Loading...
Approved Plan Set 10.9.19Community Developme 'CUPLRTIN4 Case # I n Approval Body- tall Approval a17e Signatture _ Erick 111111111111111111111111 2 �7 �4 1 I I I I I I I I I I L Q 01 2 �1 Im (E) Rear Yard Perspective View P/L P/L P/L 1- N G D Zoning R1-10 Lot Size -10055sgft (E) Main Floor = 1686 sgft (E) Garage = 485 sgft (E) Basement = 1162 sgft _(E) Living Area= 3133 sgft 40 --._ *' FAR = 4500 x slope adjument factor Slope density = .0023 x 1 x 2.23 = 20.23% 0.23 P/F / L 30' 53"E _ �P/L 2' N 121.12' 11 03 it II - II ----- T ---- `� 1350'17 111 I I � � J In I y E F G H Scope of VNork: 1. Remove and replace existing roof and framing with trusses to eliminate (E) roof windows. Move ridge -3 ft to the east, raising peak of roof by 11". 2. Replace existing east side main story windows with new windows. 3. Expand (E) master bedroom, revise layout of master bath. 4. Move basement E wall out to align above. Expand both bedrooms. 5. Add new bathroom in basement story N bedroom. 6. Remove existing fireplace and chimney. 7. Add new main story deck on E side. b. Add solar panels to (E)_ garage roof and (P) master bedrrom roofs. Per Cupertino Muni Code 111.40.060(A)(2b) for lots >101000 sgft Slope modifier = (1-(1.5x(.2023 - .1)) = 0.546 Floor Area (E) 3171 sgft (P) 3727sgft = 43.b% of net lot area Al Lot Coverage = footprint + decks + slabs = 23118 + 546 + 755 = 311 4 qft Cove aft (F) 3qq�q-saft ° f n (P) First Floor / Basement floor = 11101 /13211 = 143% GC IL 2 P/L P/I I ` P/L i r 1 -14'-7 55 = 47'-4" a 5' P.S.E. rn d o� ov r rc° EE �� m� Nv r v a= 0 LLI ld E O !JS Jv n 135 V rn o (3(3 I I r Z m N zN S Z o o I 10' P.S.E. o z in f u� > asI II Q 111 _ W J KLL wn N P rn zHE � r I� s IZ z z W v I � -o o - � I s o I I r I �� 11 3' P.5.E. 56 = 15.21 - Gas Meter- _ - J tIi r- 1 -T-1 0" 55G0 N15° 31' 2"W P/L - P/L P/L P/L P/L P/LP/L P/L P/L P/L P/L 124.98' II CD In rn r Main Floor SCALE: 0.111 = 1' B ' G ' D P/L LL ,, v Q N =m C mm 3' v, Basement SETBACK TABLE 2016 (E) MAIN FLOOR o P>� A I o (E) BASEMENT 8.91+1?.69 = 26.66 Al 5 3. 2016 California ILU m 2016 ; Electrical Code 5. Q California Residential Code I E F G H Scope of VNork: 1. Remove and replace existing roof and framing with trusses to eliminate (E) roof windows. Move ridge -3 ft to the east, raising peak of roof by 11". 2. Replace existing east side main story windows with new windows. 3. Expand (E) master bedroom, revise layout of master bath. 4. Move basement E wall out to align above. Expand both bedrooms. 5. Add new bathroom in basement story N bedroom. 6. Remove existing fireplace and chimney. 