and Kier and Wright outlining the terms and conditions of the required services, has been presented to the City Council; and said agreement having been approved by the Director of Public Works and the City Attorney. NOW, THEREFORE, BE IT RESOLVED that the Mayor and the City Clerk are hereby authorized to execute the agreement herein referred to in behalf of the City of Cupertino. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 6th day of May 1985 by the following. vote: Vote Members of the City Council AYES: Gatto, Plungy, Rogers, Sparks, Johnson NOES: None ABSENT: None ABSTAIN: None ATTEST: /s/ Dorothy Cornelius City Clerk APPROVED: /s/ Phil N. Johnson Mayor, City of Cupertino CALIFORNIA COUNCIL OI CIVIL ENGINEERS Antl LANDSDRVEVORS Form BM 79-1A © 1973 by California Council of Civil Engineers and Land Surveyors (For Office STANDARD FORM OF AGREEMENT BETWEEN CLIENT AND CONSULTANT adopted 1973, revised in 1975,1978 and 1979, by the California Council of Civil Engineers and Land Surveyors, 1107 Ninth St., Suite 811, Sacramento, California 95814 THIS AGREF,MF�VT, rqd at Cupertino on the ((,, day 19-U—, by and between City of Cupertino hereinafter called "client," and Kier & Wright Civil Engineers and Surveyors. Inc hereinafter called "consultant," is as follows: The client intends to widen De Anza Boulevard on the westerly side between Stevens Creek Boulevard and Bollinger Road hereinafter called the "project." The present record owner is: Name: City of Cupertino Business Address: 10300 Torre Avenue, Cupertino, CA 95014 Residence: The client and consultant for mutual consideration hereinafter set forth, agree as follows: A. Consultant agrees to perform the following services: 1. Topographic and utility survey 2. Utility line potholing 3. Right of Way acquisition plats and descriptions including title rPportR 4. Plans and Specifications and estimates for project improvements 5. Project construction staking B. Client agrees to compensate consultant for such services as follows: 1. Topographic survey $12,500.00 2. Potholing (Not to Exceed $2,500.00) 3. Right of Way Plats and Descriptions $8,000.00 4. Plans and Specifications - 5.4% of Construction Cost (±$27,000.00) 5. Construction STaking - $8,000.00 [Note]—Under provisions of this agreement, a late payment FINANCE CHARGE will be computed at the periodic rate of 0.833% per month, which is an ANNUAL PERCENTAGE RATE of 10%, and will be applied to any unpaid balance commencing 30 days after the date of the original invoice. [ Note ] —Under provisions of this agreement, client agrees to limit the liability of consultant in accordance with §28 of the Standard Provisions set forth upon the reverse side. C. The standard provisions set forth upon the reverse side are incorporated hereinto and made a part of this agreement. IN WITNESS WHEREOF, the parties hereto have accepted, made and executed this agreement upon the terms, conditions, and provisions above stated and on the reverse side hereof, the day and year first above written. AP RVED TO O1ZM: CONSULTAN CL t t rney t2 P,,, By B (Signature) C l y Of up r t i-Abanature) Name F -Lay UL Richard T. Kier Nam )� � p' s'© (Print) ATTEST: (fit) President rr.:,.,. KIER � WRIGHT Civil Engineers Surveyors, Inc. Proposal April 30, 1985 Mr. Bert Vidovich City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 RE: De Anza Boulevard Improvements, Cupertino Dear Bert: As requested, we are pleased to offer this proposal for the civil engineering services for the widening of De Anza Boulevard on the west side between Stevens Creek Boulevard and Bollinger Road. We have met with Travis Whitten to review the scope of services re- quired and would propose to perform the following services as out- lined below: Scope of Services 1. Prepare a topographic and utility survey along the westerly side of De Anza Boulevard for the preparation of plans of the improvements. Fee $12,500.00 2. Perform "potholing" or verification of utility depths for potential conflicts involved in street widening. Budgetted at Not to Exceed $ 2,500.00 3. Prepare plats and description for additional right of way along the west side of De Anza Boulevard including furnishing necessary title reports. Fee $ 8,000.00 