80-023 Sedway / Cooke Consultants - EIR for Seven Springs Ranch Development(ATTACHMENT)
e
City of Cupertino
AGREEMENT NO.
BY THIS AGREEMENT made and entered into on the 2nd day of February 19 81
by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and
Name (1)_ Sedway/Cooke (2)
Address 325 Pari fi c Avenue City San Francisco Zip asci i i Phone 413-0966
(Hereinafter referred as CONTRACTOR), inconsideration of their mutual covenants, the parties hereto agree as follows:
CONTRACTOR Shall provide or furnish the following specified services and/or materials:
DELIVERY:
EXHIBITS: The following attached exhibits hereby are made part of this Agreement:
Exhibit A: Scope of Work
Exhibit B: Disbursement Schedule
Exhibit C: Labor cha e$$ f x work in a cess of A reement
TERMS The services and/or materials furnisriedr in1r 1s Agreement shah commence oK
and shall be completed before six weeks aftercompletion of task performed by traffic consultant
and geologic/seismic safety consultant. Said contractors performing work based upon
COMPENSATION For the full performance of this Agreement, CITY shall pay CONTRACTOR: separate contracts.
A total of $34,000, to be disbursed based upon Exhibit B.
GENERAL TERMS AND CONDITIONS
Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and
all damage and liability of every nature, including all costs of defending any claim, caused by or arising out of the per-
formance of this agreement. City shall not be liable for acts of Contractor in performing services described herein.
Insurance. Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance
before commencing any services under this agreement. Said Certificate shall be subject to the approval of City's
Director of Administrative Services.
Non -Discrimination. No discrimination shall be made in the employment of persons under this agreement because of
the race, color, national origin, ancestry, religion or sex of such person.
Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense
that the relation of master and servant exists between City and undersigned. At all times Contractor shall be deemed to
be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in
executing this agreement. Contractor certifies that no one who has or will have any financial interest under this
agreement is an officer or employee of City.
Changes. This agreement shall not be assigned or transferred without the written consent of the City. No changes or
variations of any kind are authorized without the written consent of the City.
CONTRACT CO-ORDINATOR and representative for CITY shall be:
Name James H. Sisk Department Planning & Development
Address 10300 Torre Avenue Cupertino, CA 95014 Telephone 252-4505
This Agreement shy
AgreerKnt the day
CONT A�TOI�
Byj
Title Princip
APPROVAI S
).ecome effective upon its execution by CITY, in witness thereof, the parties have executed this
d year first written above.
CI F CUPERTIN_O: f /
e Planning Director
Exhibit A
City of Cupertino/
Sedway/Cooke;Agreement
SEVEN SPRINGS RANCH DEVELOPMENT February 2, 1981
A. Project Description
The Seven Springs Ranch Development proposal involves the construction of
approximately 419 dwellings on 148 acres. Approximately 100 acres of land is
proposed for development by Interland Development Company. Interland proposes
to construct approximately 413 dwellings in a planned development setting. A
tentative unit breakdown is as follows:
1. 165 single-family detached structures containing 4-5 bedrooms each.
2. 115 cluster dwellings consisting of approximately 70 three-bedroom
and 45 four-bedroom dwellings.
3. 133 townhouses comprised of 70 two-bedroom units and 63 two-bedroom
units.
The property owner will retain approximately 48 acres. A portion of the
development rights of said 48 acres will be transferred to Interland Development.
The owner also will desire to retain the right to construct approximately six
dwelling units which includes two dwellings currently existing on site. The
owner has no timetable for development of the four new dwellings on the 48
acres. The master plan will denote the general locations of the proposed new
dwellings and the means of access.
B. Specificity of the Environmental Report
A residential development option was assessed for the property in conjunction
with the Environmental Impact Report for the City's Hillside General Plan.
Said Plan was adopted in 1976. As provided by Section 15148 of the State of
California's Environmental Impact Report Guidelines, the project EIR for Seven
Springs Ranch may place less emphasis on cumulative Citywide impacts.