7. Add new main story deck on E side. b. Add solar panels to (E)_ garage roof and (P) master bedrrom roofs. Per Cupertino Muni Code 111.40.060(A)(2b) for lots >101000 sgft Slope modifier = (1-(1.5x(.2023 - .1)) = 0.546 Floor Area (E) 3171 sgft (P) 3727sgft = 43.b% of net lot area Al Lot Coverage = footprint + decks + slabs = 23118 + 546 + 755 = 311 4 qft Cove aft (F) 3qq�q-saft ° f n (P) First Floor / Basement floor = 11101 /13211 = 143% GC IL 2 P/L P/I I ` P/L i r 1 -14'-7 55 = 47'-4" a 5' P.S.E. rn d o� ov r rc° EE �� m� Nv r v a= 0 LLI ld E O !JS Jv n 135 V rn o (3(3 I I r Z m N zN S Z o o I 10' P.S.E. o z in f u� > asI II Q 111 _ W J KLL wn N P rn zHE � r I� s IZ z z W v I � -o o - � I s o I I r I �� 11 3' P.5.E. 56 = 15.21 - Gas Meter- _ - J tIi r- 1 -T-1 0" 55G0 N15° 31' 2"W P/L - P/L P/L P/L P/L P/LP/L P/L P/L P/L P/L 124.98' II CD In rn r Main Floor SCALE: 0.111 = 1' B ' G ' D P/L LL ,, v Q N =m C mm 3' v, Basement SETBACK TABLE 2016 (E) MAIN FLOOR 8.91+1?.69 = 26.66 (P) MAIN FLOOR 10.0+11.69 = 21.69 (E) BASEMENT 8.91+1?.69 = 26.66 Al 5 (P) BASEMENT 10.0+1?.89 = 21.69 G CODES: 1. 2016 California Building Code 2. 2016 California Mechanical Code 3. 2016 California Plumbing Code 4. 2016 California Electrical Code 5. 2016 California Residential Code 6. 2016 California Fire Code BUILDING CONTRACTOR/HOME OY4NER TO REVIEY4 AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. FLAT MAF oFFicE OF cOUxTr n55E550R -TA CLn COV xTr, LirORxin Mc CLELLAN RD.. 356• CL.4 PI $3X 1 357 4o PCL1 a+" 28 Bc' hp o a g M g I P.M.a64--21 F O 27 P A PCL_2 12 /251J 12 n V 5 `X L 2J , C\�y 12 nb:�w \ .a'-'' � al2 10 L6 p\ ,p 21 L7 \ r,m Amo-=='- \ 43 22 12 %9 y '4 .T2 2f v eao 'pt,OR ofke c fi ewes Rt 1 a .-7' 342 469 CCC \ 6 47`° 5 48� 4> 51 F G I ndex: Al Overview A2 Proposed Plan A3 Elevations A4 Elevations A5 Roof Plan H N M 0 M O N C FLOOR AREA LL F Q ° ,< LL (E) (P) o m Lu P m 0 A 334 334 N N B 621 621 Q �Ln �� G - 141 m 0 221 o �m E 491 491 Fz F 424 424 3Q G 596 5% H 15 15 O 1 62 62 J 616 616 m o� K 1bb �o W TOTAL 3111 3121 22'-1" FLAT MAF oFFicE OF cOUxTr n55E550R -TA CLn COV xTr, LirORxin Mc CLELLAN RD.. 356• CL.4 PI $3X 1 357 4o PCL1 a+" 28 Bc' hp o a g M g I P.M.a64--21 F O 27 P A PCL_2 12 /251J 12 n V 5 `X L 2J , C\�y 12 nb:�w \ .a'-'' � al2 10 L6 p\ ,p 21 L7 \ r,m Amo-=='- \ 43 22 12 %9 y '4 .T2 2f v eao 'pt,OR ofke c fi ewes Rt 1 a .-7' 342 469 CCC \ 6 47`° 5 48� 4> 51 F G I ndex: Al Overview A2 Proposed Plan A3 Elevations A4 Elevations A5 Roof Plan H 0 LU 0 "I U cY1 r I a�o.6L� Z ro °1 +� 1 E Y Q 11 0E-HU0 DATE: 7/5/2019 SCALE: N/A SHEET: A- 1 9 N M 0 M O N C >s M N M LU 0 N N C C 0 Q �Ln �� m o �m Fz N 3Q v O L D m o� _ �o W N N En o T o� LU 4) 1- Q IL z Lu E o <9 O v- Q� M o LU O H V Dz U (a a V) N .> Q CL C50 o a 0 LU 0 "I U cY1 r I a�o.6L� Z ro °1 +� 1 E Y Q 11 0E-HU0 DATE: 7/5/2019 SCALE: N/A SHEET: A- 1 9 N M 0 M O N C M N M 0 N N C C 0 0 Fz N 3Q v O L D o� _ �o W N N En o T o� LU s 1- Q IL LU Lu O o <9 v- ii a` 0 LU 0 "I U cY1 r I a�o.6L� Z ro °1 +� 1 E Y Q 11 0E-HU0 DATE: 7/5/2019 SCALE: N/A SHEET: A- 1 9 T Fz z O L D _ LU s U v O o <9 {� M o LU O Z N Dz U a 0 LU 0 "I U cY1 r I a�o.6L� Z ro °1 +� 1 E Y Q 11 0E-HU0 DATE: 7/5/2019 SCALE: N/A SHEET: A- 1 9 A Community A O Development Department M N m Planning Division - Cupertino CUPERTINO 0 N (0 APPROVED Case # Qc\V R-2019-13 Application Number(s) Approval Bo y: Director/ Staff Appro11va I a e 08/22/19 �a Si-natoure Erick Serrano Case Manager o� 3 51 f G (P) Rear Yard Prospective View 0 E G Remove (E) bearing walls on cors. Basement Addition ,570 ogft H ition 30 ogft ►i I 0 LU �U M a 0.6 Lr) �00 ���T Z ra 0) M fu mN oYQLn 0 H H U 0 DATE: 7/5/2019 SCALE: 3/1 SHEET: A-2 11W HE 111VI, CO A O M N m LU 0 rn 0 N (0 C O Qc\V O_ ii O U u Q � �a o� 0 0 L � O m d N ° 0 T LU c N LU Z U E E M O 0 O 8 N 0 0 U a V) N > a LU 0 IL OT 0 ►i I 0 LU �U M a 0.6 Lr) �00 ���T Z ra 0) M fu mN oYQLn 0 H H U 0 DATE: 7/5/2019 SCALE: 3/1 SHEET: A-2 11W HE 111VI, N M 0 M O N C A O M N m 0 rn 0 N (0 C O O_ ii O U u Q � �a o� 0 0 L � O W d N ° 0 T LU S LU LU D U E a` ►i I 0 LU �U M a 0.6 Lr) �00 ���T Z ra 0) M fu mN oYQLn 0 H H U 0 DATE: 7/5/2019 SCALE: 3/1 SHEET: A-2 11W HE 111VI, 0 7S L �4-oo U S Q � U LU D U O M O M toLU N 0 0 a ►i I 0 LU �U M a 0.6 Lr) �00 ���T Z ra 0) M fu mN oYQLn 0 H H U 0 DATE: 7/5/2019 SCALE: 3/1 SHEET: A-2 11W HE 111VI, Community Development Department Planning Division — Cupertino 'CUPERTIN4 APPROVED Case # R-2019-13 Application Number(s) / Approva I Bo y: Director/ Staff Approval late 08/22/19 Signa tiure Erick Serrano I (E) STUCCO Case Manager 2 k, rd 19 G D E G (E) METAL TILE ROOF 5KYL16HT5 (E) STUCCO (E) EAST ELEVATION (P) EAST ELEVATION DEEP GLI FFE DR. (E) METAL TILE W �:E] 1�1 I II' Mi 1 11 nF51 1 -117 RF51 FIRINTIFIrEll (E) NORTH ELEVATION (P) NORTH ELEVATION (E) STREET VIEW (P) STREET VIEW 8 G D E ' G N M O N C 10 O M N M O O+ O N 10 C C � Q N 0 o �m m N 10 U 3f Q � N N E OJ 0 U S - 0 Q m � O W N N �L- O O T O � I- E W U z v E W C O s o LU O o O Z N U) a U V) N •� sZ O 0 (E) STUCCO (E) EAST ELEVATION (P) EAST ELEVATION DEEP GLI FFE DR. (E) METAL TILE W �:E] 1�1 I II' Mi 1 11 nF51 1 -117 RF51 FIRINTIFIrEll (E) NORTH ELEVATION (P) NORTH ELEVATION (E) STREET VIEW (P) STREET VIEW 8 G D E ' G DATE: 7/5/2019 SCALE: SHEET: A-3 1 E 2 N M O N C 10 O M N M O O+ O N 10 C C � Q N 0 o �m m N 10 U 3f Q � N N E OJ 0 U S - � Q m � O W N N �L- O O T O � I- E W U z v E W C O s o LU O o O Z N U) a U V) N •� sZ O 0 DATE: 7/5/2019 SCALE: SHEET: A-3 1 E 2 N M O N C 10 O M N M O O+ O N 10 C C 0 0 FZ N 10 U 3f Q � N N E OJ 0 U S - � Q � O W N N �L- O O T O � I- Q IL W U W v Sa W C .2 ^ V / DATE: 7/5/2019 SCALE: SHEET: A-3 1 E 2 FZ z � > 0 7S S - a �L- O w s U v <9 o LU O o O Z N a DATE: 7/5/2019 SCALE: SHEET: A-3 1 E 2 Community Development Department Planning Division — Cupertino UPERTIN4 APPROVED Case # R-2019-13 Application Number(s) Approva I Bo y: Director/ Staff Approval late 08/22/19 Signa dure Erick Serrano Case Manager 2 3 Ell 19 $ G E G H METAL TILE ROOF '_'_'' '_'_'_' ___'_'_ ��IIIIIIIII���IIIIIIIII���IIIIIIIII���IIIIIIIII���IIIIIIIII���II ________ ___ _ _ I IIIIIIIIIIIIIIIIIIIIIIIIIIIII I I- � (E) WEST ELEVATION (P) WEST ELEVATION (E) METAL TILE (E) STUCCO II�III���III�III���III�III���III�III���III�III���III� IIS ��� ���-__ III III III III III III III III III IIf-III III III III III IIIIIIIIIIIIIIIIIIIl l 111 IIIIIIIIIIIIIIIII 11= IIIIIIIIIIIIIIIIIIf1 fIIIIIIIIIIIIIIIIIIIII=III= Illllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllill�- II I II I II I II I II I II I II I II I II I II I II I II I II I II I II I II I 1 1=11111111111 I_I 111111! 11 111 111 111 111 111 111 111 I F51 11 111 111 I I ��11 111 111 111 11= (E) SOUTH ELEVATION /P1 C,nl &P PdiJFI C, Elevation 12 B G D E I 1= G I H N M 0 Mi 0 { M N M O N 0 w Q � N 0 0 FZ N 10 3 Ell 19 $ G E G H METAL TILE ROOF '_'_'' '_'_'_' ___'_'_ ��IIIIIIIII���IIIIIIIII���IIIIIIIII���IIIIIIIII���IIIIIIIII���II ________ ___ _ _ I IIIIIIIIIIIIIIIIIIIIIIIIIIIII I I- � (E) WEST ELEVATION (P) WEST ELEVATION (E) METAL TILE (E) STUCCO II�III���III�III���III�III���III�III���III�III���III� IIS ��� ���-__ III III III III III III III III III IIf-III III III III III IIIIIIIIIIIIIIIIIIIl l 111 IIIIIIIIIIIIIIIII 11= IIIIIIIIIIIIIIIIIIf1 fIIIIIIIIIIIIIIIIIIIII=III= Illllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllill�- II I II I II I II I II I II I II I II I II I II I II I II I II I II I II I II I 1 1=11111111111 I_I 111111! 11 111 111 111 111 111 111 111 I F51 11 111 111 I I ��11 111 111 111 11= (E) SOUTH ELEVATION /P1 C,nl &P PdiJFI C, Elevation 12 B G D E I 1= G I H 0 LU 0 ° U M a-Co16L� ���T Z ro °1 06 5 a rj oYQILn 0E-HU0 DATE: 7/5/2019 SCALE: 5/16 11 1' SHEET: 3 �AI N M 0 Mi 0 M N M O N 0 w Q � N 0 0 FZ N 10 U 3f Q N N E� 0 7S L o � Q m �o W N N �L- O O T O � I— c W U Z v E E W C O 0 {� o 0 O �� Z N OLU a U U) N •� a O 0 LU 0 ° U M a-Co16L� ���T Z ro °1 06 5 a rj oYQILn 0E-HU0 DATE: 7/5/2019 SCALE: 5/16 11 1' SHEET: 3 �AI N M 0 Mi 0 M N M O N 0 0 0 FZ N 10 U 3f Q N N E� 0 7S L o � Q �4-oo �o W N N �L- O O T O � I— Q IL W U W v Sa W C .2 ^ V / 0 LU 0 ° U M a-Co16L� ���T Z ro °1 06 5 a rj oYQILn 0E-HU0 DATE: 7/5/2019 SCALE: 5/16 11 1' SHEET: 3 �AI FZ z�> 0 7S L a �4-oo �L- O w s U v <9 {� o 0 O �� Z N OLU a 0 LU 0 ° U M a-Co16L� ���T Z ro °1 06 5 a rj oYQILn 0E-HU0 DATE: 7/5/2019 SCALE: 5/16 11 1' SHEET: 3 �AI 'CUPERTINC Case # Appro-� Apprm, Signal OPM L %0 E C .. r-% Lod v w i i v n