4. Prepare improvement plans, specifications and cost estimates for widening of De Anza Boulevard. Fee - 5.4% of estimated construction cost $27,000.00 3350 Scott Boulevard, Building 22 • Santa Clara, California 95051 • (408) 727.6665 Mr. Vert Vidovich April 30, 1985 Page Two 5. Furnish construction staking for utility relocation and construction of curb and gutter. Fee $ 8,000,00 As you recall several years ago, we completed the median island curb work in this reach of De Anza Boulevard and feel that our firm is familiar with the area and in an excellent position to provide our services in a timely manner to the City of Cupertino. If you have any questions or would like to discuss this in further detail, please give me a call. Sincerely, KIER & WRIGHT Richard T. Kier RTK/ljm n Cit -4 of Cupwti 10300 Torre Avenue Cupertino, California 95014 Telephone: (408) 252-4505 OFFICE OF THE CITY CLERK March 29, 1986 Kier and Wright 3350 Scott Boulevard, Building -22 Santa Clara.,..California— .9501 r SUPPLEMLENTAL AGREEMENT =a ---7-/ P.O. Box 580 Cupertino, California 95015 We are enclosing to you for your files one (1) copy of the Supplemental Agreement by and between the City of Cupertino and Kier and Wright which has been fully executed by City Officials, along with one (1) copy of Resolution No. 6788, which was enacted by the City Council of the City of Cupertino, at their regular meeting of Monday, March 17, 1986. Sincerely, DOROTHY CORNELIUS CITY CLERK CITY OF CUPERTINO DC/so encl. cc: Department of Public Works RESOLUTION NO. 6788 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AUTHORIZING EXECUTION OF SUPPLEMTAL AGREEMENT WITH I= & WRIGHT FOR ENGINEERING SERVICES FOR THE WIDENING OF DE ANZA BOULEVARD WHEREAS, the City Council on May 6, 1985 authorized the execution of an agreement with Kier & Wright for engineering services for the design of the widening of De Anza Boulevard; and WHEREAS, subsequently the scope of work for said project has been expanded; and WHEREAS, submitted to the City Council is a supplemental agreement to cover the addition to the original scope of work. NOW, ARE, BE IT RESOLVED that the Mayor and the City Clerk are hereby authorized to execute the supplemental agreement between the City and Kier & Wright. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 17th day of March , 1986 by the following vote: Vote Members of the City Council AYES: Gatto, Johnson, Plungy, Sparks, Rogers NOES: None ABSENT: None ABSTAIN: None /s/ Barbara A. Rogers Mayor, City of Cupertino /s/ Dorothy Cornelius City Clerk KIER Civil Engineers WRIGHT Surveyors, Inc. Job No. 85086 February 14, 1986 Mr. Travice Whitten City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 RE: Engineering Contract - De Anza Boulevard Dear Travice: As we discussed, we are requesting that our contract dated May 6, 1985 with the City of Cupertino for the design of the widening of De Anza Boulevard be increased due to the following increase in the Scope of Services: Additional plans, surveys and staking required for the east side of De Anza Boulevard from Bollinger to Kirwin, the realignment of the McClellan Road/Pacifica intersection and medians on Stevens Creek east and west of De Anza, the northeast corner of De Anza and Stevens Creek and the west side of De Anza in the area of Bob's Big Boy. The present contract items are shown below along with the requested increased fees to cover the additional services. ITEM DESCRIPTION PRESENT FEE REQUESTED FEE 1. Topographic and utility survey $ 12,500.00 $ 20,000.00 2. Utility line potholing, (Not To Exceed) 2,500.00 2,500.00 (NTE) 3. Right—of—way plats and descrip- tions 8,000.00 10,000.00 4. Plans and specifications (5.4% of construction cost) 27,000.00 36,000.00 5. Construction staking 8,000.00 ----------- 16,000.00 ----------- TOTAL $ 58,000.00 $ 84,500.00 3350 Scott Boulevard, Building 22 • Santa Clara, California 95051 • (408) 727-6665 Mr. Travice Whitten February 14, 1986 Page Two If you have any questions regarding our request, please give me a call. Sincerely, KIER & WRIGHT Richard T. Kier RTK/ljm Approved as to form: z/ I -f, i, //14, City Attorney CITY OF CUPERTINO Mayor Attest: 7 G`''am`"� �'• �'rr��i�. City Cl k Date: �s���