CC 05-21-19 #24 SR 85 Policy Advisory Board Update_PresentationMay 21, 2019
SR 85 Policy Advisory Board
Update
Item #23 CC 5-21-19
SR 85 Transit Guideway Study
1.PAB Background
2.Concepts Presented by VTA
3.PAB Feedback
4.Staff Takeaways
SR 85 Transit Guideway Study
PAB Background/Timeline
•VTA -Express Lanes
•Lawsuit Regarding Space for Transit
•Measure B $350M Allocation
•Formation of PAB
SR 85 Transit Guideway Study
VTA Alternatives
•Fast Travel Speed
•Maximize Person Throughput
•Maximize Access
•No Project/Express Lanes
SR 85 Transit Guideway Study
Fast Travel Speed Alternative
SR 85 Transit Guideway Study
Fast Travel Speed Stations
SR 85 Transit Guideway Study
Maximize Person Throughput
SR 85 Transit Guideway Study
Maximize Person Throughput
SR 85 Transit Guideway Study
Maximize Access
SR 85 Transit Guideway Study
Maximize Access
SR 85 Transit Guideway Study
No Project Alternative
SR 85 Transit Guideway Study
1.Fewer Stations
2.Station Locations
3.Generate revenue from Corporate
Shuttles
PAB Feedback -April 2019 Meeting
SR 85 Transit Guideway Study
1.Transit Propensity Assumptions in
Travel Market Analysis
2.Priority should be on speed of
service
3.A Protected Transit Guideway from
US 101 to Mountain View is preferred
Staff Takeaways
SR 85 Transit Guideway Study
SR 85 Transit Guideway Study
SR 85 Transit Guideway Study
SR 85 Transit Guideway Study
SR 85 Transit Guideway Study
May 21, 2019
SR 85 Policy Advisory Board
Update