CC 09-18-00 AGENDA
CUPERTINO CITY COUNCIL ~ REGULAR MEETING
CUPERTINO REDEVELOPMENT AGENCY ~ REGULAR MEETING
10300 Torre Avenue, City Hall Council .Chamber
Monday, September 18, 2000
6:45 p.m.
CITY COUNCIL MEETING
PLEDGE OF ALLEGIANCE
ROLL CALL
CEREMONIAL MATTERS - PRESENTATIONS
1. Presentation by Bill Bragg regarding Portal School.
2. Presentation of check to City of Cupertino by John Kolski for Cupertino Host Lions.
POSTPONEMENTS
WRITTEN COMMUNICATIONS
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the council on any matter
not on thc agenda. Speakers are limited to three minutes. In most cases, State law will prohibit
the council from making any decisions with respect to a matter not listed on the agenda.
CONSENT CALENDAR
Unless there are separate discussions and/or actions requested by council, staff, or a member of
the public, it is requested that items 3 through 10 be acted on simultaneously.
3
4.
Minutes: September 5, 2000, regular adjourned meeting.
Accounts payable: September 1 and September 8, Resolutions 00-236 and 00-237
Payroll: September 1, Resolution 00-238.
Treasurer's Budget Report - July 2000.
Optimist Club's request a $60.00 fee waiver for November 9, 2000, event at the Quinlan
Center.
September 18, 2000
Cupertino City Council &
Cupertino Redevelopment Agency
Page 2
Acceptance of street improvements (documentation not required):
· Behzad Askarinam, 10645 Felton Way, APN 359-18-019
· Wei Jao & Jien Meei Chyu, 10423 Byme Ave., APN 357-12-034
· Kelvin & Martha Kang, Trustees, 21900 Lomita Ave., APN 357-15-003
· KC&J Investments, LLC, 21720 Alcazar Avenue, APN 357-19-013
· - Optimum Investments LLC, 21870 Lomita, APN 357-15-004
· Diana Wong, Trustee ofCIW Wong, 10067 Bianchi Way, APN 359-07-009
Change order no. 6 for $24,684.08 for the Cupertino Senior Center Expansion, Project
99-9210, Resolution No. 00-239.
10.
Authorization to execute agreement with APAC Technologies for Red Light Running
Photo Enforcement Systems Program, Resolution No. 00-240.
ITEMS REMOVED FROM THE CONSENT CALENDAR (above)
PUBLIC HEARINGS
11.
Public nuisance abatement: Public heating to consider abating a public nuisance
(overgrown foliage obstructing the sidewalk, inoperable automobile, automobile parts,
litter and trash in front yard and driveway) at 7535 Normandy Way (APN 366-11-151,
William and Elena Kettler, property owners), Resolution No. 00-241.
PLANNING APPLICATIONS
UNFINISHED BUSINESS
NEW BUSINESS
12.
De Anza Cupertino Aquatics (DACA) Lease: Request from staff to re-negotiate a lease
with DACA for the use of the Sports Center pool. Current lease with DACA expires
March 31, 2001.
13.
Stevens Creek Boulevard Bicycle Lane Ordinances:
(a) First reading of Ordinance No. 1856: "An Ordinance of the City Council of the
City of Cupertino Amending Section 11.08.250 of the Cupertino Municipal Code,
Relating to the Designation of Bicycle Lanes, Stevens Creek Boulevard from the
East City Limit to the West City Limit."
(b)
First reading of Ordinance No. 1857: "An Ordinance of the City Council of the
City of Cupertino Amending Cupertino Municipal Code, Chapter 11.24, Section
11.24.150, Relating to Parking Prohibition and Section 11.24.170, Relating to
Parking Limitation On Certain SWeets, Stevens Creek Boulevard fi'om the East
City Limits to the West City Limits."
September 18, 2000 Page 3
Cupertino City Council &
Cupertino Redevelopment Agency
14.
First reading of Ordinance No. 1858: "An Ordinance of the City Council of the City of
Cupertino Amending Section 11.20.030 of the Cupertino Municipal Code Relating to
Establishment of All Directional Stop Required at Certain Intersections."
15.
First reading of Ordinance 1859, "An Ordinance of the City Council of the City of
Cupertino Amending Chapter 11.24 of the Cupertino Municipal- Code, Section 11.24.150,
Relating to Parking Prohibition for Trucks Over 5 Tons."
16.
Cupertino City Center Hotel Project: Request from Kimpton Hotel and Restaurant Group
for partial Transient Occupancy Tax (TOT) refund for the Cupertino City Center Hotel
Project.
17.
Grant permission to apply to the California Housing Finance Agency (CHFA) for a 10
year, 3 percent loan under their HELP Program in order to pursue an additional funding
option for the Cupertino Community Services Affordable Housing Project, Resolution
00-242.
ORDINANCES
18.
Second reading and enactment of Ordinance No. 1854, "An Ordinance of the City
Council of the City of Cupertino Adding Chapter 10.80 to the City's Municipal
Ordinance Code Prohibiting Soliciting on Designated Public Rights-of-Way."
19.
Second reading and enactment of Ordinance No. 1855, "An Ordinance of the City
Council of the City of Cupertino Amending Section 11.20.030, All Directional Vehicular
Stop Required at Certain Intersections, to Include North Portal Avenue at the Intersection
with Wheaton Drive." ~
STAFF REPORTS
20. Stares report on sidewalk at 19160 Stevens Creek Boulevard.
21. Status report on Library project.
COUNCIL REPORTS.
Mayor Statton:
Association of Bay Area Governments - Alternate
Legislative Review Committee
Sister City Committee - Toyokawa
West Valley Mayors and City Managers
Vice-Mayor James:
Library Expansion Committee
Cupertino Audit Committee
Economic Development Team
September 18, 2000 Page 4
Cupertino City Council &
Cupertino Redevelopment Agency
Environmental Review Committee - Alternate
Leadership Cupertino
Northwest Flood Control Zone Advisory Committee
Santa Clara County Cities Association - Alternate
Santa Clara County Emergency Preparedness Commission
Senior Center Expansion Committee
West Valley Mayors and City Managers - Alternate
Councilmember Burnett:
North Central Flood Control Zone Advisory Committee
Public Dialog Liaison
Santa Clara County Cities Association Representative, ABAG Board of Directors
Santa Clara County Committee on Housing & Community Block Grant Program
Santa Clara County Library District JPA Board of Directors - Alternate
Santa Clara County Transportation Agency Policy Advisory Committee
Santa Clara Valley Water Commission
Senior Center Expansion Committee
Councilmember Chang:
Association of Bay Area Governments
Leadership Cupertino
Legislative Review Committee
Library Expansion Committee
Public Dialog Liaison
Santa Clara County Cities Association
Santa Clara County Committee on Housing & Community Block Grant Program-
Alternate
Santa Clara County Emergency Preparedness Commission - Alternate
Councilmember Lowenthal:
Association of Bay Area Governments - Alternate
Cupertino Audit Committee
Economic Development Team
Environmental Review Committee
Santa Clara County Library District JPA Board of Directors
CLOSED SESSION
ADJOURNMENT
REDEVELOPMENT AGENCY MEETING
Canceled for lack of business.
mp 9114100
MINUTES
CUPERTINO CITY COUNCIL
Regular Adjourned Meeting
Tuesday, September 5, 2000
CALL TO ORDER
At 5:30 p.m. Mayor Statton called the meeting to order in Conference Room A, 10300 Torre
Avenue, Cupertino, California.
ROLL CALL
City Council members present: Mayor John Statton, Vice-Mayor Sandra James, and Council
members Don Bumett, Michael Chang, and Richard Lowenthal. Council members absent: None.
Staff present: City Clerk Kimberly Smith.
INTERVIEWS OF APPLICANTS
1. Conduct interviews and appoint candidate to the Parks and Recreation Commission.
Council interviewed the following individuals: Mr. Geoffrey Patnoe, Ms. Madeleine
Kasof, Ms. Jeanne Bradford, and Ms. Mary Jo Gunderson. Council unanimously
appointed Ms. Jeanne Bradford to the term ending January 2003.
RECESS
PLEDGE OF ALLEGIANCE
At 6:45 p.m. Mayor Statton called the meeting to order in the Council Chambers and led the
Pledge of Allegiance.
ROLL CALL
City Council members present: Mayor John Statton, Vice-Mayor Sandra James, and Council
members Don Burnett, Michael Chang, and Richard Lowenthal. Council members absent: None.
Staff present: City Manager David Knapp, City Attorney Charles Kilian, Administrative Services
Director Carol Atwood, Community Development Director Steve Piasecki, Public Information
Officer Donna Krey; Public Works Director Bert Viskovich, and City Clerk Kimberly Smith.
CEREMONIAL MATTERS - PRESENTATIONS
POSTPONEMENTS - None
3._/
September 5, 2000 Cupertino City Council Page 2
WRITTEN COMMUNICATIONS - None
ORAL COMMUNICATIONS
Mr. Alvin DeRidder, 19146 Anne Lane, discussed a safety hazard at 19160 Stevens Creek
Boulevard, where a portion of sidewalk does not exist. Nearby on Anne Lane there is a home for
the disabled, and many times he has seen people in wheelchairs go out into the street to skirt this
area. He had raised the issue at the Planning Commission twice before and was told they were
working with the property owner. Mr. DeRidder felt the safety issue should be addressed
immediately, and even temporary blacktop in that area would improve the situation. Mayor
Statton asked that the Public Works Director address the problem and report back to council at
the next meeting.
Mr. E.J. Conens asked that the city donate $5,000 for a World War I memorial to be built in
Washington D.C. at a cost of $100 million. He said that it would be a small token of
appreciation for the service given. James noted that a World War II veteran, Mr. Jerry Lewis,
would be honored later this week at a ceremony at the Good Samaritan Church.
Ms. Carol Baker, 10327 Cold Harbor Avenue, said she represented a number of neighbors
concerned about the skate park being considered for Wilson Park. She submitted a petition with
75 signatures in opposition, and said they were continuing to collect more. This is a small
neighborhood park with two large baseball fields, which are barricaded and padlocked. The
picnic table area is all that is left for neighborhood use, and that would be lost if a skateboard
park were added. The neighbors were concerned about noise and the increased impact on
parking, which is already difficult when Little League games are occurring. She said the
neighborhood had not been notified about the selection of this site, the selection of the architect,
or any other part of the process.
James said that a site had not been selected, and both Wilson Park and Jollyman Park were being
considered. Meetings would be held in each neighborhood so that residents can give their input.
The meeting at Wilson is scheduled for September 13, and is open to the public. At that time
there will be an opportunity for the neighbors, skateboarders, parents, and law enforcement to
discuss the issues.
CONSENT CALENDAR
James moved to approve the items on the Consent Calendar, as recommended. Chang seconded
and the motion carded 5-0.
2. Minutes: August 21, 2000,. regular meeting.
3. Accounts payable: August 18 and August 25, Resolutions 00-228 and 00-229.
4. Payroll: August 18, Resolution 00-230..
September 5, 2000 Cupertino City Council Page 3
Review of application for Alcoholic Beverage Control license for Taipei Stone House
Restaurant, 10877 N. Wolfe Road.
Acceptance of street improvements (documentation not required):
a. Steven Fondario, 10315 Orange Ave., APN 357-15-059
b. Jayesh P. Parikh, 22092 San Fernando Ct., APN 357-12-010
Improvement Agreements
(a) Shen-Wei Shiao and Tai-Yi Shiao, 21799 Almaden Ave., APN 357-15-092,
Resolution 00-231
(b) KC&J Investments, LLC, 22393 McClellan Rd., APN 357-05-011, Resolution 00-
232
Abandonment of roadway: Bud Barkley, Stevens Canyon Road, Resolution 00-233. (The
City Clerk handed out a revised resolution, and the Public Works Director noted that the
staff report should have referred to Ricardo Road, not Regnart Road).
o
Roadway easement: KC&J Investments, LLC, 22393 McClellan Rd., APN 357-05-011,
Resolution 00-234.
10.
Quitclaim deed: KC&J Investments, LLC, 22393 McClellan Rd., APN 357-05-011,
Resolution 00-235.
Vote Council members
Ayes: Burnett, Chang, James, Lowenthal, and Statton
Noes: None
Absent: None
Abstain: None.
ITEMS REMOVED FROM THE CONSENT CALENDAR (above) - None
PUBLIC HEARINGS - None
PLANNING APPLICATIONS - None
UNFINISHED BUSINESS - None
NEW BUSINESS
11.
No solicitation ordinance: First reading of Ordinance No. 1854, "An Ordinance of the
City Council of the City of Cupertino Adding Chapter 10.80 to the City's Mtmicipal
Ordinance Code Prohibiting Soliciting on Designated Public Rights-of-Way."
September 5, 2000 Cupertino City Council Page 4
Administrative Services Director Carol Atwood reviewed the staff report and said this
ordinance was developed in response to a concern about the opening of the new Home
Depot store and the gathering of people who are soliciting employment as construction
workers.
City Attorney Charles Kilian said that the ordinance is patterned after one adopted by San
Jose. It is a simple ordinance, but difficult to enforce.
The City Clerk read the title of the ordinance. Bumett moved and James seconded to read
the ordinance by title only, and that the City Clerk's reading would constitute the first
reading thereof. Motion carried 5-0.
12.
Review of bid and award of contract to Republic Electric for South Stelling Road Bicycle
Lane Improvement Project No. 9412 and Miller Avenue Bicycle Lane Improvement
Project No. 9438 (agreement 00-092).
Bert Viskovich, Public Works Director, reviewed the staff report. He said that only one
bid was received, but it was below the engineer's estimate, and he recommended award
of the project to Republic Electric in the amount of $138,887.50 with a 10% contingency,
for a total of $152,776.25.
Lowenthal moved to award the contract to Republic Electric. Burnett seconded and the
motion carried 5-0.
13.
Amend municipal code regarding stop signs at certain intersections: reading of Ordinance
No. 1855, "An Ordinance of the City Council of the City of Cupertino Amending Section
11.20.030, All Directional Vehicular Stop Required at Certain Intersections, to Include
North Portal Avenue at the Intersection with Wheaton Drive."
Bert Viskovich, Public Works Director, reviewed the staff report and said it is necessary
to establish a four-way stop at Portal Avenue and Wheaton Drive. The city has recently
installed a circle at that intersection, and the stop signs will fome vehicles to stop before
proceeding, and allow staff to monitor necessary modifications in order to provide safety
and meet the goal of slowing traffic and protecting pedestrians.
Bumett said that four stop signs at a roundabout was contrary to the intent of the feature,
but this particular location needed more work and money to make it a functional
roundabout and he thought that should be done. True traffic calming should beautify the
area, and this roundabout needs landscaping.
Mr. E.J. Conens said he thought the project should be designed and installed properly the
first time instead of making more and more additions and changes.
September 5, 2000 Cupertino City Council Page 5
The City Clerk read the title of the ordinance. James moved and Chang seconded to read
the ordinance by title only, and that the City Clerk's reading would constitute the first
reading thereof. Motion carded 5-0.
ORDINANCES
14.
Rezoning: Second reading and enactment of Ordinance No. 1852, "An Ordinance of the
City Council of the City Of Cupertino Approving the Rezoning of a 0.96-Acre Lot From
P(Cg) to P(Res) Located At 22020 Homestead Road".
The City Clerk read the title of the ordinance. Bumett moved and Chang seconded to read
the ordinance by title only, and that the City Clerk's reading would constitute the second
reading thereof. Motion carried 5-0.
Bumett moved and Lowenthal seconded to enact Ordinance No. 1852. The motion
carried 5-0.
15.
Park Maintenance and Dedication Fees: Second reading and enactment of Ordinance No.
1853, "An Ordinance of the City Council of the City of Cupertino Amending Chapters
14.05 and 18.24 to Clarify Park Maintenance and Dedication Fees."
The City Clerk read the title of the ordinance. Burnett moved and Lowenthal seconded to
read the ordinance by title only, and that the City Clerk's reading would constitute the
second reading thereof. Motion carried 5-0.
Bumett moved and Lowenthal seconded to enact Ordinance No. 1853. Motion carried 5-
0.
STAFF REPORTS - None
COUNCIL REPORTS
Bumett discussed transportation Measure A and said that it was strongly supported by the city
governments in this county. He was strongly in favor of it and said that it has the flexibility
needed for a 30-year program. He also discussed the decisions to be made about a new bus fleet,
which must be zero emmission vehicles by 2010.
Chang said that he attended the Chinese-American tournament and the Mayor did a great job,
and even ran a lap with the torch. He also announced that the second annual Moon Festival
would happen next weekend.
Lowenthal said that the City Council had just finished interviewing candidates for the Parks and
RecreatiOn Commission, and it was good to see how effective the Leadership Cupertino program
has been, it really showed up in the quality of the applicants. He also said there are many
opportunities for good trails in the area, and he was happy with how well the Parks and
Recreation staff was doing without a director in place.
September 5, 2000 Cupertino City Council Page 6
James noted that the Cupertino Community Services (CCS) annual barbecue will take place this
Saturday.
Statton said that Diane Snow had arranged a great luncheon for the senior center volunteers, who
were treated to a tour of the new senior center that is still under construction.
CLOSED SESSION - None
ADJOURNMENT
At 7:22 p.m., the meeting was adjourned.
Kimberly Smith, City Clerk
RESOLUTION NO. 00-236
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
ALLOWING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE AMOUNTS
AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR GENERAL AND
MISCELLANEOUS EXPENDITURES FOR THE PERIOD ENDING
September 1, 2000
WHEREAS, the Director of Administrative Services or her designated
representative has certified to accuracy of the following claims and demands and to the
availability of funds for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law.
NOW, THEREFORE, BE IT RESOLVED, that the City Council hereby allows
the following claims and demands in the amounts and from the funds as hereinafter set
forth in Exhibit "A".
CERTIFIED:
Director of Administrative Services
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this day of ,2000, by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
08/31/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
579554 1020 09/01/00 17 ADIRONDACK DIRECT 6111
579554 1020 09/01/00 17 ADIRONDACK DIRECT 6111
TOTAL CHECK
579555 1020 09/01/00 1680 ADVANTAGE GRAFIX 6111
579556 1020 09/01/00 M2001 ADZICH, GEORGE 4811
579557 1020 09/01/00 26
579557 1020 09/01/00 26
579557 1020 09/01/00 26
579557 1020 09/01/00 26
TOTAL CHECK
AIR FILTER CONTROL INC 7013
AIR FILTER CONTROL INC 7013
AIR FILTER CONTROL INC 7013
AIR FILTER CONTROL INC 7013
579558 1020 09/01/00 918
579558 1020 09/01/00 918
TOTAL CHECK
ALAMO WORLDTRAVELAND TO 6301
ALAMO WORLD TRAVEL AND TO 6301
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 ' 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884.
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
579561 1020 09/01/00 1884
RUN DATE 08/31/00 TIME 15:44:11
2~J~BERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NOP, HTERN DIVIS 6111
ALBERTSONS-NOP, HTERN DIVIS 6327
ALBERTSONS-NORH~RNDIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTERNDIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6327
ALBERTSONS-NORH/~RNDIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6327
ALBERTSONS-NORH~ DIVIS 6111
ALBERTSONS-NORHTERNDIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTEI~NDIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
~J~BERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTEP,_N DIVIS 6111
ALBERTSONS-NORRTERN DIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTERNDIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6327
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6327
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NORHTERNDIVIS 6111
ALBERTSONS-NOR/~DIVIS 6111
ALBERTSONS-NORHTEI~N DIVIS 6111
ALBERTSONS-NORHTERR DIVIS 6111
ALBERTSONS-NOP, HTERNDIVIS 6111
ALBERTSONS-NOP, HTERNDIVIS 6111
ALBERTSONS-NORHTERN DIVIS 6111
ALBERTSONS-NOI~ DIVIS 6111
ALBERTSONS-NORRTERRDIVIS 6111
ALBERTSONS-NORHTERNDIVIS 6111
ALBERTSONS-NORHTER~ DIVIS 6111
ALBERTSONS-NORHTERNDIVIS 6111
PAGE 1
....... DESCRIPTION .......
P0#14054 PRINTOUT CENTER
SHIPPING & HANDLING
213.95
30.76
244.71
PO#12100 PLANT SUPPLIES
28.52
LEADERSHIP REFUND
350.00
PLEATED FILTERS
PLEATED FILTERS
PLEATED FILTERS
PLEATED FILTERS
249.73
249.74
249.74
249.74
998.95
DEPOSIT 12/10-12 SFO EXTR
DEPOSIT-YOSEMITE APR.2001
4,000.00
4,000.00
8,000.00
P0#14035 CLUB 2000
PO#14030 BEACH PARTY 7/21
PO#16305
PO#14044 STAFF MEET 8/2
LP0#21559
LP0#21562 CLUB 2K
LPO#21550 MEMORIAL PG
PO#16308
LP0#21329 DAYCAMP 8/4
PO#16307
PO#14045 BBQ 8/4/00
P0#14025 DAYCAMP 7/24~28
JENSCHOTT SUPP
PO#14032 SU'~R SCIENCE
LPO#21320 SESSION 2 SUPP
PO#14020 7/12/00 LUNCH
LPO#21377 PLAYGRD SUPP
LPO#21593 MEMORIAL PLAYG
LPO#21573 PORTAL PG
PO#12763 SUeR CAMP
PO#16301
PO#14221 DAYCAMP 7/10-14
LPO#21595 CREEKSIDE SUP
PO#16304
P0#14042 DAYCAMP 7/31-8/4
LPO#21513 NATURE CAMP
LPO#21316 MILK
PO#14024 BBQ 7/20/00
LPO#21354
LPO#21523 CLUB 2000
LPO#21527 NATURE CAMP
LP0#21541 MEMORIAL PG
LPO#21375
LPO#21376 FOR CLUE 2000
LPO#21512 NATURE CAMP
PO#14021 DAYCAMP 7/17-21
LPO#21594 CANDY C~S
LPO#21327 NATURE CAMP
75.54
89.48
56.04
71.71
6.48
21.94
24.7~
36.73
33.55
57.25
135.78
160~83
47.67
97.97
27.03
92.69
21.23
21.45
47.16
454.34'
42.21
59.91
21.03
114.88
120.00
20.16
1.29
105.89
29.23
11.98
37.69
28.74
17.85
20.51
47.65
123.98
17.41
41.87
FINANCIAL ACCOUNTING
08/31/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
PAGE 2
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT ....... DESCRIPTION .......
AMOUNT
579561 1020 09/01/00 1884 ALBERTSONS-NORHTERN DIVIS 6111 LP0#21596 SSF CAMP
579561 1020 09/01/00 1884 ALBERTSONS-NORHTERN DIVIS 6111 LP0#21526 CAMP SUPP SSF
579561 1020 09/01/00 1884 ALBERTSONS-NOPd'F~ER~ DIVIS 6111 PO#14038 CLUB 2000 7/19-2
579561 1020 09/01/00 1884 ALBERTSONS-NOR/~RR DIVIS 6111 LPO#21528 MEMORIAL PG
579561 1020 09/01/00 1884 ALBERTSONS-NORHTERN DIVIS 6111 LP0#21524 PORTAL PLAYGRD
TOTAL CHECK
23.94
45.90
281.02
19.80
22.04
2,834.59
579562 1020 09/01/00 2071 AMAZON.COM
6111 BOOKS/PLANNING CO{~.
103.29
579563 1020 09/01/00 44 AMERICAN RED CROSS
6111 FY 2000-2001 OPEN PURCHAS
95.00
579564 1020
09/01/00 45 AMERICAN TRAFFIC SUPPLY 6111 PO#10367 BARRICADES 75 EA
195.66
579565 1020 09/01/00 1343 ROSE-MARIE ANDICHOU 7014 I }iR. PERFORMANCE
90.00
579566 1020 09/01/00 2067 ASIAN ART MUSEAUM OF SAN 6301 SPEAKER'S FEES
175.00
579567 1020
09/01/00 2074 AT&T PEBBLE BEAC~ NATIONA 6301 4 ANY-DAY TICKET BOOK
1,105.00
579568 1020 09/01/00 864 CAROL ATWOOD
6204 2ND INSTALL. PROP TAX SUP
1,158.35
579569 1020 09/01/00 M2001 AVRAHAMOV, ALIZA 1113 REC REFUND
SO.O0
~,525570 1020 09/01/00 2072 AWC 6226
..~571 1020 09/01/00 2013 BAY AREA DISTRIBUTING CO. 6111
MEMBERSHIP DUES #A4468
P0#10~59 SUPPLIES
90.00
384.96
579572 1020
09/01/00 - M200i BEHESHTI, FAZLOLLAH & JES 2211 REFUND FOR IMPROVEMENT
5,625.00
579573 1020 09/01/00 1057 BENEFITAMERICA 2135 *FLEX HLTH
579573 1020 09/01/00 1057 BENEFITAMERICA 2135 *FLEX DEP
TOTAL CHECK
72.49
769.24
841.73
579574 1020 09/01/00 M2001 BERMAN, DONNA 4751 REFUND E. EUROPE
570.00
579575 1020 09/01/00 2070 BRFd%THE FREE 6111 AIR SUPPLY
149.00
579576 1020 09/01/00 2063 BRIDGE WIRELESS
6111 P0#10407 P, ADIO REPAIR
114.78
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
579577 1020 09/01/00 125
~ TOTAL CHECK
CALIF STAT~ COMPUTER STOR 9400
CALIF STATE COMPUTER STOR 9400
CALIF STATE COMPUTER STOR 6111
CALIF STATE COMPUTER STOR 6111
CALIF STATE COMPUTER STOR 9400
CALIF STATE COMPUTER STOR 9400
CALIF STATE COMPUTER STOR 9400
CALIF STATE COMPUTER STOR 9400
CALIF STATE COMPUTER STOR 9400
CALIF STATE C0~PUT]~ STOR 9400
CALiF STATE C(~4PUTER S/OR 9400
CALIF STATE C0t4PUTER STOR 9400
WINDOWS NT SERVER 4 SKU
WIN NT SVR V4.0 CD SKU #
VISIO 2000 TECHNICAL EDIT
MANA~EME~'T FEE · 1.21%
9.168 ULTRA WIDE SCSI DRV
HP NETSERVER E60 PIII/S50
64MB SDRAM DibS4 SKU#3470
PSD CONFIG/NIC-WIN NT SER
128 MB 100MBZ UNBUFFERED
MANAGEMENT FEE · 1.21%
Nu'z-KAID 3SI DISK ARRAY CO
1868 72K RPM ULTRA3 WIDE
790.82
40.18
190.53
2.30
723.16
3,294.38
260.08
528.62
465.19
142.57
3,932.96
1,747.63
12,118.42
1020
09/01/00. 130 CALIFORNIA PARK AND RECRE 6226 MEMBERSHIP-LINDA Ld%GERGRE
80.00
579579 1020 09/01/00 1460
RUN DATE 08/31/00 TIMB 15:44:11
TONI CARREIRO 7014 WEB UPDATES
2,925.00
- FINANCIAL ACCOUNTING
£
08/31/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
....... DESCRIPTION .......
