Loading...
Reso 0898HC-51,468.1 • 0 RESOLUTION NO. 898 OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE OF THE CITY OF CUPERTINO APPROVING A COMPREHENSIVE SIGN PROGRAM FOR A COMMERCIAL CENTER. PROPERTY OWNER: Sodeno Construction APPLICANT: Pettibone Signs ADDRESS: 15 Janis Way, Scotts Valley, CA 95066 LOCATION OF PROPERTY: Northwest corner of Bollinger Road and South De Anza Blvd. FINDINGS: The Architectural and Site Approval Committee finds as follows with respect to this application: 1. Approval of subject application is consistent with City of San Jose signing requirements as specified by Section 19345.40 of Article XIX (San Jose Zoning Ordinance). CONDITIONS: 1-8. Architectural and Site Approval Standard Conditions to the extent that they do not conflict with the special conditions enumerated herein. In the event a conflict does exist, the special condtitions as enumerated herein shall apply. 9. The recommendation of approval is based on Exhibit F and F-1 of this application except as may be amended by special conditions herein. 10. Subject to the Traffic Engineer's review and approval, a dimensioned site plan specifying the precise location of the approved ground sign shall be submitted at the building permit level. 11. The Architectural and Site Approval Committee or its staff shall retain the authority to review and require correction of off -site light intensity impacts for any sign approved under this application. 12. Exhibit F shall be modified at the building permit level to provide for a maximum of 30 sq. ft. of signing area per side, consistent with Section 19345.40 (lA8) of the San Jose Zoning Ordinance. -------------------------------------------------------------------------------- PASSED AND ADOPTED THIS 9th day of August, 1979, at the regular meeting of the Architectural and Site Approval Committee of the City of Cupertino, State of California, by teh following roll call vote: AYES: NAYS: ABSTAIN: ABSENT: ATTEST: 4� Ka h yn cKe a cott SeniortPlanning Technician Committee Members: Johnson, Ripplinger and Chairman Bond it " None it it None if if Sallan APPROVED' ��eVe- ' //?� C3 Elliott Bond, Chairman Architectural and Site Approval Committee