-1-
The City contracted separately for an analysis of traffic impacts associated
with the proposal. Additionally, the City utilizes the services of William
Cotton and Associates, a consultant firm which evaluates projects for the City
of Cupertino, to oversee the geologic and seismic considerations involving the
development proposal. Sedway/Cooke shall incorporate the traffic and geologic/
seismic analysis into the site specific Environmental Impact Report.
The Draft EIR shall be in compliance with the City of Cupertino's Environmental
Impact Procedure and will focus on potential environmental impacts described
below and the attached responses to the Notice of Preparation submitted by
responsible agencies and interested groups as enumerated in the enclosures
A through I.
The Draft EIR shall identify feasible alternative land uses and development
patterns and evaluate said alternative land uses and development patterns
concurrently and with the same emphasis as the project alternative.
C. Specific Environmental Impacts to be Evaluated
Physical and Biological Factors
Agriculture
The project will result in the conversion of approximately 100 acres of Class 2
and 3 soils to urban development. Said Class 2 and 3 soils are currently
cultivated in walnuts, apricots and a number of exotic plants grown in con-
junction with the wholesale nursery. The project site is currently zoned
"exclusive agriculture" in County jurisdiction and the owner has entered into
a Williamson Act contract with the County.
The Draft EIR shall evaluate the conversion. of agricultural land from a "scarce -
resource it
scarce-resource" and "economic feasibility" perspective. An unspecified segment of the
development area will be used as community garden space which will help mitigate
the loss of agricultural land.
-2-
Animal Habitat
Depending upon the final development plan for the Foothill section of the site,
the habitat of a number of animals will be contracted. The Draft EIR should
inventory animal life on the site and the probable effect of the proposed
development on said animal species. The report should describe a means to
prevent domestic animals from intruding into the residual undisturbed habitat
on the site and the adjoining Fremont Older Open Space Preserve has not been
specified.
Plant Communities
The riparian environment which parallels the expected trace of the Monta Vista
Fault will not be disturbed; however, the development of lots on the upper
slopes of the property will cause the removal of natural vegetation. The
Draft EIR shall evaluate the loss of natural vegetation on the project site.
Geologic and Soils
The Monta Vista Fault trace may cross the site diagonally adjacent to the slope
of the hillside terrain, beginning with Upland Way and tracing to Prospect Road.
A comprehensive Seismic Geologic and Soils Investigation will be completed prior
to project review. The environmental consultant shall coordinate with the City
Geologist and incorporate the geologic and seismic findings and mitigation
recommendations into the Draft EIR.
Hydrology
A large segment of the proj ect is located in the Calabazas Watershed which is
underlain by soil types which are subject to severe erosion. Additionally, urban
development will increase the run-off co -efficient for areas within the watershed
and thus increasing the potential for flooding in the vicinity of Prospect
Creek and a segment of Calabazas Creek which is off-site. The environmental
-3-
consultnat shall evaluate potential erosion problems. The consultant shall
consult the "Erosion Control Plan: Calabazas Creek Watershed, Saratoga,
California" prepared by the Evergreen Resource Conservation District.
The Draft EIR shall describe mitigation measures which may include on-site
percolation ponds.
Traffic Conaestion and Associated Air Degradation and Noise Increases
The development will result in approximately 4,200 to 5,000 additional "all -
day trips" on the local street network. The increased traffic may have a signifi-
cant impact on the local streets which are in close proximity to the project site.
(Note: A traffic study is in progress. The study will assess probable congestion
levels on local streets, and propose solutions including means to attract residenta.
to other modes of transportation. The study will identify peak hour and 24-hour
counts to enable a subsequently retained environmental consultant to assess air
pollution and noise impacts.) The Draft EIR shall incorporate the findings and
recommendations of the traffic study. The Draft EIR shall define and evaluate
the existing and future LDN and L10, L50, and L90 noise -.levels associated with
automotive and rail traffic and regional and localized "hot spot" air quality
degradation which may result from project -related automotive traffic.