PAGE 3
AMOUNT
579580 1020 09/01/00 147 CASH 6301
579580 1020 09/01/00 147 CASH 6311
579580 1020 09/01/00 147 CASH 6304
579580 1020 09/01/00 147 CASH 6305
579580 1020 09/01/00 147 CASH 6226
TOTAL CHECK
579581 1020 09/01/00 149 CASH 7014
579581 1020 09/01/00 149 CASH 6111
579581 1020 09/01/00 149 CASE 6111
579581 1020 09/01/00 149 CASH 6216
579581 1020 09/01/00 149 CASH 6216
579581 1020 09/01/00 149 CASH 6111
S79581 1020 09/01/00 149 CASH 6111
579581 1020 09/01/00 149 CASH 6216
579581 1020 09/01/00 149 CASH 6111
579581 1020 09/01/00 149 CASH 7011
579581 1020 09/01/00 149 CASH 6216
579581 1020 09/01/00 149 CASH 6111
579581 1020 09/01/00 149 CASH 6216
579581 1020 09/01/00 149 CASH 6216
579581 1020 09/01/00 149 CASH 4811
579581 1020 09/01/00 149 CASH 9300
579581 1020 09/01/00 149 CASE 9300
TOTAL CHECK
579582 1020 09/01/00 155 CENTRAL WHOLESALE NURSERY 6111
579583 1020 09/01/00 M2001 CENTURY 21 CREATIVE REALT 4063
579584 1020 09/01/00 1156 CHA 2133
579585 1020 09/01/00 M2001 CHAO, MANLI 1113
579586 1020 09/01/00 M2001 CHAO, MA~LI 1113
579587 1020 09/01/00 M2001 CHEN, CAROL 4811
579588 1020 09/01/00 M2001 CHITNIS, SWADI 1113
579589 1020 09/01/00 1824 CLARKE'S MACHINE SHOP 7013
579590 1020 09/01/00 1606 COLOUR SHOPPE DRAPERIES & 6111
579591 1020 09/01/00 183 COTTON SHIRES & ASSO INC 2211
579591 1020 09/01/00 183 COTTON SHIRES & ASSO INC 2211
TOTAL CHECK
579592 1020 09/01/00 1058 CUPERTINO COMMUNITY SERVI 6216
579592 1020 09/01/00 1058 CUPERTINO CO~4UNITY SERVI 6216
579592 1020 09/01/00 1058 CUPERTINO CO~%IUNITY SERVI 6216
579592 1020 09/01/00 1058 CUPERTINO COFa~JNITY SERVI 6214
TOTAL CHECK
579593
1020 09/01/00 1964
RUN DATE 08/31/00 TIME 15:44:11
CUPERTINO TOWN CENTER IJaC 7060
TRIPS
BINGO
VOL SUPT
SENIOR SCHOOLS
MEMBERSHIP DUES
131.20
15.19
52.31
58.20
15.00
271.90
COP~4ITTEE MEETING - JILL
SUPPLIES- MARCIA
SUPPLIES- MARCIA
BREAKFASTMEETING- CAROL
BREAKFAST MEETING- CAROL
OES SUPPLIES- MARCIA
OFFICE EXPENSES - CAROL
COUNCIL DINNER - ZEKE
SUPPLIES - DONNA
SUPPLIES - BILL
IAPMO MEETING - JERRY
BAG OF DIG CAMERA - GARY
ICBO MEETING - JOE
MEETING PARKING - RAY
DEFICIT
LIBRARY MEETING - CAROL
LIBRARY MEETING - DANIEL
4.00
49.57
49.07
37.47
18.80
17.82
26.00
106.19
44.04
12.15
20.00
18.39
12.00
3.25
-9.35
10.98
20.00
440.38
P0#10365 PLANTS
174.99
REFUND OF DBL PYMT
98.26
126.50
REC REFUND
43.00
REC REFUND
43.00
TEEN LEADERSHIP REFUND
100.00
REC REFUND
49.00
LP0#20997 ATF
19.16
PO#10330
352.90
PROF SERVICES
GEOLOGIC REPORT
1,523.00
1,359.25
2,882.25
DAVID KNAPP - 9/9 BBQ
CAROL ATWOOD
DONNA KREY
SANDY JAMES - 9/9 BBQ
30.00
30.00
30.00
30.00
120.00
SEPT 2OOO RENT
3,884.00
FINANCIAL ACCOUNTING
08/31/00 CITY OF CUPERTINO PAGE 4
ACCOUNTING PERIOD: 3/01 CIiECK REGISTER
~UND - 110 - GENER~ FL~
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
....... DESCRIPTION .......
579594 1020 09/01/00 201
579595 1020 09/01/00 850
579595 1020 09/01/00 850
579595 1020 '09/01/00 850
TOTAL CHECK
579596 1020 09/01/00 220
579596 1020 09/01/00 220
TOTAL CHECK
579597 1020 09/01/00 1994
579598 1020 09/01/00 2058
579599 1020 09/01/00 242
579599 1020 09/01/00 242
579599 1020 09/01/00 242
579599 1020 09/01/00 242
579599 1020 09/01/00 242
TOTAL CHECK
5ff~9~00 1020 09/01/00 243 '
.01 1020 09/01/00 246
579602 1020 09/01/00 2077
579603 1020 09/01/00 251
579603 1020 09/01/00 251
579603 1020 09/01/00 251
579603 1020 09/01/00 251
TOTAL CHECK
579604 1020 09/01/00 1255
579605 1020 09/01/00 M2001
579606 1020 09/01/00 264
579607 1020 09/01/00 1461
579608 1020 09/01/00 M2001
579609 1020 09/01/00 281
579609 1020 09/01/00 281
TOTAL CHECK
579610 1020 09/01/00 2056
5~.~611 1020 09/01/00 M2001
b.~o12 1020 09/01/00 292
579613 1020 09/01/00 301
RUN DATE 08/31/00 TIME 15:44:11
DAPPER TIRE C0 6123
DIDDAMS AMAZING PARTY STO 6111
DIDDAMS AMAZING PARTY STO 6111
DIDDAMS AMAZING PARTY STO 6111
DISCOUNT SCHOOL SUPPLY 6111
DISCOUNT SCHOOL SUPPLY 6111
DISTRICT ATTORNEY TRUST 2137
ECONOMY HANDICRAFTS 6111
EMPLOYI~ DEVEL DEPT 2124
EMPLOYMENT DEVEL DEFT 2124
EMPLOYM~ DEl;EL DEPT 2124
EMPLOYMENT DEVEL DEFT 2124
EMPLOYMENT DEVEL DEPT 2124
EMPLOYMENT DEVELOPMENT 2141
ENTIRE PRINTING 6112
ESRI 6216
EVANS WEST VALLEY SPRAY C 7014.
EVANS WEST VALLEY SPRAY C 7014
EVANS WEST VALLEY SPRAY C 7014
EVANS WEST VAIJ~EY SPRAY C 7014
FIRST A~IVE DISTRIBU 6111
FISHLER, ROSE 1113
FITZPATRICK BARRICADE & S 7013
FOOTHILL DE ANZA COI~JNIT 6206
FULL MOON I~i'~aiACTIVE 6216
GARDI~ 6111
GARDENLAAID 6111
GEI~BUSINESS MACHINES 6111
GLIDDEN, NANCY 1113
C, OLFLAND RNT~RTAII~NT C~ 7014
GRAYBAR ELECTRIC CO INC 6111
FY 2000-2001 OPEN PURCHAS
PO#16313 SI/PPLIES
LP0#21326 HATS ETC.
LP0#21589 MISC. SUPPLIES
PO#35372800029/14041
PO#35372800011/14041
ANGEL LOPEZ JR566-39-8126
PO#12728 SUPPLIES
SIT
SIT
SIT
SIT
SIT
SDI
P0#16310 TICKETS
ARCVIEW TRNG-N NOWACK
T&M
TiM
TIME & MATL
TaM
FY 2000-2001 OPEN PURCHAS
REC REFUND
P0#10370 BULBS
EUPHRAT MUS~ GRANT
ROOM RENTAL-ARCVIEW TRNG
SUPPLIES
SUPPLIES
PO#10384 DATE STAMP-HR
REC REFUND
P0#14052 CLUB2000 45 TICK
846.72
90.61
26.47
40.11
157.19
9.63
91.84
101.47
23.08
74.86
-19.43
103.95
12.01
-325.49
15,025.05
14,796.09
713.30
270.63
5,500.00
2,090.00
1,000.00
2,500.00
3,000.00
8,590.00
260.95
100.00
116.91
6,000.00
1,400.00
62.58
107.62
170.20
427.59
43.00
288.00
85.32
- FINANCIAL ACCOUNTING
08/31/00 CITY OF CUPERTINO PAGE 5
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
579613 1020 09/01/00 301
579613 1020 09/01/00 301
TOTAL CHECK
579614
579615
579616
579617
579617
579618
579619
579620
579621
579622
579623
579624
579625
579625
579626
579627
579628
579629
579630
579631
579631
579632
579633
579633
579633
579634
579634
GRAYBAR ELECTRIC CO INC 6111
GRAY]~%R ELECTRIC CO INC 6111
1020 09/01/00 2068 GSA-DATA PROCESSING 6113
1020 09/01/00 M2001 GUPTA, MAHESH 1113
1020 09/01/00 320 KATHI HARKNESS 7014
1020 09/01/00 1951
1020 09/01/00 1951
TOTAL CHECK
HOMESTEAD F.F.C. INC 7014
HOMESTEAD P.F.C. INC 7014
1020 09/01/00 343 ICMA RETIRF, MENT TRUST-457 2139
1020 09/01/00 346 INDEPENDENT ELECTRIC SUPP 6111
1020 09/01/00 1943 INTERSTATE SALES 9400
1020 09/01/00 1981 INTERSTATE TRAFFIC CONTRO 6111
1020 09/01/00 361 JO~N GL~GE [H~DERGROUND 7014
1020 09/01/00 1437 THE JUNGLE 7014
1020 09/01/00 935 KAR PRODUCTS 6111
1020 09/01/00 2060 KATIMEX USA/K~4AX CABLING 6111
1020 09/01/00 2060 KATIMEX USA/KMAX CABLING 6111
TOTAL CHECK
1020 09/01/00 M2001 KIM, K JIN 1113
1020 09/01/00 2075 KQ DESIGN 6111
1020 09/01/00 382 KWIK-KOPY PRINTING 6302
1020 09/01/00 M2001 LAM, A~ 1113
1020 09/01/00 386 MICHAEL LAMB 7014
1020 09/01/00 1226 I~%NDS' END CORPORATE SALE 7014
1020 09/01/00 1226 I~%NDS' ~ CORPORATE SALE 6111
TOTAL CH~CK
1020 09/01/00 M2001 LARKIN, CHRYL 1113
1020 09/01/00 404
1020 09/01/00 404
1020 09/01/00 404
TOTAL CHECK
LONGS DRUG STORES #260 6111
LONGS DRUG STORES #260 7014
LONGS DRUG STORES #260 6111
1020 09/01/00 1463
1020 09/01/00 1463
TOTAL CHECK
RUN DATE 08/31/00 TIME 15:44:11
MAAC0 AUTO PAINTING & BOD 7014
MAACO AUTO PAINTING & BOD 7014
....... DESCRIPTION .......
SAME
P0#10405 SUPPLIES
MICROFICHE UPDATE
REC REFUND
SERVICE AGREEMENT FOR CON
LPO#21328 CLUB 2K BOWLING
PO#14067 SU~4ER FINALE CP
*ICMA
FY 2000-2001 OPEN PURCHAS
BITUMINOUS APPLICATORS HA
WATERBORNE WHITE PAINT
TIME & MATERIAL
P0#14068 SUlkiER FINALE CM
PO#10378 SUPPLIES
P0#10293 SUPPLIES
PO310293 .SUPPLIES
REC REFUND
LOGO REDESIGN FOR CERT DE
PRINTING
REC REFUND
SERVICE AGREEMENT FOR CON
10 LOGO SHIRTS FOR HR
7 JACKETS WITH CITY LOGO
REC REFUND
LPO#21572 FILM PROCESSING
bpo#21335 YO. BUS TOKENS
LPO#21575 NATURE'S CAMP
REPAIR AND PAINT CITY VEH
FORD PICKUP #94 REPAIR ;tN
AMOUNT
85.32
85.33
255.97
63.00
185.00
576.00
20.00
270.00
290.00
6,969.84
46.51
3,655.60
5,880.14
4,346.80
168.61
213.08
112.01
73.88
185.89
49.00
48.71
163.46
960.00
135.00
288.70
538.10
826.80
50.00
29.47
22.00
37.66
89.13
702.82
1,335.99
2,038.81
- FINANCIAL ACCOUNTING
O~/]i/O0
ACCOUNTING PERIOD: 3/01
FUND - 110 - GENERAL FUND
CITY OF CUPERTINO
CHECK REGISTER
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
....... DESCRIPTION .......
PAGE 6
AMOUNT
579635 1020 09/01/00 1855 SUSAN MACGOWAN 7011
579636 1020 09/01/00 423 ~'TEK CORP 6111
579637 1020 09/01/00 M2001 MCG ARCHI~C'iTIRE 4520
579638 1020 09/01/00 437 M~O NEWSPAPERS 2211
579638 1020 09/01/00 437 METRO NEWSPAPERS 6201
579638 1020 09/01/00 437 METRO NEWSPAPERS 6201
579638 1020 09/01/00 437 ME~O NEWSPAPERS 6201
TOTAL CHECK
579639 1020 09/01/00 2073 DREW, MIC~L 5501
579640 1020 09/01/00 439 MICHAEI~S #13333 6111
579640 1020 09/01/00 439 MICHAELS #13333 6111
TOTAL CHECK
579641
579642
.~-~9643
643
579644
579644
579645
579645
579645
579645
579645
579645
579645
579645
579645
579645
579646
579647
579648
579649
~"~650
650
b79650
1020 09/01/00 1238
1020 09/01/00 1991
1020 09/01/00 443
i020 09/01/00 443
TOTAL CHECK
1020 09/01/00 447
1020 09/01/00 447
TOTAL CHECK
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
1020 09/01/00 1383
TOTAL C~ECK
1020 09/01/00 M2001
1020 09/01/00 M2001
1020 09/01/00 461
1020 09/01/00 463
1020 09/01/00 465
1020 09/01/00 465
1020 09/01/00 465
TOTAL CHECK
RUN DATE 08/31/00 TIME 15:44:11
MICRO CENTER 6111
MIKE'S TRUCK ACCESSORIES 6111
MI?.T.RNNIUMMECHANICAL INC 9300
MIT~.~NIUMMEC~NICAL INC 9300
~ISSION UNIFORM SERVICE 6124
MISSION UNIFORM SERVICE 6124
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BROS AUTO PARTS 6122
MITCHELL BEOS AUTO PARTS 6122
MIYASAKA, KEIKO 1113
MOORE, MARGOT 4751
MORELAND SCHOOL DISTRICT 7014
VICTOR G MOSSOTTI 7014
MOUNTAIN VIEW GARDEN CENT 6111
MOUNTAIN VIEW C,~u~DEN C~ 6111
MOUNTAIN VIEW GARDEN CENT 6111
TUITION REIMBURSEMENT
91.33
PO#10357 SUE SORB-A
407.47
15% REFUND FOR W/D APPLIC
60.75
LEGAL NOTICE
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURC~AS
97.50
52.50
50.00
47.50
247.50
REPL. CHK FOR #48898 8/4
110.38
LPO#21331 SCULPEY CLAY
PO#14056 SUPPLIES
27.01
64.91
91.92
PO#16407 SUPPLIES
78.95
SUPPLIES
172.12
2% DISCOUNT IN 10 DAYS
TIME & MATL
-24.69
1,234.28
1,209.59
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PUNCHAS
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURC~
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN pUNCT-L%S
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURCHAS
84.32
84.32
168~64
15.16
13.55
14.72
45.61
13.72
-67.09
-13.72
12.97
66.14
-66.14
34.92
REC REFUND
54. O0
REFUND AI.'~UQUERQUE
175.00
BUS TRANSPORTATION
489.60
SERVICE AGREEMENT FOR CON
207.00
SUPPLIES
SUPPLIES
SUPPLIES
28.09
28.09
28.09
84.27
- FINANCIAL ACCOUNTING
08/31/00 CITY OF CUPERTINO PAGE 7
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
579651 1020 09/01/00 471 MYERS TIRE SUPPLY COMPANY 7013
579651 1020 09/01/00 471 ~4YERS TIRE SUPPLY COMP/MTY 6121
579651 1020 09/01/00 471 MYERS TIRE SUPPLY COMPANY 7013
TOTAL CHECK
579652 1020 09/01/00 474 NATIONAL BUSINESS FURNITU 6111
579653 1020
09/01/00 485 NEWMAN TRAFFIC SIGNS 6111
579654 1020 09/01/00 487 NORTHAIRE SUPPLY CO 7013
579654 1020 09/01/00 487 NORTHAIRE SUPPLY CO 6111
579654 1020 09/01/00' 487 NORTHAIRE SUPPLY CO 6111
579654 1020 09/01/00 487 NORTHAIRE SUPPLY CO 6111
TOTAL CHECK
579655 1020 09/01/00 1358 NORTHERN TOOL & EQUIPMENT 6111
579656 1020 09/01/00 192 NOVACARE OCCUPATIONAL HEA 6205
579657 1020
09/01/00 1681 NU-WAY TOOL SUPPLY INC 6111
579658 1020 09/01/00 495 OFFICE HELPER 6111
579658 1020 09/01/00 495 OFFICE HELPER 6111
579658 1020 09/01/00 495 OFFICE HELPER 6111
TOTAL CHECK
579659 1020
09/01/00 501 OPERATING ENGINEERS #3 2123
579660
579660
579660
579660
579660
579660
579660
1020 09/01/00 981
1020 09/01/00 981
1020 09/01/00 981
1020 09/01/00 981
1020 09/01/00 981
1020 09/01/00 981
1020 09/01/00 981
TOTAL CHECK
ORCHID SUPPLY H~WARE 6111
ORCHARD SUPPLY HARDWARE 6111
ORCHARD SUPPLY HARDWARE 6111
ORCHARD SUPPLY HARDWARE 6111
ORCHARD SUPPLY HARDWARE 6111
ORCHARD SUPPLY HARDWARE 6111
ORCHARD SUPPLY HARDWARE 6111
579661
579661
1020 09/01/00 505
1020 09/01/00 505
TOTAL CHECK
OP, LANDI TRAILER 6111
ORLANDI TRAILER 6122
579662
579662
579662
579662
1020 09/01/00 507
1020 09/01/00 507
1020 09/01/00 507
1020 09/01/00 507
TOTAL CHECK
DA~ OSBORNE DBA:OSBORNE E 7013
DAN OSBOPA~E DBA:OSBORNE E 9100
DAN OSBOP, I~E DBA:OSBORNE E 7013
DAN OSBORNE DBA:OSBORNE E 7013
579663
579663
579663
579663
579663
579663
579663
1020 09/01/00 833
1020 09/01/00 833
1020 09/01/00 833
1020 09/01/00 833
1020 09/01/00 833
1020 o9/oi/oo 833
1020 09/01/00 833
TOTAL CHECK
P E R S 2125
P E R S 2127
P E R S 2144
P E R S 2127
P E R S 2127
P E R S 2125
P E R S 2125
RUN DATE 08/31/00 TIME 15:44:11
....... DESCRIPTION .......
AMOUNT
P0#10325 SUPPLIES
PO#10311 VACULA EVACUATOR
P0#10325
40.21
553.18
214.02
807.41
TWO DRAWER FILING CABINET
659.55
PO#10316
396.95
PARTS & SUPPLIES
PARTS & SUPPLIES
PARTS & SUPPLIES
PARTS & SUPPLIES
871.14
510.14
118.54
118.54
1,618.36
PO#10285 CAMERA SYSTEMS
309.23
PPD TEST FOR R M MORGAN
15.00
PO#10393 SUPPLIES
131.84
SUPPLIES
SUPPLIES
SUPPLIES
31.99
139.96
14.28
186.23
UNION DUES
457.05
PO#10289
LP0#10382
LP0#10381
PO#10303
P0#10334
LPO#16038
LP0#20994
272.00
51.94
35.98
254.72
162.19
6.99
43.87
827.69
LPO#20999 2" BALL
PO#10397 TAIL LIGHT ASSY
32.37
54.51
86.88
TIME & MATL
TIME & MATERIAL
TIME & MATL
TIME & MATL
590.59
2,800.00
472.75
623.38
4,486.72
*PERS BYBK
PERS EMPLY
PERS 1959
PERS EMPLY
PERS SPEC
*PEPS BYBK
PERS BUYBK
394.68
196.90
75.33
21,028.44
132.13
305.65
67.68
22,200.81
- FINANCIAL ACCOUNTING
08/31/00 CITY OF ~TJPERTIN0
ACCOI~INU PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
5~-~666 1020
66 1020
..666 1020
579666 1020
579666 1020
579666 1020
.579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
579666 1020
~'~.666 1020
66 1020
= ~666 1020
579666 1020
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
09/01/00
o9/ol/oo
09/01/00
09/01/00
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
09/01/00
09/01/00
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
o9/ol/oo
09/01/00
09/01/00
o9/oi/00
o9/oi/oo
o9/oi/oo
09/0i/00
o9/oi/oo
o9/oi/oo
o9/0i/00
09/01/00
o9/oi/oo
o9/ol/oo
09/01100
09/01/00
09/01/00
09/01/00
09/01/00
09/01/00
o9/oi/oo
o9/oi/oo
o9/ol/oo
09/01/00
09/01/00
o9/ol/oo
09/01/00
o9/oi/oo
o9/oi/oo
o9/oi/oo
o9/oi/oo
o9/oi/oo
o9/oi/oo
o9/ol/oo
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
511 PACIFIC BELL 6154
TOTAL CHECK
RUN DATE 06/31/00 TIME 15:44:11
PAGE
....... DESCRIPTION .......
TELEPHONE 7/16-8/15/00
TELEPHONE 8/16-9/15/00
CURRENT CHARGES
19.16
17.59
37.85
127.48
151.40
1,040.96
946.40
37.85
189.25
151.40
37.85
492.06
75.70
75.70
302.80
37.85
340.65
113.55
37.85
187.08
37.85
29.34
51.78
75.70
378.50
340.65
454.21
419.63
354.12
113.55
122.80
605.61
264.95
113.55
719.16
264.95
227.10
113.55
329.74
113.55
454.21
227.10
113.S5
113.55
113.55
75.70
189.25
416.36
113.55
227.10
81.27
347.75
13.75
57.54
151.40
12,246.35
- FINAI~CIALACCOUNTING
08/31/00 CITY OF CUPERTINO PAGE 9
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
....... DESCRIPTION .......
AMOUNT
S79667 1020 09/01/00 1528 PACIFIC UTILITY EQUIPMENT 6111
579667 1020 09/01/00 1528 PACIFIC UTILITY EQUIPMENT 6111
TOTAL CHECK
579668 1020 09/01/00 520 PAPERDIRECT INC 6111
579669 1020 09/01/00 526 PENINSULA BLUEPRINT 2211
579670 1020 09/01/00 533
PEPS LONG TERM CARE PROG 2137
579671 1020 09/01/00 2055 PW MARKET 6111
579671 1020 09/01/00 2055 PW MARKET 6111
579671 1020 09/01/00 2055 PW MARKET 6111
579671 1020 09/01/00 2055 PW MARKET 6111
TOTAJ~ CHECK
579672 1020 09/01/00 1406 RAINES CHEVORLET 6122
579672 1020 09/01/00 1406 PAINES CHEVORLET 6122
TOTAL CHECK
579673 1020 09/01/00 1907 RECYCLED TECHNOLOGY INC 9300
579673 1020 09/01/00 1907 RECYCLED TECHNOLOGY INC 9300
TOTAL CHECK
579674 1020 09/01/00 576 REED & GRARAM INC 6111
579674 1020 09/01/00 576 REED & GRAHAM INC 6111
TOTAL CHECK
579675 1020 09/01/00 581 RELIABLE ~111
579675 1020 09/01/00 581 RELIABLE 6111
579675 1020 09/01/00 581 RELIABLE 6111
579675 1020 09/01/00 581 RELIABLE 6111
579675 1020 09/01/00 581 KELIABLE 6111
579675 1020 09/01/00 581 RELIABLE 6111
579675 1020 09/01/00 581 RELIABLE 6111
TOTAL CHECK
579676 1020 09/01/00 601 ROYAL BRA~S INC 6122
579677 1020 09/01/00 602 ROY/%L COACH TOURS 6301
579677 1020 09/01/00 602 ROYAL COACH TOURS 6301
TOTAL CHECK
579678 1020 09/01/00 1417 JENNIFER ROZWOOD 7014
579679 1020 09/01/00 605 RUSS E~'r~PRISES INC 6111
579679 1020 09/01/00 605 RUSS ENTERPRISES INC 6111
TOTAL CHECK
579680 1020 09/01/00 1636 SANTA CLARA COUNTY SHERIF 7014
579680 1020 09/01/00 1636 SANTA CLARA COUNTY SHERIF 7014
TOTAL C}IECK
579681 1020 09/01/00 1530 SHA~OCK SALES 6111
579681 1020 09/01/00 1530 SHAMROCK SALES 6111
RUN DATE 08/31/00 TIME 15:44:11
LPO#20589 LEVEL INDIC.
