Loading...
Reso 0918HC-51,242.1 RESOLUTIONNO. 918 OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF SITE, ARCHITECTURE:;, LANDSCAPING AND LIGHTING FOR A CONVENIENCE MARKET AND SELF-SERVICE GASOLINE STATION. PROPERTY 014NER: Atlantic Richfield`Company APPLICANT: Atlantic Richfield Company ADDRESS: P.O. Box 5811, San Mateo, California 94402 LOCATION OF PROPERTY: Southeast corner of De Anza Boulevard and Silverado Avenue FINDINGS: The Architectural and Site Approval Committee finds as follows with respect to this application. 1. "That subject development is consistent with use permit approvals granted by the City Council on November 5, 1979, as specified in the City Council Action Letter of November 8, 1979. CONDITIONS OF APPROVAL: 1-8. Architectural and Site Approval Standard Conditions to the extent that they do not conflict with the special conditions enumerated herein. In the event • a conflict does exist, the special conditions as enumerated herein shall apply. 9. The recommendation of approval is based upon Exhibits A, B, B-1, B-2, C and E of this application except as may be amended by special conditions contained herein. 10. The site plan shall be revised to reflect the following parking and circulation modifications, subject to staff approval: a. Provide parallel parking stalls adjacent to southerly property line. b. Delete the diagonal stalls proposed adjacent to north side of building - provide one compact parallel stall, one handicap -designated stall, and handicapped ramp. Ramp shall be an extension of the front (westerly elevation) walkway. C. Provide 32 ft. minimum driveway width; at street for new approach on De Anza Boulevard. 11. Handicap ramp elevations and details shall be provided at the building permit level. 12. A 4 ft. minimum width walkway shall be provided from the handicap ramp to the front entrance of the building. 13. A 3 ft. wide walkway shall be provided along a portion of the east side of the building. 'ln.add tion, the north elevation walkway shall be extended to the rear (east) parking lot area. -1- a HC-51,242.1 Resolution No. 918 (continued) i14. All references to external public address systems shall be eliminated. 15. The trash enclosure shall be shifted in a westerly direction to facilitate access, subject to_.staff approval. 16. Subject to review by the Building Department, State architect guidelines concerning the weight of front entrance doors shall be incorporated into working drawings. The intent of subject condition is to facilitate the movement of handicapped persons. 17. The applicant shall verify compliance with interior security provisions expressed by Condition 20 of the City Council Action Letter dated November 9, 1979. 18. An east elevation rendering of the building shall be provided at the building permit level. Said drawings.shall depict a full continuation of horizontal wood siding treatment. 19. The landscape plan shall be modified tb,incorporate the following revisions, subject to staff approval: a. Delete brick paving treatment in favor of a planting bed to consist of trees, shrubs and ground cover materials. Said planting area shall be adjacent to the north and west building elevations; the walkway shall adjoin the parking areas. b. Provide shrubbery materials to accommodate these objectives: - Screen on -site pavement/parking areas from public view. - Provide greater degree of interest (clustering, height variations, etc.). - Emphasize plantings adjacent to street frontages. Shrubbery shall also be provided adjacent to the southern property line. C. Delete some Liquidambers in favor of an Evergreen tree type. d. Delete proposed Raphiolepsis adjacent to pump island, in favor of alternate chrubs with denser growth characteristics. The intent is to screen the pump island area more fully. Also include two trees. 20. Staff shall retain the ability to return the revised landscape plan for informal ASAC review and approval if deemed necessary by the Planning Department at the building permit level. 21. The applicant shall pursue alternate parking lot fixture,-, designs, and present the results of such research to the Planning Department; said alternates shall be utilized if approved by staff. The Architectural and Site Approval Committee or its staff shall retain the authority to review and require correction of off -site intensity impacts for any lighting fixtures approved under this application. -2- HC-51,_242.1 Resolution No. 918 (continued) 22. Signing is not approved at this time. The applicant shall return to ASAC for sign review and approval at a date uncertain. 23. Reference to an additional wall sign at the south elevation shall be deleted from the floor plan portrayed in Exhibit B. 24. The canopy sign stating "Please Pay in Store" is not approved. Said sign shall be deleted from plans submitted at the building permit level. 25. Parking lot lighting shall be provided in the southerly portion of subject site, subject to staff approval. PASSED AND ADOPTED this 20th day of December, 1979, at the regular meeting of the Architectural and Site Approval Committee of the City of Cupertino, State of California, by the following roll call vote: AYES: Committee Members: Johnson, Morrison, Ripplinger and Chairman Bond NAYS: IT it None ABSTAIN: If " None ABSENT: if " Sallan ATTEST: Kathy n Mc enna coV Senior Planning Technician APPROVED: (` H. Elliott Bond, Chairman Architectural and Site Approval Committee -3-