Loading...
12060058CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10081 JUDY AVE CONTRACTOR: BABEL CONSTRUCTION PERMIT NO: 12060058 OWNER'S NAME: SAN JOSE, CA 95111 PHONE NO: (408) 561-7041 ❑ LICENSED CONTRACTOR'S DECLARATION r ELECT PLUMB BUILDING PERMIT INFO: BLDG License Class_ Lic.t! MECH r RESIDENTIAL F COMMERCIAL I— Contractor ate ��o� C►�r ��i���'" I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION: DEMOLITION OF EXISTING ONE STORY RESIDENCE (1544 (commencing with Section 7000) of Division 3 of the Business & Professions SQFT) AND DETACHED GARAGE (588 SQFT) Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $15000 I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APN Number: 37507049.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs, and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per thq Cupertino Municipal Code, Section 9.18. I L Issued by: / Date: Signature RE -ROOFS: ❑ OWNER -BUILDER DECLARATION All roofs shall be inspected prior to any roofing material being installed. If a roof is I hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection, I agree to remove all new materials for the following two reasons: inspection. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Signature of Applicant: Date: Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self -insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation, as provided for by Section 3700 of the Labor Code, for the California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & I have and will maintain Worker's Compensation Insurance, as provided for by Safety Code, Section 25532(a) should 1 store or handle hazardous material. Section 3700 of the Labor Code, for the performance of the work for which this Additionally, should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District 1 will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued, I shall Health & Safety Code, Sections 25505, 25533, and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of %ork's I certify that I have read this application and state that the above information is for which this permit is issued (Sec. 3097, Civ C.) correct. I agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save Lender's Address indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply ARCHITECT'S DECLARATION with all non -point source regulations per the Cupertino Municipal Code, Section I understand my plans shall be used as public records. 9.18. Licensed Professional Signature Date CITY OF CUPERTINO FEE ESTIMATOR - BUILDING DIVISION ADDRESS: 10081 Judy Ave DATE: 06/11/2012 REVIEWED BY: Sean APN: BP#: 'VALUATION: 1$15,000 *PERMIT TYPE: Demolition Permit AI, N ('610"K PRIMARY SFD or Duplex USE: -1-- PE NTAMATION 1 SFDWL-DEM PERMIT TYPE: 'A WORK of existing one storV residence (1544 sq ft) and garage (588 sq ft) SCOPE �Demolition FEE ID FLR AREA 1DEMORES 2,132 . . . . . . . . . . . . . ... ... ..... ............... . .......... - - - ---------- Li NOTE. This estimate does not include fees due to other Departments (Lem Planning, Public Works, Fire, Sanitary Sewer District, School District, etc.). These fees are based on the preliminary information available and are only an estimate Contact the Dept for addn I info. FEE ITEMS (Fee Resolution 11-053 Eff 711111) FEE QTY/FEE MISC ITEMS A 1pvl, i F&-i, Permit Fee: $523.00 Suppl. Insp. Fee-.0 Reg. 0 OT I-0--0-1 hrs $0.00 ee: ff,'ork 14'1�holj, P;, o i ".1 . . .. .......... Strong, Motion Fee: IBSEISAffCR $1.50 Select an Administrative Item Bldp, Stds Commission Fee: IBCBSC $1.00 $525.50 $ 0.00 0, $525 .50 Revised: 06/05/2012