TRUCK MT BOOM
13.99
13.99
27.98
SUPPLIES
88.91
IMPROVEMENT PLANS
73.99
PEPS LTC
332.31
LPO#21360 GROCERIES
LPO#21322 GROCERIES
LPO#21362 GROCERIES
PO#14050 STAFF DINNER
49.51
52.76
30.69
39.55
172.51
FY 2000-2001 OPEN PURCHAS
FY 2000-2001 OPEN PURCHAS
14.90
22.51
37.41
FREIGHT, SHIPPING AND HAN
MATERIALS FOR TRAFFIC POL
400.00
2,450.00
2,850.00
ASPHALT 132.82
ASPHALT 144.18
277.00
PO#12283 SUPPLIES 80J19
SAME 9.82
PO#12284 SUPPLIES 11.88
PO#12284 SUPPLIES 44.41
SAME 42.03
SAME 11.99
PO#12285 SUPPLIES 234.10
434.42
LPO#20995 MALE COUPLERS
10.S0
~ANSPORTATION
T~SPORT'N-PACBELL 8/16
561.73
510.07
1,071.80
SERVICE AGREEMENT FOR CON
200.00
PO#10376 GLASS BEADS 476.30
PO#10400 GLASS BEADS 497.95
974.25
FINGERPRINT SERVICES
FINGERPRINT SERVICES
228.00
108.0~
336.0L
POLAROID 600 TWIN PACK 292.12
SAME 292.11
- FINANCIAL ACCOUNTING
08/31/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NU~ER CASH ACCT DATE ISSUED .............. VENDOR .............. ACCT
TOTAL CIIECK
579682 1020 09/01/00 648
579683 1020 . 09/01/00 1985
579683 1020 09/01/00 1985
TOTAL CHECK
579684 1020 09/01/00 2016
579685 1020 09/01/00 651
579686 1020 09/01/00 2076
579687 1020 09/01/00 2065
579668 1020 09/01/00 665
579689 1020 09/01/00 2010
579689 1020 09/01/00 2010
TOTAL CHECK
579690 1020 09/01/00 1421
91 1020 09/01/00 677
579692 1020 09/01/00 690
579692 1020 09/01/00 - 690
TOT~J~ CHECK
579693 1020 09/01/00 700
579694 1020 09/01/00 1564
579695 1020 09/01/00 1794
579696 1020 09/01/00 1260
579697 1020 09/01/00 1993
579698 1020 09/01/00 724
579699 1020 09/01/00 1154
579700 1020 09/01/00 732
579701 1020 09/01/00 737
579701 1020 09/01/00 737
579701 1020 09/01/00 737
TOTAL CHECK
~m'~702 1020 09/01/00 1707
~,~703 1020 09/01/00 746
579704 1020 09/01/00 749
RUN DATE 08/31/00 TIME 15:44:11
SHELTONS TP, ANSFER SERVICE 6111
SIEMENS BUILDING TECHNOLD 6111
SIEMENS BUILDING TEC~INOLO 7013
SIEMEI~S BUILDING TECHNOL 7013
SIERRA PACIFIC TURF SUPPL 6111
SILICON VAL~?I~ha, NUFACTUR 6214
SKILLPATH SEMINARS 6216
SOUTH BAY METROPOLITAN 7014
SPORTIME 6111
SPORTIME 6111
STANLEY STEF~R 7014
STATE STREET BANK & TRUST 2140
SUI~i~J~E FORD 7014
SUI~IMLE FORD 7014
TARGET SPECIAL~"f PRODUCTS 7011
'I~CHERS' HELPER 6111
TMT-PATHWAY LLC 6122
TOTAL TIRE RECYCLING ~ 7014
TRF_J%SURER OF AI~DA COUN 2137
TURF & INDUSTRIAL EQUIPME 6122
UNITED WAY OF S;tNTA CI2%RA 2132
UNIIKEP, SAL TRUCK EQUIP INC 9100
VA~?.~Y CI~STTR~E COMP;tNY 9100
VA?J.Ry CP, EST T~E C~Pia/~Y 9100
V~?~Y CRESTTREE COMPANY 9100
VARC,~ AUTO UPHOLSTERY 7014
VIKING OFFICE PRODUCTS 6111
VISA 6111
PAGE 10
....... DESCRIPTION .......
PO#10379 STABILIZER
PO#10361 POS. RELAY
PARTS & SUPPLIES
193-211 FEB STAT ~ COVE
PO#16311 SUPPLIES
REGISTR'N 9/20-S. JIIMES
ENROLI/~ SEPT. 28 SEMIN
LEAGUE ON ~ru'NE TO AUG2000
P0#14100 GOLF SUPPLIES
PO#14100 GOLF SUPPLIES
TIME & MATERIAL
*PEPS DEF
FY 2000-2001 OPEN PURC~
FY 2000-2001 OPEN PURC~
P0#10149 TRAINING CL4%SSES
P0#14070
PO#10301 DRIVE CENTRING
PO#10305 PICK UP OLD TIRE
ANGEL LOPEZ JR566-39-8126
PO#16309 SUPPLIES
UNITED WAY
TIME & MATERIAL
QUOTE 8/17
QUOTE 8/17
PO#10388/30484 PI~S
PO#10366 REPAIR SEAT
PO#16117 OFFICE SUPPLIES
ACCT#4388-0905-7007-4703
AMOUNT
584.23
281.45
412.77
80.11
492.88
1,488.43
143.21
75.00
199.00
3,434.40
125.32
145.14
270.46
792.00
949.72
123.75
97.68
221.43
490.00
98.75
99.28
72.00
161.54
56.72
96.75
5,482.00
1,728.53
527.18
387.54
2,643.25
306.66
293.23
393.88
- FII%%NCIAL ACCOIA~ITING
08/31/00 CITY OF CUPERTINO PAGE iI
ACCOUNTING PERIOD: 3/01 CHECK REGISTER
FUND - 110 - GENERAL FUND
CHECK NUMBER CASH ACCT DATE ISSUED .............. VENDOR ..............
579704 1020 09/01/00 749 VISA
TOTAL CHECK'
579705 1020 09/01/00 749 VISA
579705 1020 09/01/00 749 VISA
TOTAL CHECK
579706
579707
579708
579708
579709
579709
579710
579710
579710
579710
1020 09/01/00 750 VISION SERVICE PLAN
1020 09/01/00 302 WASHINGTON MUTUAL
1020 09/01/00 766
1020 09/01/00 766
TOTAL CHECK
WEST BAY STUMP REMOVAL IN
WEST BAY STUMP REMOVAL IN
1020 09/01/00 779
1020 09/01/00 779
TOTAL CHECK
ACCT
6216
6216
6216
2131
2138
7014
7014
WEST-LITE SUPPLY CO INC 7013
WEST-LITE SUPPLY CO INC 7013
1020 09/01/00 775 WESTERN PACIFIC SIGNAL LL 6111
1020 09/01/00 775 WESTERN PACIFIC SIGNAL LL 9300
1020 09/01/00 775 WESTERN PACIFIC SIGNAL LL 9400
1020 09/01/00 775 WESTERN PACIFIC SIGN~ LL 9400
TOTAL CHECK
09/01/00 M2001 WON, YONG JA 1113
09/01/00 951 WOOLWORTH NURSERY 6111
09/01/00. 1131 CIDDY WORDELL 6216
09/01/00 M2001 WU, YUHFEN DIANA 6216
579711 1020
579712 1020
579713 1020
579714 1020
TOTAL FUND
TOTAL REPORT
....... DESCRIPTION .......
DORAL PALM SPRINGS RESORT
DOUBLE THEE HOTEL-LEAGE
HOLIDAY INN - DAVE KNAPP
GRP#120744610001 140 EMP
*WASHMUTL
STUMP GRINDING
STUMP GRINDING ON 8/14/00
SUPPLIES
SUPPLIES
NAZTEC MODEL 980 CONTROLL
NAZTEC MODEL 980 CONTROLL
T/S SIGN~J~ SHOP WORKSTATI
NAZTEC MODEL 980 CONTROLL
REC REFUND
PO#10369 BARKS
REIMB-CONF SWA AIR FARE
MEMBERSHIP
AMOUNT
14.00
407.88
159.57
182.84
342.41
1,946.00
16,267.95
620.00
325.00
945.00
8.57
135.68
144.25
2,821.93
3,123.13
4,853.93
4,333.36
15,132.35
824.00
81.03
122200
85.00
224,041.49
224,041.49
RUN DATE 08/31/00 TIME 15:44:11
- FINANCIAL ACCOUNTING
RESOLUTION NO. 00-237
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
ALLOWING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE AMOUNTS
AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR GENERAL AND
MISCELLANEOUS EXPENDITURES FOR THE PERIOD ENDING
Septembm' 8, 2000
WHEREAS, the Director of Administrative Services or her designated
representative has certified to accuracy of the following claims and demands and to the
availability of funds for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law.
NOW, THEREFORE, BE IT RESOLVED, that the City Council hereby allows
the following claims and demands in the amounts and from the funds as hereinafter set
forth in Exhibit "A".
CERTIFIED:
Director of Administrative Services
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this day of ,2000, by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
o9/11/oo
ACCOUNTING PERIOD: 3/01
CITY OF CUPERTINO
CHECK REGISTER - DXSBURSEMENT FUND
SELECTION CRITERIA: transact.trans_date between '09/04/2000" and #09/08/2000#
FUND - 110 - GENERAL FOND
CASH ACCT CHECK NO
1020 579667 V
1020 579667 V
TOTAL CHECK
ISSUE DT .............. VENDOR ............. FUND/DEPT
09/01/00 1528 PACIFIC UTILITY EQUIPMEN 1108830
09/01/00 1528 PACIFIC UTILITY EQUIPMEN 1108830
1020 579671
1020 579671
1020 579671
1020 579671
TOTAL CHECK
V 09/01/00 2055 PW MARKET-DUP USE '509' 5806349
V 09/01/00 2055 PW MARKET-DUP USE '509" 5806349
V 09/01/00 2055 PW MARKET-DUP USE #S09' S806349
V 09/01/00 2055 PW MARKET-DUP USE "509" 5806349
1020 579692
1020 579692
TOTAL CHECK
V 09/01/00 690 SUI~ALE FORD 6308840
V 09/01/00 690 SUNI~fV;LL4~ FORD 6308840
1020 579704
1020 579704
TOTAL CHECK
V 09/01/00 749 VISA 1101200
V 09/01/00 749 VISA 1104300
1020 579715
1020 579716
1020 579717
1020 579717
TOTAL CHECK
09/05/o0 M2001
09/07/00 437
09/07/00 M2001
V 09/07/00 N2001
LAW OFFICE OF DAVID CULV 1104540
METRO NEWSPAPERS 5208003
SODEXHO MARRIOTT CATERIN 2204010
SODEXHO MARRIOTT CATERIN 2204010
1020 579718
09/07/00 M2001 SODEXHO MARRIOTT CATERIN 2204010
1020 579719
1020 579720
1020 579721
1020 579721
TOTAL CHECK
09/08/00 2084
09/08/00 I8
09/08/00 29
09/08/00 29
A.M. BEST COMPANY, INC. 1108101
ADONA OIL CORPORATION 1108005
LYNNE DIANE AITKEN 5706450
LYNNE DIANE AITKEN 5806449
1020 579722
1020 579723
1020 579724
1020 579724
TOTAL CHECK
o9/o8/oo 45
09/08/00 1343
09/08/00 71
09/08/00 71
AMERICAN TiCa. FFIC SUPPLY
ROSE-MARIE ANDICHOU
B & R ICE CREAM DIST
B & R ICE CREAM DIST
1108303
5606620
5606620
5606620
1020 579725
1020 579726
1020 579726
1020 579726
1020 579726
1020 579726
09/08/00 867
09/08/oo 872
09/08/00 872
09/08/00 872
09/08/00 872
09/08/00 872
BRIAN KANGAS FOULK
BSA ARCHITECTS
BSA ARCHITECTS
BSA ARCHITECTS
BSA ARCHITECTS
BSA ARCHITECTS
4209430
4249210
4249210
424921O
4249210
4249210
..... DESCRIPTION ......
LP0#20589 LEVEL INDIC.
TRUCK MT BOOM
LPO#21322 GROCERIES
LPO#21362 GROCERIES
P0#14050 STAPF DINNER
LPO#21360 GROCERIES
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
DORAL PALM SPRINGS RES'
ACCT#4388-0905-7007-47
LITIG. SETTLEMENT NEMET
1/4 SO AD ON 9/20
BA~ECUE 9/7
B;%RBECUE 9/7
BARBACUE 9/7
KEY RATING GUIDE
~ UP YARD, PAINT C
4 CbASSES IN AUGUST
AEROBIC INSTRUCTION
BARRICADE RENTAL
i HR PERFORIV~/~CE ON 9/
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
PROJECT#19990204-10
SALES TAX
PAGE i
0.00 -13.99
0.00 -13.99
0.00 -27.98
0.00 -52.76
0.00 -30.69
0.00 -39.55
0.00 -49.51
0.00 -172.51
0.00 -123.75
0.00 -97.68
0.00 -221.43
0.00 -14.00
0.00 -393.88
0.00 -407.88
0.00 75000.00
0.00 386.00
0.00 5. J
0.00 -535.00
0.00 0.00
0.00 .502.54
0.00 177.90
0.00 4800.00
0.00 92.00
0.00 172.S0
0.00 264.50
0.00 87.50
0.00 90.00
0.00 1120.38
0.00 705.07
0.00 1825.45
0.00 30144.84
ADDTIONAL EMCUMBR;~NCE 0.00 197.83
ADDITIONAL WORK ON PRO 0.00 3318.10
TSF BAL TO NEW ACCT 0.00 63" 95
CHANGE ORDER #S 7/18/2 0.00 ~
PROF SERVICES 0.00 lb~.00
RUN DATE 09/11/00 TIME 15:10:36
- FINANCIAL ACCOUNTING ~,,., [ /
o9/11/oo
ACCOUNTING PERIOD:
$ ION CRITERIA:
3/01
CITY OF CUPERTINO
CHECK REGISTER - DISBURSEMENT FUND
transact.trans_date between "09/04/2000" and "09/08/2000"
FUND - 110 - GENERAL FUND
CASH ACCT CHECK NO ISSUE DT .............. VENDOR ............. FUND/DEFT
TOTAL CHECK
1020 579727 09/08/00 1777 ~ORI CARR 5606620
1020 579728 09/08/00 148
1020 579728 09/08/00 148
1020 579728 09/08/00 148
1020 579728 09/08/00 148
1020 579728 09/08/00 148
1020 579726 09/08/00 148
1020 579728 09/08/00 148
1020 579728 09/08/00 148
1020 579728 09/08/00 148
1020 579728 09/08/00 146
1020 579728 09/08/00 148
1020 579728 09/08/00 146
1020 579728 09/08/00 148
1020 579728 09/08/00 148
TOTAL CHECK
1020 579~29 09/08/00 2079
1 579730 09/08/00 152
102u 579730 09/08/00 152
TOTAL CHECK
CASH 1108201
CASH 1108501
CASH 6308840
CASH 1108201
CASH 5708510
CASH 6308840
CASH 1106005
CASH 1108501
CASH 1108501
CASH 6306840
CASH 1106501
CASH 1106312
CASH 6308840
CASH 2706405
CATA~aINI RESIDENCE 110
CEB:CONTINUING EDUCATION 1101500
CEB:CONTINUING EDUCATION 1101500
1020 579731
09/06/00 1453 CHRISTOPHERS CARPET SERV 1106501
1020 579732
1020 579733
09/08/00 166 KIMBERLY MARIE CLARK 5806449
09/08/00 1128 PEGGY CLARK 5606249
1020 579734
1020 579734
TOTA~ CHECK
09/08/00 173
09/08/00 173
COCA-CO~ABOTTLING OF CA5608620
COCA-CO~ABOTTLING OF CA5606620
1020 579735
1020 579735
1020 579735
1020 579735
1020 579735
1020 579735
1020 579735
1020 579735
1020 579735
1020 579735
TOTAL CHECK
09/08/00 1293 COSMO,.TL~ 5606620
09/06/00 1293 COSMOu--C,~P 5606620
09/08/00 1293 COSHOJL~P 5606620
09/08/00 1293 COSHOu'T,1HP 5606620
09/08/00 1293 COSMOJLI~ 5606620
09/08/00 1293 COSHOJU~p 5606620
09/08/00 1293 COSMOu-%~4P 5606620
09/08/00 1293 COS~O~ 5606620
09/08/00 1293 COSMOJUMP 5606620
09/06/00 1293 COSMOJUKP 5606620
1020 579736
1, 579737
09/08/00 184 J~4ES COURTNEY 5606620
09/06/00 2091 HEATHER Ct~INE 1100000
..... DESCRIPTION ...... SALES TAX
0.00
PAGE 2
4405.14
1/2 HR PERFORMANCE 0.00 45.00
SUPPLIES 8/24 0.00 4.32
SUPPLIES 8/16 0.00 10.63
PROPANE 8/30 0.00 12.05
POSTAGE 9/5 0.00 6.60
SUPPLIES 9/1 0.00 1.95
SUPPLIES 8/29 0.00 3.68
SUPPLIES 8/31 0.00 9.29
SUPPLIES 8/28 0.00 12.95
SUPPLIES 8/31 0.00 6.04
SUPPLIES 6/31 0.00 6.62
CELL PHONE BILL 8/21 0.00 37.16
SUPPLIES 9/15 0.00 2.70
PROPANE 8/11 0.00 4.50
PROPANE BY RON SILVA 8 0.00 10.00
0.00 130.69
DUPLICATE PMT A/R 0.00 63.00
ACCT#182288 LIABILITY 0.00 70.45
ACCT#926642 0.00 170.33
0.00 240.76
CARPET REPAIRS 0.00
120.00
DANCE INSTRUCTION 0.00 300.00
DOG CLASSES#2164,2161
0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
FY 2000-2001 OPEN PURC 0.00
0.00
3 HOURS PERFORMANCE 0.00
P/R INVALID ACC'r# ERR0 0.00
1650.00
362.11
60.00
442.11
150.O0
300.00
150.00
300.00
150.00
150.00
150.00
600.00
150.00
150.00
2250.00
255.00
406.30
RUN DATE 09/11/00 TXHE 1S:10:37
ACCOUNTING
09/11/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER - DISBURSEMENT FWD
SELECTION C~XTERIA: transact.trans_daCe between '09/04/2000' and '09/08/2000~
FUND - 110 - GENERA~ ~
CASH ACCT CHECK NO ISSUE DT .............. VENDOR ............. FUND/DEFT
1020 579738 09/08/00 1407
1020 579739 09/08/00 2082
1020 579740 09/08/00 2085
1020 579741 09/08/00 210
1020 579742 09/08/00 223
1020 579743 09/08/00 239
1020 579744 09/08/00 251
1020 579744 09/08/00 251
1020 579744 09/08/00 251
TOTAL CHECK
1020 579745 09/08/00 253
1020 579745 09/08/00 253
1020 579745 09/08/00 253
TOTAL CHECK
1020 579746 09/08/00 1848
1020 579747 09/08/00 1778
1020 579748 09/08/00 275
1020 579749 09/08/00 281
1020 579749 09/08/00 281
1020 579749 09/08/00 281
TOTAL CHECK
1020 579750 09/08/00 1335
1020 579751 09/08/00 328
1020 579751 09/08/00 328
TOTAL CHECK
1020 579752 09/08/00 M2001
1020 579753 09/08/00 2064
1020 579754 09/08/00 2090
1020 5797S5 09/08/00 2089
1020 S79756 09/08/00 1760
1020 579757 09/08/00 1969
CUllINGS HENDERSON TIRE 6308840
JOYCE L. DAVIS 1101201
DB PROMOTIONS 1103300
DEEP CLIFF ASSOCIATES L 5806449
DON & MIKE'S SWEEPING IN 2308004
ELECTRICAL DISTEIBUTORS 1108830
EVANS WEST VALLEY SPRAY 1108315
EVANS WEST VALLEY SPRAY 1108314
EVANS WEST VALLEY SPRAY 1108303
EXCHANGE LINEN SERVICE 5606620
EXC~d~/qGE LINEN SERVICE 5606620
EXCHANGE LINEN SERVICE 5606620
DAVE FERGUSON 1108201
LEE FRANCIA 5606620
SUSAN FUKUBA 5806449
GARDENLA~D 6308840
GARDENL~M4~ 6308840
GARDENLAND 6308840
DENISE GOSS S806249
LAUREN HENSHALL 5806449
LAUREN HENSHALL 5706450
HO, K.Y. 5606640
HONARDO HOFF JR. 1104400
IKON OFFICE SOLUTIONS 1101500
IMSA CERTIFICATION 1108201
INSPECTION CONSULTANTS I 4249210
GA/LJ~NS~N 2204011
..... DESCRIPTION ......
FY 2000-2001 OPEN PURC
5C*S VIDEO
HORIZON PICTURE FRAME
GOLF INSTRUCTION
INC EXTRA 8/10-8/24 SW
FY 2000-2001 OPEN PI,IRC
TURF FERT. CRBEKSIDE P
TURF FERT. CREEKSIDE P
TURF FERT. MEMORIAL PA
FY 2000-2001 OPEN PUEC
FY 2000-2001 OPEN PUEC
FY 2000-2001 OPEN PURC
.PERDIEM FOR 3 DAYS
3 HRS. PERFORMANCE
KARATE INSTRUCTION
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
CLASSES#2165,2195,2201
AEROBIC INSTRUCTION
14.5 C~ASSES IN AUGUST
REPAIR GIASS
FIRST AID INSTRUCTION
CANON IMAGE RUNNER 210
CERTEXA, FPR D. FERGU
MASONRY OBSERVATION;SA
TOHORRON'S LEADERS TOD
SALES TAX
PAGE 3
0.00 123.75
0.00 100.00
0.00 177.17
0.00 3496.00
0.00 10160.80
0.00 302.03
0.00 3000.00
0.00 3200.00
0.00 3000.00
0.00 9200.00
0.00 103.35
0.00 408.42
0.00 310.55
0.00 87 ·
0.00 114.00
0.00 270.00
0.00 3090.00
0.00 4.31
0.00 48.71
0.00 67.05
0.00 120.07
0.00 150.90
0.00 172.50
0.00 333.50
0.00 506.00
0.00 109.38
0.00 44.00
0.00 9093.00
0.00 250.00
0.00 1567 00
0.00 3~..~0
RUN DATE 09/11/00 TIME 15:10:37
* FINANCIAL ACCOUNTING
og/li/oo
ACCOUNTING PERIOD:
! TION CRITERIA:
3/01
CITY OF CUPERTINO
CHECK REGISTER - DISBURSEMENT FUND
transact.trans date between "09/04/2000" and "09/08/2000'
FUND - 110 - GENERAL FUND
CASH ACCT CHECK NO ISSUE DT .............. VENDOR ............. FUND/DEPT
..... DESCRIPTION ......
SALE~ TAX
PAGE 4
1020 579758 09/08/00 1657
1020 579758 09~08/00 1657
1020 579758 09/08/00 1657
TOTAL CHECK
1020 579759 09/08/00 2086
1020 579759 09/08/00 1086
TOT~/~ CHECK
1020 579760 09/08/00 397
1020 579760 09/08/00 397
1020 579760 09/08/00 397
TOTAL CHECK
1020 579761
1020 579762
1020 579763
~"'"' 579764
579764
10Z0 579764
TOTAL CHECK
1020 579765
1020 579766
1020 579767
1020 579768
1020 579769
1020 579770
1020 579771
1020 579772
1020 579773
1020 579773
TOTAL C~ECK
1020 579774
1020 579775
1. 579776
09/08/00 M2001
09/08/00 400
09/08/00 2ov8
09/08/00 408
09/08/00 408
09/08/00 408
09/06/00 M2001
09/08/00 1356
09/08/00 1602
09/08/00 455
09/08/00 M2001
09/08/00 473
09/08/00 479
09/08/00 1550
09/08/00 480
09/08/00 480
09/08/00 192
09/08/00 1970
09/08/00 499
JOSEPHINE'S PERSONNEL SE 1106265
JOSEPHINE'S PERSONNEL SE 1106500
JOSEPHINE'S PERSONNEL SE 1106500
L. PATRICK SAMSELL 1104100
L. PATRICK S~d~SELL 1104100
LESLIE'S POOL SUPPLIES I 1108303
LESLIE'S POOL SUPPLIES I 5708510
LESLIE'S POOL SUPPLIES I 1108321
LIFETIME POOLS 110
LIFETIME TENNIS INC 5706450
LONGS DRUGS #260 110
LOS GATOS MEAT & SMOK~HO 5606620
LOS GATOS MEAT & SMOKEHO 5606620
LOS GA%OS MEAT & SMOKEHO 5606620
LUCIL~E NONIG 1103300
MATTHEW BENDER & COMPANY 1101500
MBIA MUNISERVICES COMPAN 1100000
HEATHER MOLL 5806249
MORE%,%/qD SCHOOL DISTRICT 5806349
NASER DISTRIBUTORS INC 5606620
NATURES WOOD 5606620
$d)ONIS L NEC~I%O 1103500
NELSON ENGINEERING 1108101
NELSNN ENGINEERING 1108101
NOVACARE OC~2UPATIONALNE 1108201
BARBARA NUNES 2204011
DEBBIE O'NEILL 5606620
R VILLALOBOS WE 8/13-8
R VIL/d%LOBOS WE 8/13-8
R VILLALOBOS WE 8/27/0
PROFESSIONAL SVC
MILEAGE
SUPPLIES
SUPPLIES
SUPPLIES
ENCROACHMENT BOND RELE
11301998-PA%94E~TT#4
DUPLICATE P~r~ A/R
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
BUS TR~SPORTATION
ACCT#0010034720
PROF SVS
CB#1368,1372, BC#1354
BUS ~ANSPORTATION
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
OPEEA%OR 8/19-9/1 17.5
PLAN REVIEW SERVICES
SERVICE AGREEMENT FOR
CLIFF W MABUTAS VACCIN
TOMORROW ' S T~U%DERS TOD
4 HRS PERFORMANCE
0.00 1455.40
0.00 117.80
0.00 95O.00
0.00 2523.20
0.00 4480.00
0.00 132.29
0.00 4612.29
0.00 390.82
0.00 41.12
0.00 390.81
0.00 822.75
0.00 500.00
0.00 40877.53
0.00 143.83
0.00 1705.33
0.00 2476.55
0.00 372.84
0.00 4554.72
0.00 · 274.86
0.00 256.27
0.00 1250.00
0.00 1554.00
0.00 631.60
0.00 867.03
0.00 681.98
0.00 175.00
0.00 350.00
0.00 1100.00
0.00 1450.00
0.00 70.00
0.00 375.00
0.00 360.00
RUN DATE 09/11/00 TIME 15:10:38
- FINANCIAL ACCOUNTING
09/11/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER - DISBURSEMENT FUND
SELECTION CRITERIA: transact.trans date between "09/04/2000" and
FUNP - 110 -' GENERAL FUND
CASH ACCT CHECK NO ISSUE DT .............. VENDOR ............. FUND/DEPT
..... DESCRIPTION ......