Socio/Economic Factors
Archaeology
The riparian environment of Prospect Creek and the alluvial plains in front of
several arroyos are suspected archaeologically significant sites. The historical
significance of the ranch structure shall be investigated and incorporated into the
Draft EIR.
Public Services
The Draft EIR shall evaluate the potential effect of the development on the capacity
of the public and private utility system and public services. Particular emphasis
shall be placed upon sewer capacity, fire service and the school system.
-4-
Aesthetics and Social Integration
The Cupertino General Plan emphasizes the need to physically and socially
negotiate new residential development into existing adjoining residential
neighborhoods. The Draft EIR should evaluate the project site design in
terms of the above -stated objective.
D. Public Input and Administration
Sedway/Cooke shall meet with City staff on a periodic basis, as needed, to
coordinate government agency and citizen input into the Draft EIR. Sedway/
Cooke shall participate in the following public meetings and hearings.,
1. One evening meeting to be conducted within a public school located in
the area directly affected by the proposed development. Said meeting
will be attended by City staff member, Sedway/Cooke representative, and
representatives of the project sponsor. The meeting will be conducted
prior to preparation of the Draft EIR.
2. Two public hearings scheduled before the Planning Commission to consider
Project -.and its Draft EIR.:.
3. Two public hearings scheduled before the City Council to consider the
Certification of the Draft EIR and the Project.
4. One public hearing scheduled before the Santa Clara County Local Agency
Formation Commission to consider the annexation of the property into
the City of Cupertino.
In order to complete the services hereinabove described by the agreed-upon
date and price, no modifications to the development proposal will
be allowed unless mutually agreed to by Sedway/Cooke and City. Additional
services shall not be performed and Sedway/Cooke shall not be entitled to
receive any compensation for additional services unless prior written approval
of such additional services has been given by the City. Any additional services
provided by Sedway/Cooke beyond those services described herein shall be billed
separately, on a time and material basis, based upon Exhibit C attached hereto
which -shall include involvement in related litigation.
-5-
After the City staff review, revisions and refinements will be made as necessary,
incorporating staff comments. A camera-ready copy of the preliminary Draft EIR
(reproducible masters) will be submitted to the City. The preliminary Draft EIR,
in keeping with CEQA guidelines, will conform to the following report format:
Project Description
Environmental Setting
Environmental Impacts of Proposed Project
Alternatives to Proposed Project
Recommended Impact Mitigation Measures
Conclusions
- Boundaries of area significantly affected by proposed action
- Relationship between short-term uses of man's environment and the
maintenance and enhancement of long-term productivity
- Growth -inducing impacts
- Any irreversible environmental changes if the project is implemented
Upon staff approval of the preliminary Draft EIR, Sedway/Cooke shall print and
deliver forty (40) copies of the Draft EIR.
E. For purposes of this EIR, Sedway/Cooke will assess impacts based only upon the
development proposal site plan and accompanying project description received
by Sedway/Cooke within ten (10) .days after execution of this agreement. Descriptive
materials submitted after execution shall not be expressly evaluated in this impact
assessment.
F. The firm of Sedway/Cooke has no past or present direct financial involvement or
interest with Interland Construction Company or any of its affiliates.
sm
EXHIBIT B
Moneys will be disbursed from City to Sedway/Cooke based upon the below schedule:
1. Monthly billings not to exceed 80% of the contract price prior to
completion of preliminary Draft EIR.
2, 20% of contract price upon certification of EIR.
EXHIBIT C
Additional Non -litigation Rates
Pincipal $75.00
Associate $40.00
Planner $30.00
Research Assistant $20.00
Word Processor $20.00
Additional Litigation Rates
Principal $125.00
Associate $ 70.00
Planner $ 50.00
Research Assistant $ 30.00