Loading...
86-152 MPA Designs - Landscape architectural services for Stevens Creek Blvd. widening project Reso 6845\ c c (ATTACHMENT) REGEiv® $8,000.00 v MAY 3 u 1*6 120-8217-761 City of Cupertino MPA D51g11 AGREEMENT NO. BY THIS AGREEMENT made and entered into on the 19th day of May 19 86 by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (1) MPA DESIGN (2) Address 562 Mission Street City San Francisco Zip 94105 Phone (41 5)_543-4664 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR Shall provide or furnish the following specified services and/or materials: Landscape architectural services for STEVENS CREEK BLVD. WIDENING PROJECT DELIVERY: EXHIBITS: The following attached exhibits hereby are made part of this Agreement: EXHIBIT A TERMS The services and/or materials furnished under this Agreement shall commence on and shall be completed before (negotiated) COMPENSATION For the full performance of this Agreement, CITY shall pay CONTRACTOR: EIGHT THOUSAND DOLLARS ($8,000.00) GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and all damage and liability of every nature, including all costs of defending any claim, caused by or arising out of the per- formance of this agreement. City shall not be liable for acts of Contractor in performing services described herein. Insurance. Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance before commencing any services under this agreement. Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non -Discrimination. No discrimination shall be made in the employment of persons under this agreement because of the race, color, national origin, ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense that the relation of master and servant exists between City and undersigned. At all times Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement. Contractor certifies that no one who has or will have any financial interest under this agreement is an officer or employee of City. Changes. This agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY shall be: Name Travice Whitten Department Public Works Address 10300 Torre Avenue Cupertino, CA 95014 Telephone (408) 252-4505 This Agreement shall become effective upon its execution by CITY, in witnestthof, partie ee e d this Agreement the day and year first written above.AppROVED: or, Cit o upertino CONTR7 CITY OF CUPE BY �� �� By Title Title ZYZAMAA Approved as to form: MPA Design I ❑ i,kc;ipc Arclrilcc is and 1311/11/1 I h•sii,ncts May 6, 1986 Mr. Travice Whitten City of Cupertino Dept. of Public Works 10300 Torre Ave. Cupertino, CA 95014 5n1 Mission surer Smi k nccisco, CA 9-1105 415 54;-1664 Subject: Stevens Creek Boulevard Improvements Fee Proposal Dear Travice: MPA Design is very pleased to submit this fee proposal for landscape architectural services for the City of Cupertino, Stevens Creek Boulevard Improvements. After meeting with you and visiting the site, we are familiar with the extreme sloping condition and requirement for screening the adjacent properties. The success of this project will depend in large part on the use of deep rooting plant materials installed to hold the 1:1 slopes and sparing but effective use of irrgation to deep root water the planting without causing earth sliding. The steep earth cuts will require rounding at edges of cut to blend naturally with adjacent properties. At this time we estimate construction costs to be as follows: 22,500 S.F. x $2.80 = $63,000 Probable 20% increase for working on steep slopes +12,600 Estimate of Construction Costs $75,600 Based on this, I have outlined the major components to be reviewed as part of the design. A. Stevens Creek Improvements Goals: 1. To create an attractive landscape experience which compliments and blends with existing Stevens Creek Boulevard landscaping and the natural Stevens Creek plant community. t 7j.ri Travice Whitten May 6, 1986 2. To provide a low maintenance and low water consumption landscape. 3. Aid in slope stabilization through use of deep rooted plant materials. 4. Maintain safe open views at intersections for crossing traffic. B. Design Parameters The existing plantings at Stevens Creek Boulevard, at Stevens Creek and at adjacent properties require study in order to achieve a logical planting plan which blends these existing plant communities. Also, the soils engineer's reports require review to determine planting compatibility, and to verify potential need for amended import topsoil. The following is an initial list of design parameters: 1. Provide landscaping each side of Stevens Creek Boulevard from west of Carmen Road to west of Pharlap Drive. 