Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
12100191
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 19973 PEAR TREE CT CONTRACTOR: MR ELECTRIC PERMIT NO: 12100191 OWNER'S MOUNTAIN VIEW, CA 95014 PHONE NO: (408) 725-8380 ❑ LICENSED CONTRACTOR'S DECLARATION F r r BUILDING PERMIT INFO: BLDG ELECT PLUMB License Class Q—/G Lic. N %s 7 707 MECH r RESIDENTIAL COMMERCIAL / Date -2-- I hereby affirm that I am licensed under the provisions of aapter 9 JOB DESCRIPTION: INSTALL 2ND METER WITH 40 AMP CIRCUIT FOR EV (commencing with Section 7000) of Division 3 of the Business & Professions CHARGING STATION Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Sq. Ft Floor Area: Valuation: S4000 Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APN Number: 31630087.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs, and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. ^ Date 2 /GPI ❑ OWNER -BUILDER DECLARATION RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is I hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection, I agree to remove all new materials for the following two reasons: inspection. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Signature of Applicant: Date: Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self -insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation, as provided for by Section 3700 of the Labor Code, for the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & I have and will maintain Worker's Compensation Insurance, as provided for by Safety Code, Section 25532(a) should I store or handle hazardous material. Section 3700 of the Labor Code, for the performance of the work for which this Additionally, should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued, I shall Health & Safety Code, Sections 25505, 25533, and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I : '� S become subject to the Worker's Compensation provisions of the Labor Code, I must Date: forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of work's I certify that I have read this application and state that the above information is for which this permit is issued (Sec. 3097, Civ C.) correct. I agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save Lender's Address indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply ARCHITECT'S DECLARATION with all non -point source regulations per the Cupertino Municipal Code, Section I understand my plans shall be used as public records. 9.18. Licensed Professional Signature Date CITY OF CUPERTINO FM-7, FEE ESTIMATOR - BUILDING DIVISION ADDRESS: 19973 pear tree ct. DATE: 10/25/2012 REVIEWED BY: bobs. APN: BP#: �a Od *VALUATION: 1$4,000 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair PRIMARY SFD or Duplex USE: PENTAMATION SOLAR-RES PERMIT TYPE: WORK install new meter and EV charging station SCOPE NOTE: This estimate does not include fees due to other Departments (Le. Planning, Public Works, Fire, Sanitary Sewer District, School District, etc). These fees are based on the preliminary information available and are only an estimate- Contact the Dept for addn'l info. FEE ITEMS (Fee Resolution 11-053 E . 711112) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 1 # $102.00 Alternative Energy System 1CHRGSTA EV Charging Station Suppl. PC Fee: Q Reg. © OT 0.0 1 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp. Fee-0 Reg. Q OT 0.0 1 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construclion Tax: Administrative .Fee: 0 Work Without Permit? 0 Yes (j) No $0.00 Advanced Planning Fee: $0.00 Select a Non -Residential Building or Structure 0 i Travel Docannentation Fees: Strong Motion Fee: 1BSEISMICR $0.50 Select an Administrative Item Bldg Stds Commission Fee: 1BCBSC $1.00 SUBTOTALS: $1.50 $102.00 TOTAL FEE- $103.50 Revised: 10/01 /2012