Loading...
85-050 MPA Designs - Landscape architectural services on Foothill Blvd. Reso 6692City of Cupertino (ATTACHMENT) AGREEMENT 0162,25 NO. BY THIS AGREEMENT made and entered into on the by and between the CITY OF CUPERTINO (Hereinafter ref das CITY) and ay 79 Name (1) MPA DESIGN Address 562 Mission Street,__ City (2) (Hereinafter referred as CONTRACTOR), in consideration of heirFmutual,covenants, the parties hereto agree as follows: CONTRACTOR Shall provide or furnish the following specified services and/or materZrp1��Phone (3_466 i LANDSCAPE als: ARCHITECTURAL SERVICES FOR FOOTHILL BOULEVARD STREET IMPROVEMENTS DELIVERY: EXHIBITS: The following attached exhibits hereby are made part of this Agreement: EXHIBIT A TERMS The services and/or materials furnished under this Agreement shall commence aux u on exeeu and shall be completed before tion of agreemeu COMPENSATION For the full performance of this Agreement, CITY shall pay CONTRACTOR: Twenty—three Thousand Dollars ($233000) plus direct costs as specified GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees frin Exhibit A. all damage and liability of every nature, including all costs of defending any is rs, caused by or ployo Page 4. per- formance of this agreement. City shall not be liable for acts of Contractor in performing services described he om any and Insurance,arising out of the Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance before commencing any services under this a reement. Said Certificate shall be subject to the herein. Director of Administrative Services, g � approval of City's Non -Discrimination. No discrimination shall be made in the employment of persons under this agreement because of the race, color, national origin, ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in that the relation of master and servant exists between City and undersigned. At all times Contractor shall b be an independent contractor and Contractor is not authorized to bind the City to any contracts or other o the sense executing this agreement. Contractor certifies that no one who has or will have any financial ' e deemed to agreement is an officer or employee of City, obligations in interest under this Changes. This agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY shall be: Name Travice Whitten Address 10300 Torre Avenue Department Public Works Cupertino, CA 95014 Telephone (408) 252-4505 This Agreement shall become effective upon its execution by CITY, in witness thereof Agreement the day and year first written above. �he parties have executed this K4, �- III APPROVALS Departme ad ate ; L� C l�. RESOLUTION NO. 6692 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AUTHORIZING EXECUTION OF AGREEMENT WITH MPA DESIGN PROVI- DING FOR LANDSCAPE ARCHITECTURAL SERVICES FOR FOOTHILL BLVD. STREET IMPROVEMENTS WHEREAS, the City is desirous of engaging the services of a consultant to prepare the plans and specifications for landscape architectural services for Foothill Boulevard street improvements; and WHEREAS, the firm of MPA Design is qualified and willing to provide the necessary services; and WHEREAS, an agreement between the City of Cupertino and MPA Design outlining the terms and conditions of the required serviceshas been presented to the City Council; and said agreement having been approved by the Director of Public Works and the City Attorney; NOW, THEREFORE, BE IT RESOLVED, that the Mayor and the City Clerk are hereby authorized to execute the agreement herein referred to in behalf of the City of Cupertino. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino, this 21 day of October 1985, by the following vote: VOTES MEMBERS OF THE CITY COUNCIL AYES: Gatto, Plun. y, NOES: None ABSENT: Rogers ABSTAIN: None ATTEST: /s/Dorothy Cornelius CITY CLERK Sparks, Johnson APPROVE: /s/Phil Johnson MAYOR, CITY OF CUPERTINO MPA Design Landscape Architects and Urban Designers October 4, 1985 Mr. Travice Whitten Asst. City Engineer City of Cupertino Dept. of Public Works 10300 Torre Ave. Cupertino, CA 95014 562 Mission Street San Francisco, CA 94105 415 543.4664 Subject: Foothill Boulevard Proposal City of Cupertino Dear Travice: EXHIBIT A MPA Design is very pleased to submit this fee proposal for landscape architectural services for the City of Cupertino, Foothill Boulevard street improvements. We have studied the proposed street improvement plans and are familiar with the components of your proposal. After meeting with both you and Mr. Bruce Bane at the City of Los Altos, MPA Design is anxious to participate in a quality public improvement which is also a joint effort between the Cities of Cupertino and Los Al to s . Based on this, I have outlined the major components to be reviewed as part of the design: A. Foothill Boulevard Goals: 1. To create an attractive landscape experience which compliments and blends with existing Foothill Expressway, Los Altos. 