Loading...
CC 04-16-19 #9 McClellan Rd Separated Bikeways-Phase 1B Project PresentationMcClellan Road Separated Bikeways- Phase 1B 1 SITE MAP OF IMPROVEMENTS Phase 1A – Imperial to Rose Blossom – Some make ready work completed, kickoff ceremony on May 17th, project starts May 20, 2019, anticipated completed by August 9, 2019 Phase 1B – Intersection improvements at Bubb & Stelling Phase 2 – Rose Blossom to Torre – land donations by property owners ongoing; status of design 35%; Summer 2020 construction. Phase 3 – Imperial to Byrne – requires land donations by property owners. Construction anticipated Summer 2021 construction Phase 4 – Intersection improvements at De Anza/Pacifica/McClellan. Construction anticipated Fall 2020 construction In the 2016 Bike Plan this project was rated as a priority ? 2 McClellan Road & Bubb Avenue Due to long lead times, City purchased (ordered) required signal poles and arms in December, 2018; these items will be delivered to the City early May, 2019. Bollards were ordered September, 2018 and received in October, 2018. Scope of improvements include: Curb ramp modifications to increase pedestrian refuge / calm traffic Traffic signal modifications Bike lane through intersection Bike boxes Improved curb ramps 3 McClellan Road & South Stelling Road Scope of improvements include: Curb ramp modifications to increase pedestrian refuge / calm traffic Traffic signal modifications Bike lane through intersection Bike boxes reconfigured 4 Construction Dollars Phase 1A – $1,821,831 Phase 1B - $1.5M Phase 2 - $1.5M Phase 3 - $1.5M Phase 4 - $1.5M Total: $7.82M External funding: Developer in-lieu- $157,000 Vehicle Emissions Reduction Based at Schools (VERBS) Grant-$1M Transportation Fund for Clean Air (TFCA) Grant- $85,900 Apple- $4.63M 2016 Measure B- $1M 5 Recommendation Award construction contract for the Phase 1B Project in the amount of $1,365,420 and authorize contingency amount of up to $136,000 for a total authorized amount of $1,501,420. 6