2. Use drought tolerant trees, shrubs, and groundcovers which are compatible with native vegetation and aid in slope stabilization, and which require little or no irrigation two to four years after planting. 3. Provide 100% coverage using automatic spray or bubbler type irrigation system (no spaghetti tube drip irrigation). 4. Provide landscape planting to screen Stevens Creek Boulevard from adjacent properties. 5. Provide flowering plantings which add visual interest in addition to slope holding requirement. Scope of Work Our research of the project materials and subsequent preparation of this proposal suggests the following major areas of work: 1. Coordination of earthwork grading with H.M.H. Inc., Civil Engineers. 2. Review of existing landscape conditions at properties adjacent to the project, for coordination with landscape design. 3. Prepare base maps (check dimensions in field). 2 Travice Whitten May 6, 1986 4. Attend one meeting with community group to present schematic drawings. 5. Landscape architectural services including: alopsoil irrigation, erosion control, and planting. Items not included in scope of work: Sidewalks, rough grading, lighting, street signage, surveys, soil testing, removal of existing vegetation. SERVICES MPA Design includes the following services in this proposal: I. Schematic Design A. Based on established program and order of magnitude construction budget, prepare a schematic plan showing general plant areas and tree masses. (Includes preparing base maps). B. Attend one meeting with community group to review schematic plans. C. Estimate of probable construction cost. II. Design Development A. Based on approved schematic drawings and construction budget, prepare design development drawings showing: 1. Plant material types, sizes and locations. 2. Erosion control 3. Conceptual landscape grading (only if different from civil drawings). B. Prepare estimate of probable construction cost. III. Contract Documents A. Based on approved design development drawings and construction budget, prepare construction drawings and specifications. 1. Working Drawings a. Planting/Grading Plan: 3 Travice Whitten May 6, 1986 Establishment of horizontal control of landscape elements and establishment of finish grades in landscape areas. b. Landscape Construction Details such as: Erosion control, tree planting on steep slopes, staking or guying. C. Irrigation Plan and Details. 2. Specifications IV. Construction Consultation A. Site visits B. Review of shop drawings, samples, and other submittals. Compensation Our proposed fee for landscape architectural services for Schematic, Design Development, and Contract Documents will be: Landscape Services $7,640 Community Group Meeting(s) to present Schematic Design (cost per visit) $ 360 Total $8,000 Construction Consultation will be figured on a time and materials basis at time of construction. Direct costs such as printing, reproduction, freight, delivery charges, transportation, and long distance calls will be reimbursed at cost plus loo above the lump sum fee. Thank you for your interest in MPA Design. We hope this proposal provides the information you require. If we can clarify any information or provide supplemental information to you, please feel free to contact us. Very truly yours, MPA Design Michael Painter President 4 Q"W.74rxy✓ David W. Nelson Associate RESOLUTION NO. 6845 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AUTHORIZING EXECUTION OF AGREEMENT WITH MPA DESIGN PROVIDING FOR LANDSCAPE ARCHITECTURAL SERVICES FOR THE STEVENS CREEK BOULEVARD PROJECT WHEREAS, the City desires to engage the services of a landscape architect to design and prepare the plans and specifications for the Stevens Creek Improve- ment project; and WHEREAS, the firm of MPA Design is qualified and willing to provide the necessary services; and WHEREAS, an agreement between the City of Cupertino and MPA Design outlining the terms and conditions of the required services, has been presented to the City Council; and said agreement having been approved by the Director of Public Works and the City Attorney; NOW, THEREFORE, BE IT RESOLVED that the Mayor and the City Clerk are hereby authorized to execute the agreement herein referred to in behalf of the City of Cupertino. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 19th day of May , 1986 by the following vote: Vote Members of the City Council AYES: Johnson, Plungy, Gatto NOES: None ABSENT: Sparks, Rogers ABSTAIN: None ATTEST: APPROVED: /s/ Dorothy Cornelius City Clerk /s/ John Gatto Acting Mayor, City of Cupertino