2. To provide a low maintenance and low water consumption landscape. 3. To design the Foothill Boulevard entry to the City of Cupertino which is compatible with similar existing city boulevards. 4. Create a safe driving environment through use of small to moderate size trees which at maturity will not grow massive trunks, thereby eliminating potential hazards to motorists. Travice Whitten October 4, 1985 5. Maintain safe open views at intersections for crossing traffic. 6. Discourage pedestrian traffic from crossing Foothill Boulevard except at marked intersections. B. Desiqn Parameters 2 The entire Boulevard and adjacent areas require study from North I-280 exit to Stevens Creek in order to achieve a logical sequence of landscaping and adequate open space allocation. Furthermore, the pedestrian movement systems require study to verify modifications to allow for normal flow of pedestrians between neighborhoods north and south of Foothill Boulevard. The following is an initial list of design parameters: 1. Provide median landscaping from the northbound I-280 exit to Stevens Creek Boulevard. Include landscaping at perimeter areas northwest and southwest of Poppy Drive and southeast of Vista Knoll Boulevard. 2. Provide pedestrian access across median at intersections where determined necessary and approved by City review. 3. Use drought tolerant trees, shrubs, and groundcovers which are compatible with native vegetation and which will require little or no irrigation water two to four years after planting. 4. Provide 100% coverage using automatic spray irrigation system (no drip irrigation). 5. Provide typical City of Cupertino sign at Cristo Rey Drive. 6. Provide planting and cobble rock paving at median noses to be compatible with other City of Cupertino medians. 7. Trees selected shall have small trunk at maturity to reduce the potential hazard to motorists. 8. Regrade median as necessary to enhance roadway and maintain visual access. Travice Whitten 3 October 4, 1985 9. Drain medians into proposed catch basins. Scope of Work Our research of the project materials and subsequent preparation of this proposal suggests the following major areas of work: 1. Coordination of utilities installation between Jennings, McDermott, Heiss Civil Engineers and Land Planners; California Water Service Company; and the City of Cupertino. 2. Landscape architectural services including: approved walks, cobble rock paving, City of Cupertino sign, earthwork and topsoil, irrigation, and planting. Items not included in scope of work: Roads, curbs, drainage, lighting, street signage, surveys, soil testing, base maps. Services MPA Design includes the following services in this proposal: I. Schematic Design A. Based on established program and order of magnitude construction budget, prepare a schematic plan showing special paving, pedestrian walks, and general plant areas and tree masses. B. Estimate of probable construction cost. II. Design Development A. Based on approved schematic drawings and construction budget, prepare design development drawings showing: 1. Special Paving. 2. Pedestrian Walks. 3. Conceptual Landscape Grading. 4. Plant Material Types. B. Prepare estimate of probable construction cost. Travice Whitten October 4, 1985 III. Contract Documents A. Based on approved design development drawings and construction budget, prepare construction drawings and specifications. 1. Working Drawings a. Dimension and Grading Plan: establishment of horizontal control of landscape elements and establishment of finish grades in landscape areas. b. Landscape Construction Details such as: cobble rock paving, pedestrian paving (approved), City of Cupertino sign. c. Planting Plan and Details. d. Irrigation Plan and Details. 