Loading...
tear offCUPERTINO REROOF TEAR -OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buildinq(&.cupertino.orq PROJECT ADDRESS (() 1 K.., / //, Q/� (� J /�JS ( [APN #.,,L, OWNER NAME le\(( f�. A rr ofRio pat % 1 ,-" E-MAIL STREET ADDRESS�� M CITY, STATE, ZIP ZIP` FAX 41137 BUS. LIC. #14 U CO TOR NAME/Ai' I (�� l ///��� LICENSE NUMBER �^- S l J/ U U // a LICENSE TYPE /-37 (J _ r COMPANY NAME t�l��l �jr �-i E-MAIL inn(1 I-(r.., rioe L,�' FAX �REET� DRESS Gr Im �.J CITY STATE, ZIP,, L `1 (el / I� P . (l/ ' `/ o / ` - I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re -roof project shall comply with all applicable provisions of the 2016 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please schedule inspections online or call (408) 777-3228 from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm (Friday) to schedule inspection. For Tear -Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. The hours for this service are: 7:30-10:30am and 12:30-3:30 (Mon-Thurs) and 7:30-10:30am and 12:30-2:30 (Friday). Final Inspections will be given a two hour window. 3. Tear -Off Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked -down or removed prior td this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re -roofing is completed. To receive a final sign -off, the following items will be verified: a. Flat roofs shall have a minimum of per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre -manufactured products used shall be available on -site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. CMC Section 9.18.210 does NOT allow copper roofing or copper architectural materials. NOTE: If you call for a tear -off or plywood nailing inspection and the work is not complete, you will be charged a re -inspection fee. The re -inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re -roof policy stated above. I also understand that smoke detectors and carbon monoxide detectors are required to beinstalled in accordance with Sections R314 and R315 of the 2016 California Residential ode. Signature of Applicant/Agent: � Date: RerooJPolicv_2018.doc revised 01/15/18