PAGE 5
SALES TAX AMOUNT
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1106265
1020 . 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1104510
1020 579779 09/08/00 493 OFFICE DEPOT 1104000
1020 579779 09/08/00 493 OFFICE DEPOT 1106265
1020 579779 09/08/00 493 OFFICE DEPOT 1108601
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 S79779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1104000
1020 579779 09/08/00 493 OFFICE DEPOT 1108101
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1101000
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1104400
1020 579779 09/08/00 493 OFFICE DEPOT 1103500
1020 579779 09/08/00 493 OFFICE DEPOT 5806649
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1108101
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1106342
1020 579779 09/08/00 493 OFFICE DEPOT 1108601
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 5806349
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DE]~)T 1106265
1020 579779 09/08/00 493 OFFICE DEPOT 1101201
1020 579779 09/08/00 493 OFFICE DEPOT 1106265
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1104400
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1108601
1020 579779 09/08/00 493 OFFICE DEPOT 1108601
1020 579779 09/08/00 493 OFFICE DEPOT 1106265
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1108601
1020 579779 09/08/00 493 OFFICE DEPOT 5806249
1020 579779 09/08/00 493 OFFICE DE]K)T 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1108601
1020 579779 09/08/00 493 OFFICE DEPOT 1101200
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1106100
1020 579779 09/08/00 493 OFFICE DEPOT 1101000
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1106100
1020 579779 09/08/00 493 OFFICE DEPOT 1104510
1020 579779 09/08/00 493 OFFICE DEPOT 1104510
1020 579779 09/08/00 493 OFFICE DEPOT 1106265
1020 S79779 09/08/00 493 OFFICE DEPOT 5208003
ORDERED BY JO-ANNE 0.00 87.03
SUPPLIES 0.00 8.41
SUPPLIES 0.00 286.24
SUPPLIES 0.00 60.79
RETURN SUPPLIES 0,00 -12.95
SUPPLIES 0.00 46.76
SUPPLIES 0.00 81.24
SUPPLIES 0.00 28.02
SUPPLIES 0.00 9.05
UNDER INV#103666564001 0.00 -9.05
SUPPLIES 0,00 328.47
RETURN SUPPLIES 0.00 -50.98
RETURN SUPPLIES 0,00 -34.98
SUPPLIES 0,00 42.35
OFFICE SUPPLIES 0,00 32.73
CREDIT MEMO (LABELER.. 0.00 -239.65
SUPPLIES 0.00 22.28
SUPPLIES 0,00 12.65
SUPPLIES 0.00 20.79
SAME 0,00 195.65
OFFICE SUPPLIES 0.00 ~
OFFICE SUPPLIES 0.00 8, ,
SUPPLIES 0.00 36.~6
ORDERED BY JOANNE 0.00 35.79
SUPPLIES 0.00 462.15
RET IN INV310520421100 0.00 -14.99
SUPPLIES 0.00 142.10
SUPPLIES 0.00 16.45
SUPPLIES 0.00 733.52
SUPPLIES 0.00 17.88
SUPP. 0.00 97.90
UNDER INV#105241950001 0.00 -87.03
ORDERED BY S. JOHNSON 0.00 21.63
SUPPLIES 0.00 18.90
OFFICE SUPPLIES 0.00 214.90
ORDERED BY S CHENG 0.00 144.40
RETURN 0.00 -3.63
ORDERED BY R SHAFFER 0.00 38.57
OFFICE SUPPLIES 0.00 415.91
ORDERED BY C SHEPHERD 0.00 29.37
ORDERED BY LINA LAGUGA 0.00 16.44
ORDERED BY JOANNE 0.00 193.98
SUPPLIES 0.00 12.29
SUPPLIS 0.00 73.84
SUPPLIES 0.00 92.25
SUPPLIES 0.00 58.73
SUPPLIES 0.00 66.76
SUPPLIES 0.00 1~ '"
SUPPLIES 0.00 ~
SAME 0.00 37.45
RUN DATE 09/11/00 TIME 15:10:39
- FINANCIAL ACCOUNTING
og/n/oo
ACCOUNTING PERIOD:
SI ON CRITERIA:
3/01
CITY OF CUPERTINO
CHECK REGISTER - DISBURSEMENT FUND
transact.trans date between #09/04/2000" and '09/08/2000#
FUND - 110 - GENERAL FUND
CASH ACCT CI~ECK NO ISSUE DT .............. VENDOR ............. FUND/DEPT
1020 579779 09/08/00 493 OFFICE DEPOT 1108101
1020 579779 09/08/00 493 OFFICE DEPOT 1104510
1020 579779 09/08/00 493 OFFICE DEPOT 1101000
1020 579779 09/08/00 493 OFFICE DEPOT 1108601
1020 579779 09/08/00 493 OFFICE DEPOT 1104100
1020 579779 09/08/00 493 OFFICE DEPOT 1108101
1020 579779 09/08/00 493 OFFICE DEPOT 1108101
1020 579779 09/08/00 493 OFFICE DEPOT 1104530
TOTAL CHECK
1020 579780 09/08/00 1190 RONALD OLDS 1103500
1020 579781 09/08/00 507 DAN OSBORNE DBA:OSBORNE 1108501
1020 579781 09/08/00 507 DAN OSBORNE DBA:OSBORNE 5606620
TOTAL CHECK
1020 579782 09/08/00 508 P E R S - HEALTH 1104510
1020 579782 09/08/00 508 P E R S - HEALTH 1104510
1020 579782 09/08/00 508 P E R S - HEALTH 110
TOTAL CHECK
10~ 579783 09/08/00 511 PACIFIC BELL 6104800
1020 579784 09/08/00 513
1020 579784 09/08/00 513
1020 579784 09/08/00 513
1020 579784 09/08/00 513
1020 579784 09/08/00 513
TOTAL CHECK
PACIFIC GAS & ELECTRIC ( 1108602
PACIFIC.GAS & ELECTRIC ( 1108407
PACIFIC GAS & ELECTRIC ( 4209110
PACIFIC GAS & ELECTRIC ( 1108503
PACIFIC GAS & ELECTRIC ( 5606620
1020 579785
09/08/00 515 PACIFIC WEST SECURITY IN 4209110
1020 579786
1020 579786.
TOTAL CHECK
09/08/00 1099
09/08/00 1099
PAVEIqENT ENGINEERING INC 2708404
PAVEMENT.ENGINEERING INC 2708404
1020 579787
09/08/00 536 ANNE MARIE PETERSON 5806249
1020 579788
09/08/00 M2001 PHILLIP BURTON HIGH SCHO 5600000
1020 579789
09/08/00 541 ROBIN PICKEL
5706450
5606640
5506549
5606620
5606620
5706450
1020 579790
09/08/00 545 JEFF PISERCHIO
1020 S79791
1020 579792
102~ 579793
10~ 579794
09/08/00 1186 THE PRINTERS
09/08/00 579 KEVIN REID
09/08/00 588 BART RIBOTTA
09/08/00 606 JOYCE RUSSUM
DESCRIPTION ......
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SAME+
SUPPLIES
8/14-8/27 SVC EQ MAINT
TIME AND MATERIAL
ELECTRICAL SERVICES
SEPT HEALTH PREMIUM
SEPT HEALTH PREMIUM
SEPT HEALTH PREMIUM
SALES TAX
PAGE G
0.00 121.70
0.00 113.66
0.00 6.51
0.00 78.75
0.00 16.88
0.00 335.05
0.00 48.80
0.00 32.60
0.00 4685.03
0.00 250.00
0.00 1800.00
0.00 887.64
0.00 2687.64
0.00 20262.40
0.00 293.83
0.00 40062.63
0.00 60618.86
7/21-8/19 TEL. SVC 0.00 520.73
8/2-8/31 SVC 0.00 90.93
8/1-8/30/00 ELEC SVC 0.00 11.03
7/31-8/29 SVC 0.00 141.59
7/5-8/4 ELEC SVC 0.00 120.85
8/1-8/30 ELEC SVC 0.00 7.80
'0.00 372.20
0.00 1933.00
BURGLARY INTRU SYSTEM
SERVICE AGREEMENT FOR
SERVICE AGREEMENT FOR
0.00 750.00
0.00 1100.00
0.00 1850.00
SERVICE AGREEMENT FOR 0.00 545.40
REFUND-OVERPMT OF PICN 0.00 1330.00
19 CLASSES IN AUGUST 0.00 665.00
8/23-9/5 CONT SVC 0.00 1790.00
LABEL & NAME TAGS 0.00 111.50
LIFEGUARD 6 DAYS 0.00 840.00
LIFEGUARD 5 DAYS WORK 0.00 70.0.00
8 CLASSES IN AUGUST 0.00 184.00
RUN DATE 09/11/00 TIME 15:10:39
- FINANCIAL ACCOUNTING
09/11/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER - DISBUNSEM~NT FUND
SELECTION CRITERIA: transact.trans_date between "09/04/2000" and '09/08/2000"
FUND - 110 - GENERAL FUND
CASH ACCT CHECK NO ISSUE DT .............. VENDOR ............. FUND/DEPT
..... DESCRIPTION ......
SALES TAX
PAGE 7
AMOUNT
1020 579795 09/08/00 1643
1020 579796 09/08/00 1442
SAFEGUARD BUSINESS SYSTE 5506549
SAN JOSE ICE COMPANY 5606620
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPA~Pf 5606620
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/06 625 SAN JOSE WATER COMPANY 4209110
1020 579801 09/08/00 625 SAN JOSE WATER COMPIuNY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108506
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108315
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108315
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108321
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108315
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108315
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108321
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPARY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPAI%Uf 1108321
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER CO~ANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108315
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108312
1020 579801 09/08/00 625 SAN JOSE WATER CO~IPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPA~ 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COmPAnY 1108312
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108312
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108504
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 5606620
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 5606620
1020 579801 09/08/00 625 SAN JOSE WATER CO~4PANY 1108504
1020 579801 09/08/00 625 SAN JOSE WATER C0~PANY 5606640
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108303
MEMBERSHIP
SUPPLIES
6/21-8/22 WATER SVC
6/21-8/23 WATER SVC
6/30-9/1 WATER SVC
6/30-9/1 WATER SVC
6/30-8/31 WATER S¥C
6/30-8/31 WATER SVC
6/21-8/24 WATER SVC
6/21-8/22 WATER SVC
6/30-9/1 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
7/26-8/23 WATER SVC
7/26-8/23 WATER SVC
7/27-8/24 WATER SVC
7/26-8/23 WATER SVC
7/26-8/23 WATER SVC
7/27-8/25 WATER SVC
7/26-8/23 WATER SVC
7/26-8/23 WATER SVC
7/26-8/23 WATER SVC
6/29-8/30 WATER SVC
7/26-8/23 WATER SVC
7/31-8/29 WATER SVC
6/29-8/30 WATER SVC
6/29-8/30 WATER SVC
7/31-8/29 WATER SVC
7/27°8/24 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
6/29-8/30 WATER SVC
6/29-8/30 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
7/26-8/23 WATER SVC
7/27-8/24 WATER SVC
7/57-8/24 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
7/24-8/24 WATER SVC
7/31-8/29 WATER SVC
7/27-8/24 WATER SVC
7/27-8/24 WATER SVC
0.00 129.77
0.00 240.00
0.00 88.31
0.00 94.12
0.00 2847.63
0.00 539.82
0.00 38.54
0.00 14.60
0.00 296.70
0.00 101.27
0.00 128.69
0.00 8.65
0.00 38.52
0.00 31.95
0.00 30.50
0.00 71.96
0.00 2841.65
0.00 30.42
0.00 13'
0.00 15
0.00 1427.22
0.00 96.33
0.00 2684.82
0.00 193.07
0.00 4774.59
0.00 973.11
0.00 30.42
0.00 450.99
0.00 203.38
0.00 30.42
0.00 45.75
0.00 139.77
0.00 910.81
0.00 164.93
0.00 295.03
0.00 100.05
0.00 237.08
0.00 12.98
0.00 29.85
0.00 1950.74
0.00 1283.46
0.00 88.03
0.00 195.29
0.00 8.65
0.00 345.62
0.00 g. O0
0.00 :
0.00 19~..10
RUN DATE 09/11/00 TIME 15:10:40
- FINANCIAL ACCOUNTING
09/11/00
ACCOL~TrI~G PERIOD:
iON CRITERIA:
3/01
CITY OF CUPERTINO
CHECK REGISTER - DISBURSEMENT FUND
transact.trans_date between "09/04/2000" and "09/08/2000"
FUND - 110 - GENERAL FUND
CASH ACCT CHECK NO ISSUE DT .............. VENDOR ............. FUND/DEPT
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108303
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108504
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108507
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 5708510
1020 579801 09/08/00 625 SAN JOSE MATER COMPANY 5708510
1020 579801 09/08/00 625 SAN JOSE WATER COMP~%'Y 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108302
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108303
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108503
103"'" 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108303
il 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108303
102o 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108314
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 5606620
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 5708510
1020 579801 09/08/00 625 SAN JOSE WATER COMPA~ 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108408
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPA~'Y 1108506
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 5606620
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPARY 1108407
1020 579801 09/08/00 625 SAN JOSE WATER COMPANY 1108407
TOTAL CHECK
1020 579802 09/08/00 633
1020 579802 09/08/00 633
TOTAL CHECK
SANTA CLARA COUNTY SHERI 5606620
SANTA CI4ARA COUNTY SHERI 1106248
1020 579803 09/08/00 640
1020 579803 09/08/00 640
1020 579803 09/08/00 640
1¢ 579803 09/08/00 640
10. 579803 09/08/00 640
SCA HYGIENE PAPER INC 1108315
SCA HYGIENE PAPER IMC 1108302
SCA HYGIENE PAPER INC 1108314
SCA HYGIENE PAPER INC 1108303
SCA HYGIENE PAPER INC 1108312
..... DESCRIPTION ......
SALES TAX
PAGE
AMOUNT
7/27-8/24 WATER SVC 0.00 39.96
7/27-8/24 WATER SVC 0.00 157.41
7/27-8/24 WATER SVC 0.00 176.20
7/27-8/24 WATER SVC 0.00 117.23
7/27-8/24 WATER SVC 0.00 88.03
7/27-8/24 WATER SVC 0.00 35.63
7/27-8/24 WATER SVC 0.00 982.79
7/27-8/24 WATER SVC 0.00 95.26
7/31-8/29 WATER SVC 0.00 9.00
7/27-8/24 WATER SVC 0.00 314.97
7/31-8/29 WATER SVC 0.00 9.00
7/27-8/24 WATER SVC 0.00 1427.75
7/27-8/24 WATER SVC 0.00 426.28
7/27-8/24 WATER SVC 0.00 1128.79
7/27-8/24 WATER SVC 0.00 1332.60
7/27-8/24 WATER SVC 0.00 150.48
7/27-8/24 WATER SVC 0.00 767.71
7/27-8/24 WATER SVC 0.00 208.01
7/27-8/24 WATER SVC 0.00 76.46
7/27-8/24 WATER SVC 0.00 30.50
7/27-8/24 WATER S¥C. 0.00 109.71
7/27-8/24 WATER SVC 0.00 1640.79
7/27-8/24 WATER SVC 0.00 187.77
7/27-8/24 WATER SVC 0.00 216.97
7/27-8/24 WATER SVC 0.00 236.92
7/27-8/24 WATER SVC 0.00 144.69
7/27-8/24 WATER SVC 0.00 269.01
7/27-8/24 WATER SVC 0.00 93.45
7/26-8/23 WATER SVC ' 0.00 159.94
7/27-8/24 WATER SVC 0.00 26.96
7/27-8/24 WATER SVC 0.00 12.50
7/27-8/24 WATER SVC 0.00 68.87
7/27-8/24 WATER SVC 0.00 31.29
7/27-8/24 WATER SVC 0.00 16.84
7/27-8/24 WATER SVC 0.00 73.57
7/27-8/24 WATER SVC 0.00 12.50
7/24-8/24 WATER SVC 0.00 20.21
7/27-8/24 WATER SVC 0.00 12.50
7/27-8/24 WATER SVC 0.00 34.18
7/27-8/24 WATER SVC 0.00 128.79
0.00 39935.95
0.00 973.04
0.00 798.42
0.00 1771.46
0.00 150.34
0.00 150.33
0.00 150.34
0.00 150.34
0.00 150.34
AUG 19-26 SVCS
DEPUTIES FOR ART&WINE
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
RUN DATE 09/11/00 TIME 15:10:41
- FINANCIAL ACCOUNTING
09/11/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER - DISBURSEMENT FUND
SELECTION CRITERIA: transact.trans_date between "09/04/2000" and "09/08/2000"
FUND - 110 - GENERAL FUND
CASH ACCT CHECK NO
TOTAL CHECK
1020 579804
1020 579805
1020 579805
TOTAL CHECK
1020 579806
1020 579807
1020 579807
1020 579807
1020 579807
TOTAL CHECK
1020 579808
1020 579809
1020 579810
1020 579811
1020 579812
1020 579813
1020 579814
1020 579815
1020 579816
1020 579817
1020 579817
1020 579817
1020 579817
TOTAL CHECK
1020 579818
1020 579818
TOTAL CHECK
1020 579819
1020 579819
TOTAL CHECK
1020 579820
1020 579821
ISSUE DT .............. VENDOR ............. FUND/DEPT
09/08/00 647
09/08/00 2016
09/08/00 2016
09/08/00 2076
09/08/00 658
09/08/00 658
09/08/00 658
09/08/00 658
09/08/00 1523
09/08/00 2OO
09/08/00 M2001
09/08/00 2088
09/08/00 M2001
09/08/00 684
09/08/00 686
09/08/00 690
09/08/00 M2001
09/08/00 695
09/08/00 695
09/08/00 695
09/08/00 695
09/08/00M2001
09/08/00 M2001
09/08/00 898
09/08/00 698
o9/os/oo 7o8
o9/o8/ob ?09
ELIZABETH SHANNON 5806449
SIEMENTS BUILDING TECHNO 1108501
SIEMENTS BUILDING TECHNO 1108501
SILICON VALLEY MANUFACTU 1107301
SILVERADO SPRINGS BOTTLE 1104510
SILVERADO SPRINGS BOTTLE 1104510
SILVERADO SPRINGS BOTTLE 1104510
SILVERADO SPRINGS BOTTLE 1104510
JANA SOKALE 4209113
LESLIE SOKOL DBA DANCEKI 5806449
SOPHIA HUANG 110
SPECIALTY TECHNICAL PUBL 1108005
STEPH~.N. IE DOWNEY 110
CHERYL STODDARD 5806449
DARRYL STOW 2204010
SUNNYVALE FORD 6308840
SUPER 8 MOTEL 1108201
SYSCO FOOD SERVICES OF S 5606620
SYSCO FOOD SERVICES OF S S606620
SYSCO FOOD SERVICES OF S 5606620
SYSCO FOOD SERVICES OF S 5606620
SYSCO FOODS 5806249
SYSCO FOODS 5506549
TALLY'S ENTERPRISES 2709444
TALLY'S ENTERPRISES 2708403
NANCY THO~4PSON 5806449
LOU THURMAN 5806449
..... DESCRIPTION ......
AEROBIC INSTRUCTION
SUPPLIES
SUPPLIES
REGISTRATION
15 BOT WATER & DISPENS
16 BOT WATER
18 BOT WATER
18 BOTTLED WATER
STEVENS CRK TRAIL CONS
CLASS # 1898
MAINT FEE REFUND
SUBSCRIPTION RENEWAL
DEVEL. MAINT. REFUND
AEROBIC INSTRUCTION
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
LODGING/DAVID FERGUSON
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
VENDING PROGRAM
COFFEE FOR SR. CENTER
REMOVE CONCRETE ISLAND
PROGRESS PAYMENT #2
A~ROBIC INSTRUCTION
CLASSES 1830,1833,2933
PAGE 9
SALES TAX AMOUNT
0.00 751.69
0.00 529.0O
0.00 67.77
0.00 60.07
0.00 127.84
0.00 45.00
0.00 128.75
0.00 88.00
0.00 99.00
0.00 99.00
0.00 414,75
0.00 2374.73
0.00 259.00
0.00 571.41
0.00
0.00 198.78
0.00 -373.75
0.00 750.00
0.00 97.68
0.00 146.13
0.00 1877.60
0.00 854.81
0.00 7290.93
0.00 -163.14
0.00 9860.20
0.00 89.40
0.00 223.04
0.00 313.24
0.00 5400.00
0.00 50999.22
0.00 56399.22
0.00 34e
0.00 634.64
RUN DATE 09/11/00 TIME 15:10:42
- FINANCIAL ACCOUNTING
09/11/00 CITY OF CUPERTINO
ACCOUNTING PERIOD: 3/01 CHECK REGISTER - DISBURSEMENT FUND
SE 'ON CRITERIA: transact.trans date between '09/04/2000# and #09/08/2000"
FUND - 110 - GENERAL FUND
CASH ACCT CHECK NO ISSUE DT .............. VENDOR ............. FUND/DEPT
1020 579822 09/08/00 724
1020 579822 09/~8/00 724
1020 579822 09/08/00 724
1020 579822 09/08/00 724
1020 579822 09/08/00 724
1020 579822 09/08/00 724
1020 579822 09/08/00 724
~X)TAL CHECK
1020 579823 09/08/00 2087
1020 579824 09/08/00 725
1020 579825 09/08/00 1833
1020 579826 09/08/00 732
1020 579827 09/08/00 2083
1020 579828 09/08/00 739
iI 579829 09/08/00 757
10~. 579829 09/08/00 757
TOTAL CHECK
1020 579830 09/08/00 761
1020 579831 09/08/00 768
1020 579832 09/08/00 781
1020 579833 09/08/00 782
1020 579834 09/08/00 792
1020 579835 09/08/00 2080
1020 579836 09/08/00 962
1020 S79837 09/08/00 799
1020 579837 09/08/00 799
TOTAL CHECK
1020 579838 09/08/00 1558
TOTAL CASH ACCOUNT
TOTAL FUND
TL REPORT
TURF & INDUSTRIAL EQUIPM 6308840
TURF & INDUSTRIAL EQUIPM 6308840
77JRF & INDUS~I~IAL EQUIPM 6308840
TURF & INDUSTRIAL EQUIPM 1108303
TURF & INDUSTRIAL EQUIPM 6308840
TURF & INDUSTRIAL EQUIPM 6308840
TURF & INDUSTRIAL EQUIPM 1108303
IITJRFGRASS TRENDS 1108201
TWISTERS GYMNASTICS INC 5806449
U.S. WEB 110'
UNIVERSAL TRUCK EQUIP IN 6309820
UP & AWAY TRAVEL 1104000
V;~LLEY SLURRY SEAL CO 2708404
JOYCE WATERMAN 5606620
JOYCE WATERMAN 5606620
WEDEMEYER BAKERY 5606620
WEST GROUP PAYMENT CENTE 1101500
DOLORES WHITTAKER 5706450
TRAVICE WHI~'I~_/q 4249210
LILY WU 5706450
YANO 110
LINDA YEI~AVICH S506549
ZANKER ROAD I2~NDFILL S208003
ZANKER ROAD LANDFIll, 5208003
JOSE ZUNXGA JR 1106265
..... DESCRIPTION ......
FY 2000-2001 OPEN PIJRC
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
4 POST ROLL GARD W/CAN
FY 2000-2001 OPEN PURC
FY 2000-2001 OPEN PURC
4 POST ROLL GARD W/CAN
NEWSLETTER RENEWAL
SDT~WER CAMPS...THRU 8/
DUPLICATE PMT A/R
TIME & MATERIAL
ICMA CONF-AIRFARE
PROGRESS PAYMT#1 2000/
1/2 HR PERFORMANCE
3 HOURS WORK
FY 2000-2001 OPEN PURC
ACCESS FOR JULY 2000
14 ChASSES IN AUGUST
ENG SVCS FOR SR CTR PR
6 CI2~SSES IN AUGUST
DUPblCATE PNT A/R
REIM SUPPLIES-VOL RECO
MAY 2000 YARDWASTE
MAY 2000 PROCESSING
5.5 HRS SEC~XTY ON 9/
SALES TAX
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
"0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0. O0
0.00
0.00
0.00
PAGE 10
174.34
178.04
44.75
1510.63
13.94
1.33
755.31
2678.34
170.00
27481.50
240.00
3067.95
1299.00
144905.82
45.00
270.00
315.00
615.86
267.06
322.00
4031.48
138.00
63.00
143.79
23969.45
1441.27
2S410.V2
82.50
631756.25
631756.25
631756.25
RUN DATE 09/11/00 TIME 15:10:42
- FINANCIAL ACCOUNTING
RESOLUTION NUMBER 00-238
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
ALLOWING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE AMOUNTS
AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR SALARIES
AND WAGES PAID ON
SEPTEMBER 01, 2000
WHEREAS, the Director of Administrative Services, or their designated representative
has certified to the accuracy of the following claims and demands and to the availability of funds
for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law;
NOW; THEREFORE, BE IT RESOLVED that the City Council hereby allows the
following claims and demands in the amounts and from the funds set forth:
GROSS PAYROLL
Less Employee Deductions
$381,210.17
$(119,361.60)
NET PAYROLL
$261,848.57
Payroll check numbers issued 49287 through 49550
Void check number
/~//.TIFIED: . ,..
Director of Administrative Services
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this ~ day of ,2000, by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
CITY OF
CUPE INO
City Hall
10300 Torte Avenue
Cupertino, CA 95014-3255
Telephone: (408) 77%3220
FAX: (408) 777-3366
DEPARTMENT OF ADMINISTRATIVE SERVICES
Agenda Item No. ~
SUMMARY
Meeting Date: September 18, 2000
SUBJECT
Monthly Treasurer's and Budget Report - July 2000
BACKGROUND
Attached is the Treasurer's and Budget report for the period ended July 31, 2000. The
report includes all funds in control of the City.
Investments
The market value of our current portfolio totaled $43.3 million at month end with a
maturity value of $43.5 million. The City intends to hold investments until maturity to
redeem full value of the securities currently with a maturity value below market value.
The current investment portfolio remained relatively unchanged during the month of J. uly
with incoming revenues offsetting expenditures.
The investments of the City of Cupertino are in full compliance with our City investment
policy and/or State law. Investments are tiered to adequately provide the City with
sufficient cash flows to pay its obligations over the next six months.
Revenue/Expenditure Trends
General fund revenues are below budget projections at the end of July due to the timing
of major tax payments received by the State and County.
Operating expenditures for the General Fund remain below budget by 13.09%.
RECOMMENDATION:
Staff recommends that the City Council review and accept the July Treasurer's and
Budget report.
Submitted by:
Ldi'~ s 4~. Eagle O
Deputy Treasurer
Approved for submission:
Davici W. Knapp
City Manager
US Treasury Note
54%
Investments By Type]
Managed Portfolio I
0% Corporate Bonds
O%
LAIF
29%
Money Market
2%
Mortgage Obligation
15%
Rate of Return Comparision
6.60%
6.40%
6.20%
6.00%
5.80%
5,60%
5.40%
5,20%
5.00%
7/99 8/99
9/99 10/99 11/99 12/99 1/00 2/00 3/00 4/00 5/00 6/00 7/00
¢i0 of Cupe no
ooo
PURCHASE ] MATURITY [ DESCRIPTION REF yIELD COST VALUE ] VALUE I PROFIT/LOSS
SECUR~'rlES SOLD
I None
SECURITIES MATURED
08/29/97 07/31/00 /I reasury Note ~6a 6.03%1 1,000,000 1,000,000 ' 1,000,000 0
SECURITIES PURCHASED
! None ! ',
CURRENT PORTFOLIO ; i i '
CASH I t
07/31/00 1Cup~ ',.ino National t 0I 0'~ 0 0
: '. 0~ 0 0 0
CORPORATE BONDS : 0 I 0 0 0
i ~ 0,, 0 0 0
.' 07/31/00 IState Pool i6f i 6.44%i 12,792,96'~ 12,792,962i 12,79'~,9621 0
MONEY MARKET FUNDS ~ i i
i 07/31/00 ICuperfino Natl Bank 6j :. 5.61%i 1[ li 1'~ 0
07/31/00 ~CupertinoNatl-Sweepaccount 6j : 5.45%i 406,121 [ 406,121 i 406,121:
07/31/00 :Schwab 16j i 5.37%I 581,871i 581,871 i 581,871 ~ 0
[ 987,993 i 987,993 ! 987,993 . 0
MORTGAGE OBLIGATIONS
07/09/93 04/15/07 ;~:HLMC(P) i6k 6.11%i 1,019,483 t 1,000,000 I 99O,580 i (:'8,9O3
09/30/93 09/15/07 ~FHLMC(P) 16k 7.42%t 2,499,910 2,400,000I 2,418,936 '~ (80,974
09/30/93 05/15/08 !FHLMC(P) !6k . 6.62%~ 2,9,~5,69~, 2,860,0001 2,753,408i ' (192,~86
US GOVERNMENT SECURI'HI:::5 i ;
01/14/00 08/17/00 IT~ary Note 16~ 5 75% 498,703 500,000 483,515 05,1881
10/08/97 ~ 09130100 !l~e~ary Note t6~ 5171% 1,000,631 1,000,000 1,011,250 ~ 10,619
08/04197 ~ 11/30/00 ITr~ary Note 16a I 6.01%1 2,497,095 2,500,000 2,471,094 (26,001)
07107/00 02/15/01 : T~-~ar~ Not~ [6a ~I 6.35%I 1,989,682 2,000,000 1,988,760 {922)
10108/97 03/31101 ~ lr~uury Nora 16~ i 5.75% 2,007,414 2,000,000 2,0~8,750
08/06/97 ! 05/31/01 !Tr~sury Nora 6~ ! .6.05% 2,508,263 2,500,000 2,500,825 (7,438)
07107100I 05/31/01 ~, l~m'y No~ 6~ i 6.40% 1,000,7~4 !,000,000 1,000,260 {464)
10/08/97 09/30/01 Ilr~asury No~ ~6a ! 5.79%t 2,012,094 2,000,000 2,041,250 29,156
01/10/00 ,, 12/31/01 ilr-~i.iary Not~ ~ i. 6.31%t, 2,493,826 2,500,000 2,491,406t (2,419)'
01/I0/00: 06130102 !lmasury No~ i 6.33% 2,496,670 2,500,000 2,495,703 ~ (967)!
06/25/99 i 11/30/02 !l~u~ No~ I~ 5.90% 2,498,709 2,500,000 2,467,975
021071001 06/30103 IT~sur~ No~ 16~ 6.62% 2,419,827 2,500,000 2,406,641 (13,186
~ [ 23,423,638 23,.~00,000 23,397,429I (26,209]
Total Managed Por~f.c~P.c. t t i 43,669,679 I 4~,.~0,95~ t 4~,.341,307 i (32~72
Average Yield '~ i I
Average Length to Maturity '(in y~rs) i i 6.12%
City of Cupertino
July 2000
ACTIVITY DATE [
PURCHASE ] MATURITY
DESCRIPTION
REF YIELD COST VALUE
MARKET
VALUE
UNREALIZED
PROFIT/LOSS
ITRUST & AGENCY PORTFOLIO
CERTIFICATES OF DEPOSIT:
07/26/00 06/27/01 ~Cupertino Natl(Kestcr Trust) i6b
5.60%: 36,988 36,988 36,988
Total Trust & Agency Portfolio
36,988 30,988 36,988
BOND RESERVE PORTFOLIO
Traffic Impact
;Franklin Fiduciary Trust
Project Fund .
City Haii Escrow ^ Lease Fund (~06954)
MemoriaiFvViison h Lease Fund
Blackberry/Fremont 1993 Series A (0400969)
Memorial/Wilson Escrow B (0400948)
ICash
Reserves
04/06/93
12/16/92
12/16/92
01/01/03 lRepo - Escrow A (400972)
12/16/99 I Money Mkt - Escrow A (400957)
12/16/99 iMoney Mkt - Escrow B (400963)
Blackberry/Fremont Older 1993 Escrow A (0400966)
iCash
04/06/93 ~ 08/15100 !U.S. Treasury
04/06/93 02/15101 tU.S. Treasury Stripped Int
Total Bond Reserve Portfolio
5.68%i
19,100
5.65%i
5.64%
3.80%!
6.25%
6.10%~
6.10%!
6.2~%
6.05%I
19,1001 19,100
24
2,833,425
839,130
1,333,800
5,006~56
3,496
915,949
28,160,576
29,080,021
0
0 0
24t 24 0
I ~ 0
24 [ 24 , 0
2,833,425
839,130
1,333,800
S,006~56
[ 2,833,425 t 0
] 839,130 ~ 0
I 1,333,8001 0
~ 5,006,356 I 0
3,496 3,496 I 0
915,000II 915,858 (92
28,910,0(X) I 28,057,155 (103,421
29,828,496 28,976,.~9 (103,512
34,853,976[ 34,001,989 (103,~12]
City of Cupertino
Summary of Budget Transfers
7/31/00
Budget Revenue Expenditure
Acct #
Description
Adiustment
Budget
Budget
2000/01 ADOPTED BUDGET I : 55,422,000 59,936,570
PROJECT CARRYOVERS various
1999/00 CARRYOVER: i
Encumbrances [ ,various
Department carryovers
Project carryovers
Budget carryovers
4,122,0721 4,122,072
REVENUE ADJUSTMENTS:
EXPENDITURE ADJUSTMENTS:
Adjust Budget Estimate
-60,000
1110~1040-7018
! -6o,ooo'
2000/01 ADJUSTED BUDGET
55,422,000
63,998,642
500.000
450,000
400.000
350,000
300,000
250,000
200,OOO
150.000
100,000
50,000
0
IRevenue Comparison
1 2 3 4 5 6 7 8 9
Sales Tax
Property Tax
Ufili~ Tax
Franchise & License
Other
$ Money and Property
7 lntergovernmeatal
8 Charges For services
19 Fines & Forfeitures
'10 O~her Revenue
, BYTE) 07/31/99
; BYTD 07/31/00
450,000
400,000
'[ Expenditure Comparison
35O,0O0
300,000
250,000
200.000
I Administration
2 Law Enforcement
3 Community Service
4 A4:lmin. Service
5 Recreation Service
6 Community Dev.
7 Public Works
BYTD 07/31/99
1 2 3 4 5 6 7
COMPLIANCE WITH INVESTMENT POLICY
City of Cupertino
July 31, 2000
Category ~ Standard Comment
Treasury Issues ':No limit I Complies
US Agencies (eg FHLMC) !No limit !Complies
Medium Term Corporate Bonds/Notes ~30% with A rating [Complies
LAIF [$20 million [Complies
Money Market Funds 120% !Complies
Maximum Maturities !25% up to 15 years I Complies (FHLMC at 9.5 yrs)
" !Remainder up to 5 years t Complies
Per Issuer Max 10% (except govts) Complies
Bankers Acceptances [270 days & 40% Complies
Commercial Paper I15% Complies
Negotiable Certificates of Deposit i30% Complies
Repurchase Agreements i365 days ]Complies
Reverse Repurchase agreements i Prohibited i Complies
18'
0
CITY OF
cuP :KT o
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: (408) 777-32110
FAX: (408) 777-3366
Website: www. cupertino.org
PARKS AND RECREATION DEPARTMENT
Agenda
Item Number 4
SUBJECT AND ISSUE
STAFF REPORT
Agenda Date: September 18, 2000
Request fi.om The Optimist Clubs of Cupertino for waiver of use fees.
BACKGROUND
As part of their celebration of "Youth Appreciation Week," The Optimist Clubs of Cupertino will
recognize a local young person who has given service to their school and community in a special way.
The ceremony is planned for Thursday, November 9, 2000, at the Quinlan Center. The Optimist Clubs
of Cupertino is requesting waiver of the use fee for this event, and Council has traditionally waived
these use fees.
STAFF RECOMMENDATION
City Council waive use fee in the approximate amount of $60.00 for The Optimist Clubs of Cupertino.
SUBMITTED BY:
Christine Hanel, Re're'at'on Supervisor
David Knapp, City Manager
Printed on Recycled Paper
To: Cupertino City Council
September 7, 2000
On November 9, 2000, Thursday, The Optimist Clubs of Cupertino and
De Anza/Cupertino, in cooperation with the Optimist Clubs of Los Gatos,
Miracle Mile/San Jose, and Santa Clara, will recognize local young people
who give service to their school and community in a very special way.
Two recipients from each of the selected schools will be recognized by
their peers, their school administrators, their parents, and local Optimist Club
members, at an Awards Ceremony at 7:30 P.M. at the Quinlan Community
Center, 10185 North Stel~ling Road, Cupertino.
A prominent, local citizen will be the keynote speaker preceding the
awards ceremony. We hope that Cupertino will join with Optimist
International in proclaiming the week of November 5 - 11, 2000 as "Youth
Appreciation Week" in the City of Cupertino. Each of the participating cities
will also be presenting their City Proclamations in honor of the students.
I am requesting that the Cupertino City Council waive the fee for the
use of the Quinlan Community Center for this event. Thank you for your
consideration.
Sincerely,
V. Dean Skeels
Past Governor, Pacific Central District
YAW Committee Chairman
RESOLUTION NO. 00-239
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
)~PPROVING CONTRACT CHANGE ORDER NO. 6 SENIOR CENTER
EXPANSION, PROJECT NUMBER 99-9210
RESOLVED by the City Council of the City of Cupertino, California, that
Change Order No. 6 for changes to work which has been approved by the Director of
Public Works and this day presented to this Council, be, and it hereby approved in
conjunction with the project known as
SENIOR CENTER EXPANSION,
PROJECT NUMBER 99-9210
BE IT FURTHER RESOLVED that funds are available and no further
appropriation is necessary.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 18t~ day of September, 2000, by the following vote:
Vote
Members o__fth, ee City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk.
Mayor, City of Cupertino
CITY OF
CLJPEI INO
City Hall
10300 Tone Avenue
Cupertino, CA 95014-3255
Telephone: (408)777-3354
FAX: (408)777-3333
PUBLIC WORKS DEPARTMENT
CUPERTINO SENIOR CENTER
PROJECT NUMBER 99-9210
CONTRACT CHANGE ORDER NO. 6
Contractor
McCrary Construction Company
1300 Elmer Street
Belmont, CA 94002-4011
The following changes are hereby approved:
6A. Fire Dept. Plan Review Fee for sprinklers
6B. Add 1-erm'egency lighting fixture & revise other locations
6C. Add drywall expansion joint material in veranda
6D. Add vertical control joints at east and north gables
6E. Deep irrigation for Oak Trees per arborist
6F. Furnish and Install ball valve to isolate domestic water
6G. Overhead cost for Additional working days
6H. Labor to Install heat tape on hot water lines
6I. Install "Ridge to Roof" flashings at end of equ. Wells
Total Change Order No. 6
183.08
4,403.00
174.00
376.00
1,033.00
468.00
14,484.00
2,571.00
992.00
$ 24,684.08
Total Project:
Original Contract
Change Order No. 1
Change Order No. 2
Change Order 1%. 3
Change Order No. 4
Change Order No. 5
Change Order No. 6
Revised Contract
$ 3,357,800.00
2,753.92
9,171.00
175,674.00
14,271.00
59,579.00
24,684.08
$ 3,643,933.00
CONTRACTOR
CITY OF CUPF..RTINO
Title
Date
Ben ~. Viskovich
Director of Public Works
City Council: ~-'/~-00 (Date)
Resolution No. ~ ¢3 7
Printed on Recycled Pal)er
CITY OF
CUPEI INO
City Hall
! 0300 Torte Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
PUBLIC WORKS DEPARTMENT
Summary
AGENDA ITEM
AGENDA DATE September 18, 2000
SUBJECT AND ISSUE
Authorization to Execute Agreement with APAC Technologies for Red Light Running Photo Enforcement
Systems Program
BACKGROUND
APAC Technologies (APAC) has a proposal for the City to demonstrate their photo enforcement systems for red
light running violation~s. APAC is the American distributor for Poltech International (Poltech), an Australian
corporation that manufactures photo enforcement systems. They want to deploy Poltech's Centaur digital red
light camera system in Cupertino. The system is in use in Australia, but not in America.
On April 17, 2000, City Council approved an agreement with Lockheed-Martin IMS (LM) to deploy their wet
film red light camera systems at seven traffic signals. LM has first right of refusal for any particular location.
LM also has exclusive right to process citations for red light running violations by photo enforcement systems of
other contractors. LM is coordinating with our Public Safety Commission on selection of seven traffic signals
for deployment. They will coordinate the initial public education campaign scheduled for November with red
light enforcement commencing in December.
The minimum fine for a red light running violation is $281.00 The City's share is $137.01 per paid citation.
Agreement
APAC will annually pay $42,000 per field camera unit to the City for a minimum term of five years. They want
to install a minimum of two field camera units. They will receive $49.51 for each paid citation.
After LM selects their seven traffic signals for deployment, APAC will install two or more field camera units.
They will coordinate their deployment with LM.
There is no financial risk to the City unless the City wishes to terminate for convenience within the first eighteen
months. The termination fee is $25,000 for each field camera unit.
STAFF RECOMMENDATION
Staff recommends that the City Council adopt Resolution No. ~0 -~s/~ authorizing execution of an agreement on
nt systems with APAC Technologies.
· ~ Approved for submission:
Director~6f Public Works City Manager
Pr¢ntod on Recycled Paoer / 0
RESOLUTION NO. 00-240
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTiNO
AUTHORIZING EXECUTION OF AGREEMENT BETWEEN APAC TECHNOLOGIES
AND THE CITY OF CUPERTINO FOR RED LIGHT RUNNING PHOTO
ENFORCEMENT SYSTEMS PROGRAM
WHEREAS, there has been presented to the City Council a proposed agreement between
APAC Technologies and the City of Cupertino to deploy and implement a program of red light
running photo enforcement systems; and
WHEREAS, the provisions, terms, and conditions of said agreement have been reviewed
and approved by the Director of Public Works and the City Attorney.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Cupertino
hereby approves the agreement and authorizes the Mayor and the City Clerk to execute said
agreement on behalf of the City of Cupertino.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 18t~ day of September, 2000, by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
AGREEMENT
This agreement for goods and services (hereinafter referred to as 'the Agreement') is entered into by
and between the City of Cupertino (hereinafter referred to as 'Cupertino' or 'the City') and Poltech
International Limited ('Poltech') and Amedcan Plastics & Chemicals, Inc. dba APAC Technologies, Inc.
('APAC') (hereinafter referred to jointly and severally as 'Contractor').
RECITALS
Whereas,
A. The City is a State of California municipal corporation with offices at City Hall, 10300 TorTe
Avenue, Cupertino, CA 95014-3255;
Poltech is a State of Victoria, Australia corporation with headquarters offices at Level 54 Rialto
Building, 525 Collins Street, Melbourne, Victoria 3000, Australia, and U.S. offices at 3300 Oak
Lawn Avenue, Suite 500, Dallas, TX 75219-4266;
C. APAC is a State of Delaware, U.S.A. corporation with headquarters offices at 3300 Oak Lawn
Avenue, Suite 500, Dallas, TX 75219-4266;
D. Cupertino has determined installation of a red light camera system will advance the City's ongoing
efforts to protect the lives and property of its citizens and others;
E. The City has entered into a contract with Lockheed Martin IMS ('LM-) to install a red light camera
system which uses wet film technology;
F. The City wishes to reseamh the capabilities of a red light camera system which uses state-of-the-
art digital technology to capture and process red light running offenses;
G. LM does not presently offer red light camera systems which use digital technology;
Ho
Poltech is an international leader in the development, manufacture, and marketing of digital
imaging systems used expressly for law enforcement purposes, including CentaurTM, the
Company's patented digital md light camera system;
I. APAC is the exclusive U.S.A. distributor for CentaurTM and other Poltech products; and
Jo
The City and Contractor wish to enter into an agreement whereby Contractor will provide certain
equipment and services to the City in accordance with the terms and conditions set forth
hereunder;,
K. If conflict arises between the Terms and Conditions of this Agreement and Agreement entered into
by the City and LM, the City's Agreement with LM shall prevail.
Now, Therefore, in consideration of the covenants contained heroin and other good and valuable
consideration, the receipt of which is hereby acknowledged, the City and Contractor do hereby agree as
follows.
TERMS AND CONDITIONS
Definitions
Certain words and phrases used in this Agreement shall have the specific meaning set forth in this
Section. All other words and phrases, unless specifically defined herein, shall have their usual and
customary meaning.
1.1
'Field Camera Unit' ('FCU') means a digital imaging system and ancillary equipment
installed at an intersection including, without limitation, a housing, Peizoelectdc stdp tdgger
system, digital cameras, flash, central processing unit, WORM (write-once-mad-many)
magneto optic disk data storage system, loop detector, traffic signal interface, and power and
communications links.
1.2 "Minotaurm" means Poltech's proprietary software and back office system for processing
citations, testing FCU performance, and reporting.
1.3 "Red light camera system" ("RLCS~) means the equipment and services provided by
Contractor to the City pursuant to this Agreement.
1.4
"Violation" means an action of a vehicle or ddver of a vehicle prohibited by the State of
California Vehicle Code or the City Municipal Code including, without limitation, operating a
motor vehicle contrary to traffic signal instructions and operating a motor vehicle without
proper display of a valid license plate or registration.
1.5 "Fine' means a monetary sum assessed for a Violation, including bail forfeitures.
1.6 'Citation" means the initial pleading in a criminal or civil traffic action relating to a Violation
captured by Contractor's RLCS.
1.7 "Photograph' means an image recorded either on film or in a digital format on an magneto
optic medium.
1.8 "Person' means an individual, partnership, joint venture, corporation, trust, unincorporated
association, any governmental authority, political subdivision, or any other form or entity.
Term
2.1
Pdmary Term
The Primary Term shall commence as of the date of execution of this Agreement and shall
terminate five (5) years after the first day Citations are issued for violations captured by
Contractor's RLCS.
2.2
Contract Extension(s)
This Agreement may be extended
Parties.
beyond the
Pdmary Term by mutual consent of the
2.2.1 The City shall provide Contractor with not less than ninety (90) days wdtten notice of
its intention to extend the ^greement.
3. Contractor's Scope of Work
Contractor's scope of work shall include provision of the following equipment and services:
3.1 Field Camera Units
Contractor shall provide the City with FCU's capable of simultaneously monitoring up to four
(4) lanes of traffic (including turn lanes) traveling in the same direction. Each FCU will
include (1) mounting poles, if required, (2) a steel weatherproof and vandalism resistant
housing, (3) state-of-the-art digital cameras, (4) CPU (central processing unit), (5) auxiliary
flash unit, (6) Piezoelectric stdp triggering devices, (7) WORM magneto optic disk data
storage system, (8) Piezo controller, (9) traffic signal interface, (10) communications links,
(11) connection of FCU with electric power, and (12) power conditioner (UPS).
3.1.1 FCU's will be installed at sites mutually acceptable to the City and Contractor.
3.1.2 Not less than two (2) FCU'S will be installed initially. Subject to mutual
agreement of the City and Contractor, additional FCU's may be installed in the
future.
3.1.3 All FCU's installed by Contractor shall remain the property of Contractor.
3.2 Installation of FCU's
3.2.1 Contractor will install or cause to be installed all of the FCU equipment enumerated in
Section 3.1. of this Agreement.
3.2.2
Contractor will be responsible for obtaining all required permits, licenses, and
insurance required for installation provided, however, that the City will use its best
efforts to assist Contractor in obtaining all such required permits and licenses.
3.2.3 The City shall not levy any permit fees or, if municipal ordinance requires the
assessing of such fees, the City shall pay for any such fees.
3.2.4 The City shall provide Contractor with 'as built' drawings as may be required by
Contractor.
3.2.5
The Contractor may employ subcontractors to perform certain of its responsibilities
hereunder provided, however, that Contractor shall not subcontract any portion of its
installation responsibilities without receiving express written authorization from the
City. If the City consents to such subcontract(s), the Contractor shall be fully
responsible to the City for all acts and omissions of the subcontractor. Nothing in this
Agreement shall create any contractual relationship between the City and
subcontractor nor shall it create any obligation on the pert of the City to pay or to see
to the payment of any monies due to any such subcontractor other than as otherwise
is required by law.
3.2.6 In the event installation of a FCU requires the removal or relocation of a City loop,
the cost of such removal or relocation shall be borne by Contractor.
3.3 Testing, Repair and Maintenance of FCU's
3.3.1
Testing
Contractor will conduct daily remote testing of FCU cameras, loop detector, traffic
signal interface, power and communications links, and Piezoelectric strip trigger.
Contractor will conduct on-site testing of FCU components not less than once each
month.
3.3.2 Repair
Contractor will respond to a report of a malfunctioning FCU within 24 hours of
receiving notice of the malfunction.
3.3.3 Maintenance
Contractor will perform scheduled maintenance on its FCU's not less than once each
month.
3.3.4 Reports
All FCU testing will be certified by Contractor staff and reports detailing such testing
will be made available to the City at the City's request. Maintenance logs will be
maintained by Contractor and will be made available to the City at the City's request.
3.4 Data Capture, Storage and Transfer
Data pertaining to each Violation captured by Contractor's FCU, including not less than three
(3) digital images of the violation, will initially be stored on the WORM magneto optic disk
located within the FCU. The data stored on the WORM disk will be securely encrypted and
transferred to Contractor's central server complex not less than once each work day. Within
two (2) work days after receipt of the data at the central server complex, the data will be
transmitted to LM in a form acceptable to LM for processing into Citations. The Violation
data transmitted to LM will include, but not necessarily be limited to:
a. Location, date and time
b. Number of seconds into red traffic signal
c. Vehicle speed
d. One (1) close-up frontal view of automobile and front license plate
e. One (1) panoramic view of the intersection and the violating automobile taken after
the automobile has crossed the limit (stop) line while the traffic signal is in the red
phase.
f. One (1) panoramic view of the intersection and the violating automobile taken
subsequent to the photograph described in Section 3.4.e.
3.5 Real Time Viewing of Contractor Monitored Intersections
3.6
Contractor will provide, install, and maintain up to two (2) sets of equipment, software, and
communications links which will permit City and other authorized personnel to conduct real
time viewing of intersections monitored by Contractor FCU's. Such equipment, software, and
communications links shall remain the property of Contractor.
RLCS Enhancements
Contractor will promptly provide City with all RLCS modifications which result in meaningful
enhancements to system performance.
3.7 RLCS Orientation
Contractor will conduct at no cost to the City one pre-startup and one post-startup RLCS
orientation session. Each two (2) day session will accommodate up to 30 City designated
personnel and will be held in facilities provided by the City. The sessions will focus on (1)
description of the RLCS equipment and operation, (2) explanation and hands-on
demonstration of the capabilities of the MinotaurTM software, (3) legal considerations vis a vis
digital versus wet film technology and State of California evidence code, and (4) introduction
to key Contractor personnel. Session schedules will be mutually established by the City and
Contractor.
Should the City request additional
sessions on a full cost-reimbursable
accepted accounting principles).
orientation sessions, Contractor shall provide such
basis (as determined by Contractor using generally
3.8
Reports
Contractor will provide the City with periodic reports on RLCS performance, the content and
timing of which will be mutually agreed upon by City and Contractor personnel. In addition,
Contractor will prepare and submit financial, program progress, monitoring, evaluation, and
such other reports as is required by City or State of California law authorizing the use of
automated enforcement systems. Contractor shall maintain and permit on-site inspections of
property, personnel, financial, and other records and reports as are considered necessary by
the City to assure proper accounting for all compensation paid by the City to Contractor.
3.9 Advisory Services
At the City's request, Contractor will provide the City with advice and counsel regarding
operation of a red light camera system, site selection, implementation and administration of a
public awareness campaign, and other subjects of mutual interest to Contractor and the City.
3.10 Defense of Legal Challenges
Contractor shall defend any challenge in any court of competent jurisdiction to the use of the
FCU, the RLCS, or the validity of the evidence obtained by their use. In the event of
contested Citations, and as may be reasonably necessary to protect the interests of the City
and Contractor, Contractor will also provide expert witness testimony regarding the accuracy
and technical operation of the FCU and RLCS. Contractor shall supply all courts of
competent jurisdiction with a statement of technology for use at informal hearings.
3.11 Removal of FCU's and Other Contractor Owned Equipment
Within 60 days after termination of this Agreement Contractor shall remove or cause to be
removed all Contractor owned equipment at no expense to the City and shall restore all City
property to its original condition. Should Contractor fail to remove its equipment within 60
days after termination of this Agreement, the City shall have the right to remove said
equipment and bill Contractor for its removal.
4. City of Cupertino Responsibilities
In addition to the City's responsibilities set forth elsewhere in this Agreement, Cupertino shall also
have the following responsibilities:
4.1 Prosecution of Citations
The City shall diligently prosecute each Citation arising from Violations captured by
Contractor's FCU's.
4.2 Damage To Contractor Property
The City will reimburse Contractor for any damage to Contractor property resulting from City-
financed public works projects. The City will use its best efforts to assist Contractor to
identify and obtain compensation from any party who is responsible for damage to Contractor
equipment.
4.3 City Representative
The City Traffic Engineer shall serve as the City's representative relative to administration of
this Agreement and the RLCS project. All Contractor activities shall be coordinated with this
individual.
4.4 Electric Power
The City shall provide all electdc power required to operate the FCU, however Contractor
shall be responsible for connecting the FCU to the source of the electrical power.
4.5 Traffic Signal Operations
The City will not modify traffic signal operations which were in effect at the time of selection
of the FCU sites without advising Contractor in advance of such change(s) and without
considering the impact of the change(s) on RLCS operation.
4.6 Establishment of Certain Criteda For Violation Capture
The City .shall establish the amount of time which will be permitted to elapse between the
start of the traffic signal's red phase and the time the FCU's cameras are activated to record
violations, i.e. the time that may elapse between the time the signal light tums red and the
time an automobile may enter the intersection after the signal light has turned red without the
cameras being activated to record the Violation. This elapsed time shall not exceed the
lesser of three tenths of one second (0.3 seconds) or the time delay established by the City
for LM operated Units pursuant to Section 8.3.5 of that agreement between the City and LM
dated May 26, 2000.
4.7 Use of the RLCS For Studies
The City shall not use the RLCS, or allow use of the RLC$ by a third party, for studies
without the prior written consent of Contractor.
4.8 Relationship With Contractor
The City shall work with Contractor as may be necessary to facilitate Contractor's
performance of its services. Upon request, the City shall provide all relevant documentation
in its possession to Contractor in order to minimize duplication of efforts by Contractor and
the City.
4.9 Property Tax Exemption
The City shall exempt Contractor from City property taxes on Contractor assets located in the
City.
Payment For Services
5.1 Contractor Compensation
The Contractor shall be compensated for performing the Scope of Work set forth in Section 3
of this Agreement, as follows:
5.1.1 The City shall compensate Contractor only for Citations for which the Fine has been
paid.
5.1.2
The City shall pay to Contractor a fee equal to Forty-Nine and 51/100 Dollars
($49.51) for each Citation for which the Fine has been paid. This fee is the amount
received by the City from each paid Fine less the amount to be paid by the City to LM
for Citation processing pursuant to Section 7.2 of that Agreement between the City
and LM dated May 26, 2000.
5.1.3
5.1.4
Contractor shall provide the City with bi-weekly invoices which shall set forth the
number of Citations for which Fines were paid dudng the pedod covered by the
invoice and the amount due to be paid Contractor. Payment of invoices is due within
thirty (30) days of the City's receipt thereof.
The City, Sheriff, and Courts shall assist Contractor in obtaining relevant information
regarding Citations from LM and the Courts in order that Contractor can track
payments of Fines and properly invoice the City. The City shall be responsible for
any Court costs associated with this interface.
5.2 City of Cupertino Compensation
Contractor shall reimburse the City for expenses incurred in administration of this Agreement
and for services rendered by the City to Contractor at the rate of Three-Thousand-Five-
Hundred Dollars ($3,500) per month. Payment of this reimbursement for expenses will begin
ninety (90) days after the day Citations are flint issued for Violations captured by Contractor's
RLCS, and will continue each month thereafter during the term of this Agreement. Payment
of said reimbursement is due within ten (10) days following the end of the month fOr which
the payment is due.
6. Termination
6.1 Termination For Convenience
Either
giving
6.1.1
Party in its sole discretion may terminate this Agreement without cause at any time by
the other Party thirty (30) days notice of such termination.
City Termination of the Agreement
In the event the City terminates this Agreement for convenience prior to eighteen (18)
months from the date Citations are first issued for Violations captured by Contractor's
RLCS, the City shall pay Contractor a termination fee of Twenty-Five Thousand
Dollars ($25,000) per installed FCU. Payment of this termination fee is due as of the
date of termination. The Contractor will also receive payment for Citations issued at
the time of termination for which Fines are paid after the date of termination.
-7-
6.2 Termination For Cause
6.2.1 Insolvency
The non-affected Party may terminate this ^greement at any time after either Party is
declared or acknowledges that it is insolvent, or upon the filing of any proceeding
(whether voluntary or involuntary) for bankruptcy, insolvency or relief from creditors.
6.2.2 Legal Ruling(s)
In the event any court of last resort shall rule (other than dicta) that red light camera
results connected with Contractor's detection of violations are inadmissible or
othen~,ise contrary to law, the City may terminate this Agreement immediately with
wdtten notice.
6.2.3 Breach
All terms, conditions, provisions, and specifications of this Agreement are matedal
and binding and the failure of either Party to perform any matedal portion of their
responsibilities described herein shall be considered a breach of this Agreement.
However, prior to exercising its right to terminate hereunder, the non-defaulting Party
shall send the defaulting Party a notice of default which specifies the nature of the
default and the steps which need to be taken to cure same. The defaulting Party
shall have thirty (30) days following receipt of the notice of default to cure the default.
If the default is not cured within such thirty (30) day pedod, then the non-defaulting
Party may terminate this Agreement.
6.2.4 Force Majeure
Neither Party shall be liable for any delay or failure of performance due to any reason
or unforseen circumstances beyond the affected Party's reasonable control, including
acts of God or public authorities, war and war measures (whether or not a formal
declaration of war is in effect), civil unrest, tire, epidemics, delay in transportation,
delivery or supply, or labor disputes. The obligations and dghts of the excused Party
shall be extended on a day-to-day basis for the time period equal to the period of the
excusable delay.
6.3 Post Termination
Upon termination of this Agreement, the Parties agree to continue cooperating with each
other and to carry out an orderly termination of their relations. This shall include, but not be
limited to, (1) each Party's prompt payment of any sums owed to the other, (2) the City's
assistance to Contractor in the removal of Contractor's property, and (3) Contractor's
expedient delivery to City of all records for, or belonging to, the City.
6.4 Liability On Termination
Except as specifically provided for in this Agreement, neither Party shall have any liability to
the other solely by reason of the termination of this Agreement including, but not limited to,
any liability or obligation (statutory or othen~,ise) to compensate or reimburse the other for
any indemnity, claims, or damages whatsoever (including, but not limited to, claims relating
to lost revenues or lost profits, or reimbursement of any expenditures, investments, leasehold
or employment obligations or other continuing commitments incurred by such Party in the
performance of its duties or obligations hereunder).
7. Confldenfiali~
Subject to the City's obligations under the Public Records Act, proprietary and technical
information, including information about the use, design, specifications, and other mattem related
to the RLCS learned from and about Contractor during the term hereof, shall be held in confidence
and shall not be used or disclosed by the City without the express written consent of Contractor,
The City agrees that it will take all reasonable measures necessary to protect the secrecy and
confidentiality of, and avoid disclosure or use of, the confidential information of and about
Contractor.
The obligations of confidentiality shall not apply to information which: (1) has entered the public
domain other than as a result of an act or omission of the City, or (2) which subsequent to
disclosure hereunder is obtained by the recipient Party on a non-confidential basis from a third
party who has the right to disclose such information to the recipient Party.
The foregoing commitments shall survive any termination or expiration of this Agreement.
8. Personnel
8.1 Employee Control and Supervision
Contractor represents that it has, or will secure at its own expense, all personnel required to
perform the services required under this Agreement. All of the services required under this
Agreement will be performed by Contractor or under its supervision, and all personnel
engaged in the work shall be qualified to perform such services. The Contractor reserves the
right to determine the assignment of its own employees to the performance of the
Contractors services under this Agreement, however the City reserves the right, for good
cause, to require the Contractor to exclude any employee from performing services on the
City's premises.
8.2 Employee Performance, Payment and Insurance
Contractor shall be solely responsible for the satisfactory work performance of its employees,
or any reasonable performance standard established by the City and mutually agreed to by
Contractor. Contractor shall be solely responsible for payment of all employees' wages and
benefits and subcontractors' costs. VVithout any additional expense to the City, Contractor
shall comply with the requirements of employee liability, worker's compensation, employment
insurance and Social Security.
Contractor shall hold the City harmless from any liability, damages, claims, costs and
expenses of any nature arising from alleged violations of pemonnel practices.
The City shall have the right to demand removal from the project, for a reasonable cause,
any personnel furnished by Contractor. The City must be notified of new hires and
reassignments of project personnel.
8.3
Changes In Contractor Management
Contractor must notify City in writing of all changes in management and project supervisory
personnel related to the project.
9. Indemnification
9.1
Contractor shall indemnify, defend, and hold harmless the City, and its officers, employees,
and agents (City Indemnitees), from and against any and all causes of action, claims,
liabilities, obligations, judgements, or damages, including reasonable attorneys' fees and
/ o-//
9.2
costs of litigation ("claims"), arising from Contractor's negligent or wrongful acts, errors, or
omissions in the performance of its services hereunder. In the event the City Indemnitees
are made a party to any action, lawsuit, or other adversarial proceeding alleging negligent or
wrongful conduct on the part of Contractor.
9.1.1
Contractor shall
reimburse their
defense of such
provide a defense to the City Indemnitees or, at the City's option,
costs of defense, including reasonable attorneys' fees, incurred in
claims; and
9.1.2
Contractor shall promptly pay any final judgement or portion thereof rendered against
the City Indemnitees with respect to claims determined by a trier of fact to have been
the result of Contractor's negligent or wrongful performance.
9.3
The City agrees to indemnify, defend, and hold harmless Contractor and its officers,
directors, shareholders, affiliates, employees and agents against any and all threatened or
pending claims, actions, losses and damages of any kind (including all costs and expenses
and reasonable attorneys' fees) arising out of or in connection with the negligent or willful
misconduct or intentional wrong of the City, its employees or agents.
9.4
Notwithstanding any other provision of this Agreement or otherwise, Contractor will not be
liable under any section of this Agreement or under any contract, negligence, strict liability or
other legal or equitable theory for any incidental, indirect, consequential, special or
exemplary damages, lost revenues, lost prefits, lost business relationships or cost of
procurement of substitute goods, technology or service.
10.
10.1
The City shall not be responsible for any damage to pemons or property due to the use,
misuse, or failure of any equipment used by the Contractor, or by any of its employees, and
third parties even though such equipment may be provided to City by Contractor.
Insurance Requirements
Contractor shall provide satisfactory evidence of insurance to the City no later than fifteen
(15) days after full execution of this Agreement. Contractor shall give the City at least thirty
(30) days written notice of any material change or cancellation of any policy of inSurance
required by this Agreement. Contractor, at Contractor's own cost and expense, shall procure
and maintain, for the duration of the Agreement, the following insurance policies:
10.1.1 Workers' Compensation Coverage
Contractor shall maintain Workem' Compensation Insurance and Employer's Liability
Insurance ($1,000,000 per occurrence) for its employees in accordance with the laws of the
State of California. In addition, Contractor shall require any and every subcontractor to
similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in
accordance with the laws of the State of California for all of the subcontractor's employees.
Any notice of cancellation or non-renewal of all Workers' Compensation policies must be
received by the City at least thirty (30) days prior to such change.
10.1.2 Commercial General Liability Coverage
Contractor shall maintain commercial general liability insurance in an amount of not less than
One Million Dollars ($1,000,000) per occurrence for bodily injury, personal injury, and
property damage. If a commercial general liability insurance form or other form with a
general aggregate limit is used, either the general aggregate limit shall apply separately to
the work to be performed under this Agreement or the general aggregate limit shall be at
least twice the required occurrence limit, or Two Million Dollars ($2,000,000).
10.1.3 Automobile Liability Coverage
Contractor shall maintain automObile liability insurance covedng bodily injury and property
damage for Contractor's operation of the vehicles arising out of or in connection with the
work to be performed under this Agreement, including coverage for Contractor's owned,
hired, and non-owned vehicles driven by Contractor's employees, in an amount of not less
than One-Million Dollars ($1,000,000) combined single limit for each occurrence.
10.2 Endorsements
Each general liability and automobile liability insurance policy shall be issued by insurers
possessing a Best's rating of no less than A - and shall be endorsed with, or include a
provision related to, the specific language of Sections 10.2.1 through 10.2.5, below.
10.2.1
'The City, its elected or appointed officers, officials, and employees, are to be
covered as additional insureds with respect to liability arising out of work performed
by Contractor in relation to general liability and automobile liability.'
10.2.2
'This policy shall be considered primary insurance as respects the City, its elected
or appointed officers, officials, and employees. Any insurance maintained by the
City, including any self-insured retention the City may have, shall be considered
excess insurance only and shall not contribute with this policy'.
10.2.3
'This insurance shall act for each insured and additional insured as though a
separate policy had been written for each, however, the insurance shall provide no
additional limits of liability".
10.2.4 'The insurer waives all rights of subrogation in relation to general liability against
the City, its elected or appointed officers, officials, or employees'.
10.2.5
'The insurance provided by this policy shall not be canceled, non-renewed, or
materially changed in coverage or in limits required by this Agreement except after
thirty (30) days written notice has been received by the City'.
10.3 Certificate of Insurance
Contractor shall provide certificates of insurance with Standard Accord Forms to the City as
evidence of the insurance coverage required herein. Certificates of such insurance shall be
filed with the City no later than fifteen (15) days after full execution of this Agreement.
Current certification of insurance shall be kept on file with the City at all times dudng the term
of this Agreement.
10.4 Failure To Procure Insurance
Failure on the part of Contractor to procure or maintain required insurance shall constitute a
material breach of contract under which the City may terminate this Agreement pursuant to
Section 6.2.3, above, or, at the City's discretion, procure or renew such insurance and pay
any and all premiums in connection therewith, and all monies so paid by the City shall be
repaid by Contractor upon demand.
11. Assignment and Subcontracting
The Parties hereto recognize that a substantial inducement to the City for entering into this
Agreement is the professional reputation, experience, and competence of Contractor.
Assignments of any or all rights, duties, or obligations of Contractor under this Agreement will be
permitted only with the express consent of the City. Contractor shall not subcontract any portion
-il-
of the work to be performed under this Agreement without the written authorization of the City. If
the City consents to such subcontract, Contractor shall be fully responsible to the City for all acts
or omissions of the subcontractor. Nothing in this Agreement shall create any contractual
relationship between the City and subcontractor nor shall it create any obligation on the part of the
City to pay or to see to the payment of any monies due to any such subcontractor other than as
othenvise is required by law.
12. Compliance With Laws, Codes, Ordinances, and Regulations
Contractor shall use the standard of care in its profession to comply with all applicable federal,
state, and local laws, codes, ordinances, and regulations.
!2.1 Taxes
Contractor agrees to pay all required taxes on amounts paid to Contractor under this
Agreement, and to indemnify and hold the City harmless from any and all taxes,
assessments, penalties, and interest asserted against the City by reason of the independent
contractor relationship created by this Agreement. In the event the City is audited by any
Federal or State agency regarding the independent contractor status of Contractor and the
audit in any way fails to sustain the validity of a wholly independent contractor relationship
between the City and Contractor, then Contractor agrees to reimburse the City for all costs,
including accounting and attorneys' fees, arising out of such audit and any appeals relating
thereto.
12.2 Workers' Compensation Law
Contractor shall fully comply with the workers' compensation law regarding Contractor and
Contractor's employees. Contractor further agrees to indemnify and hold the City harmless
from any failure of Contractor to comply with applicable workers' compensation laws. The
City shall have the right to offset against the amount of any compensation due to
Contractor under this Agreement any amount due to the City from the Contractor as a result
of Contractor's failure to promptly pay to the City any reimbursement or indemnification
adsing under this Section.
12.3 Licenses
Contractor represents and warrants to the City that it has all licenses, permits,
qualifications, insurance, and approvals of whatever nature which are legally required of
Contractor to practice its profession. Contractor represents and warrants to the City that
the Contractor shall, at its sole cost and expense, keep in effect or obtain at all times during
the term of this Agreement any licenses, permits, insurance, and approvals which are
legally required of Contractor to practice its profession. Contractor shall maintain a City of
Cupertino business license.
13. Conflict of Interest
Contractor confirms it has no financial, contractual, or other interest or obligation that conflicts
with, or is harmful to, performance of its obligations under this Agreement. Contractor shall not,
during the term of this Agreement, knowingly obtain such an interest or incur such an obligation,
nor shall it employ or subcontract with any person for performance of this Agreement who has
such an incompatible interest or obligation.
13.1
Contractor, its agents and employees shall comply with all applicable Federal, State, and
local laws and regulations governing conflict of interest. To this end, Contractor shall make
available to its agents and employees copies of all applicable Federal, State, and local laws
and regulations governing conflict of interest. Contractor shall furnish to the City, prior to
the execution of this Agreement, a written list of all current subgrantees/subcontractors,
vendors, or personal service providers, including subsidiaries of Contractor, which shall
receive Ten-Thousand Dollars ($10,000) or more from this Agreement. Such a list shall
include the names, addresses, telephone numbers, and identification of principal party(les)
and a description of services to be provided. During the term of this Agreement, Contractor
shall notify the City in writing of any change in the list of subgrantees/subcontractors,
vendors, personal service providers, or subsidiaries of the Contractor within fifteen (15)
days of any change.
14. Non-Discrimination and Equal Employment Opportunity
Contractor represents and agrees it does not and will not discriminate against any employee or
applicant for employment because of race, religion, color, medical condition, sex, sexual
orientation and/or gender identity, national origin, political affiliation or opinion, or pregnancy or
pregnancy-related condition.
15. Records and Audits
Contractor shall maintain accounts and records, including personnel, property, performance and
financial records, adequate to identify and account for all costs directly related to this Agreement
and such other records as may be deemed necessary by the City or any authorized representative.
Such records will be retained for three (3) years after the expiration of this Agreement and shall be
made available for inspection or audit by the City upon reasonable request during Contractor's
normal business hours.
15.1
Contractor agrees to prepare and submit financial, program progress, monitoring,
evaluation, and other reports as required by City or by State law authorizing the use of
automated enforcement systems. Contractor shall maintain and permit on-site inspections
of such property, personnel, financial, and other records and accounts as are considered
necessary by the City to assure proper accounting for all Agreement funds. Subject to the
City's obligations under the Public Records Act, proprietary and technical information shall
be deemed confidential as described in Section 7 of this Agreement.
15.2 Monthly Management Reports
Contractor shall submit to the City monthly reports as described in Section 3.8 of this
Agreement.
15.3
Contractor shall insure its employees and board members furnish such information, which in
the judgement of City representatives, may be relevant to a question of compliance with
contractual conditions with City of Cupertino granting agency directives, or with the
effectiveness, legality, and achievements of the program.
15.4 Monitoring and Evaluation
To ensure proper performance of this Agreement and that the enforcement program is
conducted for the City, the City will monitor, evaluate, and provide guidance to Contractor
in the performance of this Agreement. Authorized representatives of the City shall have
the dght of access to all activities and facilities operated by the Contractor under this
Agreement. Facilities include all files, records, and other documents related to the
performance of this Agreement. Such activities will include attendance at meetings directly
related to Contractor's administration of the RLCS and observation of ongoing program
functions. Contractor will insure the cooperation of its staff in such efforts. The City's
Project Manager or her/his designee will conduct pedodic program progress reviews.
16. Religious and Political Activities
Contractor agrees that no funds made available under this Agreement shall be used to promote
religious or political activities. Furthermore, Contractor agrees it will not perform, or permit to be
performed, any religious or political activities in connection with the performance of this
Agreement.
17. Independent Conl]'actor
Contractor is and shall at all times remain as to the City a wholly independent contractor. Neither
the City nor any of its agents shall have control over the conduct of Contractor or any of
Contractor's employees or agents, except as herein set forth. Contractor shall not at any time or in
any manner represent that it or any of its agents or employees are in any manner agents or
employees of the City. The Contractor shall have no power to incur any debt, obligation, or
liability on behalf of the City or otherwise act on behalf of the City as an Agent.
18. Governing Law
This Agreement shall be governed by the laws of the State of Califomia.
19. Entire Agreement I Modification
This Agreement supercedes any and all other agreements, either oral or written, between the
Parties, and contains all of the covenants and agreements between the Parties. Each Party to this
Agreement acknowledges that no representations, inducements, promises, or agreements, oral or
otherwise, have been made by any party, or anyone acting on behalf of any party that are not
embodied herein. Any agreement, statement, or promise not contained in the Agreement, and any
modification to the Agreement, will be effective only if signed by beth Parties.
20. Commencement of Performance
Contractor's commencement of performance and provision of the Scope of Work set forth herein
is subject to (1) Contractor's and City's execution of this Agreement, (2) Contractor's receipt of a
Notice to Proceed from the City, (3) Lockheed Martin IMS' provision of certain citation processing
services to City as is required by Section 2.1 of that Agreement between the City and Lockheed
Martin IMS dated May 26, 2000, and (4) the 30-day public awareness "grace" period after the
RLCS is installed.
21. Contract Administration
M. Edward Stewart shall serve as Manager-in-Charge of the project for Contractor and shall be
responsible for performance of all its tasks and assuring compliance on all matters relating to this
Agreement. The Manager-in-Charge shall not be replaced without the written consent of the City.
Any changes to this Agreement shall be in writing and signed by the City Traffic Engineer and M.
Edward Stewart.
22. Notice
All notices, requests, reports, submissions and other communications permitted or required to be
given under this Agreement shall be deemed to have been duly given if such notice or
communication shall be in writing and sent by personal delivery or by airmail, cable, telegram,
telex, facsimile transmission or other commercial means of rapid delivery, postage or costs of
transmission and delivery prepaid, to the Parties at the following addresses. The Parties may
change addresses for delivery of notices by giving the other Party not less than ten (10) days prior
written notice of any change of address.
23.
24.
25.
The City's address is:
City of Cupertino
Department of Public Works
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3255
Attn: City Traffic Engineer
Contractor's address is:
APAC Technologies, Inc.
3300 Oak Lawn Avenue
Suite 500
Dallas, TX 75219-4266
Attn: M. Edward Stewart
Attorneys' Fees
In any action brought to declare the rights granted herein or to enforce any of the terms of this
Agreement, the prevailing Party shall be entitled to an award of reasonable attorneys' fees in an
amount determined by the court.
Waiver
Waiver of a breach or default under this Agreement shall not constitute a continuing waiver of a
subsequent breach of the same or any other provision under this Agreement. Payment of any
invoice by the City shall not constitute a waiver of the City's right to obtain correction or
replacement of any defective or non-compliant work product.
Execution
This Agreement may be executed in several counterparts, each of which shall constitute one and
the same instrument and shall become binding upon the Parties when at least one copy hereof
shall have been signed by both Parties hereto. In approving this Agreement, it shall not be
necessary to produce or account for more than one such counterpart.
26. Authority To Enter Agreement
Contractor has all requisite power and authority to conduct its business and to execute, deliver,
and perform this Agreement. Each Party warrants that the individuals who have signed this
Agreement have the legal power, right and authority to make this Agreement and to bind each
respective Party.
IN WITNESS WHEREOF, the Parties have executed this Agreement the __
2000.
day of
POLTECH INTERNATIONAL LIMITED
and
APAC TECHNOLOGIES, INC.
By:
President, APAC Technologies, Inc.
CITY OF CUPERTINO
Attest:
Mayor, City of Cupertino
Approved As To Form:
City Attorney
RESOLUTION NO. 00-241
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
ORDERING ABATEMENT OF PUBLIC NUISANCE AT 7535 NORMANDY
WAY
RECITALS:
(a) On August 21, 2000, the City Council of the City of Cupertino adopted its
Resolution No. 00-220, a copy of which is attached hereto and made a part thereof by
reference;
(b) Pursuant thereto, the City Council of the City of Cupertino held a hearing
with respect thereto, on September 18, 2000, at 6:45 p.m., in the Council Chambers, in
the City Hall, located at 10300 Torre Avenue;
(c) The following members of the City Council were present: Burnett,
Chang, James, Lowenthal, Statton;
(d) The following members of the City's staff, among others, were present:
1. Director of Administrative Services Carol Atwood
2. Deputy City Clerk Roberta Wolfe
3. City Attorney Charles Kilian
(e) The following interested persons were also present:
(f) After hearing opening remarks, the City Council heard and considered all
relevant evidence including, but not limited to, testimony under oath from owners,
witnesses and parties interested, as well as received into evidence exhibits and staff
reports, relative to said matter;
(g) Following the presentation of all evidence and closing remarks, the City
Council considered the matter, and resolved as follows:
1. The following findings of fact are hereby made:
(a) Notice of the time and place of the hearing to abate, and
Resolution No. 00-220 were duly and regularly posted and served, as required by the
provisions of Ordinance No. 794 of the City of Cupertino, enacted on April 18, 1977.
(b) The overgrown foliage obstructing the sidewalk and street, an
appliance, broken equipment, and litter in the front yard and driveway at 7535 Normandy
Way in the City of Cupertino, State of California, constitutes a public nuisance, in that
Resolution No. 00-241 Page 2
said conditions constitute a hazard to public health, safety and general welfare, by reason
of threatening the free use and enjoyment of adjoining property.
2. IT IS THEREFORE ORDERED as follows:
(a) Said public nuisance shall be abated.
(b) A description of the needed corrections and/or repairs, necessary to
comply with the abatement order is as follows:
· Removal of the foliage, appliance, broken equipment, and litter at 7535 Normandy
Way by September 28, 2000.
(c) Any property owner shall have the right to have the public
nuisance, as declared, abated, provided the same is completed as per Item 2(b) of this
Resolution, which time, upon good cause shown, may be extended for a reasonable time
by the City Council.
(d) If such public nuisance is not abated within such time or any
extension of time which may be granted, the Director of Administrative Services shall, by
City forces or private contract, cause the same to be abated.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 18th day of September, 2000, by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
Deputy City Clerk
Mayor, City of Cupertino
RESOLUTION NO. 00-220
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
DECLARING INTENT TO CONDUCT A PUBLIC HEARING CONCERNING A
NUISANCE ON PARCEL 366-11-151, 7535 NORMANDY WAY, OVERGROWN
FOLIAGE OBSTRUCTING THE SIDEWALK AND STREET, AN APPLIANCE,
BROKEN EQUIPMENT, AND LITTER IN THE FRONT YARD AND
DRIVEWAY
WHEREAS, Section 1.09.03A of the Cupertino Municipal Code defines a
nuisance as anything which is declared by the City Council to be or likely to become
injurious to the senses, or an obstruction to the free use of property, so as to interfere with
the comfortable enjoyment of life or property; and
WHEREAS, there exists overgrown foliage obstructing the sidewalk and street,
an appliance, broken equipment, and litter in the front yard and driveway
on parcel 366-11-151; and
WHEREAS, as provided by Ordinance No. 794, the City Council shall hold a
public heating to determine whether or not said condition constitutes a public nuisance
and, if said determination is made, the City Council shall require abatement of said public
nuisance by immediate removal of all overgrown foliage, appliances/broken equipment,
and litter.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Cupertino does, upon adoption of this resolution, establish the date of September 18,
2000, 6:45 p.m., as the time and 10300 Torre Avenue, Cupertino, California as the place
wherein public testimony will be taken relative to the determination as to whether or not
a public nuisance exists and if so determined, what type of abatement is necessary.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 21st day of August, 2000 by the following vote:
Vote
Members of the City Council
AYE S:
NOES:
ABSENT:
ABSTAIN:
Bumett, Chang, James, Lowenthal, Statton
None
None
None
ATTEST:
APPROVED:
/s/Kimberly Smith
City Clerk
/s/John Statton
Mayor, City of Cupertino
CITY OF
cUPEPxT nO
City Hall
10300 Torte Avenue
Cupertino, CA 95014-3255
Telephone: (408) 777-32110
FAX: (408) 777-3366
Website: www.cupertino.org
Agenda Item Number 12
STAFF REPORT
PARKS AND RECREATION DEPARTIVIENT
Agenda Date: September 18, 2000
SUBJECT AND ISSUE
Parks and Recreation staff to negotiate a lease with D.A.C.A. (De Anza Cupertino Aquatics) for the
use of the Sports Center pool. Current lease with D.A.C.A. expires March 31, 2001.
BACKGROUND
D.A.C.A. is a co-sponsored club of the city for the last 20 years. D.A.C.A. is the current tenant of the
Sports Center pool and has been for approximately the last five years. Their lease expires on March 31,
2001. They provide a learn-to-swim program for youth participants and a small amount of swim
classes for adults at the Sports Center. D.A.C.A. has a huge program with several hundred members
that participate in swim lessons. This is a very lucrative program for D.A.C.A.D.A.C.A. has upgraded
the pool facility in part by providing the following improvements:
· A bubble to allow for year-round programs
· Resurfaced the pool's interior
· Various mechanical upgrades
D.A.C.A. has been a good tenant and is requesting to enter into a second lease agreement with the city.
STAFF RECOMMENDATION
Staff to negotiate a lease with D.A.C.A. for the Sports Center pool.
SUBMITTED BY:
D~n-Mc-Carthy, ReckOn S~pervisor
APPROVED FOR SUBMISION
TO CITY COUNCIL:
David Knapp, City Manager
CITY OF
CUPE INO
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
PUBLIC WORKS DEPARTMENT
AGENDA ITEM
Summary
AGENDA DATE
September 18, 2000
SUBJECT AND ISSUE
Ordinance No./~(~: "An Ordinance of the City Council of the City of Cupertino Amending Section
11.08.250 of the Cupertino Municipal Code, Relating to the Designation of Bicycle Lanes, Stevens
Creek Boulevard from the East City Limit to the West City Limit."
BACKGROUND
Stevens Creek Boulevard, west of Foothill Boulevard, was recently resurface& A new striping plan
was implemented, allowing for travel lanes and bikes lanes as part of the Stevens Creek Recreational
Trail Bicycle Facility Improvements Project. This project completes the bicycle lanes on Stevens Creek
Boulevard between east City limit to the west City limit for continuous bicycle travel.
STAFF RECOMMENDATION
Staff recommends that the City Council conduct the first reading of Ordinance No. /~.
~~~D~rector of Public Works
Approved for submission:
David W. Knapp
City Manager
Printed on Recycled Paper
/.Cc-
ORDINANCE NO. 1856
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
AMENDING SECTION 11.08.250 OF THE CUPERTINO MUNICIPAL CODE,
RELATING TO THE DESIGNATION OF BICYCLE LANES, STEVENS CREEK
BOULEVARD FROM THE EAST CITY LIMIT TO THE WEST CITY LIMIT
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY ORDAIN that
Chapter 11.08, Section 11.08.250 be amended to delete the following:
Street
Stevens Creek Boulevard
Stevens Creek Boulevard
Stevens Creek Boulevard
Stevens Creek Boulevard
Stevens Creek Boulevard
Decription
Pharlap Drive to Stelling Road
Stelling Road to De Anza Boulevard
Stelling Road to De'Anza Boulevard
Pharlap Drive to Stem Avenue
Foothill Boulevard to Stem Avenue
Side
Both
South
North
Both
Both
The City Council of the City of Cupertino does hereby ordain that Chapter 11.08, Section
11.08.250 be amended to add the following:
Street Decription
Stevens Creek Boulevard East City Limit to the West City Limit
Side
Both
INTRODUCED at a regular meeting of the City Council of the City of Cupertino this 18th day of
September, 2000 and ENACTED at a regular meeting of the City of Cupertino this day
of ,2000 by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
CITY OF
City Hall
10300 Torte Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
AGENDA ITEM //-~ ~
Summary
AGENDA DATE
PUBLIC WORKS DEPARTMENT
September 18, 2000
SUBJECT AND ISSUE
First reading of Ordinance No./~(/~r-f: "An Ordinance of the City Council of the City of Cupertino
Amending CMC, Section 11.24.150, Parking Prohibition & Section 11.24.170, Parking Limitation -
Stevens Creek Blvd. from the East City Limits to the West City Limits"
BACKGROUND
Stevens Creek Boulevard, west of Foothill Boulevard, was recently resurface& In view of this, a new
striping plan was implemented on Stevens Creek Boulevard. This new striping plan included bicycle
lanes as part of the Stevens Creek Recreational Trail Bicycle Facility Improvement Project. In
addition, Chapters 11.24.150 and 11.24.170, regarding "No Parking", require amendment to include
two time zones and two no parking zones on Stevens Creek Boulevard west of Bubb Road to ensure a
continuous bike lane facility from the east City limit to the west City limit.
STAFF RECOMMENDATION
Staff recommends that the City Council conduct the first reading of Ordinance No.
~.ert J. Visl~
Director of ]
'ublic Works
Approved for submission:
David W. Knapp
City Manager
Printed on Recycled Paper
ORDINANCE NO. 1857
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
AMENDING CUPERTINO MUNICIPAL CODES, CHAPTER 11.24, SECTION 11.24.150,
RELATING TO PARKING PROHIBITION AND SECTION 11.24.170, RELATING TO
PARKING LIMITATION ON CERTAIN STREETS, STEVENS CREEK BOULEVARD
FROM THE EAST CITY LIMITS TO THE WEST CITY LIMITS
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY ORDAIN that Chapter
11.24, Section 11.24.150 be amended to delete the following:
Street Sides of Street
Stevens Creek Boulevard Both
Stevens Creek Boulevard Both
Stevens Creek Boulevard North
Stevens Creek Boulevard South
Stevens Creek Boulevard South
Stevens Creek Boulevard South
Stevens Creek Boulevard South
Portion
Between De Anza Boulevard and Bret Avenue, all portions
currently or hereafter within the City limits.
Between Bubb Road and Stelling Road, all portions currently
or hereafter within the City limits.
Between Foothill Boulevard and Bubb Road, all portions
currently or hereafter within the City limits.
Between Imperial Avenue and Bubb Road.
Between Saich Way and a point 100 feet west thereof.
Between a point 500 feet east of Janice Avenue and Orange
Avenue.
Between De Anza Boulevard and a point 300 feet West of
Bandley Drive.
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY ORDAIN that Chapter
1 ! .24, Section 1 ! .24.170 be amended to delete the following:
Street Period of Hours Sides of Portion Exceptions
Time Street
Stevens Creek 15 All Hours East Between a point 100 feet Sundays &
Boulevard west of Saich Way to a point Holidays
270 feet west thereof.
Ordinance 1857 Page 2
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY ORDAIN that Chapter
11.24, Section 11.24.150 be amended to add the following:
Street
Stevens Creek Boulevard
Sides of Street
North
Portion
Between the east City limit to a point 565 feet west of Saich
Way, thence from a point of 1010 feet west of Saich Way to a
point 1525 feet west of Mann Drive, thence from a point 2230
feet west of Mann Drive to a point 712 feet west of Foothill
Boulevard, finally from a point 300 feet west of California
Oak way to the west City limit.
Stevens Creek Boulevard
South
Between the west City limit to California Oak Way, thence
from Camino Vista Drive to a point 222 feet west of Pharlap
Drive, thence from a point of 626 feet east of Pharlap Drive to
a point 150 feet east of Pasadena Avenue, and finally from
Imperial Avenue to the east City limit.
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY ORDAIN that Chapter
11.24, Section 11.24.170 be amended to add the following:
Street Period of Hours Sides of Portion Exceptions
Time Street
Stevens Creek 15 9 a.m. to South Between a point 150 feet east of Sundays &
Boulevard 6 p.m. Pasadena Avenue to Imperial Holidays
Avenue.
INTRODUCED at a regular meeting of the City Council of the City of Cupertino this 18~ day
of September, 2000, and ENACTED at a regular meeting of the City of Cupertino this __ day of
,2000 by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
CITY OF
CUPEI INO
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
PUBLIC WORKS DEPARTMENT
AGENDA ITEM
Summary
AGENDA DATE
September 18, 2000
SUBJECT AND ISSUE
First reading of Ordinance No. : "An Ordinance Of The City Council of the City of
Cupertino Amending Section 11.20.030 of the Cupertino Municipal Code Relating To
Establishment Of All Directional Stop Required At Certain Intersections, Bubb Road at
Regnart Road"
BACKGROUND
It has been determined that a four-way stop be installed on Bubb Road at Regnart Road to
create a safer crossing environment for school age children. Currently this intersection has an
assigned crossing guard for Regnart Elementary School. The crossing guard has indicated that
the motoring public does not slow down, adding to the difficulty of crossing for the pedestrian.
The Traffic Safety Committee supports the all-way stop.
STAFF RECOMMENDATION
That the City Council enact Ordinance No.
intersection of Bubb Road and Regnart Road.
s~~S itte ~
, authorizing installation of all-way stop at the
Approved for submission:
David W. Knapp
City Manager
Pdnted on Recycled Paper
ORDINANCE NO. 1858
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
AMENDING SECTION 11.20.030 OF THE CUPERTINO MUNICIPAL CODE
RELATING TO ESTABLISHMENT OF ALL DIRECTIONAL STOP REQUIRED
AT CERTAIN INTERSECTIONS, BUBB ROAD AT REGNART ROAD
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY ORDAIN that
Chapter 11.24, Section 11.20.030 be amended to add the following:
Bubb Road and Regnart Road
INTRODUCED at a regular meeting of the City Council of the City of Cupertino this 18~ day
of September, 2000, and ENACTED at a regular meeting of the City of Cupertino this
day of ,2000, by the following vote:
Council Members
Vote
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
CITY OF
CUPERJINO
City Hall
10300 Tone Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
AGENDA ITEM
SUBJECT AND ISSUE
Summary
AGENDA DATE
PUBLIC WORKS DEPARTMENT
September 18, 2000
First reading of Ordinance No./69 1: An Ordinance of the City Council of the City of Cupertino
Amending Chapter 11.24 of the ~upertino Municip~al Cod~,, Section 11.24.150, Relating to
Parking Prohibition For Trucks Over 5 Tons
BACKGROUND
Recently, Stevens Creek Quarry asked the City to provide no parking restrictions for tracks over
5 tons on Foothill Boulevard and on Stevens Canyon Road between Stevens Creek Boulevard
and the south City limit. This request was initiated because independent trackers queue up on
Foothill Boulevard and Stevens Canyon Road and idle their engines in the neighborhood while
waiting the Quarry to open.
As part of the Quarry's good neighbor practice, this parking restriction on tracks would
discourage the independent trackers from coming to the Quarry too early and also reduce the
noise in the neighborhood.
STAFF RECOMMENDATION
Staff recommends that the City Council enact ordinance No./ff~.
[Iirector of 1~ ablic Works
Approved for submission:
David W. Knapp
City Manager
ORDINANCE NO. 1859
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
AMENDING CHAPTER 11.24 OF THE CUPERTINO MUNICIPAL CODE,
SECTION 11.24.150, RELATING TO PARKING PROHIBITION FOR TRUCKS
OVER 5 TONS
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY
ORDAIN that Chapter 11.24, Section 11.24.150 be amended to add the following:
Street Sides of Street Portion
Foothill Boulevard
Both
Between Stevens Creek Boulevard and
McClellan Road - Trucks Over 5 Tons.
Stevens Canyon Road Both
Between McClellan Road and the South
City limits - Trucks Over 5 Tons.
INTRODUCED at a regular meeting of the City Council of the City of Cupertino this 18t~
day of September, 2000 and ENACTED at a regular meeting of the City Council of the City of
Cupertino this day of ., 2000, by the following vote:
Vote
Members of the City Council
AYE S:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
CITY OF
CUPE INO
City Hall
10300 Torte Avenue
Cupertino, CA 95014-3255
Telephone: (408) 777-3220
FAX: (408) 777-3366
DEPARTMENT OF ADMINISTRATIVE SERVICES
SUMMARY
Agenda Item No. ! {~
Meeting Date: September 18, 2000
SUBJECT AND ISSUE
Kimpton Hotel & Restaurant Group, Inc.
1. Consider a partial refund of Transient Occupancy Tax (TOT) for the Cupertino City Center
Hotel.
BACKGROUND
In May of this year, James Whelan of the Kimpton Hotel & Restaurant Group approached Don
Brown with concerns over the rising costs of the City Center Hotel project. At that time, Mr.
Whelan proposed a partial refund of TOT in the amount of $2 million dollars to help underwrite the
project. Mr. Brown was not supportive of the proposal and relayed that the only way the city would
consider a rebate is if we could have a consultant review Kimpton's assumptions and verify the
need. (Attachment A)
On August 23, Mr. Whelan approached city staff requesting the $2 million refund of TOT. He was
told that the city would need to have his assumptions verified by an independent consultant and was
directed to contact Tim Kelly ofKeyser Marston. On September 1, Mr. Whelan approached the city
again and asked for an $800,000 refund of TOT, which was followed by a written request received
on September 13 (Attachment B). He stated that unless the city was to underwrite the $40 million
dollar project by this amount, he could not continue with the hotel as proposed. He also stated that
he needed an answer by September 18th. Again he was directed to an independent contractor and at
that time recommended the services of PKF Consulting.
PKF was then contracted to evaluate the Kimpton Hotel Group's assumptions. Their report
(Attachment C) concludes that Kimpton's financial projections for the proposed Cupertino hotel are
reasonable and that the proposed TOT rebate is necessary in order for the project to provide a
market rate return to the hotel's equity investors in its early years of operation. Finally, they
included a list of hotel projects that had been subsidized in the area.
Based on discussions with Kimpton, the City Center Hotel Project is projecting a remm to their
investors of 18% to 24%. In addition, although staff concurs that the cost of construction has risen
in the past 6 months, hotel room rates have also risen in this area by 10%.
All this having been said, a significant issue still exists with this request, namely that the City
Attorney has reviewed this proposal and has deemed this a gift of public funds. It should be noted
that the cities listed in the PKF report are charter cities or a city/county, and are governed by
different rules regarding gifts of public funds.
Printed on Recycled Paper [ ~') ~ [
RECOMMENDATION
Staff recommends that the $800,000 not be refunded to this project as it is a girl of public funds. If
Council wishes to provide $800,000 towards this project, we recommend that the funds be given as
a loan at 10 ½% interest, payable in years 4-6 and secured by a second deed of trust on the property.
Please note that this option will require a modification to our investment policy.
Submitted by:
CarolfA. Atwood
Director of Administrative Services
Approved for submission:
David W. Knapp
City Manager
Attachment A
ICarol Atwood
From: Donald Brown
Sent: Tuesday, May 23, 2000 8:22 AM
To: Carol Atwood; Steve Piasecki
Subject: Kirnpton Hotel
Hi Carol and Steve:
I am sending this to you because I have to report to Jury Duty today. I'll keep it
as short as possible.
Jim Whelan visited me yesterday with a sad story about how the costs had gone
up 30% on their project and that they were not going to be able to make their
return necessary to do the project with out some help. He said that Pegasus had
agreed to a $350K reduction in land price to help out.
Here's what he wants: $400K per year in TOT rebate for 5 years. My reaction
was pretty strongly negative. I said that this is very late in the game and that we
have never considered this as an option. He moaned and groaned and said he
would probably not take the project on to the city council unless he could get
some review of this issue.
I told him that the only way we would even consider it is if we could have our
consultant (Tim Kelly?) look at all their numbers to verify the need. We would
also need some policy direction from the council.
I had planned to raise this with Sandy and Richard today, but wont be able to.
Carol, I promised to call Jim Whelan (415-955-5~~. 1 ) sat 3:30 p.m. today to let
him know if there was any support for further evaluation of this. You and Steve
might want to discuss this, and if possible run it by Sandy and Richard. Then, if
you can, please call Jim today to let him know.
I had suggested once possibility: The city would look at getting at least one
million in TOT before any sharing would take place. He projected TOT in first
year at 1 million, going up to 1.3 million in year 3, with 3% increase each year
thereafter. So some kind of deal like Apple might work.
Thanks, sorry for the short notice.
P.s. I can't make this mornings meeting on the county agreement. Go ahead
without me. DB
HOTELS
SAN FRANCISCO
CARLTON HOTEL
~ ic,-H T HOTEL
Ct,~.RJON BEDFORD
Attachment
KIMPTON HOTEL & RESTAURANT GROUP, INC..
SAN FRANCISCO PORTLAND SEATTLETACOMA CHICAGO DENVER SALT LAKE CITY VANCOUVER WHISTLER
B
RESTAURANTS
SAN FRANCISCO
C~FFE ESPRESSO
CAFFE KULETO'
~FE PESCATORE
GALLERIA PARK HOTEL
FIFTH FLOOR
HARBOR COURT HOTEL
GRAND CAE[
HOTEL IULtANA
HOTEL MONACO
MONTICELLO INN
HOTEL PALOMAR
PRESCOTT HOTEL
SERRANO HOTEL
~IR FRANCIS DRAKE HOTEL
HOTEL TRITON
TUSCAN INN
VILLA FLORENCE HOTEL
HOTEL VINTAGE COURT
PORTLAND
5TH AVENUE SUITES
HOTEL VINTAGE PLAZA
SEATTLE
ALEXIS HOTEL'
HOTEL VINTAGE PARK
HOTEL MONACO
TACOMA
SHERATON HOTEL'
CHICAGO
HOTEL ALLEGRO
HOTEL BURNHAM
HOTEL MONACO
September 13, 2000
Mr. David Knapp
City Manager
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
Ms. Carol Atwood
Director of Administrative Services
City of Cupertino
10300 Torte Avenue
Cupertino, CA 95014
Re: Cupertino City Center Hotel
Dear Mr. Knapp and Ms. Atwood:
Please accept this letter as a further explanation of our proposal for a partial TOT
refund for the Hotel/Restaurant/Meeting Space we are proposing to build at
Cupertino City Center. We are appreciative of 'he City's willingness to consider
our proposal and we are hopeful that, for thc reasons set forth below, we will be
able to prove ourselves worthy of your support.,
As our Company discussed with the City prior to the June hearings on the Hotel
approval, the costs of the Hotel have significantly exceeded our initial investment
and underwriting plans for the project. Our construction costs alone are about
$4,600,000 in excess of our earlier expectations.
We are requesting a very modest partial refund due to, and conditioned on, the
increased amount of our investment ($40,000,0(}0) in the project. And, if we are
able to exceed our expectations we will return the refund with a bonus to the City
as described below.
HARRY DENTON'S
STARLIGHT ROOM
KULETO'S
ITALIAN RESTAURANT
KULETO'S TRATTORIA
MASA'S
PONZU
POSTRIO
PUCCINI & PINETTI
$CALA'S BISTRO
SPLENDIDO
PORTLAND
PAZZO RISTORANTE
PAZZORIA
RED STAR TAVERN
AND ROAST HC'
SEATT[~
THE BOOKSTORE
A BAR AND CAFE'
THE PAINTED TABLE'
TULIO
SAZERAC
TACOMA
ALTEZZO RISTORANTE*
BROADWAY GRILL'
CHICAGO
312 CHICAGO
DENVER A good portion of the cost increases is due to an increase in the quality and scope ~'OSSANT BISTRO
.OTEL MONACO of the programmatic expectations for the Hotel project. It is a very high quality, A~,OD CAEE
four-star Hotel. It is a wonderfully designed Restaurant with upgraded exterior eNcoRE
hardscape and other design features, which will be very esthetically pleasing for
the whole community to view. And it is a large, high quality Meeting Space
which will be able to host community events.
SALT LAKE CITY
HOTEL MONACO
VAt,' VER, B.C.
P~IEIC PALISADES
DENVER
?ANZ. ANO
SALT LAKE CITY
WHISTLER, B.C.
BAMBARA
SUMMIT LODGE o~4~a~ed b~ i~til~ ·
!
222 KEARNY STREET, SUF'7 SAN FRANCISCO. CA q4108 TEL 1415) 397-5572 FAX (415~ 296-8031 V~vVVV, KIMPTONGROUPCOM /~ ~¢
Mr. Knapp and Ms. Atwood
§eptember 13, 2000
Page 2
As described in our proposal, we will generate TOT tax revenues to the City of
$16,600,000 over the eleven and a half years following the opening of our hotel.
Of that amount we are requesting a conditional refund of only $800,000, spread
out over a three year period, leaving a net to the City of about $16,000,000. And,
if we are able to exceed our expectations we will return the TOT refund with a
$200,000 bonus, which will create revenues to the City of almost $17,000,000.
In addition to the project cost increases resulting from an increase in the scope
and quality of the project, we have incurred significant cost increases simply
resulting from the highly competitive economic environment and shortages of
materials. Concrete, sheet rock, and other major components of construction have
gone up significantly. Additionally, electrical and other subcontractors have
priced their services up. We have worked extensively with four very reputable,
very qualified general contractors to obtain the best possible, responsive,
competitive bids and to squeeze any excess costs out of the project. We have
selected a very qualified general contractor and we have worked with them
extensively, together with consultants and design build subcontractors, to value-
engineer cost savings solutions to the construction of this project. It is only after
having evaluated all of this during the summer that we concluded we were forced
to come back to the City to request the TOT refund assistance. The marginal
increase in the room count which we were able to achieve by turning some of the
larger suites into individual guest rooms, without increasing the size of the
building, allows us to believe that we can recover a portion of the increased costs
through higher occupancies and higher rates which we will charge because of the
higher quality and larger investment we are making in the
Hotel/Restaurant/Meeting space.
Additionally, we increased the size of the meeting space (and the parking
facilities associated with that) to allow for meetings which can hold 300 or more
persons at a single event. We believe this is beneficial from the community's
perspective, in allowing the Hotel to be a venue for civic as well as private
community gathering events. We believe that the City will see significant
payoffs, both financially as well as culturally, from the total package which this
high quality Hotel/Restaurant/Meeting Space brings to this important City Center
location.
There were questions from staff about whether the current land owner is charging
too much for the land, and whether or not the land owner should reduce the price
to cover the shortfall. We believe the current land owner has been very
cooperative in helping us on the Hotel. The land owner has made a significant
price reduction and is picking up other costs associated with the project. During
the course of obtaining City approvals, and since the time that we first discussed
the possibility of TOT assistance from the City, the land owner has taken three
incremental price reductions on the purchase price of the property and is
Mr. Knapp and Ms. Atwood
September 13, 2000
Page 3
absorbing other development costs. The land owner made these concessions in a
direct and open effort to reach an agreement with the City on the development
potential for the combined apartments/retail/hotel development. We believe the
City should consider the seller's concessions more than sufficient. It is our
understanding that the market price for property in the area exceeds $1,500,000
per acre. It is our belief that our purchase price from the seller is half the market
price. It is important to remember that, with our purchase of the net land, we are
acquiring undivided interests in a large amount of common area which has
already been improved at great expense: driveways, walkways, plazas, fountains,
the amphitheater, the swimming pool, and related facilities, and the park which
will be improved at the conclusion of the apartment development. A significant
portion, perhaps even a majority, of our purchase price can be allocated to our
acquisition of parking facility easements and rights in the parking garages at
Cupertino City Center. These have significant value to a hotel/restaurant/meeting
center, and are being delivered to us at no additional charge. Accordingly, it is
our belief that the land seller has taken a significant discount from the price of the
land in order to achieve an overall concession with the City. The land seller has
worked extensively with us in a very cooperative, compromising manner to make
the project work.
It is our belief that the City benefits well from the increased quality of our Hotel
project and that the TOT partial refund is a very sound, prudent decision which
will enable the City to receive a multiple of that refund back in increased TOT
revenues over time. The increased hotel scope enables us to provide a modest
increase in the number of rooms, which generates an increased source of TOT
revenue which would not otherwise be available. For example, just twenty-four
additional guest rooms which we have squeezed into the building envelope
creates approximately $2,000,000 in increased TOT present value alone.
Included along with this letter is a schedule showing the TOT partial refund and
potential bonus return proposal. It is very sound, prudent, and well reasoned from
the City's perspective. The schedule displays that the City obtains, and retains, all
TOT collections after the first thirty months of hotel operations and, during the
first thirty months of hotel operations the hotel receives three modest incremental
rebates only after the City retains the majority of the scheduled TOT collections.
Hence, the hotel is at risk because if we do not raise the scheduled level of TOT
collections during the first thirty months of operations we will not receive the full
rebate.
Lastly, we are proposing that if we are able to exceed our investors expected
levels of returns that we will return the refund x/rith a bonus to the City in years
2011 and 2012 as shown on the attached schedule. We are proposing a very
simple and measurable method of calculating the potential TOT return and bonus.
Because payroll costs are the most significant cost component of a high-end, full
Mr. Knapp and Ms. Atwood
September 13, 9~000
Page 4
service, hotel and restaurant operation we are suggesting that we compare
REVPAR growth from the end of year three to the end of year ten on an industry
standard, commonly measured, compound average annual growth method
(CAAG), to our total payroll cost CAAG over the same period. If the REVPAR
growth exceeds the payroll cost growth by 2.25 then we will repay the City
$500,000 each in year eleven and twelve, giving the City a bonus of $200,000 for
a total return of $1,000,000. This method is fair, and is easily calculated and
measured. It can be noted by the City on our Hotel Operating License. The two
data points can be gathered at the end of year three, verified by our independent
accountant, and compared to the two data points that can be gathered and verified
at the end of year ten. The simple mathematical calculation can then be
performed and the return calculation obligation determined very systematically.
For the City's protection this method is clean, clear, simple, easily calculated, and
capable of an easy audit if desired.
I hope the foregoing is understandable and xneets with your approval. We will be
available to discuss with you at your earliest opporttmity, and to answer any
questions that you may have. Thank you for yo,ur consideration.
We understand that you have retained PKF Inc., a hospitality consulting firm, to
assist in your evaluation of this proposal. We have provided PKF with
background information regarding the project scope, costs and budget, and we
will forward to them a copy of this letter.
Very truly yours,
KIMPTON HOTEL & RESTAURANT GROUP, INC.
Chi~..~velo~ent Officer
JJW/gn
CCi
Mr. Thomas Callahan, PKF, Inc.
Mr. Arthur May
CUPERTINO CITY CENTER HOTEL
PARTIAL TOT REFUND PROPOSAL
SUMMARY
Cupertino Partial TOT Refund Proposal:
We willreceive apartial TOT refund of $100,000
$300,000
$400,000
Total $800.000
first six months
second twelve months
third twelve months
based on the assumptions in the attached schedule.
It assumes we invest a minimum of $40,000,000 id the transaction generally as set forth
in the development budget.
And it assumes we generate and the City retains the first mounts of TOT prior to a
partial refund to us as shown on the schedule.
Then, if we exceed the mid-level success necessary to provide sustainable returns to the
project, we will pay back the TOT refund with a bgnus as follows:
If the compound average annual REVPAR growth (CAAG) exceeds our average annual
payroll growth by 2.25% (CAAG) from the end of year three to the end of year ten, then
in years eleven and twelve we will pay the City One Million Dollars in installments of
$500,000 each.
If we do not receive the scheduled refunds there is no repayment due. And if the
REVPAR growth does not exceed the payroll cost growth there is no payback required.
Payroll costs are the biggest component of operating costs so if our payroll costs go up
(which include salaries, wages, benefits, payroll taxes, and related costs) it is very likely
the CPI will also be increasing and any REVPAR growth not in excess of those rates
will not be creating an excessive return to the owners.
Thus, by example, if our payroll costs go up by an average 3.0% per year CAAG from
the end of year three to the end of year ten and if our REVPAR achieves a CAAG of
5.25% from the end of year three to the end of year ten, then in years eleven and twelve
we will pay back the City $500,000 each year for a total of $1,000,000.
The calculations are quite simple and can be verified by our independent accountants.
At the end of year three the two data points are collected, verified, and delivered. Then
at the end of year ten the two other data points are collected, verified, and delivered and
the simple mathematical calculation is completed. Our Hotel operating license can be
marked to note the need to provide the data. '
Sent Via F. acslmile (408J 777-336~6
Hard copy to follow via Federal Express
September 13, 2000
Ms. Carol A. Atwood, CPA
Director of Administrative Services
City of Cupertino
10300 'rorre Avenue
Cupertino, California 9.5!04
Attachment C
CONSULTING
SuRe 1650
S~n Francl=co CA g~I04
Teiephone (415) 421-5376
Te;efsx (415) 956-7708
Re: Proposed Cupertino City Center Hotel
Dear Ms. Atwood:
Pursuant to your request, we have prepared a brief summary of our findin§s and
conclusions associated wfth our evaluation of the financial feasibility of the proposed
hotel to be developed by the Kimpton Hotel & Restaurant Group, Inc. to be located in
Cupertino, California.
A. BACKGROUND AND SCOPE OF STUDY
As we understand it, ti~e City of Cupertino (the City) is negotiating with the Kimpton
I lotel & Restaurant Group, In(:. (Kimpton) for the development of a first-class, full
service hotel to be located at the intersection of De Anza Boulevard and Stevens Creel<
Boulevard in Cupertino's City Center. '['he hotel will offer 228 rooms, a 4,500 square
foot restaurant and approximately 4,000 square feet of meeting space. The total
development cost of this project is estimated to be $40.7 million ($ ! 78,508 per room).
We furlher understand that Kimpton has requested a financial subsidy from the City in
the. form of a partial rebate of the hotel's transient occupancy tax (TOT) for the
property's first three years of operation. Kimpton asserts that this subsidy is required to
make the project feasible, particularly §iven the City's requirements for a larser
ballroom (3,0OO square feet) lhan is typical for a Kimpton property and the hi§h quality
of the hotel's exterior treatment. The TOT subsidy would tota~ $8OO, O00 and be
funded over the hotel's first ~h~ee years o¢ operation as presented on the chart in the
fei lowing page.
A wJ~'~'~j~ owned subsidiaw*of Hospitality Asset Advisors International, Inc.
Carol A. A twood
Septeml~er 15, 2000.,
Year ,i Amounl ~
2002 i $ oo, ooo [
I oo,ooo
I
I ½,400,000 ,,
'[ho above subsidy would be repaid together with an additional sum of $200,000 ($1.0
million in ,*oral) at the end of a ten-year period if the holel achieves certain levels of
revenua growl,h in excess of the increase itt payroll cost.
PKF Consulting was retained by the City of Cupertino to evaluate if the foregoing
subsidy is necessary and reasonab!e. To date, representatives of PKF Consulting have;
7. Prepared a summa~ of financial subsidies provided by odier Bay Area
communities to give representatives of ~.he City an understanding of what is
[ypical;
2. Reviewed Kim~on's Business Plan for ~he proposed hotel including
development costs, operating projecdo~;s and financing plan;
3. Inspected the site on which the proposed ho~el would be developed;
4. Performed a limited update of d~e current and fi]mre supply and demand
for hotel accommodations in tt~e Cupertino area;
$. Reviewed the acl:ual operating results of five similar hotels opera,ed by
Kimpton;
6. Reviewed [he development cost of eight other new or proposed hotels; and
7, Interviewed representatives of the Kimpton Hotel & Restaurant Croup, inc.
Based on our review and analysis of the forgoing, we have developed an opinion as to
I. tle reasonableness of Kimplon's projeclions as well as the necessity of lhe requested
subsidy. Our findings and conclusions are summarized in the following paragraphs.
Following our discussion of the proposed project is a brief discussion of other Bay Area
hoLel developments that have required a financial subsidy.
REVIEW OF KIMPTON'S DEVELOPMENT PROGRAM
in reviewing Kimpton's clevciopment program for the proposed hotel, we focused on
the following four areas.
Development Costs
Revcnties
Operating Expen,~e~
Financing Plan & Return on Equity Inveslment
Ms. Carol A, Atwood 3 Septem6er 13, 2000
· · Ill I I iiiI
1. Development Costs
The total cost oF development for the proposed hotel is projected to be $40.7 million.
Excluding land, the cost of the hotel is estimated to be approximately $38.0 million.
7his equates to approximately $168,000 per room. As a point of ¢ompar!sOn,
presented below is a table which summarizes the cost of other similar hotels located
[hroughout the Bay Area.
........ ~===~um~ary et Co~j iarable Hotel Development Costs
Hotel Location Number of Rooms
Weslin
Conference Center Hotel'*
Hamp.~hire Hotel'
W Hotel
Marriol. t
B n bassy Suites
Sheraton Grand
Pale Alto
5an Leandro
SFO/Millbrae
San Francisco
Fremont
Sacramemo
Sacramento
Ncwark
184
200
500
423
321
241
500
174
Suites
All cost estimations are exck*sive of land value.
* The facilities are currently pro~seo and are. not yet under development.
Suurce: PKF Con~ultin,~ and project mana~er, for indi~-idual development~
Dewelopment C. ~ost
$40,300,000
$39,000,000
$97,400,000
$74,000,000
$55,000,000
$38,600,000
$79,800,000
?s, oo,ooo ,,
Cost Per Room
$ 219,00 0
$195,000
$194~800
$174,900
$171,300
f, 160~200
$159,600
$147,100
As can bo noted, the cost for tile above eight hotels ranged from a Iow of $147,000 to
a high of $219,000, with an average of $178,000. Based on the above comparison,
coupled with our general knowledge of the cost of developing a hotel in this area, we
are of the opinion that Kimpton's construction cost estimates are reasonable.
2. Re venues
The primary source of revenue for a typical hotel is from the rental of 8uestrooms. For
the proposed Kimpton hotel, over 70 percent of its revenue will be from this source.
Kimpton is projecting the subject hotel to achieve all occupancy level of 67 percent in
its first six months of operation at and average daily roorn (ADP.) of $194.00. Over the
next two years they project the hotel's occupancy to increase to 76 percent and then
stabilize at that level. With regard to averase daily room rate fADE), Kimpton project5
the property to achieve an ADR of $197,00 in 2003, increasin§ to $210.00 in 2004.
"1 hereal'ter, they project the hotel's ADR to increase at inflation (assumed to be 3.0
percent).
As a point of comparison, through the first seven months of this year, the weighted
average occupancy for hotels in the local market area is approximately 81 percent with
ar? ADR of $152. However, siren the fact that between 1,500 and 2,000 new full
~2rvice hotels are planned to be added to the local market over the next four years,
rnos~ industry analysts are projecting the occupancy for the area's hotel to decline to
15, Carol A, Atwood
4 ,, ~eptember 73, 2000
the mid to high )'Os'. According, a stabilized occupancy for the proposed Kimpton
hol. el of 76 percent is reasonable, With regard to room rates, the projected ADR for
the proposed hotel is also reasonable, and it places the properl, y at the very top of the
local market.
3. Operating Expenses
We t~ave compared the projected operating expenses for the proposed hotel to the
actual operating performance of five other hol,els operated by Kimpton, as ,.veil as to a
sample of similar hotels located throughout the Bay Area, Based on lhis review, we
am o1' the opinion that the projected operating expenses for the proposed hotel are
reasonable.
4. Payments to K;mpton
As we understand it, Kimpton (or an affil!ate) will receive a fee of 1.5 percent of
COIl$1. rUCtiOl~ COSLS as compensation to oversee the development of [he hotel.
In addition, as ~he operator, Kimpton will receive a base management fee of four
percent of total revenues plus an incentive fee, which equates to ta,,,o percent of tolal
revenues in a stabilized year of operation, to manage the hotel. Based on our
experience, the foregoing development and management fees are appropriate for an
operator of the quality of the Kimpton Group.
5. Financing Plan and Equity Return
The Kimpton business plan assumes a loan of 60 percent of construction costs
($24,420,000) with the balance of the developmenl funded through equity investment,
They further assume the loan has a 25-year amortizalion period and pays in!erest at a
10..5 percent rate. All of the forgoing terms are typical. However, the assumed inlerest
rate is at the high end et~ the ran§e f'or a borrower such as Kimpton. Representatives of
Kimp~on have correctly noted that interest rates for hotel properties have increased
significantly over the past lhree years. Accordingly, they deem it prudent to be
conservative in this area.
Based on Kimptoq's cash flow forecast, and assuming an equity investment of
$16.280,000 (40 percent of the total cost), the resulting "cash on cash" return to the
investor group over the first five years of operation of the hotel, both with and wilhout
Ihe 'rOT rebate, is presented on the following page.
Carol A. Atwood
,,, S, eptember 13, 2000
Annual Cash on Cash Return I0 ~guity ....
without Rebate With Kebate
Year CaSh Flow Fquity l~eturn; Cash Flow Equil), Returns
2002' ($190,975) (7.2)% ($90,975) (0.6)%
2004 1,098,170 6.8% 1,397,170 8.6°/°
2005 2,23§,690 13.8 % 2,638,690 16.2 %
2006 2,332,390 14.3% 2,332,390 I ~4.3%
2007 ~/440,310 15.0% ~ 2t440,3~0 ,[ 15,0°to
~Six months of operation.
~Ratio lo $16.3 million E0uity Investment.
As can be noted, in either case, the hotel will generate a negative cash flow in its first
six nlonths et~ operation. In the firs: full year of operation (2004), the hotel is projected
to generate a 6.8 percent return to equity withou[ the ~ebate, and a 8.6 percent return
with the rebate. In the second full year of operation, the returns are projected to
increase to 13,8 and 16.2 percent, respectively. For the following two years, the
equiW return is project to be between 14 and 1.5 percent for both scenarios.
As a point of reference, investors in today's market typically require a 10 to 12 percent
relum on investment by the first 12 to 24 months of the oDeration of a hotel, increasing
to in excess of 15 percent by the third year of opera[ion. Accordingly, without the
'lOT rebate, the projected return on equity from this hotel is below what is typically
expected in today's investment climate.
C. SUMMARY OF SUBSIDIES PROVIDED BY OTHER COMMUNITIES
Public subsidies to stimulate the development full-service hotels are fairly common in
Northern California. However, after a period of activity in the mid-1980's to early-
1990% little full-service development has occurred until recently, consistent with the
overall development [rends in full-service hotels. In the following table, we have
identified a sampling of subsidized, full-service hotel projects located in Northern
California, proximate to Cupertino, in which local municipalities were involved over
the past 15 years. For illustrative purposes, this sampling gives insight as to the
structure of the development packages negotiated.
Ms. Carol A. Atwood
Septet. bet 13, 2000
ConFerence Cente; Hotel/Proposed
~he~alm~ Grand Hotel/Proposed
Embassy SuitedProposed
Summ,.a~ of Hotel 5ubsid~ T~jae~
Location Subsidy T~pe
Sar Leandro Preferentiai Joan and deferral of ~,round rent
Petaluma Transient occupancy tax rebate et $2mm; offsite improvements of $1 mm
Sacramento Free land and $2,9 million direct subsidy
Shera:o~ Grande/2001 , Sacramento Full project financing, le~sed garage, significant c~tv involvement
W t-lolel/1999 [ San ~ranci~co Land at favorable ma~et price
~ ~ lillan I'lotcV1992 ~ San Jose Favorable land lea~e and Construction financin~
~li Hotel St. Clair~1992 ~ 5~n Jose :avo~b~e land lease, renovation cost funding, ~and purchase option
~ t
~ Doubletree If)lei, 1990 s Modeslo Fuvor~b e land lease and favorable garage lease
~ Fairmont Hoter/1987 San Jose Favorable purchase option
la~d lease with
~ Oakland M~t~enter/1983... ..... J Oakland ~,Favorable la~d lease inc[udin~ payment deferral
"L~e,y]'F.?./Zf c..,./~;.l ........... .-.,,., " _. ......
As indic~ied in the preceding table, a vadetv of subsidy structures nre possible. The
following paragr~t)hs provide additional information on ~he four most recent subsidy
projects.
'the City of San Leandro has proposed to negotiate a lease for the ground underlying a
p¢oposed conference center to include up to $15,000,000 as a loan to be used in the
deve]opment of the facility, a proposed 200-room hotel and conference facility. '[he
loan repayment would be characterized as base rent in addition to percentage rent to
he paid on a monthly basis. The developer estimates the overall development cost for
the project, exclusive of laqd, at $39,000,000, indicating that the subsidy approximates
38 percent of project development cost.
The City of Pete!urea and the developers of a proposed Sheraton Hotel are currently
negotialing a two-part subsidy on a marina development site. The city is desirous, of
the construclion of a facility that would nol only complement the overall marina
development, but would also provide much needed meeting and conference space in
tho city limits. We understand that the latest subsidy proposal includes $750,000 in
on/off sile improvements and a rebate of up to $2,000,000 in transient occupancy
taxes over a ten-year period, l'i~e present value of these subsidies is estimated by PKF
Consultin$ at $! ,400,000, or approximately 5.0 percent of total development cost.
In Sacramento, the value of the development site for I.i~e proposed Embassy Suites
hotel is estimated at $.2,400,000, or 6.2. percent of development costs. The siie for the
hotel was given al no cost to the developer by the City. Further, the City recently
agreed to fund $2.9 million in an additional direct subsidy towards off-site
improvements to enable this project to go forward.
ihs. C.~ro/ A. Atwood 7 September 13~ 2000
A second subsidized here) in Sacramento is the Sheraton Grand. The total city-
sponsored construction-financin§ package for t~e Sheraton (exclusive of set.aside cash
reserves and payment of professional f.ees) is roundly estimated at $84,000,000. PKF
Consulting, as part el the d,Je-diiigence involved in the bond issuance made to finance
ti~e cons[ruction of the hotel., which is located adjacent to the city-operated convention
center, valued the property on a prospective value upon openin§ at $61,000,000.
There[ore, the apparent subsidy in this case would be approximately $23,000,000
($84,000,000 less $6i,000,0001, or :37.7 percent of market vatue.
D, CONC! USiON
Ii1 summary, we are of the opinion that Kimpton's financial projections for the
proposed Cupertino hotel are reasonable. Further, the proposed lOT rebate is
necessary in order for the project to provide a market rate return to the hotel's equity
invos('ors in ils early years of operation. Finally, as shown in the above discussion, the
proposed type of' subsidy is relatively common in order to support the development of
high cost, full service hotels.
We appreciate this ol)po;~unity to be of assistance to you. If you have any questions
on lhe foregoing, or if we can be of any further assistance, please do not hesitate to
calf.
Very truly yours,
PKF Consulting
/Thomas Ex Callaha , C A, CRE, MA
Executive Vice President
CITY OF
cUPeM no
City Hall
10300 Torte Avenue
Cupertino, CA 95014-3255
Telephone: (408) 777-3220
FAX: (408) 777-3366
DEPARTMENT OF ADMINISTRATIVE SERVICES
SUMMARY
Agenda Item No. / 7
Meeting Date: September 18, 2000
SUBJECT AND ISSUE
Cupertino Community Services (CCS) Affordable Housing Project.
1. Approve a resolution that permits CCS to apply to the California Housing Finance Agency
(CHFA) for a 1 O-year, 3% loan for their Affordable Housing Project.
BACKGROUND
In February 1999, the City Council approved $1.6 million in funding towards the CCS affordable
housing project on Stevens Creek Boulevard. Cupertino National Bank was to finance the project.
Due to increased interest rates, CCS is considering alternatives to this conventional loan. Several
options are currently being explored by their consultants Bridge Housing, including the application
for a 10-year, 3%, fully amortized loan from CHFA.
The CHFA application deadline is this month. If successful in their efforts to obtain this funding,
CCS may be looking to the City of Cupertino to help fund the cash flow shortfall of meeting their
operation and debt service obligations during this ten-year period. City staff has requested
proformas for this scenario as well as several others for our review and consideration. Once those
financial scenarios are obtained from Bridge Housing, we will be recommending a course of action
to Council. Until that time, we feel that it is in the best interest of CCS to keep all of their options
open for financing of this project, including application for the CHFA funds. The attached
resolution is required as part of that application process.
This resolution is not intended to obligate the City to assist in a CHFA option, but to keep the
option available in the event that the CHFA loan is the best way for the agency to be successful in
this endeavor. Pursuit of this option would be contingent on securing the loan, staff review and
Council approval once all financial information has been fully evaluated.
RECOMMENDATION
Staff recommends that the Council approve the attached resolution to permit CCS to apply for this
funding option.
Submitted by:
Carol A. Atwood
Director of Administrative Services
Approved for submission:
David W. Knapp
City Manager
Pdn~edont~ecycledP~per
RESOLUTION NO. 00-242
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
APPROVING CUPERTINO COMMUNITY SERVICES APPLICATION
TO THE CALIFORNIA HOUSING FINANCE AGENCY FOR A LOAN FOR THEIR
AFFORDABLE HOUSING PROJECT
WHEREAS, Cupertino Community Services, a California nonprofit corporation ("CCS"),
desires to develop twenty four units of multi-family rental housing in the City of Cupertino (the
"Development"); and
WHEREAS, the housing in the Development will be offered at rents affordable to low and
very low income households; and
WHEREAS, the City of Cupertino wishes to support CCS in the development of affordable
housing in the City of Cupertino; and
WHEREAS, the California Housing Finance Agency ("CHFA") is accepting applications
under its new HELP Program to lend funds to local jurisdictions for use in the development of
affordable housing; and
WHEREAS, the City desires to apply to CHFA under the HELP Program to borrow funds in
an amount not to exceed Two Million Dollars ($2,000,000) which will be loaned to CCS to assist in
financing the construction &the Development.
NOW, THEREFORE, BE IT RESOLVED that the City Council authorizes the application to
CHFA for a loan under the HELP Program in an amount not to exceed Two Million Dollars
($2,000,000).
BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to
negotiate and execute the HELP Program application and to take other actions necessary to facilitate
the proposal program..
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino
this 18th day of September, 2000, by the following vote:
Vote
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
Members of the City Council
Deputy City Clerk
Mayor, City of Cupertino
RESOLUTION NO. 00-242
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
APPROVING CUPERTINO COMMUNITY SERVICES APPLICATION
TO THE CALIFORNIA HOUSING FINANCE AGENCY FOR A LOAN FOR THEIR
AFFORDABLE HOUSING PROJECT
WHEREAS, Cupertino Community Services, a California nonprofit corporation ("CCS"),
desires to develop twenty four units of multi-family rental housing in the City of Cupertino (the
"Development"); and
WHEREAS, the housing in the Development will be offered at rents affordable to low and
very low income households; and
WHEREAS, the City of Cupertino wishes to support CCS in the development of affordable
housing in the City of Cupertino; and
WHEREAS, the California Housing Finance Agency ("CHFA") is accepting applications
under its new HELP Program to lend funds to local jurisdictions for use in the development of
affordable housing; and
WHEREAS, the City desires to apply to CHFA under the HELP Program to borrow funds in
an amount not to exceed Two Million Dollars ($2,000,000) which will be loaned to CCS to assist in
financing the construction of the Development.
NOW, THEREFORE, BE IT RESOLVED that the City Council authorizes the application to
CHFA for a loan under the HELP Program in an amount not to exceed Two Million Dollars
($2,000,000).
BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to
negotiate and execute the HELP Program application and to take other actions necessary to facilitate
the proposal program..
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino
this 184 day of September, 2000, by the following vote:
Vote
AYES:
NOES:
ABSENT:
ABSTAIN:
Members of the City Council
ATTEST:
Deputy City Clerk
Mayor, City of Cupertino
ORDINANCE NO. 1854
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF CUPERTINO ADDING CHAPTER 10.80 TO THE CITY'S
MUNICIPAL ORDINANCE CODE PROHIBITING
SOLICITING ON DESIGNATED PUBLIC RIGHTS-OF-WAY
THE CITY COUNCIL OF THE CITY OF CUPERTINO HEREBY ORDAINS AS
FOLLOWS:
Section 1. Amendment
There is hereby added to the Cupertino Municipal Code Chapter 10.80 which
reads as follows:
Chapter 10.80
Solicitation Prohibitions on Designated
Public Rights-of-Way
Section 10.80.010 Definitions
For purposes of this Chapter the following words and phrases have the meanings
ascribed herein:
a) "Employment" means services, industry or labor performed by a person for wages
or other compensation or under any contract for hire, written, oral, express as implied.'
b) "Solicit" means any request, offer, enticement, or action which announces the
availability for or of employment, the sale of goods, or a request for money or other property,
or any request, offer, enticement or action which seeks to purchase or secure goods or
employment, or to make a contribution of money or other property. Solicitation shall include
participation in discussions undertaken in response to the solicitation by another. A
solicitation shall be deemed complete when made whether or not an actual employment
relationship is created, a transaction is completed, or an exchange of money or other property
takes place.
c) "Public Right-of-Way" means public streets, highways, and sidewalks, including
driveways.
d) "Director" means the City's Director of Public Works.
Ordinance No. 1854 Page 2
Section 10.80.020 Prohibition
mo
It shall be unlawful for any person, while standing in any portion of a public
right-of-way, in a posted no vehicle solicitation zone, to solicit, or attempt to
solicit any person traveling in a vehicle along a public right-of-way.
It shall be unlawful for any person, while the driver or occupant of any
x)ehicle in a public right-of-way, in a posted no vehicle solicitation zone, to solicit,
or attempt to solicit any person who is within the public right-of-way.
Section 10.80.030 No Vehicle Solicitation Zone
Ao
The Director may declare any public right-of-way, or portion thereof, within the
City to be a no vehicle solicitation zone if the Director finds, based upon traffic
volume, traffic patterns and the nature of the conduct of the solicitation activity,
that the solicitation occurring in that area creates an undue hazard to public safety.
B°
The prohibition set forth in Section 10.08.020 is only enforceable in any area
declared to be a no vehicle solicitation zone upon the posting of signs giving
notice of the prohibition.
Section 10.80.040 Violation - Penalty
Any person violating any of the provisions of this Chapter shall be deemed guilty of
an infraction, and upon conviction thereof shall be punishable as provided in Chapter 1.12.
Publication Clause
The City Clerk shall cause this ordinance to be published at least once in a newspaper
of general circulation published and circulated in the City within 15 days after its adoption,
in accordance with Government Code Section 36933, shall certify to the adoption of this
ordinance and shall cause this ordinance and her certification, together with proof of
publication, to be entered in the Book of Ordinances of the Council of this City.
PC/O/OS8100 2
Ordinance No. 1854 Page 3
INTRODUCED at a regular adjourned meeting of the City Council of the City of
Cupertino the 5th day of September, 2000 and ENACTED at a regular meeting of the City
Council of the City of Cupertino the of 2000, by the
following vote:
Vote:
Ayes:
Noes:
Absent:
Abstain:
Members of the City Council
ATTEST:
APPROVED:
City Clerk
Mayor
PC/O/OS8100
3
ORDINANCE NO. 1855
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
AMENDING SECTION 11.20.030, ALL DIRECTIONAL VEHICULAR STOP
REQUIRED AT CERTAIN INTERSECTIONS, TO INCLUDE NORTH PORTAL
AVENUE AT THE INTERSECTION WITH WHEATON DRIVE
THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES HEREBY ORDAIN
THAT Section 11.20.030 be amended to include the following:
Section 11.20.030 All Directional Vehicular Stop Required at Certain Intersections.
North Portal Avenue and Wheaton Drive
INTRODUCED at a regular meeting of the City Council of the City of Cupertino this 5t~
day of September, 2000, and ENACTED at a regular meeting of the City Council of the City of
Cupertino this m day of ., 2000, by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
APPROVED:
City Clerk
Mayor, City of Cupertino
CITY OF
CUPEI INO
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
PUBLIC WORKS DEPARTMENT
AGENDA ITEM
Summary
AGENDA DATE
September 18, 2000
SUBJECT AND ISSUE
Status report on sidewalks on Stevens Creek Boulevard
BACKGROUND
City Council requested a status report on the feasibility of installing a sidewalk at 19160 Stevens Creek
Boulevard. Staff has contacted the property owner on several occasions in the past in an attempt to
install a temporary walkway. Each time, we were told that development is imminent.
On the basis that the project does not seem to be moving along, nor do we know its timetable, the staff
will construct a temporary sidewalk on the above-mentioned property.
STAFF RECOMMENDATION
None
Approved for submission:
David W. Knapp
City Manager
CITY OF
CUPE INO
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3255
(408) 777-3354
FAX (408) 777-3333
AGENDA ITEM
PUBLIC WORKS DEPARTMENT
Summary
AGENDA DATE September 18, 2000
SUBJECT AND ISSUE
Stares report on new Cupertino Library
BACKGROUND
The City Council has been reviewing two different locations for the new library on the current Civic
Center property for the past two years. Just recently, a third site was introduced in the Town Center
redevelopment project to the west of the Civic Center site bounded by De Anza Boulevard, Rodrigues
Avenue, and Torre Avenue. This redevelopment offers an opportunity to make the library a focal
point of the Town Center/Civic Center area.
In order to develop a conceptual master plan for the Civic Center and the new library, the Town Center
preliminary design needs to be considered. The library project has been delayed until this is reviewed.
Combining the Town Center with the Civic Center could yield a development that makes the library
the centerpiece of a pedestrian-friendly Civic Center with shopping, offices, and housing nearby. It
will be destination for gathering, special events, entertainment, and other interests that will make the
delay worthwhile. Once the Cupertino Library Building Steering Committee is given direction, it will
proceed to develop the new library.
STAFF RECOMMENDATION
None
D/rector
,~ovic[ '
Public Works
Approved for submission:
David W. Knapp
City Manager
Printed on Recycled Paper