2. Specifications IV. Construction Consultation A. Site visits B. Review of shop drawings, samples, and other submittals. Compensation Our proposed fee for landscape architectural services for Schematic, Design Development, and Contract Documents will be $23,000. Construction Consultation will be figured on a time and materials basis at time of construction. Direct costs such as printing, reproduction, freight, delivery charges, transportation, and long distance calls will be reimbursed at cost plus 10% above the lump sum fee. 4 Travice Whitten October 4, 1985 Thank you for your interest in MPA Design. We hope this proposal provides the information you require. If we can clarify any information or provide supplemental information to you, please feel free to contact us. Very truly yours, MPA Design Michael Painter President do/hm 000475 Q.4 W. K'("' David W. Nelson Project Manager k' - Cit -4 of Cuperti"o 10300 Torre Avenue P.O. Box 580 Cupertino, California 95014 Cupertino, California 95015 Telephone: (408) 252-4505, - OFFICE OF THE CITY CLERK March 17, 1986 MPA Design 562 Mission Street San Francisco, CA 94105 AGREEMENT - SUPPLEMENTAL AGREEMENT - FOOTHILL BOULEVARD - STREET IMPROVEMENTS We are enclosing to you for your files one (1) copy of Supplemental Agreement by and between the City of Cupertino and MPA Design, which has been fully executed by City Officials, along with one (1) copy of Resolution No. 6776, which was enacted by the City Council of the City of Cupertino, at their.regular meeting of Monday, March 3, 1986. Since y DOROTHY CORNELIUS CITY CLERK CITY OF CUPERTINO DC/so encl. cc: Department of Public Works RESOLUTION NO. 6776 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERI7NO AUTHORIZING EXECUTION OF SUPP== AGREEN= WITH MPA DESIGN PROVIDING FOR LANDSCAPE ARCHITECTURAL SERVICES FOR F00lLIILL BOULEVARD STREET IMPROVEMENTS. WHEREAS, the City Council on October 21, 1985 authorized the execution of an agreement with MPA Design for landscape architectural services for the Foothill Boulevard median project; and WHEREAS, the City desires to retain the services of MPA Design to also perforin site inspections during the construction of the project; and WHEREAS, submitted to the City Council is a supplemental agreement for inspection services all as more fully outlined in said agreement. NOW, THEREFORE, BE IT RESOLVED that the Mayor and the City clerk are hereby authorized to execute the agreement herein referred to in behalf of the City of Cupertino. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 3 day of March , 1986 by the following vote: Vote Members of the City Council Ate: Gatto, Johnson, Plungy, Sparks, Rogers NOES: None ABSENrI': None ABSTAIN: None /s/ Barbara A. Rogers Mayor, City of Cupertino ATTEST: /s/ Dorothy Cornelius City Clerk 1 MPA Design Landscape Architects 562 Mission Street and Urban Designers San Francisco, CA 94105 415 543-4664 January 22, 1986 Mr. Travice Whitten City of Cupertino Dept. of Public Works 10300 Torre Ave. Cupertino, CA. 95014 Subject: Foothill Boulevard Stgreet Improvements Consultation Fee Proposal Dear Travice: Thank you for requesting our participation for construction consul- tation for the Foothill Boulevard Street Improvements. Our scope of work as consultant includes, but is not limited to the following: 1. Attending the pre -construction meeting to meet the contractor and answer his questions. 2. Review submittals and shop drawings for compliance with plans and specifications. 3. Make one plant materials inspection at the place of growth and/or on the project site for size, variety, condition, defects, or injury. 4. Make two site inspections: 1. Soil preparation, finish grading, and plant material inspection. 2. Punch list inspection of planting prior to beginning of contractor's maintenance period. 5. Prepare change orders with required graphics. January 22, 1986 Mr. Travice Whitten 6. Final inspection of entire project to insure compliance with plans and specifications. Due to the potential for change of scope and number of site visits required, we are proposing to perform the work on a time and materials basis according to the following billing rates, to a maximum billing of $3,000: Rate Per Hour Principal $95.00 Senior Associate 68.00 Associate 60.00 Project Manager 55.00 Senior Designer 55.00 Senior Staff 50.00 Intermediate Staff 45.00 Junior Staff 35.00 Word Processors 42.00 The following miscellaneous expenses will be billed at cost plus 10%, in addition to the time card maximum: Reproduction and photography Travel: This includes coach air fare, accommodations, meals, parking, car rental, or mileage at $.205 per mile Long distance telephone expense Freight and messenger services Computer time Itemized postage and xeroxing Any work requiring our irrigation consultant will be billed in addition to our work. The above rates will be in effect through December 1986. January 22, 1986 Mr. Travice Whitten 3 If this proposal is acceptable to you, please sign one copy and return it to us. Sincerely, MPA Design 14dii Michael Painter President Qa4WALA) David W. Nelson Project Manager Approved as to form: City Attorney APPROVED AND ACCEPTED City of Cupertino By: 2 me (Title) Date: Attest: