Loading...
CC 05-19-2020 Item No. 1 Study Session_FY 2021 Proposed Budget_Written CommunicationsCC 05-19-20 Special Meeting Study Session #1, Proposed FY 2010-2021 Budget Written Comments 1 Cyrah Caburian From:Sashi Begur <sashibegur@gmail.com> Sent:Sunday, May 17, 2020 11:09 PM To:City Council Cc:Cupertino City Manager's Office Subject:Proposed Budget 20-21 - Budget Review Session CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.    Dear Council members,   I looked at the proposed budget the link to which is https://www.cupertino.org/home/showdocument?id=27577    (1)  (i) There is only been 1 hour allocated for Budget Review Why is that? (ii)Can we schedule a few more hours of  budget review?    (2.a) (i)Who generated this budget ‐ was it city staff or was it another consultant? (ii) If it is the city staff I thank them for  the work and I request that they re‐do the details based upon the questions below 3‐5  (2.b) If it is a consultant ‐ (i) why do we need to use this consultant (ii) how much have we paid this consultant? (iii) Can  we cancel the contract ASAP if not why not? (iv) if we have to use their services how much more will we owe them for  the details required in questions 3‐5    (3.a)Where are the details of the revenue specified in the proposed budget on Page 86  (3.b) The revenue breakdown seems very optimistic. Given the current financial state of the country and the world we  can only assume that things will get worse before they get better. (i)Please re‐do the revenues with the worst case  scenario (ii) justification for why that case is the worst case needs to be provided as well    (4) (i)Where are the details of the expenditures specified in the proposed budget on page 86, why do we need $8M of  materials, who are we paying $30M for contract services, what are the special projects and are they required under  these circumstances, what contingencies are we planning for we already are in the bad situation! Each line item must  have a link to the details of the numbers to which it rolls up. There must be numbers from previous years which I am  assuming are being used. The employee compensation does it include contractors as well. (ii)Also are there any  overlaps?      (5.a) (i) I would like to request a Budget task force be setup comprising of City council and residents so we can see what  is being put forth before it comes to the council for review. Ideally we need a finance commission, so we don’t have this  issue the next time around (ii) the commissions that exist now, must also get a chance to review the budget, can it be  sent to all the commissions, so we understand what projects we think can be cancelled or are required?  (5.b) speaking of commissions ‐ can we also add the Public works commission?     Thank you for the work you do for our city and for patience with my questions.    regards  Sashi        1 Cyrah Caburian From:Viji <viji55665@gmail.com> Sent:Monday, May 18, 2020 10:10 PM To:City Council; City Clerk Subject:Written Communication Agenda Item #1 - May19th, 2020 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.    Dear City Council Members,  Here are my comments/questions to Item #1 Study Session for proposed budget for 20-21.  Administration – The cost of City administration is approximately 10% of the budget. This has ballooned from $4.09M actuals in FY 2018 to $8.30M budgeted for FY 20-21. This is more than 100% increase in 4 years. The City should explain the need for this enormous amount to be allocated to the administration department and it is the Council’s responsibility to trim this amount.   Contingency Funds: One of the budget balancing strategies for the City is reducing $850,000 (Page 7 of Proposed Budget FY20-21) in contingency in General fund. The contingency amount allocated was 986K for 20-21(this includes reduction). In FY 19-20 adopted budget (Page 9) the contingency amount allocated in GF was $1.07M. How did it go down by 50%? This is not clear and some explanation is needed.  5 limited Term Positions. The City is converting 5 limited Term Positions into permanent positions. The budget document says, the staff will recommend adding positions if ongoing revenues could support the position long term. How important is that all 5 positions have to be made permanent. What would be the incremental cost in converting these positions to permanent positions? Does on going revenues support long term position especially with COVID-19 revenue decline.  Transient Occupancy Tax: TOT went down by 38% (9.7M pre COVID, Impact estimated $3.7M) in FY19-20. TOT is projected to decrease 21.9% in FY 20-21 This decline represents an effective loss of one full quarter of TOT revenue for our City. The American Hotel & Lodging Association released new data showing that 70 percent of hotel employees have been laid off or furloughed as eight in 10 hotel rooms across the nation remain empty. As the COVID-19 crisis progresses, the impact to the travel industry is nine times worse than 9/11, with forecasted occupancy rates for 2020 hitting record lows worse than rates in 1933 during the Great Depression.  According to City’s proposed Budget document, TOT revenues are highly correlated with B2B revenue, as TOT revenues in Cupertino are primarily driven by business travel . What are the assumptions here for just one quarter decline? International travel is not happening, majority of flights are grounded for a long time, many High-Tech companies in bay area have asked their employees to work from home until end of the year, so how does the City assume that Hotel occupancy will go back to normal from September. Did the Staff present you with the best- and worst-case scenario for TOT revenues? According to American Hotel and Lodging Association, individual hotels and major operators are projecting occupancies below 20%. At an occupancy rate of 35% or lower, hotels may simply close their doors. New hotel construction is not happening in Cupertino in FY20-21. I would also like to know if the Council Member Sinks’ request to the staff to project monthly decline in TOT allocation be presented to the public as well.  Public Works Administration(PWA): The proposed budget for PWA is $4M higher this year when compared to last year($37.5 in FY20-21 VS $33.3 in FY19-20). Why did it go up more than 10% this year when we have significant decline in revenue due to COVID-19? This expenditure should be contained.   The library services budget of $318,340 represents a decrease of $479,700 (-60.1%) from the FY 2019-20 Adopted Budget and the decreased costs are due to a change in allocation methodology. I see this term, “change in allocation 2 methodology” very often in budget. Its very confusing for public to make the interpretation as to what has changed. A brief explanation as how the methodology has changed has to be part of the budget. Why is library services budget reduced for 20-21?  Attorney – The budgeted amount to attorney is $2M in FY20-21. Is having an outside attorney cost efficient for the City?   The City’s $19M economic uncertainty funds should not be touched unless there is a dire need for funds to pay City’s most important expenses. And this decision should be made by the Council and not to be at the discretion of the Manager.  I also notice that Budget Study session is less than 75 mins tomorrow. I request the Mayor to let fellow council members ask all the relevant questions so the Council can recommend a fiscally conservative budget this year. If you are unable to finish the deliberation in less than 75 mins, then this item should come back as a special agenda item next week.  I expect the elected council members to do due diligence to take a hard look to reduce the expenditure and not dip into rainy day funds.  Thank You,  Viji      1 Cyrah Caburian From:Munisekar <msekar@gmail.com> Sent:Monday, May 18, 2020 11:28 PM To:City Council; Cupertino City Manager's Office; City Clerk Cc:Munisekaran Madhdhipatla Subject:Closed Session: Agenda 1: Study Session regarding the Proposed Fiscal Year 2020 - 2021 Budget CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.    Dear Mayor & Council,     As an involved resident, I would like provide the following input with regard to 2020‐2021 fiscal budget study session.I  understand that our city is facing a budget shortfall like every other city, county and state due to economic distress  caused by COVID19 Pandemic. We need to handle this carefully to preserve the fiscal strength of our city government.  1. Review every capital projects in the pipeline including the ones already approved in the context of current  situation. Unless the project is essential, please halt it ASAP; even in the mid‐stream; just because you approved  it earlier, it doesn't mean that you need to spend the $$s. The conditions when you approved vs. current  situation are dramatically different.  2. I would like to understand why the management office budget is growing dramatically. It appears it is doubling  in 4 years. Please take a hard look at this.  3. Public works department expense seems to be the biggest spend item; please take a hard look at reducing  spend in this area.  4. Please compare the outsourced legal expenses with previous 2 years and see if there is opportunity to improve.  5. Please DO NOT CUT the law enforcement budget as the crime rate is increasing in our city and residents are not  feeling safe; we don't want to aggravate it further.  6. Please try to balance the budget without dipping into the reserves as we don't know how bad the situation is  going to be next year and the following. The bad economic conditions may persist for a while and so preserving  reserves is important.  7. Please use this opportunity to make surgical cuts where we have excess staff as it is time to operate lean and  mean like a private enterprise.  These are difficult times and call for difficult decisions; this is not the time to get emotional or make popular decisions;  rather time to make tough decisions.    I hope you do what is right for the city and the residents.    Please make this as part of my public comments on this topic.    Cheers  Muni Madhdhipatla  Cupertino Resident    1 Cyrah Caburian From:Govind Tatachari <gtc2k7@gmail.com> Sent:Tuesday, May 19, 2020 4:00 PM To:Steven Scharf; Darcy Paul; Liang Chao; Rod Sinks; Jon Robert Willey; Cupertino City Manager's Office; City Clerk; City Attorney's Office Subject:Agenda item 20-7311- FY2020-21 Proposed Budget related CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.    I have gone through major points of the 516‐page FY2020‐21 proposed budget at the link (id=27577,  name=FY202021ProposedBudgetwTOC.pdf) in the City council meeting notice.    Thank you City Manager for the cover letter which spells out the fiscal uncertainty due to current outbreak and your  overview organized as Budget balancing strategies (3.2 + .85 + .67 + 1.0 + 0.5 = 6.22 Million),  Long‐Term financial  planning, Virtual activities, meetings, and services, and Embracing change and innovation.    I wish to thank the City for virtual budget study session (agenda item 20‐7311). Here are some questions and few  suggestions to consider and help with discussions and deliberations, if any.    1) Uncertainty  Our understanding of gravity of outbreak and its potential multiyear occurance, containment strategy requirements  (including SIP) and extent of impact on different businesses and livelihood are quite unknown and evolving.    2) City council, residents and study session  Successive City council with inputs from residents and management have taken decisions to ensure the City continues to  have a solid financial foundation. A one‐hour study session seems insufficient to get inputs from residents and  deliberate on such an important topic.    3) Overall observation  City budget influences City services provided to residents. To help with better understanding and useful discussion, the  council and residents can benefit from a budget presentation that covers multiple scenarios: worst case, projected /  actuals and best case. The rest of this email will assume it.    4) Revenue Management Challenges and Scenarios  W.r. to City’s top three revenue sources have been property, sales, and transient occupancy taxes.  i) Sales tax related ‐ need multiple scenarios    ii) Property tax related (pgs 97‐99)  pg 97 pie‐chart: While it is known that the % breakdown are decided based on certain statutory conditions, a  comparative view of the % breakdown across different cities in Santa Clara county will be very helpful.    iii) Transient occupancy taxes (TOT) related ‐ need multiple scenarios    iv) Encouraging Property improvement  To help stimulate local economy and also help with sustainability and housing goals, can we discuss how the city can  incentivize and increase existing residential property improvements to move towards net‐zero goals and make it more  affordable to add ADUs.    2 4) Expense Management Challenges and Scenarios (next email)    5) Others (next email)    Thank you for your consideration,    Govind Tatachari  Cupertino Resident    1 Cyrah Caburian From:Connie Cunningham <cunninghamconniel@gmail.com> Sent:Tuesday, May 19, 2020 4:12 PM To:City Council Subject:Homeless Encampments--2020 May 19 City Council Study Session, Proposed FY2020-21 Budget Attachments:F - Budget Message-3.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the  sender and know the content is safe.    Dear Mayor, Vice‐Mayor, Councilmembers and City Manager: Tonight at 5:30 Cupertino City Council Meeting, there is a Study Session regarding the Proposed FY 2020‐21  Budget   The City Manager has a Budget Message, Attachment F.  On page 15, one of the New Initiatives includes the  following:  Homeless Encampments The Code Enforcement Office is currently working on creating a Standard Operating Procedure  and contract to have public camping sites removed from the Public Right‐of Way and public  property. The City of Cupertino has seen a growth of illegal camping sites along Wolfe Road and  280. The goal of this project is the removal of unlawful encampments and the mitigation of  health, safety and access issues while respecting the rights of the occupants and informing them  of alternative resources within the community.  It does not include any mention about what an alternative resource might be. Has the City not discussed this with West Valley Community Services? WVCS is the non-profit agency to whom the City has provided grants to assist many categories of vulnerable citizens. These grants include funding for Rental Assistance due to COVID-19, as well as annual grants for operating various programs to help those who are vulnerable to loss of food, medicine or housing — living paycheck to paycheck. This includes helping people suffering from homelessness. It is unimaginable to me that this sort of New Initiative is being considered at this time of severe need and the likelihood that there will be more people who lose their homes in the coming months. Governor Newsom has created a number of different initiatives and funding sources, from trailers to hotel rooms. He has, also, urged cities, counties and other legal districts to find buildings that can be used to house those suffering homelessness. It is essential to the good financial running of the City as well as our good health, to ensure safety and health for everyone. That means EVERYONE! Below find my email that I sent on April 21, 2020, when this action was first discussed. Sincerely, 2 Connie   Reference: Report on Homeless, April 21, 2020, City Council Meeting Whose cries are the loudest? Who do we hear? Dear Mayor, Vice-Mayor and Councilmembers: Dear Steve, Darcy, Liang, Jon and Rod: This cannot be how you want Cupertino to be remembered in this hour of world-wide grief and fear.   This cannot be that you would act upon the report that was given to you on April 21, 2020 at your City Council Meeting. Say “no” to the inhumanity of sweeping people from the streets of their hometown because we have not yet helped them find a safe, decent place to live. Say “no” to the inhumanity of sweeping people from their encampments the DAY AFTER the COVID-19 SHELTER-IN-PLACE ORDER IS LIFTED. I was horrified by the words coming out of the young man’s mouth. I was horrified at the idea of removing all the homeless people from the encampments right after the COVID-19 order were to be lifted (really, at any time). It is simply NOT A PLAN to have the Sheriff’s Office, well-intentioned though they are, hand out pamphlets with information about how to get help, when WE KNOW THERE IS NOT ENOUGH HELP for all of them. Not enough help now, and certainly not enough help as the number continues to grow due to the devastating economic downturn we are experiencing. The Sheriff reported last night that 22 complaints (about homeless) have come in since January 22, 2020. How many calls for help has West Valley Community Services received in that same time? Hundreds. Whose cries are the loudest? Who do we hear? That report last night was so at odds with everything that was discussed in the January 21, 2020 Report on Homelessness . Remember-just three months ago? Kathryn Kaminski, County Office of Supportive Housing was there. Sujatha Venkatraman, West Valley Community Services was there. Rob Mieso, VP of Student Services, De Anza College was there. Genevieve Kolar, De Anza College Student Trustee, was there. Kerri Heusler, City Staff was there. I was there. You were there. Many residents were present. Before COVID-19. You seemed to give positive support to the City helping out on several ideas. I think now that the Council offering to give WVCS $25,000 for bus coupons wasn’t exactly a roaring success. I had thought it was a start. Please tell me, tell us, the City residents, that it wasn’t a delay tactic. You discussed trailers last night. That was good. Please keep talking about that idea, and keep asking City Staff to find other solutions. There are portable hand-washing stations. There are portable toilets. There are people working with the homeless every day. Work with those people. That is where the answer lies. Please do not act upon the report as it is written. Please step back from this precipice. Connie Cunningham Horrified Resident Housing Commissioner, self only. But I think the other Commissioners would agree. May 1, 2020 To the Residents of Cupertino, Honorable Mayor, and Members of the City Council: As the City of Cupertino enters a time of economic uncertainty, I am pleased to present the City Council with a balanced budget for Fiscal Year 2020/2021. Forecasting anything, be it the economy or the weather, is not an exact science. There are many variables and a lot that we cannot see. But what we can do, and what we are doing, is preparing for the worst while taking steps to ensure the continual financial stability of our organization. The COVID-19 pandemic, and the ensuing lockdowns, has negatively affected the economies of all countries and likely caused a worldwide recession. The City, for purposes of our budget forecast, is anticipating at least a two-year recession. The Fiscal Year 2020/2021 Proposed Budget presents a General Fund with revenues of $79.5 million and expenditures of $82.3 million. The City’s top three revenue sources have been property, sales, and transient occupancy taxes. While this will continue to be true, the City will not see the same level of revenue as in recent years. Sales tax is anticipated to experience an approximately 20% decline, while transient occupancy tax is expected to drop by 25%. The City also expects a decline in fee revenues, mostly attributed to Parks & Recreation Departments programs being ceased, but also due to economic strains on the local, state, and national levels. With declining revenues for the next several years, difficult but necessary decisions must be made to bring expenditures into line. The City is implementing several budget balancing strategies to the General Fund forecast as noted below: x Phasing in an increase of vacant staff positions from five (5) to twenty (20) within a three-year period, which will result in up to $3.2 million in annual savings. x Reducing contingencies by 50%, which is expected to save approximately $850,000. This reduction has been implemented in the proposed budget and will remain as part of the final adopted budget. x Reducing materials by 10%, which is expected to save approximately $670,000 in Fiscal Year 2020/2021. This reduction will be implemented as part of the final adopted budget. x Reducing contract services by $1 million, which will be part of the final adopted budget. 7 x Reducing special projects by $500,000, which will be part of the final adopted budget. While we expect these actions to be enough in the short-term, staff will continue to monitor the situation and adjust when necessary. Staff fully intends on keeping the City Council and community informed with regular updates. Having the latest information and up-to-date data will allow for informed decision making. It is said that even the darkest cloud has a silver lining. The COVID-19 pandemic has shone a bright light on quite a few positive things going on in Cupertino. I would like to highlight them for the City Council and community below: Long-Term Financial Planning The foresight of the City Council and staff in previous years to focus on ensuring healthy reserves is paying off in full. While we will focus on reducing expenditures to offset declining revenues, we do have healthy reserves that could be used to mitigate any unforeseen shortfalls. The City’s Economic Uncertainty Reserve remains intact, with $19 million, and may be used to mitigate potential shortfalls in future fiscal years. The City’s Section 115 Pension Trust ($12 million) also could be used to mitigate potential increases to CalPERS’ annual required contribution rate or further reductions in the discount rate as set by CalPERS. The City’s unassigned fund balance remains healthy and will be able to assist in addressing funding gaps. Virtual Activities, Meetings, and Services The future is virtual. That we already knew. But the COVID-19 pandemic provided an impetus to move some of our most significant activities and services online—most likely permanently. The City's Innovation Technology Department (IT) had the vision years ago to slowly migrate full-time employees to laptop computers. This allowed staff to be more mobile. Coupled with IT's decision to move to a VoIP phone system, which allows staff to answer their work lines from a computer, the transition from working in the office to working at home was practically seamless for many employees. With the addition of Zoom virtual conferencing and Microsoft Teams, an online collaboration tool, staff was able to keep internal meetings and communication moving forward. It also allowed the City to quickly offer its services and activities online once the first Shelter-in-Place Order was given in March 2020. The City began utilizing standard video conferencing software to provide virtual inspections for essential activities. In addition, the Geographic Information System (GIS) Division and the Building Division worked to develop a longer-term solution that allows applicants to submit building inspection videos in lieu of a physical inspection. 8 Applicants upload their submission through an online form, the videos are stored into a que, and inspectors review the video remotely. While the form was developed in response to the COVID-19 pandemic, the Building Division expects this new video inspection review process to remain a part of Cupertino’s inspection process for limited scopes of work. The Parks & Recreation Department also began utilizing teleconferencing software in April 2020 to offer residents free virtual fitness classes. These classes quickly gained in popularity, going from about 10 attendees in the first week about 100 after just a few class offerings. Residents have already requested that the City continue some form of virtual classes once the Shelter-in-Place Order is lifted and in-person classes begin. Embracing Change and Innovation Change is difficult for everyone. It can be uncomfortable and stressful. That is why I have been so impressed with City staff, which has quickly and eagerly embraced change and innovation. Along with the move to new equipment and software, the reason the City's was able to continue its services with little interruption was because of our employees. Work is being completed and internal virtual meetings have been utilized to a great extent. Our staff has been a critical link to our City's success. It gives me confidence that our employees will readily accept more changes and continue to improve our programs and services. The City Council and residents should be heartened to know that Cupertino is in good hands. In conclusion, the City—along with every other municipalities—is heading into much uncertainty. While there is a lot we do not know, the picture will become clearer as we move forward and receive more information. Fortunately, the City stands on a solid financial foundation and decisions have already been made, and will continue to be made, to ensure that stays true into the foreseeable future. Respectfully Submitted, Deborah L. Feng City Manager 9 Notable Accomplishments and New Initiatives ȱ NOTABLEȱACCOMPLISHMENTSȱINȱFISCALȱYEARȱ2019Ȭ20ȱ ȱ ReducingȱYouthȱAccessȱtoȱTobaccoȱ InȱFebruary,ȱtheȱCityȱapprovedȱaȱtobaccoȱordinanceȱtoȱreduceȱyouthȱaccessȱtoȱtobacco.ȱMostȱ notablyȱtheȱordinanceȱprohibitsȱtheȱsaleȱofȱvapingȱproductsȱandȱflavoredȱtobacco.ȱThisȱeffortȱ wasȱfundedȱthroughȱaȱ$48,608ȱgrantȱtheȱCityȱwasȱawardedȱfromȱtheȱSantaȱClaraȱCountyȱPublicȱ HealthȱDepartment.ȱNextȱyearȱtheȱCityȱwillȱpursueȱoptionsȱtoȱreduceȱexposureȱtoȱsecondhandȱ smokeȱthroughȱanotherȱgrantȱreceivedȱfromȱtheȱCounty.ȱ ȱ ReachȱCode:ȱTheȱCityȱofȱCupertinoȱActsȱonȱFossilȱFuelsȱinȱNewȱBuildingsȱ Cupertino’sȱClimateȱActionȱPlanȱoutlinesȱaȱpathȱtowardsȱcreatingȱaȱhealthy,ȱlivable,ȱandȱvibrantȱ placeȱforȱitsȱcurrentȱandȱfutureȱresidentsȱtoȱlive,ȱlearn,ȱwork,ȱandȱplay.ȱItȱwasȱfoundȱthatȱfossilȱ fuelsȱusedȱinȱbuildingsȱandȱcarsȱpresentsȱtheȱbiggestȱremainingȱchallengeȱtoȱmeetingȱtheȱ2030ȱ greenhouseȱgasȱemissionsȱtargets.ȱTheȱCityȱCouncilȱtookȱstepsȱtoȱenhanceȱtheȱsafetyȱandȱcostȱ savingsȱofȱtheȱCity’sȱbuildingsȱbyȱadoptingȱaȱlocalȱreachȱcodeȱthatȱrequiresȱmostȱnewȱbuildingsȱ toȱutilizeȱcleanȱelectricityȱforȱusesȱlikeȱwaterȱheatingȱandȱcooking.ȱEliminatingȱtheȱnaturalȱgasȱ lineȱforȱnewȱdevelopmentsȱisȱexpectedȱtoȱsaveȱmoneyȱforȱbothȱconsumersȱandȱcontractorsȱinȱ mostȱcases.ȱWithȱthisȱstepȱCupertinoȱjoinsȱtheȱvanguardȱofȱ30ȱotherȱCaliforniaȱcities,ȱandȱseveralȱ acrossȱtheȱnation,ȱinȱstartingȱaȱlongȬtermȱreductionȱinȱfossilȱfuelȱuseȱinȱtheȱ community.ȱȱOutreachȱwasȱconductedȱbyȱCityȱstaffȱandȱregionalȱpartnersȱSiliconȱValleyȱCleanȱ Energy.ȱHomeowners,ȱstudents,ȱcontractors,ȱrealȱestateȱprofessionals,ȱandȱbusinessȱownersȱinȱ CupertinoȱprovidedȱfeedbackȱonȱwhatȱanȱallȬelectricȱreachȱcodeȱwouldȱmeanȱforȱthem.ȱȱ ȱ GreenhouseȱGasȱInventoryȱShowsȱCupertinoȱMeetingȱ2020ȱEmissionsȱTargetsȱ TheȱCityȱofȱCupertinoȱClimateȱActionȱPlanȱgoalȱisȱtoȱreduceȱGHGȱemissionsȱbyȱ15%ȱbyȱ2020,ȱ comparedȱtoȱ2010ȱGHGȱlevels.ȱSinceȱ2010,ȱCupertinoȱhasȱexperiencedȱanȱestimatedȱ6%ȱincreaseȱ inȱpopulation,ȱ18%ȱincreaseȱinȱjobs,ȱandȱaȱ10%ȱincreaseȱinȱserviceȱpopulation.ȱHowever,ȱdueȱtoȱ theȱCity’sȱclimateȱactions,ȱthereȱisȱanȱoverallȱ24%ȱdecreaseȱinȱcommunityȱGHGȱemissionsȱ duringȱthatȱperiodȱofȱeconomicȱgrowth.ȱTheȱpathȱforwardȱtoȱtheȱ2030ȱtargetȱremainsȱambitious,ȱ withȱtransportationȱandȱnaturalȱgasȱusedȱinȱbuildingsȱbecomingȱtheȱlargestȱremainingȱ categoriesȱofȱgreenhouseȱgasȱemissionsȱandȱairȱpollutants,ȱandȱtheȱStateȱofȱCaliforniaȱ consideringȱplansȱforȱzeroȱemissionsȱbyȱ2045.ȱ ȱ ȱȱ 10 EmployeeȱCommuteȱProgramȱHelpsȱEmployeesȱGetȱtoȱWorkȱandȱReduceȱClimateȱImpactsȱ StaffȱcreatedȱaȱpilotȱprogramȱtoȱhelpȱCityȱemployeesȱgetȱtoȱworkȱusingȱalternativesȱtoȱdrivingȱ alone.ȱTheȱpilotȱprogramȱresultedȱinȱ70ȱemployeesȱsigningȱupȱtoȱreduceȱtheirȱsoloȱcarȱtrips.ȱ Overȱtheȱcourseȱofȱtheȱpilotȱprogram,ȱwhichȱranȱfromȱAugustȱ2019ȱtoȱMarchȱ2020,ȱemployeesȱ tookȱ2,541ȱ“alternativeȱtrips”ȱtoȱworkȱwhichȱincludesȱtransit,ȱcarpooling,ȱbiking,ȱorȱtakingȱtheȱ VIAȱshuttleȱtoȱwork.ȱThisȱresultedȱinȱreducedȱparkingȱimpactsȱatȱCityȱHall,ȱpaycheckȱincentivesȱ paidȱdirectlyȱtoȱstaff,ȱandȱanȱestimatedȱ12ȱmillionȱpoundsȱofȱcarbonȱemissionsȱavoided.ȱTheȱ program’sȱearlyȱsuccessȱledȱtoȱaȱsuccessfulȱgrantȱawardȱforȱtheȱCityȱtoȱcontinueȱwithȱaȱPhaseȱIIȱ employeeȱcommuteȱpilot,ȱwhichȱisȱbeingȱdesignedȱandȱrolledȱoutȱbyȱstaff.ȱȱȱ ȱ MasterȱPlanȱAdoptionȱ Thisȱyear,ȱtheȱParksȱandȱRecreationȱSystemȱMasterȱPlanȱwasȱcompletedȱandȱadopted,ȱfollowingȱ anȱextensiveȱpublicȱinputȱprocess.ȱȱAȱfinalȱdraftȱMasterȱPlanȱasȱwellȱasȱtheȱassociatedȱ environmentalȱclearanceȱdocumentsȱwereȱcirculatedȱforȱpublicȱreview.ȱȱTheȱdocumentsȱwereȱ presentedȱtoȱtheȱPlanningȱCommission,ȱParksȱandȱRecreationȱCommission,ȱandȱEnvironmentalȱ ReviewȱCommittee.ȱȱOnȱFebruaryȱ18,ȱ2020,ȱtheȱCityȱCouncilȱadoptedȱtheȱenvironmentalȱ clearanceȱdocumentsȱandȱadoptedȱtheȱParksȱandȱRecreationȱSystemȱMasterȱPlan.ȱ ȱ ProgramȱOverviewȱandȱMarketingȱAnalysisȱCompletedȱ TheȱCityȱcontractedȱwithȱtheȱLearningȱResourceȱNetworkȱ(LERN)ȱtoȱprovideȱaȱtwoȱdayȱ programȱreviewȱthatȱwouldȱanalyzeȱrecreationȱprogramȱofferingsȱinȱadditionȱto:ȱȱprovideȱ benchmarkȱtrackingȱtoȱmeasureȱdepartmentȱperformance,ȱprovideȱrecommendationsȱandȱkeyȱ actionsȱtoȱimplementȱtoȱreduceȱcostsȱandȱboostȱrevenueȱandȱregistration,ȱȱandȱdescribeȱspecificȱ stepsȱtoȱimproveȱmarketingȱstrategiesȱandȱoverallȱdepartmentȱoperations.ȱȱRecommendationsȱ onȱbestȱpracticesȱandȱtrendsȱinȱtheȱdeliveryȱofȱrecreationȱservicesȱwereȱpresentedȱtoȱtheȱParksȱ andȱRecreationȱCommissionȱinȱMarchȱ2020.ȱȱȱ ȱ Volunteers,ȱWellness,ȱandȱCollaborationȱ TheȱSeniorȱCenterȱstrivesȱtoȱcreateȱaȱcultureȱofȱcollaborationȱandȱengagesȱtheȱcommunityȱatȱallȱ levels—thisȱcanȱbeȱnotedȱinȱtheȱdiverseȱprogramȱofferingsȱatȱtheȱfacility.ȱTheȱCupertinoȱSeniorȱ Centerȱcelebratedȱtheȱcommitmentȱofȱitsȱ230ȱvolunteersȱwhoȱhaveȱdevotedȱ24,000ȱhoursȱtoȱ servingȱtheȱcommunityȱthroughȱvariousȱvolunteerȱopportunitiesȱatȱtheȱSeniorȱCenter.ȱTheȱ50+ȱ Sceneȱnewsletterȱunderwentȱanȱexpansiveȱcontentȱandȱaestheticȱoverhaulȱinȱorderȱtoȱadhereȱtoȱ theȱOfficeȱofȱCommunication’sȱbrandingȱguidelines,ȱasȱwellȱasȱensureȱtheȱpublicationȱisȱmoreȱ readableȱandȱuserȬfriendly.ȱTheȱSmartȱLivingȱandȱWellnessȱHealthȱFairȱprovidedȱvaluableȱ informationȱandȱservicesȱtoȱtheȱ50+ȱcommunityȱonȱhowȱbestȱtoȱmaintainȱaȱhealthyȱandȱ independentȱlifestyle,ȱcoordinatedȱbyȱtheȱCity’sȱownȱCaseȱManagementȱteam.ȱTheȱyearlyȱ HiddenȱTreasuresȱeventȱbroughtȱinȱtheȱmostȱsalesȱeverȱatȱ$15,000,ȱwhichȱhelpsȱsupportȱtheȱcaseȱ managementȱprogramȱandȱtheȱStayȱActiveȱFundȱtoȱkeepȱCupertinoȱseniorsȱstayȱactiveȱandȱ 11 engaged.ȱȱTheseȱinnovativeȱservicesȱforȱtheȱ50+ȱpopulationȱcontinueȱtoȱrespondȱtoȱtheȱCity’sȱ changingȱcommunityȱneeds.ȱ ȱ AppointmentȱofȱCupertino’sȱSixthȱPoetȱLaureateȱȱ OnȱFebruaryȱ18,ȱ2020ȱCupertino’sȱCityȱCouncilȱapprovedȱtheȱLibraryȱCommission’sȱ recommendationȱofȱJingȱJingȱYangȱforȱtheȱappointmentȱofȱtheȱnewȱCupertinoȱPoetȱLaureate.ȱAȱ celebrationȱeventȱwasȱheldȱonȱFebruaryȱ27thȱatȱQuinlanȱCommunityȱCenterȱwithȱnearlyȱ100ȱ attendeesȱtoȱthankȱtheȱoutgoingȱPoetȱLaureate,ȱKaeceyȱMcCormickȱforȱherȱcontributionsȱtoȱtheȱ PoetȱLaureateȱprogramȱandȱtoȱwelcomeȱJingȱJingȱYangȱasȱtheȱnewȱPoetȱLaureate.ȱTheȱeventȱalsoȱ featuredȱtheȱrevealingȱofȱKaecey’sȱfinalȱprojectȱasȱPoetȱLaureate,ȱ“CelebrateȱCreativity:ȱAȱ CupertinoȱCommunityȱAnthology”,ȱwithȱ350ȱpagesȱfeaturingȱcreativeȱwritingȱfromȱoverȱ80ȱ contributorsȱfromȱtheȱCupertinoȱcommunity.ȱAȱcopyȱofȱtheȱAnthologyȱwillȱbeȱavailableȱatȱtheȱ CupertinoȱLibrary.ȱȱ ȱ SummerȱEventsȱ Theȱ Summerȱ Eventsȱ programȱ ranȱ fromȱ Juneȱ 2019ȱ toȱ Septemberȱ 2019ȱandȱ offeredȱ activitiesȱ atȱ 12ȱ differentȱ sites.ȱ Theȱ programȱ includedȱ themedȱ activities,ȱ 11ȱ Movies,ȱ 11ȱ Concerts,ȱ 10ȱ Freeȱ Fitnessȱ inȱ theȱ Parkȱ classesȱ (Zumbaȱ andȱ Yoga),ȱ 5ȱ Artȱ inȱ theȱ Parkȱ Parent/Childȱ classes.ȱ Itȱ alsoȱ includedȱ Shakespeareȱ inȱ theȱ Park,ȱ Cupertino’sȱ firstȱ Nightȱ Market,ȱ Gameȱ Night,ȱ Astronomyȱ Night,ȱ Hawaiianȱ Luau,ȱ Chess,ȱ Bollywoodȱ Nightȱ andȱ Cupertinoȱ Campoutȱ withȱ 230ȱ campers.ȱ Attendanceȱ wasȱ slightlyȱ underȱ 12,000.ȱ Otherȱ offeredȱ eventsȱ highlightedȱ celebrityȱ guests,ȱ nonȬ profits,ȱandȱlocalȱpartnerships.ȱȱ ȱ TeenȱOfferingsȱ TeenȱprogramsȱwereȱenhancedȱtoȱaddressȱtheȱteenȱstressȱlevelsȱinȱCupertinoȱthroughȱ innovative,ȱcollaborativeȱandȱeducationalȱapproachesȱwhileȱaddressingȱcommunityȱlivabilityȱ amongstȱtheȱteens.ȱTheȱBobatinoȱeventȱhadȱitsȱsecondȱsuccessfulȱyearȱwithȱoverȱ600ȱteensȱ enjoyingȱvariousȱactivitiesȱwhileȱdrinkingȱfreeȱmilkȱteaȱprovidedȱbyȱtheȱCity.ȱTechieȱTeensȱ beganȱinȱAugustȱofȱ2019.ȱTheȱprimaryȱgoalȱofȱCupertino’sȱTechieȱTeensȱvolunteerȱprogramȱatȱ theȱSeniorȱCenterȱisȱtoȱhelpȱteensȱgiveȱbackȱtoȱtheȱcommunityȱbyȱengagingȱtheȱ50+ȱcommunityȱ toȱassistȱinȱdevelopingȱtheirȱtechnologicalȱskills.ȱTheȱvolunteersȱcanȱexpectȱtoȱgainȱtheȱfollowingȱ experiences:ȱleadershipȱroles,ȱpublicȱspeakingȱopportunities,ȱinterpersonalȱcommunication,ȱandȱ muchȱmore.ȱTheȱCupertinoȱCaféȱrunȱbyȱtheȱYouthȱActivityȱBoardȱstartedȱinȱMayȱ2019ȱbutȱ expandedȱinȱwinterȱ2020ȱwithȱmoreȱdatesȱandȱpartnershipsȱwithȱtheȱlibrary.ȱ ȱȱ 12 CorridorȱStrollȱȱ OnȱFriday,ȱAugustȱ2,ȱtheȱParksȱ&ȱRecreationȱDepartmentȱheldȱtheȱfirstȱannualȱCorridorȱStrollȱ onȱtheȱStevensȱCreekȱCorridor.ȱParticipantsȱstrollingȱbetweenȱMcClellanȱRanchȱPreserveȱandȱ BlackberryȱFarmȱenjoyedȱacousticȱmusic,ȱaȱmagician,ȱwineȱtasting,ȱfoodȱtrucks,ȱcrafts,ȱrangerȱ activities,ȱreptileȱandȱinsectȱpresentationsȱandȱblacksmithȱdemonstrations.ȱ ȱ SigningȱSantaȱȱ OnȱFebruaryȱ27,ȱtheȱParksȱandȱRecreationȱDepartmentȱreceivedȱaȱprogrammingȱawardȱfromȱtheȱ CaliforniaȱParksȱandȱRecreationȱSociety,ȱforȱtheirȱinnovativeȱSigningȱSantaȱevent.ȱThisȱeventȱ wasȱtheȱfirstȱofȱitsȱkindȱinȱtheȱBayȱAreaȱandȱprovidedȱanȱopportunityȱforȱdeafȱandȱhardȱofȱ hearingȱchildrenȱtoȱtalkȱtoȱSantaȱandȱhisȱelvesȱusingȱAmericanȱSignȱLanguage.ȱȱȱMoreȱthanȱ70ȱ peopleȱattendedȱtheȱeventȱthatȱincludedȱcrafts,ȱcookies,ȱhotȱcocoa,ȱandȱqualityȱtimeȱwithȱSanta.ȱȱ ȱ BlacksmithȱShopȱatȱMcClellanȱRanchȱȱ InȱtheȱFallȱofȱ2019,ȱtheȱrestoredȱBaerȱBlacksmithȱShopȱatȱMcClellanȱRanchȱPreserveȱbecameȱfullyȱ operational.ȱFreeȱdropȬinȱhoursȱareȱofferedȱoneȱSundayȱaȱmonth,ȱandȱvolunteersȱareȱlearningȱ blacksmithingȱtechniques.ȱDemonstrationsȱcanȱalsoȱbeȱscheduledȱforȱschoolsȱandȱgroups.ȱTheȱ blacksmithȱshopȱdoesȱnotȱoperateȱifȱSpareȬtheȬAirȱorȱRedȱFlagȱwarningsȱhaveȱbeenȱissued.ȱȱ ȱ GolfȱCourseȱImprovementsȱȱ InȱtheȱSpringȱofȱ2020,ȱmuchȱneededȱimprovementsȱwereȱmadeȱtoȱtheȱteeȱboxesȱonȱholesȱ#1ȱandȱ #9.ȱBothȱteeȱboxesȱwereȱleveledȱandȱhadȱnewȱturfȱinstalled.ȱInȱadditionȱtoȱtheseȱtees,ȱtheȱgreenȱ onȱholeȱ#6ȱwasȱmadeȱlevelȱandȱenlarged.ȱȱ ȱ McClellanȱRanchȱPreserveȱMeadowȱHabitatȱRestorationȱȱ TheȱCity’sȱpartnershipȱwithȱGrassrootsȱEcologyȱcontinuesȱtoȱyieldȱpositiveȱresultsȱforȱtheȱ restorationȱofȱtheȱmeadowȱatȱMcClellanȱRanchȱPreserve.ȱInȱFYȱ19Ȭ20,ȱoverȱ350ȱvolunteersȱ plantedȱoverȱ300ȱnativeȱplants,ȱremovedȱinvasiveȱplants,ȱandȱmonitoredȱtheȱwaterȱqualityȱinȱ thisȱopenȱspace.ȱ ȱ AthleticȱFieldsȱUseȱStudyȱȱ InȱFY19Ȭ20,ȱtheȱParksȱandȱRecreationȱDepartmentȱbeganȱaȱfieldȱuseȱstudyȱtoȱupdateȱtheȱcurrentȱ FieldȱUseȱPolicy.ȱTheȱstudyȱencompassesȱreviewȱofȱtheȱuserȱgroupȱcategories,ȱtheȱfeesȱandȱhowȱ theȱCityȱchargesȱusers,ȱtimes,ȱdaysȱforȱuse,ȱandȱrestȱperiodsȱforȱtheȱfields.ȱTheȱnewȱpolicyȱisȱ expectedȱtoȱbeȱadoptedȱbyȱtheȱFallȱofȱ2020ȱandȱimplementedȱinȱtheȱSpringȱseasonȱofȱ2021.ȱ ȱȱ 13 AccessoryȱDwellingȱUnitȱOrdinanceȱ TheȱAccessoryȱDwellingȱUnitȱOrdinanceȱ(ADU)ȱwasȱadoptedȱbyȱCityȱCouncilȱafterȱtheȱitsȱ secondȱreadingȱonȱMarchȱ3,ȱ2020.ȱThisȱwasȱinȱaȱresponseȱtoȱtheȱStateȱadoptingȱsixȱ(6)ȱseparateȱ AssemblyȱandȱSenateȱBillsȱthatȱseekȱtoȱstreamlineȱandȱencourageȱtheȱdevelopmentȱofȱADUsȱinȱ anȱeffortȱtoȱrelieveȱtheȱState’sȱhousingȱcrisis.ȱSuchȱrevisionsȱallowȱaȱshorter,ȱmoreȱaffordableȱ reviewȱprocessȱwhichȱwillȱalsoȱfurtherȱflexibilityȱonȱcertainȱdevelopmentȱstandards.ȱ ȱ DeȱAnzaȱHotelȱProjectȱApprovalȱ TheȱDeȱAnzaȱHotelȱProjectȱwasȱpartȱofȱaȱGeneralȱPlanȱAmendmentȱproposalȱtoȱdevelopȱaȱ155ȱ room,ȱsevenȱstoryȱboutiqueȱhotelȱonȱtheȱsiteȱcurrentlyȱoccupiedȱbyȱGoodyearȱTiresȱatȱ10931ȱNȱ DeȱAnzaȱBlvd.ȱTheȱdeveloper,ȱJohnȱVidovichȱofȱDeȱAnzaȱProperties,ȱhasȱagreedȱtoȱaȱ DevelopmentȱAgreementȱthatȱwouldȱcontributeȱaȱoneȬtimeȱpaymentȱ$500,000ȱtoȱtheȱCityȱtoȱ fundȱvariousȱprojects,ȱreducedȱpriceȱshuttleȱserviceȱforȱCityȱresidentsȱtoȱutilizeȱforȱAirportȱ transportationȱasȱwellȱasȱconnectionsȱtoȱjobȱcenters,ȱfreeȱuseȱofȱhotelȱfacilitiesȱforȱtheȱCityȱandȱ localȱschools,ȱandȱpublicȱaccessȱtoȱaȱroofȱtopȱbarȱ&ȱrestaurant.ȱȱȱȱ ȱ CaliforniaȱDepartmentȱofȱHousingȱandȱCommunityȱDevelopmentȱ(HCD)ȱSBȱ2ȱPlanningȱGrantsȱ Programȱ TheȱCaliforniaȱDepartmentȱofȱHousingȱandȱCommunityȱDevelopmentȱ(HCD)ȱannouncedȱthatȱ theȱCityȱofȱCupertinoȱwasȱawardedȱ$310,000ȱinȱgrantȱfundsȱunderȱtheȱHCD’sȱSBȱ2ȱPlanningȱ GrantsȱProgram.ȱTheȱCityȱwillȱuseȱtheȱfundsȱtoȱimproveȱtheȱPermitȱCenterȱtoȱofferȱcommunityȱ accessȱtoȱgovernmentȱservicesȱutilizingȱadvancingȱtechnologies.ȱAsȱpartȱofȱtheȱPermitȱCenterȱ improvements,ȱstaffȱisȱredesigningȱtheȱcustomerȱexperienceȱthroughȱprojectsȱrangingȱfromȱ physicalȱonȬsiteȱenhancements,ȱavailabilityȱofȱonlineȱresourcesȱandȱservices,ȱpermitȱsoftwareȱ andȱprograms,ȱandȱupdatesȱtoȱdistributionalȱhandoutsȱonȱdevelopmentȱregulations.ȱTheȱSB2ȱ PlanningȱGrantsȱfundsȱwillȱbeȱusedȱspecificallyȱtoȱoffsetȱtheȱdigitalȱprogramȱimprovementsȱandȱ onlineȱaccessȱsolutions.ȱ ȱ CupertinoȱVillageȱHotelȱProjectȱApprovalȱ TheȱCupertinoȱVillageȱHotelȱProjectȱwasȱpartȱofȱaȱGeneralȱPlanȱAmendmentȱproposalȱtoȱ developȱaȱ185ȱroom,ȱ5Ȭstoryȱhotelȱwithȱeventȱmeetingȱrooms,ȱrestaurant,ȱandȱrooftopȱbar.ȱTheȱ developer,ȱKimcoȱRealty,ȱagreedȱtoȱaȱDeveloperȱAgreementȱthatȱwouldȱcontributeȱ$1.85ȱmillionȱ ($10,000ȱperȱroom)ȱtowardsȱCommunityȱAmenityȱFunding,ȱparticipationȱinȱaȱTransportationȱ ManagementȱAssociation,ȱshuttleȱserviceȱaccess,ȱmeetingȱroomȱavailabilityȱforȱofficialȱCityȱ business,ȱreducedȱratesȱforȱpeopleȱvisitingȱCupertinoȱforȱofficialȱCityȱbusiness,ȱandȱinternshipȱ opportunities.ȱWhenȱconstructed,ȱtheȱprojectȱisȱanticipatedȱtoȱhaveȱaȱnetȱfiscalȱimpactȱofȱ$1.78ȱ millionȱonȱtheȱCity’sȱGeneralȱFund.ȱ ȱ ȱ 14 HomelessȱEncampmentsȱ TheȱCodeȱEnforcementȱOfficeȱisȱcurrentlyȱworkingȱonȱcreatingȱaȱStandardȱOperatingȱProcedureȱ andȱcontractȱtoȱhaveȱpublicȱcampingȱsitesȱremovedȱfromȱtheȱPublicȱRightȬofȱWayȱandȱpublicȱ property.ȱTheȱCityȱofȱCupertinoȱhasȱseenȱaȱgrowthȱofȱillegalȱcampingȱsitesȱalongȱWolfeȱRoadȱ andȱ280.ȱTheȱgoalȱofȱthisȱprojectȱisȱtheȱremovalȱofȱunlawfulȱencampmentsȱandȱtheȱmitigationȱofȱ health,ȱsafetyȱandȱaccessȱissuesȱwhileȱrespectingȱtheȱrightsȱofȱtheȱoccupantsȱandȱinformingȱthemȱ ofȱalternativeȱresourcesȱwithinȱtheȱcommunity.ȱ ȱ PermitȱTrackingȱandȱElectronicȱPlanȱReviewȱSystemȱ Cupertino’sȱinitiativeȱtoȱreplaceȱitsȱobsoleteȱpermitȱtrackingȱsystemȱwasȱrealizedȱonȱJulyȱ22,ȱ 2019,ȱwithȱtheȱimplementationȱofȱAccelaȱandȱtheȱsuccessfulȱintegrationȱtoȱtheȱelectronicȱplanȱ reviewȱsystem,ȱProjectDox.ȱCupertino’sȱnewȱsystemȱgivesȱstaffȱbetterȱtrackingȱandȱmanagementȱ ofȱpermittingȱprocessesȱwithȱaȱcentralizedȱdatabaseȱandȱGISȱcentricȱcontrolsȱwhichȱallowsȱ informationȱtoȱbeȱsharedȱacrossȱDepartmentsȱforȱimprovedȱcommunication.ȱȱ ȱ PlanȱReview,ȱPermitȱandȱInspectionȱServices:ȱSmoothȱtransitionȱafterȱShelterȬInȬPlaceȱorderȱȱȱȱ TheȱDevelopmentȱReviewȱprocessȱwhichȱincludesȱBuilding,ȱPlanning,ȱPublicȱWorks,ȱFire,ȱ SanitaryȱDistrict,ȱandȱCodeȱEnforcementȱtoȱreviewȱplans,ȱissueȱpermitsȱandȱprovideȱobservationȱ inspectionsȱsuccessfullyȱtransitionedȱcrucialȱCityȱServiceȱfunctionsȱasȱaȱtelecommutingȱ operationȱonȱdayȱoneȱofȱtheȱShelterȬinȬPlaceȱorderȱdueȱtoȱCOVIDȬ19.ȱAllȱservicesȱareȱ electronicallyȱprocessedȱremotelyȱwithȱtechnologyȱthatȱeachȱDepartmentȱworkedȱtirelesslyȱoverȱ theȱpastȱfourȱyearsȱtoȱimplement.ȱȱWhileȱotherȱjurisdictionsȱhadȱnoȱchoiceȱbutȱtoȱshutȱdownȱ theirȱDepartments,ȱCupertinoȱwasȱableȱtoȱseamlesslyȱcontinueȱoperationsȱremotelyȱwithȱ minimalȱimpacts.ȱ ȱ ReachȱCodesȱ InȱJanuaryȱ2020,ȱtheȱCityȱCouncilȱconsideredȱandȱadoptedȱaȱlocalȱadditionȱtoȱtheȱbuildingȱcodesȱ inȱCupertinoȱthatȱwillȱlowerȱgreenhouseȱgasȱimpactsȱfromȱnewlyȱconstructedȱbuildings,ȱknownȱ asȱtheȱallȬelectricȱbuildingȱreachȱcode.ȱStaffȱisȱpleasedȱtoȱreportȱthatȱtheȱCupertinoȱreachȱcodeȱ hasȱbeenȱheardȱatȱaȱpublicȱmeetingȱofȱtheȱCaliforniaȱEnergyȱCommissionȱonȱAprilȱ8,ȱ2020.ȱCECȱ staffȱfoundȱthatȱtheȱCupertinoȱreachȱcodeȱmetȱallȱrequirementsȱinȱorderȱtoȱbeȱadopted.ȱȱ CECȱstaffȱissuedȱaȱresolutionȱstatingȱthat,ȱ“CECȱapplaudsȱtheȱCityȱofȱCupertinoȱforȱseekingȱtoȱ achieveȱadditionalȱenergyȱdemandȱreductions,ȱenergyȱsavings,ȱandȱotherȱbenefitsȱexceedingȱ thoseȱofȱtheȱ2019ȱEnergyȱCode.”ȱ AȱcopyȱofȱtheȱCECȱresolutionȱcanȱbeȱviewedȱatȱ(outsideȱlink):ȱ https://ww2.energy.ca.gov/business_meetings/2020_packets/2020Ȭ04Ȭ 08/Item_04f_CUPERTINO_ADA.pdfȱ ȱ ȱ 15 RealȱEstateȱSignȱPickupsȱ TheȱCodeȱEnforcementȱOfficeȱconductedȱtheȱremovalȱandȱstorageȱofȱillegallyȱplacedȱrealȱestateȱ signsȱfromȱtheȱPublicȱRightȬofȬWay.ȱTheȱprojectȱinvolvedȱaȱcodeȱenforcementȱofficerȱpatrollingȱ onȱtheȱweekendsȱforȱunlawfullyȱplacedȱrealȱestateȱsignsȱandȱpromptlyȱremovingȱthemȱforȱ storageȱatȱtheȱCupertinoȱServiceȱCenter.ȱTheȱinvestigatingȱofficerȱwouldȱnotifyȱtheȱoffendingȱ agent(s)ȱandȱadviseȱthemȱofȱtheȱnumberȱofȱsign(s)ȱremovedȱincludingȱinstructionsȱonȱhowȱtoȱ retrieveȱtheȱsignsȱwithȱaȱfee.ȱȱNoȱAdministrativeȱCitationsȱwereȱissuedȱforȱthisȱproject.ȱȱ ȱ RecruitmentsȱandȱOnboardingȱSoftwareȱImplementationȱ Cupertinoȱpridesȱitselfȱinȱtheȱhighȱlevelȱofȱservicesȱprovidedȱtoȱtheȱcommunity,ȱalwaysȱstrivingȱ toȱhireȱtheȱbestȱemployees.ȱȱHumanȱResourcesȱconductedȱ17ȱfullȬtimeȱrecruitmentsȱresultingȱinȱ 21ȱnewȱhiresȱorȱpromotions.ȱȱAdditionally,ȱphaseȱtwoȱofȱNeoGov,ȱanȱonlineȱsystemȱforȱ onboarding,ȱrecruitmentȱandȱapplicantȱtracking,ȱwasȱimplementedȱtoȱstreamlineȱtheȱnewȱhireȱ andȱonboardingȱprocessȱforȱallȱdepartments.ȱȱImplementingȱtheȱOnboardingȱmoduleȱwasȱ comprisedȱofȱstaffȱtraining,ȱconvertingȱallȱnewȱhireȱpayroll,ȱpolicies,ȱandȱbenefitȱinformationȱ intoȱdigitalȱformat,ȱcreatingȱaȱWelcomeȱPortalȱpage,ȱuploadingȱcontentȱforȱnewȱhires,ȱandȱ testing.ȱTheȱnewȱonboardingȱmoduleȱhasȱbeenȱaȱgreatȱsuccessȱwithȱnewȱhires.ȱHumanȱ Resourcesȱhasȱbeenȱableȱtoȱcompleteȱnewȱhireȱonboardingȱwithȱteleworkȱinȱplace.ȱ ȱ COVIDȬ19ȱLeavesȱImplementationȱ TheȱFamiliesȱFirstȱCoronavirusȱResponseȱActȱ(FFCRA)ȱisȱanȱemergencyȱlawȱpassedȱbyȱCongressȱ andȱsignedȱbyȱtheȱPresidentȱonȱMarchȱ18,ȱ2020,ȱinȱresponseȱtoȱtheȱCOVIDȬ19ȱPandemic.ȱTheȱlawȱ requiredȱtheȱCityȱofȱCupertinoȱtoȱprovideȱemployeesȱwithȱEmergencyȱPaidȱSickȱLeaveȱ(EPSL),ȱ and/orȱEmergencyȱFamilyȱandȱMedicalȱLeaveȱExpansionȱ(EFMLEA),ȱforȱreasonsȱrelatedȱtoȱ COVIDȬ19.ȱHumanȱResourcesȱquicklyȱimplementedȱtheseȱnewȱpaidȱleavesȱeffectiveȱAprilȱ1,ȱ 2020.ȱStaffȱoutreachȱandȱtrainingȱincludedȱwebinars,ȱdevelopmentȱofȱwebpage,ȱinfographicsȱandȱ individualȱmeetingsȱwithȱallȱemployeesȱasȱneeded.ȱȱ ȱ CitywideȱEmployeeȱTrainingȱȬȱBESTȱ “BEST”ȱ(BuildingȱEmployeeȱSkillsȱthroughȱTraining)ȱprogramȱfocusedȱonȱprofessionalȱ developmentȱasȱpartȱofȱCupertino’sȱsuccessionȱplanningȱandȱemployeeȱretentionȱinitiatives.ȱ HumanȱResourcesȱofferedȱ7Ȭ8ȱworkshopsȱeachȱquarterȱonȱsubjectsȱsuchȱasȱPublicȱSpeakingȱandȱ TimeȱManagement.ȱHumanȱResourcesȱalsoȱlaunchedȱpopularȱquarterlyȱEmployeeȱOrientationsȱ andȱRefreshersȱforȱtheȱdepartmentsȱtoȱshareȱtheȱlatestȱCitywideȱpoliciesȱandȱprogramsȱavailableȱ toȱemployees.ȱȱȱ ȱȱ 16 EmployeeȱEngagementȱInitiativeȱ HumanȱResourcesȱimplementedȱitsȱfirstȱcitywideȱEmployeeȱEngagementȱInitiativeȱtoȱsupportȱ eachȱotherȱandȱworkȱtogetherȱtowardsȱtheȱCity’sȱmissionȱtoȱprovideȱexceptionalȱservice,ȱ encourageȱallȱmembersȱofȱtheȱcommunityȱtoȱtakeȱresponsibilityȱforȱoneȱanother,ȱandȱsupportȱtheȱ valuesȱofȱeducation,ȱinnovation,ȱandȱcollaboration.ȱȱCityȱemployeesȱwereȱassignedȱtoȱaȱWorkȱ Group,ȱparticipatedȱinȱaȱcitywideȱEmployeeȱEngagementȱsurvey,ȱandȱcreatedȱActionȱPlanȱ Teamsȱtoȱbrainstormȱsolutionsȱforȱanyȱissuesȱidentifiedȱinȱtheȱsurvey.ȱȱEmployeeȱEngagementȱisȱ aȱmutualȱcommitmentȱbetweenȱtheȱorganizationȱandȱtheȱemployee,ȱandȱthisȱinitiativeȱwasȱaȱ successfulȱfirstȱstepȱtowardsȱtheȱgoalȱofȱhavingȱengagedȱemployeesȱwhoȱfeelȱvalued,ȱareȱ listenedȱto,ȱandȱareȱenthusedȱaboutȱtheirȱwork.ȱ ȱ InvestmentȱManagementȱ ThroughȱaȱformalȱRequestȱforȱProposalȱ(RFP)ȱprocess,ȱtheȱFinanceȱDivisionȱengagedȱChandlerȱ AssetȱManagementȱforȱinvestmentȱmanagementȱservicesȱinȱFYȱ2018Ȭ19.ȱManagingȱtheȱCity’sȱ investmentȱportfolioȱwithȱthreeȱkeyȱprinciplesȱinȱmind:ȱsafetyȱtoȱensureȱtheȱpreservationȱofȱ capitalȱinȱtheȱoverallȱportfolio,ȱprovideȱsufficientȱliquidityȱforȱcashȱneedsȱandȱaȱmarketȱrateȱofȱ returnȱconsistentȱwithȱtheȱinvestmentȱprogram.ȱSinceȱinceptionȱinȱJanuaryȱ2019,ȱtheȱCity’sȱ portfolioȱhasȱyieldedȱaȱtotalȱrateȱofȱreturnȱofȱ4.96%,ȱsignificantlyȱhigherȱthanȱU.S.ȱTreasuryȱandȱ LocalȱAgencyȱInvestmentȱFundȱratesȱduringȱthatȱtimeȱperiod.ȱȱAsȱaȱresult,ȱtheȱCity’sȱinvestmentȱ portfolioȱisȱwellȬpositionedȱtoȱmoveȱforwardȱasȱtheȱCOVIDȬ19ȱpandemicȱcontinuesȱtoȱevolve.ȱ ȱ InternalȱAuditȱFunctionȱȱ ThroughȱaȱformalȱRequestȱforȱProposalȱ(RFP)ȱprocess,ȱtheȱFinanceȱDivisionȱengagedȱMossȱ AdamsȱLLPȱforȱinternalȱauditȱservicesȱinȱFYȱ2019Ȭ20.ȱȱThisȱfunctionȱwillȱbeȱassistingȱtheȱCityȱinȱ accomplishingȱitsȱobjectivesȱbyȱbriningȱaȱsystematic,ȱdisciplinedȱapproachȱtoȱevaluateȱandȱ improveȱtheȱeffectivenessȱofȱriskȱmanagement,ȱcontrol,ȱandȱgovernanceȱprocesses.ȱȱWhileȱtheȱ timingȱofȱtheȱonboardingȱandȱinitialȱriskȱassessmentȱhaveȱbeenȱdelayedȱdueȱtoȱCOVIDȬ19,ȱtheȱ Cityȱisȱeagerȱtoȱresumeȱitsȱinternalȱauditȱfunction.ȱ ȱȱ 17 InnovationȱTechnologyȱStrategicȱPlanȱ TheȱInnovationȱTechnologyȱDepartmentȱconcludedȱtheȱfinalȱphaseȱofȱaȱthreeȬyearȱstrategicȱplan,ȱ publishedȱinȱOctoberȱ2017.ȱȱȱȱTheȱplanȱrevolvedȱaroundȱtheȱimplementation/executionȱofȱ54ȱ technicalȱinfrastructureȱorȱenterpriseȱapplicationȱprojects.ȱȱȱAsȱofȱJulyȱ2020,ȱallȱ54ȱprojectsȱareȱ complete.ȱȱȱHighlightsȱofȱthisȱyear’sȱeffortsȱinclude:ȱȱ ȱ Applicationsȱ xGoingȱliveȱwithȱAccelaȱLandȱManagementȱSystem;ȱaȱcloudȬbasedȱapplicationȱthatȱ includesȱurbanȱplanning,ȱpermittingȱandȱbuildingȱinspections.ȱȱȱAccela’sȱwebȬbasedȱ customerȱportalȱprovidesȱeasyȱaccessȱandȱuseȱtoȱcustomersȱapplying,ȱreviewingȱstatusȱ orȱpayingȱforȱaȱpermit.ȱ xImplementationȱofȱtheȱNeoGovȱOnboardingȱapplication;ȱaȱcloudȬbasedȱapplicationȱ utilizedȱbyȱHumanȱResourcesȱtoȱonboardȱnewȱstaffȱ xDevelopmentȱofȱanȱElectronicȱContentȱManagementȱthreeȬyearȱroadmapȱthatȱguidesȱ theȱexpansionȱandȱbestȱpracticesȱforȱtheȱCity’sȱrecordȱmanagementȱsystem.ȱȱȱ xExpansionȱofȱtheȱCity’sȱcloudȬbasedȱassetȱmanagementȱsystem,ȱCityworksȱtoȱincludeȱ storeroom.ȱȱUpdateȱassetȱinventoryȱforȱstreetȱlegendsȱandȱstripingȱasȱwellȱasȱ streetlightȱcabinets.ȱȱ xImplementationȱofȱChyronȱutilizedȱbyȱtheȱVideoȱDivisionȱforȱtelevisionȱgraphicsȱ xUpgradedȱBuildingEyeȱtoȱCivicȱCentral.ȱȱIntegratedȱCivicȱCentralȱwithȱAccelaȱLandȱ Managementȱ xImplementedȱNextRequest,ȱcloudȬbasedȱapplicationȱthatȱstreamlinesȱtheȱpublicȱ recordsȱactȱrequestȱprocess.ȱȱ xMicrosoftȱO365ȱandȱExchangeȱcitywideȱimplementationȱ xImplementȱZoomȱasȱCity’sȱteleconferencingȱsolution.ȱ xCobblestone,ȱcloudȬbasedȱcontractȱmanagementȱworkflowȱapplicationȱwasȱ implemented.ȱȱ  TechnicalȱInfrastructureȱ xBuild/testȱofȱdisasterȱrecoveryȱenvironmentȱoutsideȱofȱCaliforniaȱ xUpdatedȱEmergencyȱOperationsȱCenterȱtoȱincludeȱstateȬofȬtheȬartȱAVȱandȱ teleconferencingȱequipmentȱ xWindowsȱ10ȱandȱServerȱ2019ȱupgradesȱcitywide.ȱ ȱ ProjectsȱCompletedȱoutsideȱofȱStrategicȱPlanȱ xTransitionedȱ10ȱconferenceȱroomsȱtoȱ“ZoomȱRooms”ȱprovidingȱtheȱabilityȱtoȱ teleconference.ȱ xInstalledȱ300ȱterabyteȱvideoȱstorageȱsystemȱ 18 xDevelopedȱBidȱManagementȱapplicationȱforȱpublishingȱCityȱRFPsȱandȱprovidingȱ capabilityȱofȱvendorsȱtoȱsubmitȱbidsȱelectronically.ȱȱ xUpgradedȱtheȱCity’sȱrecordȱretentionȱscheduleȱtoȱalignȱwithȱbestȱpracticesȱ xUpgradedȱPermitȱParkingȱapplicationȱwhichȱallowsȱresidentsȱtoȱrenewȱparkingȱ applicationsȱonline.ȱ xUpgradedȱCommunityȱHallȱprojectorȱsystemȱ xImplementedȱaȱQueueȱManagementȱsystemȱtoȱprovideȱaȱmoreȱstreamlinedȱandȱ friendlyȱexperienceȱforȱpermitȱcenterȱcustomers.ȱ ȱ InnovationȱTechnologyȱDataȱVisualizationȱandȱAnalyticsȱ Dataȱvisualizationȱisȱtheȱpresentationȱofȱdataȱinȱaȱpictorialȱorȱgraphicalȱformatȱprovidingȱtoolsȱ toȱbetterȱunderstandȱtheȱdataȱand/orȱidentifyȱpatterns.ȱȱȱCupertinoȱpridesȱitselfȱonȱmakingȱ transparentȱdataȬdrivenȱdecisionsȱ–ȱthisȱisȱoneȱmoreȱtoolȱtoȱassistȱinȱthatȱprocess.ȱȱȱTheȱfollowingȱ dashboardsȱandȱstorymapsȱwereȱaddedȱthisȱyear.ȱȱ ȱ xCapitalȱImprovementȱPlanȱStorymap.ȱȱDefineȱproject,ȱstatusȱandȱlocationȱofȱCIPȱ projects.ȱȱ x311ȱDashboard.ȱȱȱProvidesȱgraphicalȱrepresentationȱofȱ311ȱ(workȱrequest)ȱtickets.ȱȱȱ Howȱmany,ȱstatus,ȱlocationȱandȱtimeȱtoȱrespond.ȱȱ xPavementȱConditionȱIndexȱStorymap.ȱȱȱProvidesȱCitywideȱviewȱofȱtheȱPCIȱvalueȱforȱ Cityȱstreets.ȱȱ xBike/PedȱStorymapȱ–ȱDefineȱproject,ȱstatusȱandȱlocationȱofȱbikeȱandȱpedestrianȱ projectsȱthroughoutȱtheȱCity.ȱ xCivicȱCentralȱ–ȱViewȱpermitsȱgeographicallyȱbyȱstreet,ȱneighborhood,ȱorȱtheȱentireȱ City.ȱȱȱȱResidentsȱcanȱbeȱnotifiedȱofȱnewȱpermitsȱifȱdesired.ȱȱ ȱ InnovationȱTechnologyȱResponseȱtoȱCOVIDȬ19ȱ BusinessȱContinuityȱ(BC)ȱisȱaȱmajorȱandȱnecessaryȱgoalȱforȱallȱorganizations.ȱȱȱTheȱabilityȱtoȱ continueȱbusinessȱoperationȱduringȱandȱafterȱaȱnaturalȱorȱpersonȬmadeȱdisruptionȱisȱaȱtrueȱtestȱ ofȱanȱorganization’sȱBC.ȱȱȱȱCOVIDȬ19ȱprovidedȱsuchȱaȱtestȱ–ȱandȱIT’sȱresponseȱwasȱexemplary.ȱȱȱȱȱ WithinȱaȱdayȱofȱtheȱShelterȬinȬPlaceȱorder,ȱ95%ȱofȱallȱcomputerȬbasedȱstaffȱwereȱableȱtoȱ teleworkȱasȱifȱtheyȱwereȱinȱtheȱoffice.ȱȱȱStaffȱhadȱtheȱequipmentȱ(laptopȱ&ȱsoftphone),ȱ applications,ȱcollaborationȱtools,ȱandȱnecessaryȱcybersecurityȱmeasuresȱtoȱseamlesslyȱ&ȱsecurelyȱ continueȱtheirȱdailyȱwork.ȱȱȱȱȱCupertinoȱleadȱtheȱwayȱinȱprovidingȱaȱsecure,ȱyetȱeasyȱtoȱuseȱ teleconferencingȱsolutionȱforȱCouncil,ȱCommissionȱandȱCommitteeȱmeetings.ȱȱȱAdditionally,ȱITȱ providedȱaȱquickȱturnaroundȱforȱCOVIDȬ19ȱrelatedȱapplicationsȱsuchȱas:ȱCOVIDȬ19ȱupdateȱ page,ȱWhatȱBusinessesȱareȱOpenȱwebȱpage,ȱHRȱInformationȱPage,ȱanȱelectronicȱbidȱsubmission,ȱ andȱelectronicȱsignaturesȱonȱcitywideȱcontractsȱtoȱnameȱaȱfew.ȱȱȱ ȱ 19 VERBSȱGrantȱAwardȱ TheȱMcClellanȱRoadȱSeparatedȱBikewayȱprojectȱwasȱawardedȱtheȱVehicleȱEmissionsȱReductionsȱ BasedȱatȱSchoolsȱ(VERBS)ȱAwardȱforȱ$1MȱfromȱtheȱMetropolitanȱTransportationȱCommission.ȱȱ ȱ McClellanȱRoadȱSeparatedȱBikeȱLaneȱPhaseȱ1ȱ TheȱCapitalȱImprovementȱProgramȱmostȱnotablyȱcompletedȱtheȱfirstȱphaseȱofȱtheȱMcClellanȱ RoadȱBikeȱCorridorȱfromȱStellingȱRoadȱtoȱImperialȱAvenue,ȱwhichȱisȱpartȱofȱtheȱ2016ȱBicycleȱ TransportationȱPlanȱtoȱenhanceȱandȱpromoteȱsaferȱbicycleȱtransportationȱinȱtheȱCity.ȱȱ ȱ SidewalkȱImprovementsȱ–ȱByrneȱAvenueȱȱ TheȱCapitalȱImprovementȱProgramȱalsoȱcompletedȱstandardȱrightȬofȬwayȱimprovementsȱonȱ ByrneȱAvenueȱfromȱMcClellanȱRoadȱtoȱGranadaȱAvenue,ȱincludingȱsidewalks,ȱcurbȱandȱgutterȱ andȱrelocatedȱutilityȱpoles.ȱAddingȱsidewalksȱwillȱimproveȱpedestrianȱsafetyȱinȱtheȱMontaȱVistaȱ TriȬschoolȱarea.ȱȱ ȱ McClellanȱRanchȱWestȱParkingȱLotȱImprovementȱ Thisȱ projectȱ formalizedȱ theȱ existingȱ useȱ ofȱ theȱ siteȱ locatedȱ atȱ 22241ȱ McClellanȱ Road.ȱ Thisȱ newȱ “green”,ȱ meadowȬstyleȱ parkingȱ lotȱ hasȱ aȱ permeableȱ concreteȱ pavingȱ andȱ appropriateȱ landscaping.ȱȱ Theȱ parkingȱ lotȱ andȱ landscapingȱ hasȱ beenȱ designedȱ toȱ beȱ compatibleȱ withȱ andȱ sensitiveȱtoȱtheȱcreekȱenvironmentȱinȱorderȱtoȱhaveȱminimalȱimpactȱtoȱtheȱsite.ȱȱ ȱ SeniorȱCenterȱADAȱSidewalkȱ TheȱCapitalȱImprovementȱProgramȱalsoȱcompletedȱconstructionȱofȱanȱADAȱcompliantȱsidewalkȱ adjacentȱtoȱtheȱSeniorȱCenterȱparkingȱlot.ȱȱTheȱnewȱsidewalkȱprovidesȱaȱsafeȱpedestrianȱpathȱofȱ travelȱconnectingȱtheȱpermitȱparkingȱareasȱtoȱtheȱSeniorȱCenterȱcomplex.ȱ ȱ StreetlightȱInstallationȱ–ȱRandyȱLaneȱ&ȱLarryȱWayȱȱ TheȱCapitalȱImprovementȱProgramȱcompletedȱtheȱinstallationȱofȱLEDȱstreetlightsȱonȱRandyȱ LaneȱbetweenȱMerrittȱDriveȱandȱLucilleȱAvenueȱ&ȱLarryȱWayȱbetweenȱMerrittȱDriveȱandȱ LucilleȱAvenueȱ ȱ Projectsȱthatȱhaveȱmetȱsignificantȱprogressȱmilestonesȱincludeȱ xMcClellanȱRoadȱBikewayȱPhaseȱ2ȱ(StellingȱRdȱtoȱTorreȱAve)ȬȱdesignȱComplete;ȱ xRegnartȱCreekȱTrailȱ–ȱDesignȱandȱEnvironmentalȱClearanceȱcompletedȱ xBlackberryȱFarmȱEntranceȱRoadȱFeasibilityȱStudyȱȬȱStudyȱCompleteȱ xStevensȱCreekȱBlvdȱClȱIVȱBikewayȱPhaseȱ1ȱ–ȱDesignȱCompleteȱ xCivicȱCenterȱParkingȱAnalysisȱ–ȱStudyȱCompleteȱ ȱ ȱȱ 20 ViaȱCommunityȱShuttleȱLaunchȱ PublicȱWorksȱTransportationȱstaffȱwasȱintegralȱinȱlaunchingȱVia,ȱanȱonȬdemandȱmicroȱtransitȱ systemȱtoȱallȱofȱCupertinoȱandȱbeyond,ȱconnectingȱtheȱCityȱtoȱregionalȱrailȱserviceȱforȱtheȱfirstȱ timeȱever.ȱTheȱprogramȱincludesȱdiscountedȱfaresȱforȱlowȬincomeȱriders,ȱseniors,ȱandȱDeȱAnzaȱ Collegeȱstudents.ȱ ȱ ArborȱDayȱFoundationȱTreeȱCityȱUSAȱdesignationȱandȱGrowthȱAwardȱ TheȱArborȱDayȱFoundationȱnamedȱtheȱCityȱofȱCupertinoȱ“TreeȱCityȱUSA”ȱforȱtheȱeighthȱ consecutiveȱyearȱandȱwasȱawardedȱtheȱ“GrowthȱAward”ȱforȱtheȱsixthȱtime.ȱTreeȱCityȱUSAȱ distinctionȱactivitiesȱincludeȱtwoȱpublicȱplantingȱevents,ȱ188ȱnewȱtreesȱplanted,ȱ3387ȱtreesȱ prunedȱandȱcommunityȱoutreachȱeffortsȱaboutȱtheȱimportanceȱofȱaȱhealthyȱUrbanȱForest.ȱ GrowthȱAwardȱactivitiesȱincludeȱenhancingȱtheȱassetȱmanagementȱsystemȱwithȱtreeȱInventoryȱ andȱongoingȱeffortsȱofȱpublicȱeducationȱ/ȱpublicȱrelations.ȱ ȱ CleanȱWaterȱ&ȱStormȱProtectionȱFeeȱ PublicȱWorksȱEnvironmentalȱProgramȱstaffȱconductedȱextensiveȱcommunityȱoutreach,ȱ education,ȱandȱpublicȱhearingsȱresultingȱinȱsuccessfullyȱpassingȱtheȱballotȱinitiativeȱtoȱupdateȱ Cupertino’sȱCleanȱWaterȱandȱStormȱProtectionȱFeesȱforȱtheȱfirstȱtimeȱsinceȱ1992.ȱTheseȱfeesȱwillȱ helpȱprotectȱstormwaterȱinfrastructure,ȱlocalȱcreeks,ȱregionalȱwetlands,ȱtheȱSanȱFranciscoȱBayȱ andȱocean.ȱȱ ȱȱȱ ȱȱ 21 ȱ NEWȱINITIATIVESȱFORȱFISCALȱYEARȱ2020Ȭ21ȱ ȱ BlackberryȱFarmȱGolfȱCourseȱ DetermineȱshortȬtermȱandȱlongȬtermȱimprovementsȱtoȱtheȱgolfȱcourseȱandȱamenities.ȱToȱbeȱ completedȱbyȱtheȱSpringȱofȱ2021.ȱ ȱ DogȱOffȱLeashȱAreasȱ Identifyȱadditionalȱareasȱsuitableȱforȱpermittingȱdogsȱtoȱbeȱoffȱleashȱandȱestablishȱoneȱsuchȱarea,ȱ ifȱtheȱcurrentȱtrialȱperiodȱisȱsuccessful.ȱTheȱParksȱandȱRecreationȱCommissionȱwillȱevaluateȱtheȱ DOLAȱatȱJollymanȱParkȱafterȱtheȱtrialȱperiodȱconcludesȱinȱJulyȱ2020ȱbeforeȱconsideringȱ additionalȱsitesȱinȱtheȱcommunity.ȱToȱbeȱcompletedȱbyȱSpringȱofȱ2021.ȱ ȱ Pilotȱ–ȱSensorȱTechnologyȱbasedȱonȱIOTȱ(InternetȱofȱThings)ȱ Sevenȱprojectsȱfallȱunderȱthisȱclassification:ȱȱAdaptiveȱtrafficȱsignaling,ȱmultiȬmodalȱtrafficȱ count,ȱnoiseȱmeasurement,ȱpollutionȱmonitoring,ȱtrashȱcollectionȱandȱwaterȱscheduling.ȱȱȱȱAllȱ projectsȱareȱpartȱofȱtheȱCityȱCouncilȱWorkȱProgram.ȱȱȱȱTheȱgoalȱisȱtoȱextendȱtheȱCity’sȱnetworkȱ andȱdatabaseȱstructureȱtoȱincludeȱIOTȱbasedȱsensorsȱtoȱdetermineȱtheȱcost/benefitȱandȱ practicalityȱofȱutilizingȱthisȱtechnologyȱtoȱprovideȱenhancedȱserviceȱandȱdataȱthatȱwillȱdriveȱ futureȱbusinessȱdecisions.ȱȱȱȱȱ ȱ ESRIȱIOTȱforȱAnalyticsȱisȱaȱcloudȬbasedȱsolutionȱthatȱwillȱbeȱimplementedȱforȱtheȱCityȱtoȱingest,ȱ visualize,ȱandȱanalyzeȱspatialȱbigȱdataȱrealȬtimeȱtoȱgainȱinsightsȱthatȱallowȱforȱanalysisȱandȱdataȱ drivenȱaction.ȱThisȱapplicationȱwillȱallowȱtheȱCityȱtoȱcategorizeȱandȱmakeȱsenseȱofȱtheȱdataȱ generatedȱfromȱtheȱaboveȱmentionedȱIOTȱsensors.ȱ ȱ ProjectDoxȱExpansionȱandȱUpgradeȱ ProjectDoxȱisȱanȱonȬpremiseȱapplicationȱthatȱprovidesȱforȱelectronicȱplanȱsubmissionȱandȱ review.ȱȱProjectDoxȱisȱintegratedȱwithȱtheȱCity’sȱlandȱmanagementȱsystem,ȱAccela.ȱȱȱTheseȱtwoȱ applicationsȱhaveȱbroughtȱsignificantȱimprovementsȱ(forȱbothȱstaffȱandȱcustomers)ȱinȱtheȱwayȱ permitsȱareȱprocessedȱbyȱtheȱBuildingȱDivision.ȱȱȱȱTheȱgoalȱofȱthisȱrequestȱisȱtoȱextendȱtheseȱ improvementsȱtoȱtheȱPlanningȱDivisionȱandȱPublicȱWorksȱEngineering.ȱȱȱȱAdditionally,ȱ ProjectDoxȱwillȱbeȱmigratedȱtoȱaȱcloudȬbasedȱapplicationȱallowingȱforȱenhancedȱbusinessȱ continuityȱandȱdisasterȱrecovery.ȱȱ ȱ ȱȱ 22 AIȱCybersecurityȱToolsȱ ThisȱpastȱyearȱhasȱseenȱmultipleȱmunicipalitiesȱfallȱvictimȱtoȱRansomwareȱattacks.ȱȱȱTheȱ remediationȱofȱtheseȱattacksȱhasȱcostȱmillionsȱofȱdollarsȱonȱtopȱofȱtheȱextendedȱdownȱtimeȱforȱ crucialȱCityȱservices.ȱȱȱThisȱprojectȱwillȱaddȱartificialȱintelligenceȱ(AI)ȱtoȱtheȱCity’sȱcybersecurityȱ defenses.ȱȱȱȱȱWhileȱAIȱwillȱnotȱstopȱanȱattackȱ–ȱitȱcanȱquicklyȱisolateȱtheȱimpactedȱfilesȱandȱ mitigateȱtheȱspreadȱofȱRansomware.ȱȱȱȱAsȱhackersȱcontinueȱtoȱimproveȱtheirȱattackȱprofileȱ–ȱsoȱ mustȱCupertinoȱimproveȱitsȱdefenses.ȱ ȱ ReviewȱofȱCity’sȱHousingȱandȱHumanȱservicesȱgrantȱfundsȱ Reviewȱ existingȱ grantȱ fundsȱ toȱ determineȱ allowableȱ usesȱ forȱ emergencyȱ financialȱ assistanceȱ programs.ȱȱ Considerȱ increasingȱ Belowȱ Marketȱ Rateȱ Affordableȱ Housingȱ Fundȱ Publicȱ Serviceȱ allocation.ȱ ȱ HousingȱStrategiesȱ Exploreȱ theȱ developmentȱ ofȱ strategiesȱ thatȱ providesȱ aȱ varietyȱ ofȱ productsȱ acrossȱ theȱ affordabilityȱ levelsȱ includingȱ housingȱ forȱ theȱ developmentallyȱ disabled,ȱ asȱ wellȱ asȱ thoseȱ withȱ moderate,ȱlow,ȱveryȱlow,ȱandȱextremelyȱlowȱincome.ȱȱ*ContinuedȱfromȱFYȱ19Ȭ20ȱworkȱprogram.ȱ ȱ HeartȱofȱtheȱCityȱ Amendȱ theȱ Heartȱ ofȱ theȱ Cityȱ Specificȱ Plan:ȱ 1)ȱ Forȱ clarificationsȱ toȱ theȱ minimumȱ streetȱ sideȱ setbackȱ requirements.ȱ 2)ȱ Toȱ reviewȱ streetȱ treeȱ requirementsȱ toȱ allowȱ largerȱ trees,ȱ increaseȱ diversityȱ ofȱ treeȱ typeȱ andȱ encourageȱ droughtȬtolerantȱ andȱ nativeȱ treeȱ types.ȱ 3)ȱ Updateȱ sectionsȱ suchȱ asȱ transitȱ corridorsȱ inȱ theȱ City.ȱ 4)ȱ Maintainȱexistingȱ setbacksȱ andȱ considerȱ minimumȱ retailȱ percentageȱtoȱmaintainȱaȱcommercialȱstrip.ȱ5)ȱMinimumȱretailȱspace.ȱ ȱ VallcoȱSpecificȱPlanȱ CreateȱaȱcommunityȬbasedȱvisionȱandȱobjectiveȱstandardsȱforȱdevelopmentȱatȱVallco.ȱ ȱ TrafficȱCongestionȱMapȱandȱIdentifyȱSolutionsȱ Indentifyȱ trafficȱ congestionȱ areasȱ inȱ aȱ heatȱ map.ȱ Identify,ȱ implementȱ andȱ measureȱ effectivenessȱ ofȱdataȱdrivenȱsolutionsȱtoȱimproveȱtrafficȱflowȱinȱmostȱcongestedȱareas.ȱ ȱ SingleȬUseȱPlasticsȱOrdinanceȱ SingleȬuseȱplastics,ȱespeciallyȱthoseȱusedȱasȱfoodwareȱ(plasticȱutensils,ȱfoodȱpackaging,ȱstraws,ȱ coffeeȱstirrers,ȱlidsȱforȱcoffeeȱcups,ȱspillȬpreventionȱplugsȱtoȱgoȱintoȱthoseȱlids,ȱetc.)ȱareȱnotȱ recyclableȱandȱcreateȱsignificantȱamountsȱofȱwasteȱthatȱendȱupȱinȱlandfillsȱandȱasȱlitteredȱitemsȱ thatȱreachȱandȱharmȱtheȱmarineȱenvironment.ȱȱJurisdictionsȱinȱtheȱBayȱAreaȱareȱbeginningȱtoȱ considerȱandȱimplementȱordinancesȱthatȱaimȱtoȱreduceȱsingleȬuseȱfoodwareȱwhereȱpossible.ȱ ThisȱalignsȱwithȱCupertino’sȱZeroȱWasteȱPolicyȱ(adoptedȱinȱDecemberȱ2017)ȱwhichȱspecifiesȱaȱ 23 goalȱtoȱ“Reduceȱtheȱproliferationȱofȱunnecessaryȱplasticȱreusableȱfoodȱserviceȱwareȱandȱ packagingȱinȱdailyȱcommerce,ȱtoȱtheȱextentȱpracticable.”ȱEnvironmentalȱProgramsȱstaffȱ participateȱonȱCountyȱandȱwiderȱBayȱAreaȱworkȱgroupsȱdevelopingȱmodelȱordinanceȱlanguageȱ whichȱincludesȱenablingȱreȬusableȱfoodwareȱbusinessȱmodelsȱthatȱallowȱforȱuse,ȱsterilization,ȱ andȱreȬuseȱofȱtoȬgoȱfoodware.ȱȱȱ ȱ ClimateȱActionȱandȱAdaptationȱPlanȱupdatesȱ TheȱCupertinoȱClimateȱActionȱPlanȱwasȱcreatedȱnearlyȱtenȱyearsȱagoȱandȱhasȱguidedȱtheȱCityȱtoȱ aȱsuccessfulȱreductionȱofȱcarbonȱemissions,ȱevenȱwhileȱtheȱCityȱhasȱexperiencedȱstellarȱ economicȱgrowth.ȱSinceȱadoptingȱtheȱCAP,ȱtheȱStateȱofȱCaliforniaȱhasȱevolvedȱtheȱguidelinesȱtoȱ addressȱnotȱonlyȱcarbonȱemissions,ȱbutȱalsoȱadaptationȱtoȱchangingȱclimateȱrisksȱlikeȱwildfiresȱ andȱdroughts.ȱTheȱSustainabilityȱCommissionȱandȱCityȱStaffȱareȱplanningȱanȱupdateȱofȱtheȱCAPȱ toȱalignȱwithȱnewȱscienceȬbasedȱtargetsȱforȱcarbonȱemissionsȱandȱresilientȱinfrastructure.ȱThisȱ budgetȱincludesȱfundingȱtoȱsupportȱthisȱupdateȱtoȱtheȱPlan.ȱAnȱupdateȱtoȱtheȱCAPȱwouldȱ includeȱpublicȱoutreachȱactivitiesȱandȱtechnicalȱanalysisȱofȱtheȱbestȱoptionsȱtoȱsupportȱ Cupertino’sȱresilientȱandȱclimateȬfriendlyȱgrowth.ȱTheȱEarthȱDayȱvolunteerȱnetworkȱandȱallȱ interestedȱresidentsȱareȱencouragedȱtoȱbeginȱconversationsȱaboutȱwhatȱCupertino’sȱ sustainabilityȱstrategyȱshouldȱbeȱforȱtheȱnextȱ10ȱyears.ȱȱ ȱ ReduceȱSecondhandȱSmokeȱExposureȱ Reviseȱandȱdevelopȱpoliciesȱtoȱreduceȱexposureȱtoȱsecondhandȱsmoke.ȱPotentialȱoptionsȱincludeȱ smokeȬfreeȱmultiȬunitȱhousing,ȱsmokeȬfreeȱserviceȱareas,ȱandȱsmokeȬfreeȱpublicȱevents.ȱ ȱ ȱ ȱ 24 Proposed Budget Overview TheȱProposedȱBudgetȱreflectsȱaȱtotalȱCityȱbudgetȱofȱ$113.8ȱmillion,ȱaȱdecreaseȱofȱ$36.7ȱmillionȱorȱ 24.4%ȱ whenȱcomparedȱ toȱ theȱ FYȱ 2020ȱ Adoptedȱ Budget.ȱ TheȱCity’sȱ Generalȱ Fundȱ isȱ proposedȱ atȱ $82.3ȱ million,ȱ representingȱ aȱ $2.2ȱ million,ȱ orȱ 2.7%ȱ increaseȱ overȱ theȱ FYȱ 2020ȱ Adoptedȱ Budget.ȱȱ Theȱ Generalȱ Fundȱ isȱ fundedȱ throughȱ theȱ useȱ ofȱ Generalȱ Fundȱ revenueȱ ofȱ $79.5ȱ million,ȱ $2.8ȱ millionȱ ofȱ unassignedȱ fundȱ balance,ȱ andȱ isȱ projectedȱ toȱ endȱ FYȱ 2021ȱ withȱ approximatelyȱ $14.7ȱ millionȱ inȱ unassignedȱ fundȱ balanceȱ thatȱ mayȱ beȱ transferredȱ toȱ theȱ Capitalȱ Reserveȱ perȱ theȱ Reserveȱ andȱ Oneȱ Timeȱ Useȱ Policyȱ asȱ partȱ ofȱ theȱ City’sȱ FY20Ȭ21ȱ MidȬYearȱ Financialȱ ReportȱȱTheȱ transferȱisȱnotȱreflectedȱinȱtheȱProposedȱBudget.ȱȱ ȱ ȱ ȱ Asȱshownȱinȱtheȱchartȱbelow,ȱtheȱProposedȱBudget’sȱlargestȱfundȱisȱtheȱGeneralȱfundȱatȱ72%.ȱ ȱ ȱ ȱ ȱ FundȱType TotalȱProposedȱ Expenditures TotalȱProposedȱ Revenue Changeȱ in ȱFundȱ Balance/Netȱ Position General ȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱ82,287,295ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱ79,450,892ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ(2,836,403) SpecialȱRevenueȱ ȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱ10,573,245ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱ11,926,643ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ1,353,398ȱ DebtȱService ȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ3,169,138ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ3,169,138ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȬȱȱȱ CapitalȱProjects ȱ ȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ343,274ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȬȱȱȱ ȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ(343,274) Enterprise ȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ9,016,263ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ8,631,042ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ(385,221) InternalȱService ȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ8,396,030ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱȱ5,245,334ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ(3,150,696) Total ȱ $ȱȱȱȱȱȱȱȱȱȱȱ113,785,245ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱ108,423,049ȱȱ$ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ(5,362,196) 25 TheȱgraphȱbelowȱsummarizesȱtheȱchangesȱinȱtheȱCity’sȱGeneralȱFundȱforȱaȱfiveȬyearȱperiod:ȱ ȱ ȱ ȱ Aȱ totalȱ ofȱ 202.75ȱ positionsȱ areȱ proposedȱ inȱ FYȱ 2020Ȭ21.ȱȱPriorȱ toȱ COVIDȬ19,ȱ theȱ Cityȱ wasȱ anticipatingȱ bringingȱ aȱ numberȱ ofȱ newȱ positionȱ requestsȱ toȱ Cityȱ Councilȱ overȱ aȱ threeȬyearȱ period;ȱ however,ȱ givenȱ theȱ levelȱ ofȱ fiscalȱ uncertaintyȱ surroundingȱ COVIDȬ19,ȱ theȱ Cityȱ hasȱ removedȱ allȱ positionȱrequestsȱinȱFYȱ2020Ȭ21.ȱȱAsȱ theȱ COVIDȬ19ȱ situationȱ evolves,ȱ Cityȱ staffȱ willȱ bringȱ forwardȱ requestsȱ forȱ Cityȱ Councilȱ approvalȱ asȱ moreȱ informationȱ becomesȱ availableȱ forȱ purposesȱofȱmakingȱinformedȱdecisions.ȱȱ ȱ ȱ ȱ Inȱ theȱ past,ȱ staffȱ recommendedȱ addingȱ positionsȱ onlyȱ onȱ aȱ limitedȱ termȱ basisȱ unlessȱ staffȱ wasȱ confidentȱ thatȱ theȱ neededȱ levelȱ ofȱ serviceȱ wouldȱ beȱ permanent,ȱ orȱ ongoingȱ revenuesȱ couldȱ supportȱ theȱ positionȱ longȱ term,ȱ orȱ staffȱ couldȱ notȱ recruitȱ and/orȱ retainȱ theȱ staffȱ resourceȱ onȱ aȱ FYȱ2019Ȭ20ȱAdoptedȱBudget 202.75 MaintenanceȱWorkerȱI/II 1.00 FYȱ2020Ȭ21ȱProposedȱBudget None 0.00 FYȱ2020Ȭ21ȱBenefittedȱPositions 203.75 26 limitedȱtermȱbasis.ȱȱTheȱCityȱcurrentlyȱhasȱfiveȱ(5)ȱlimitedȬtermȱpositionsȱareȱstaffȱareȱrequestingȱ thatȱtheyȱbeȱconvertedȱtoȱaȱpermanentȱbasis.ȱȱȱ ȱ ȱ ȱ ChangesȱtoȱtheȱBudgetȱandȱPoliciesȱȱ CityȱstaffȱperformedȱaȱzeroȬbaseȱbudgetȱforȱtheȱFYȱ2020ȱbudgetȱdocumentȱinȱwhichȱallȱexpensesȱ wereȱjustifiedȱandȱeveryȱfunctionȱwithinȱtheȱCityȱwasȱanalyzedȱforȱitsȱneedsȱandȱcosts.ȱȱTheȱCityȱ hadȱplannedȱtoȱ convertȱtoȱaȱbiennialȱbudgetȱprocess;ȱ however,ȱ givenȱ theȱtimingȱandȱ constraintsȱ ofȱ COVIDȬ19,ȱ theȱ Cityȱ willȱ beȱ deferringȱ theȱ conversionȱ untilȱ nextȱ fiscalȱ year.ȱ Belowȱ areȱ aȱ fewȱ highlightsȱfromȱtheȱbudgetȱandȱprocess:ȱ ȱ RevisedȱFeesȱandȱCostȱAllocationȱPlanȱ(CAP)ȱ Whileȱ theȱ Costȱ Allocationȱ Planȱ remainedȱ relativelyȱ consistentȱ overȱ theȱ previousȱ fiscalȱ year,ȱ aȱ changeȱ inȱ methodologyȱ wasȱ implementedȱ inȱ theȱ FYȱ 2020Ȭ21ȱ model.ȱȱCostsȱ attributableȱ toȱ groundsȱandȱfacilities,ȱspecificallyȱandȱonlyȱrelatedȱtoȱtheȱCity’sȱCivicȱCenter,ȱareȱbeingȱchargedȱ outȱforȱmoreȱequitableȱandȱreasonableȱcostȱsharingȱamongȱserviceȱprovidersȱinȱtheȱCity.ȱȱ ȱ Additionally,ȱ Cityȱ Councilȱ approvedȱ theȱ feeȱ schedulesȱ effectiveȱ forȱ FYȱ 2020Ȭ21ȱ onȱ Aprilȱ 21,ȱ 2020.ȱȱDueȱ toȱ impactsȱ relatedȱ toȱ COVIDȬ19,ȱ andȱ theȱ City’sȱ intentȱ toȱ provideȱ financialȱ reliefȱ duringȱ thisȱ timeȱ ofȱ greatȱ uncertainty,ȱ theȱ increasesȱ toȱ theȱ City’sȱ feesȱ wereȱ delayedȱ andȱ willȱ notȱ becomeȱeffectiveȱuntilȱ Octoberȱ 1,ȱ2020.ȱȱTheȱ increasesȱ toȱ theȱvariousȱ feeȱschedulesȱ areȱ estimatedȱ toȱ resultȱ inȱ increasedȱ revenuesȱ ofȱ approximatelyȱ $900,000ȱ overȱ theȱ previousȱ fiscalȱ year;ȱ however,ȱ theȱ timingȱ ofȱ servicesȱ toȱ beȱ providedȱ andȱ revenuesȱ toȱ beȱ collectedȱ mayȱ beȱ impactedȱ byȱCOVIDȬ19ȱthroughoutȱfiscalȱyearȱ2020Ȭ21.ȱ ȱ InvestmentȱPolicyȱ Theȱ Cityȱ Councilȱ annuallyȱ updatesȱ andȱ adoptsȱ aȱ Cityȱ Investmentȱ Policyȱ thatȱ isȱ inȱ complianceȱ withȱStateȱstatutesȱonȱallowableȱinvestments.ȱByȱpolicy,ȱtheȱAuditȱCommitteeȱreviewsȱtheȱpolicyȱ andȱ actsȱ asȱ anȱ oversightȱ committeeȱ onȱ investments.ȱ Theȱ policyȱ directsȱ thatȱ anȱ externalȱ auditorȱ performȱagreedȬuponȱproceduresȱtoȱreviewȱCityȱcomplianceȱwithȱtheȱpolicy.ȱTheȱfullȱpolicyȱwillȱ beȱavailableȱonȱtheȱCityȱwebsiteȱasȱpartȱofȱtheȱMayȱ19,ȱ2020ȱCityȱCouncilȱagendaȱpacket.ȱ ȱ GANNȱAppropriationsȱLimitȱ Forȱ FYȱ 2021,ȱ theȱ City’sȱ estimatedȱ appropriationsȱ ofȱ proceedsȱ fromȱ taxes,ȱ lessȱ statutoryȱ exclusions,ȱ areȱ unchangedȱ asȱ ofȱ theȱ Proposedȱ Budget.ȱȱDataȱ neededȱ toȱ calculateȱ theȱ FYȱ 2021ȱ Department Position AdministrativeȱServices SeniorȱManagementȱAnalyst Public ȱWorks SeniorȱTransportationȱPlanner Public ȱWorks AssistantȱCivilȱEngineer Public ȱWorks Public ȱWorksȱProjectȱManager Parksȱ&ȱRecreation RecreationȱCoordinator LimitedȬTermȱConversions 27 appropriationsȱlimitȱwillȱnotȱbeȱavailableȱuntilȱmidȬMay.ȱȱȱIfȱaȱcityȱexceedsȱtheȱlegalȱlimit,ȱexcessȱ taxȱ revenueȱ mustȱ beȱ returnedȱ toȱ theȱ Stateȱ orȱ citizensȱ throughȱ aȱ processȱ ofȱ refunds,ȱ rebates,ȱ orȱ otherȱ meansȱ thatȱ mayȱ beȱ determinedȱ atȱ thatȱ time.ȱȱTheȱ appropriationsȱ limitȱ isȱ notȱ expectedȱ toȱ presentȱ aȱ constraintȱ onȱ currentȱ orȱ futureȱ budgetȱ deliberations.ȱȱThisȱ reflectsȱ theȱ priorȱ yearȱ limitȱ andȱ willȱ notȱ beȱ updatedȱ untilȱ theȱ Adoptedȱ Budgetȱ whenȱ theȱ informationȱ requiredȱ forȱ thisȱ calculationȱisȱavailable.ȱ ȱ RevisedȱCommunityȱFundingȱPolicyȱ Theȱ firstȱ Communityȱ Fundingȱ policyȱ wasȱ adoptedȱ byȱ Cityȱ Councilȱ inȱ FYȱ 2012Ȭ13,ȱ andȱ theȱ mostȱ recentȱ policyȱ wasȱ adoptedȱ asȱ partȱ ofȱ theȱ FYȱ 2015Ȭ16ȱ Adoptedȱ Budget.ȱȱAtȱ theȱ Budgetȱ Adoptionȱ hearingȱinȱJuneȱ2018,ȱCityȱCouncilȱrequestedȱthatȱtheȱCommunityȱFundingȱProgramȱbeȱupdatedȱ inȱ orderȱ toȱ assureȱ thatȱ allȱ applicationsȱ receivedȱ dueȱ considerationȱ andȱ thatȱ Cityȱ Councilȱ isȱ providedȱwithȱallȱinformationȱnecessaryȱtoȱmakeȱfinalȱfundingȱdecisions.ȱȱȱAtȱthatȱmeeting,ȱCityȱ Councilȱ requestedȱ thatȱ theȱ Parksȱ andȱ Recreationȱ Commissionȱ evaluateȱ allȱ grantȱ applications,ȱ andȱ provideȱ fundingȱ recommendationsȱ toȱ Councilȱ forȱ consideration.ȱȱAnȱ updatedȱ policyȱ withȱ minimalȱsubstantiveȱchangesȱwasȱapprovedȱbyȱCityȱCouncilȱinȱ2020.ȱȱ ȱ BudgetȱbyȱFundȱ GeneralȱFundȱ Theȱ Generalȱ Fundȱ paysȱ forȱ coreȱ servicesȱ suchȱ asȱ publicȱ safety,ȱ recreationȱ andȱ communityȱ services,ȱ planningȱ andȱ communityȱ development,ȱ streetsȱ andȱ trees,ȱ andȱ aȱ hostȱ ofȱ otherȱ vitalȱ services.ȱ Theȱ revenueȱ usedȱ toȱ payȱ forȱ theseȱ servicesȱ comesȱ primarilyȱ fromȱ localȱ taxesȱ suchȱ asȱ propertyȱ taxȱ andȱ salesȱ tax,ȱ transientȱ occupancyȱ tax,ȱ chargesȱ forȱ service,ȱ andȱ aȱ varietyȱ ofȱ otherȱ discretionaryȱsources.ȱȱ ȱ Generalȱ Fundȱ revenueȱ isȱ estimatedȱ atȱ $79.5ȱ millionȱ inȱ theȱ FYȱ 2021ȱ Proposedȱ Budget.ȱȱThisȱ isȱ anȱ overallȱ decreaseȱ ofȱ $7.6ȱ millionȱ (8.7%)ȱ whenȱ comparedȱ toȱ theȱ FYȱ 2020ȱ Adoptedȱ Budget.ȱ Inȱ recentȱyears,ȱtheȱCityȱhasȱexperiencedȱlocalȱeconomicȱboomȱthatȱhadȱdrivenȱstrongȱgainsȱinȱsalesȱ tax,ȱ propertyȱ tax,ȱ andȱ transientȱ occupancyȱ taxȱ revenues,ȱ whichȱ wereȱ partiallyȱ offsetȱ byȱ decreasesȱ inȱ developmentȬrelatedȱ fees.ȱȱFYȱ 2021ȱ willȱ experienceȱ significantȱ Generalȱ Fundȱ declinesȱinȱsalesȱtaxȱ ($4.7ȱ millionȱorȱ18%)ȱ andȱ transientȱoccupancyȱ taxȱ ($2.1ȱmillionȱ orȱ 22%)ȱdueȱ toȱ COVIDȬ19ȱ impacts.ȱȱPropertyȱ taxȱ isȱ notȱ anticipatedȱ toȱ beȱ affectedȱ byȱ COVIDȬ19ȱ inȱ FYȱ 20Ȭ21ȱ dueȱtoȱtheȱtimingȱofȱassessedȱmarketȱvaluations;ȱhowever,ȱtheȱCityȱanticipatesȱaȱflatteningȱofȱtheȱ propertyȱtaxȱrevenuesȱinȱFYȱ21Ȭ22.ȱȱȱ ȱ InȱanȱeffortȱtoȱmitigateȱtheȱimpactsȱtoȱCOVIDȬ19,ȱtheȱCityȱisȱtakingȱstepsȱtoȱreduceȱexpendituresȱ byȱ increasingȱ vacancyȱ levelsȱ throughȱ attritionȱ (upȱ toȱ $3.2ȱ millionȱ annually),ȱ reducingȱ materialsȱ andȱ contractȱ servicesȱ spendingȱ ($650,000ȱ andȱ $1ȱ million,ȱ respectively),ȱ reducingȱ contingencyȱ amountsȱ byȱ 50%ȱ orȱ $850,000),ȱ andȱ reducingȱ theȱ amountȱ ofȱ specialȱ projectȱ andȱ capitalȱ outlayȱ spendingȱonȱanȱannualȱbasis.ȱȱȱȱ ȱ AlthoughȱitȱisȱdifficultȱtoȱestimateȱtheȱfullȬimpactsȱofȱCOVIDȬ19ȱintoȱtheȱnearȱandȱlongȬterm,ȱtheȱ City’sȱfiscalȱfoundationȱremainsȱstrong.ȱWithȱtheȱGeneralȱFund’sȱEconomicȱUncertaintyȱReserveȱ 28 intactȱ andȱ aȱ healthyȱ unassignedȱ fundȱ balance,ȱ theȱ Cityȱ isȱ poisedȱ toȱ withstandȱ theȱ impactsȱ ofȱ COVIDȬ19ȱintoȱtheȱfuture.ȱȱȱ ȱ Theȱ followingȱ chartȱ showsȱ fourȱ yearsȱ ofȱ totalȱ revenue,ȱ expendituresȱ andȱ changesȱ toȱ fundȱ balanceȱforȱtheȱGeneralȱFund:ȱ ȱ GeneralȱFundȱRevenue,ȱExpendituresȱandȱChangesȱinȱFundȱBalanceȱ ȱ ȱ Theȱ Generalȱ Fundȱ unassignedȱ fundȱ balanceȱ isȱ projectedȱ toȱ decreaseȱ fromȱ theȱ currentȱ yearȱ estimateȱ ofȱ $17.5ȱ millionȱ toȱ $14.7ȱ millionȱ inȱ FYȱ 2021.ȱ Asȱ shownȱ inȱ theȱ chartȱ below,ȱ theȱ FYȱ 2021ȱ endingȱ fundȱ balanceȱ isȱ estimatedȱ toȱ beȱ $50.6ȱ million,ȱ orȱ 5.3%ȱ lowerȱ thanȱ theȱ FYȱ 2020ȱ yearȬendȱ estimate.ȱȱThisȱ isȱprimarilyȱ attributableȱtoȱaȱnotableȱdeclineȱinȱsalesȱtaxȱandȱtransientȱoccupancyȱ taxȱrevenuesȱdueȱtoȱCOVIDȬ19.ȱȱȱ ȱ ȱ Classification FYȱ17Ȭ18ȱ Actual FYȱ18Ȭ19ȱ Actual FYȱ19Ȭ20ȱ Estimated FYȱ20Ȭ21ȱ Proposed Percentȱ Change Unassigned 21,704,922$ȱȱȱ 27,896,128$ȱȱ 17,500,000$ȱ 14,672,597$ȱȱȱȱȱ Ȭ16% AllȱOtherȱClassification 30,805,535ȱȱȱȱȱ 31,026,457ȱȱȱȱ 35,938,546ȱȱȱ 35,929,546ȱȱȱȱȱȱȱ 0% TotalȱFundȱBalance 52,510,457$ȱȱȱ 58,922,585$ȱȱ 53,438,546$ȱ 50,602,143$ȱȱȱȱȱ Ȭ5.3% GENERALȱFUNDȱFUNDȱBALANCE 29 ȱ Asȱ shownȱ inȱ theȱ graphȱ below,ȱ theȱ majorityȱ ofȱ Generalȱ Fundȱ resourcesȱ areȱ usedȱ toȱ supportȱ PublicȱWorksȱ(29%),ȱNonȬDepartmentalȱexpendituresȱ(12%),ȱLawȱEnforcementȱ(18%),ȱParksȱandȱ Recreationȱ(9%),ȱAdministrationȱ(10%),ȱandȱCommunityȱDevelopmentȱandȱPlanningȱ(12%).ȱ ȱ ȱ ȱ SpecialȱRevenueȱFundsȱ Specialȱ Revenueȱ Fundsȱ areȱ aȱ fundȱ typeȱ usedȱ toȱ accountȱ forȱ theȱ proceedsȱ ofȱ specificȱ revenueȱ sourcesȱ thatȱ areȱ legallyȱ restrictedȱ toȱ expendituresȱ forȱ specificȱ purposes.ȱ Specialȱ Revenueȱ Fundsȱ accountȱ forȱ 9%ȱ ofȱ theȱ citywideȱ expenditureȱ budget.ȱ Theȱ largestȱ Specialȱ Revenueȱ Fundȱ accountsȱ forȱ streets,ȱ roads,ȱ andȱ transportation.ȱ Otherȱ fundsȱ accountȱ forȱ stormȱ drainȱ management,ȱ affordableȱ housingȱ programs,ȱ andȱ parkȱ development.ȱ Theȱ Proposedȱ Budgetȱ forȱ Specialȱ Revenueȱ Fundsȱ forȱ FYȱ 2020ȱ isȱ $10.6ȱ million,ȱ whichȱ isȱ anȱ $800,000,ȱ orȱ 8%,ȱ increaseȱ fromȱ FYȱ 2020ȱ Adoptedȱ Budgetȱ primarilyȱ dueȱ toȱ stormȱ drainȱ activities,ȱ previouslyȱ budgetedȱ inȱ theȱ Generalȱ Fund,ȱthatȱwereȱreallocatedȱtoȱtheȱEnvironmentalȱManagementȱSpecialȱRevenueȱFund.ȱȱȱȱ ȱ Budgetsȱ withinȱ theȱ Specialȱ Revenueȱ Fundsȱ areȱ fundedȱ byȱ $8.1ȱ millionȱ inȱ restrictedȱ departmentȱ revenue,ȱ andȱ $3.8ȱ millionȱ inȱ transfers,ȱ bringingȱ totalȱ fundingȱ sourcesȱ forȱ theȱ fundȱ toȱ $11.9ȱ million.ȱ Thisȱ willȱ resultȱ inȱ aȱ projectedȱ increaseȱ toȱ fundȱ balanceȱ ofȱ $1.4ȱ million.ȱ Theȱ Specialȱ RevenueȱFundsȱareȱprojectedȱtoȱendȱtheȱyearȱwithȱfundȱbalancesȱofȱ$24.8ȱmillion.ȱȱ ȱ CapitalȱProjectsȱFundsȱ TheȱCapitalȱImprovementȱProjectȱFund,ȱStevensȱCreekȱCorridorȱParkȱFund,ȱandȱCapitalȱReserveȱ Fundȱ areȱ currentlyȱ inȱ theȱ Capitalȱ Projectsȱ Fundȱ typeȱ category.ȱ Thisȱ fundȱ typeȱ isȱ typicallyȱ usedȱ toȱ accountȱ forȱ financialȱ resourcesȱ thatȱ areȱ usedȱ forȱ theȱ acquisitionȱ orȱ constructionȱ ofȱ majorȱ 30 capitalȱ facilitiesȱ orȱ toȱ provideȱ facilitiesȱ forȱ Cityȱ departments,ȱ andȱ areȱ identifiedȱ inȱ theȱ fiveȬyearȱ CapitalȱImprovementȱProgramȱ(CIP).ȱȱ ȱ Theȱ Proposedȱ Budgetȱ forȱ theȱ Capitalȱ Projectsȱ Fundsȱ forȱ FYȱ 2021ȱ isȱ $343,274.ȱȱTheȱ FYȱ 2021ȱ budgetȱ isȱ $37.6ȱ millionȱ lowerȱ thanȱ FYȱ 2020ȱ Adoptedȱ Budgetȱ appropriationsȱ untilȱ theȱ Capitalȱ ImprovementȱProgramȱbudgetȱisȱincorporatedȱinȱtheȱAdoptedȱBudget.ȱȱ ȱ EnterpriseȱFundsȱȱ Enterpriseȱ Fundsȱ areȱ setȱ upȱ forȱ specificȱ servicesȱ thatȱ areȱ fundedȱ directlyȱ byȱ feesȱ chargedȱ forȱ goodsȱ orȱ services.ȱ Enterpriseȱ Fundsȱ consistȱ ofȱ Resourceȱ Recoveryȱ forȱ theȱ solidȱ wasteȱ collectionȱ franchise,ȱ Blackberryȱ Farmȱ forȱ theȱ CityȬownedȱ golfȱ course,ȱ theȱ Cupertinoȱ Sportsȱ Center,ȱ andȱ RecreationȱProgramsȱforȱcultural,ȱyouth,ȱteen,ȱsports,ȱandȱphysicalȱrecreationȱprograms.ȱȱ ȱ TheȱProposedȱBudgetȱforȱEnterpriseȱFundsȱforȱFYȱ2021ȱisȱ$9.0ȱmillion,ȱaȱdecreaseȱofȱ$2.5ȱmillionȱ fromȱ theȱ FYȱ 2020ȱ Adoptedȱ Budget.ȱ Budgetsȱ withinȱ theȱ Enterpriseȱ Fundsȱ areȱ fundedȱ byȱ $6.1ȱ millionȱinȱ programȱrevenueȱ andȱ$2.5ȱmillionȱinȱtransfersȱfromȱtheȱ GeneralȱFund.ȱTheȱ Enterpriseȱ Fundsȱalsoȱrelyȱonȱ$5.0ȱmillionȱofȱpriorȱyearȱfundȱbalance,ȱbringingȱtotalȱfundingȱsourcesȱforȱtheȱ fundsȱ toȱ $13.6ȱ million.ȱ Theȱ Enterpriseȱ Fundsȱ areȱ projectedȱ toȱ beginȱ theȱ fiscalȱ yearȱ withȱ $5.0ȱ millionȱ inȱ retainedȱ earningsȱ andȱ areȱ projectedȱ toȱ endȱ theȱ yearȱ withȱ retainedȱ earningsȱ ofȱ $4.6ȱ million.ȱȱImpactsȱ toȱ Enterpriseȱ Fundȱ revenuesȱ asȱ aȱ resultȱ ofȱ COVIDȬ19ȱ areȱ significant,ȱ particularlyȱ whileȱ shelterȬinȬplaceȱ ordersȱ remainȱ inȱ effect.ȱȱFYȱ 2020ȱ experiencedȱ sharpȱ declinesȱ inȱ theȱ fourthȱ quarterȱ andȱ asȱ such,ȱ staffȱ areȱ conservativelyȱ budgetingȱ forȱ anticipatedȱ reductionsȱ inȱ overallȱ revenueȱ andȱ expenditures.ȱȱWhileȱ itȱ isȱ difficultȱ toȱ estimateȱ theȱ extentȱ ofȱ shelterȬinȬ placeȱ ordersȱ forȱ FYȱ 2020Ȭ21,ȱ staffȱ willȱ continueȱ toȱ monitorȱ theȱ activitiesȱ andȱ reportȱ toȱ Cityȱ Councilȱonȱaȱregularȱbasis.ȱȱ ȱ InternalȱServiceȱFundsȱ Internalȱ Serviceȱ Fundsȱ areȱ usedȱ forȱ areasȱ whereȱ goodsȱ orȱ servicesȱ areȱ providedȱ toȱ otherȱ Cityȱ departmentsȱ orȱ governmentsȱ onȱ aȱ costȬreimbursementȱ basis.ȱ Internalȱ Serviceȱ Fundsȱ includeȱ fundsȱ andȱ programsȱ forȱ informationȱ technology,ȱ workers’ȱ compensation,ȱ equipment,ȱ compensatedȱabsence,ȱlongȬtermȱdisability,ȱandȱretireeȱmedicalȱinsurance.ȱȱ ȱ TheȱProposedȱ Budgetȱ forȱ theȱ InternalȱServiceȱ Fundsȱisȱ$8.4ȱmillion,ȱ whichȱ isȱ $0.5ȱ millionȱ higherȱ thanȱ theȱ FYȱ 2020ȱ Adoptedȱ Budget.ȱȱBudgetsȱ withinȱ Internalȱ Serviceȱ Fundsȱ areȱ fundedȱ byȱ $4.6ȱ millionȱinȱdepartmentȱrevenue,ȱ$0.7ȱmillionȱinȱtransfersȱfromȱtheȱGeneralȱFund,ȱandȱ$3.2ȱmillionȱ fromȱ aȱ combinationȱ ofȱ depreciationȱ reservesȱ andȱ retainedȱ earnings.ȱ Theȱ Internalȱ Serviceȱ Fundsȱ areȱ projectedȱ toȱ beginȱ theȱ fiscalȱ yearȱ withȱ $6.8ȱ millionȱ inȱ retainedȱ earningsȱ andȱ areȱ projectedȱ toȱ endȱtheȱyearȱwithȱretainedȱearningsȱofȱ$3.7ȱmillion.ȱ ȱ SpecialȱProjectsȱ Theȱ FYȱ 2021ȱ Proposedȱ Budgetȱ includesȱ fundingȱ forȱ severalȱ oneȬtimeȱ Specialȱ Projects.ȱȱTheseȱ projectsȱ areȱ identifiedȱ asȱ partȱ ofȱ theȱ Specialȱ Projectȱ sectionȱ withinȱ eachȱ programȱ andȱ areȱ summarizedȱ inȱ theȱ tableȱ onȱ theȱ nextȱ page.ȱȱThisȱ listȱ excludesȱ oneȬtimeȱ capitalȱ outlaysȱ andȱ ongoingȱpavementȱmanagementȱcosts.ȱ 31 FYȱ2020Ȭ21ȱSpecialȱProjectsȱ ProgramȱBudgetȱ ProjectȱNameȱ Expenditureȱ FundingȱSourceȱ Workȱ Programȱ 120ȱCityȱManagerȇsȱ Officeȱ ReduceȱSecondȱHandȱSmokeȱ Exposureȱ ȱ$ȱȱȱȱȱȱȱȱ27,592ȱȱ GeneralȱFundȱ Yesȱ 122ȱSustainabilityȱ ClimateȱActionȱPlanȱ ȱ$ȱȱȱȱȱȱ212,000ȱȱ GeneralȱFundȱ Yesȱ 300ȱI&TȱAdministrationȱ PilotȱAdaptiveȱTrafficȱSignalingȱ ȱ$ȱȱȱȱȱȱȱȱ65,000ȱȱ InternalȱServiceȱ Fundȱ Yesȱ 300ȱI&TȱAdministrationȱ PilotȱMultiȬmodalȱTrafficȱCountȱ ȱ$ȱȱȱȱȱȱȱȱ40,000ȱȱ InternalȱServiceȱ Fundȱ Yesȱ 300ȱI&TȱAdministrationȱ PilotȱNoiseȱMeasurementȱ ȱ$ȱȱȱȱȱȱȱȱ35,000ȱȱ InternalȱServiceȱ Fundȱ Yesȱ 300ȱI&TȱAdministrationȱ PilotȱPollutionȱMonitoringȱ ȱ$ȱȱȱȱȱȱȱȱ35,000ȱȱ InternalȱServiceȱ Fundȱ Yesȱ 300ȱI&TȱAdministrationȱ PilotȱTrashȱCollectionȱ ȱ$ȱȱȱȱȱȱȱȱ25,000ȱȱ InternalȱServiceȱ Fundȱ Yesȱ 800ȱPWȱAdministrationȱ MunicipalȱWaterȱSystemȱ ȱ$ȱȱȱȱȱȱȱȱ50,000ȱȱ GeneralȱFundȱ Yesȱ 801ȱResourceȱRecoveryȱ SingleȱUseȱPlasticsȱOrdinanceȱ ȱ$ȱȱȱȱȱȱȱȱ30,000ȱȱ Enterpriseȱ Yesȱ 804ȱPlanȱReviewȱ AlternativesȱtoȱNewȱCityȱHallȱ ȱ$ȱȱȱȱȱȱȱȱ25,000ȱȱ GeneralȱFundȱ Yesȱ 845ȱTrafficȱSignalȱ Maintenanceȱ AdaptiveȱTrafficȱSignalingȱandȱ BatteryȱBackupȱ ȱ$ȱȱȱȱȱȱ180,000ȱȱ GeneralȱFundȱ Yesȱ ȱȱ ȱȱTOTALȱCITYȱCOUNCILȱWORKȱ PROGRAMȱ ȱ$ȱȱȱȱȱȱ724,592ȱȱ ȱȱ ȱȱ ȱȱ ȱȱ ȱȱ ȱȱ ȱȱ 122ȱSustainabilityȱ SustainableȱInfrastructureȱAuditȱ ȱ$ȱȱȱȱȱȱȱȱ10,000ȱȱ GeneralȱFundȱ ȱȱ 300ȱI&TȱAdministrationȱ PilotȱWasteȱManagementȱ ȱ$ȱȱȱȱȱȱȱȱ10,000ȱȱ InternalȱServiceȱ Fundȱ ȱȱ 305ȱVideoȱ CommunityȱHallȱPodiumȱ Replacementȱ ȱ$ȱȱȱȱȱȱȱȱ15,000ȱȱ GeneralȱFundȱ ȱȱ 305ȱVideoȱ PortableȱSignalȱGenerator/Analyzerȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ9,000ȱȱ GeneralȱFundȱ ȱȱ 305ȱVideoȱ WirelessȱVideoȱTransmissionȱSystemȱ ȱ$ȱȱȱȱȱȱȱȱ11,500ȱȱ GeneralȱFundȱ ȱȱ 308ȱApplicationsȱ VehicleȱMilesȱTraveledȱ ȱ$ȱȱȱȱȱȱȱȱ25,000ȱȱ GeneralȱFundȱ ȱȱ 310ȱInfrastructureȱ ArtificialȱIntelligenceȱRemediationȱ ȱ$ȱȱȱȱȱȱȱȱ50,000ȱȱ InternalȱServiceȱ Fundȱ ȱȱ 310ȱInfrastructureȱ FacilityȱBatteryȱ ȱ$ȱȱȱȱȱȱȱȱ40,000ȱȱ InternalȱServiceȱ Fundȱ ȱȱ 701ȱCurrentȱPlanningȱ MarinaȱPlazaȱ ȱ$ȱȱȱȱȱȱȱȱ50,000ȱȱ GeneralȱFundȱ ȱȱ 801ȱResourceȱRecoveryȱ TrashȱEnclosureȱSWMPȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ2,500ȱȱ Enterpriseȱ ȱȱ 802ȱNonȬPointȱSourceȱ TrashȱEnclosureȱSWMPȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ2,500ȱȱ SpecialȱRevenueȱ ȱȱ 807ȱServiceȱCenterȱ Administrationȱ CitywideȱOfficeȱReconfigurationȱ ȱ$ȱȱȱȱȱȱȱȱ95,000ȱȱ GeneralȱFundȱ ȱȱ 812ȱSchoolȱSiteȱ Maintenanceȱ IrrigationȱPumpȱforȱHydeȱMiddleȱ Schoolȱ ȱ$ȱȱȱȱȱȱȱȱ85,000ȱȱ GeneralȱFundȱ ȱȱ 812ȱSchoolȱSiteȱ Maintenanceȱ DedicatedȱWaterȱServiceȱatȱCollinsȱ Schoolȱ ȱ$ȱȱȱȱȱȱȱȱ60,000ȱȱ GeneralȱFundȱ ȱȱ 812ȱSchoolȱSiteȱ Maintenanceȱ HydeȱMiddleȱSchoolȱFenceȱRepairsȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ6,600ȱȱ GeneralȱFundȱ ȱȱ 32 813ȱNeighborhoodȱParksȱ MasterȱValveȱandȱFlowȱSensorȱatȱ HooverȱParkȱ ȱ$ȱȱȱȱȱȱȱȱ12,000ȱȱ GeneralȱFundȱ ȱȱ 813ȱNeighborhoodȱParksȱ TotȱLotȱRubberȱResurfacingȱ ȱ$ȱȱȱȱȱȱȱȱ80,000ȱȱ GeneralȱFundȱ ȱȱ 813ȱNeighborhoodȱParksȱ IrrigationȱandȱDomesticȱServiceȱ ȱ$ȱȱȱȱȱȱȱȱ70,000ȱȱ GeneralȱFundȱ ȱȱ 813ȱNeighborhoodȱParksȱ EnvironmentalȱConsultingȱServicesȱ ȱ$ȱȱȱȱȱȱȱȱ14,000ȱȱ GeneralȱFundȱ ȱȱ 820ȱSidewalkȱCurbȱandȱ Gutterȱ AnnualȱSidewalkȱCurbȱandȱGutterȱ ȱ$ȱȱȱ1,500,000ȱȱ Transportationȱ Fundȱ ȱȱ 820ȱSidewalkȱCurbȱandȱ Gutterȱ ConcreteȱMaintenanceȱBacklogȱ ȱ$ȱȱȱȱȱȱ550,000ȱȱ Transportationȱ Fundȱ ȱȱ 820ȱSidewalkȱCurbȱandȱ Gutterȱ AnnualȱSidewalkȱGrindingȱProjectȱ ȱ$ȱȱȱȱȱȱȱȱ80,000ȱȱ Transportationȱ Fundȱ ȱȱ 821ȱStreetȱPavementȱ Maintenanceȱ PavementȱMaintenanceȱ ȱ$ȱȱȱ2,000,000ȱȱ Transportationȱ Fundȱ ȱȱ 822ȱStreetȱSignȱMarkingȱ StanleyȱCutoffȱ&ȱChainȱSawsȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ5,600ȱȱ Transportationȱ Fundȱ ȱȱ 825ȱStreetȱTreeȱ Maintenanceȱ TreesȱandȱBadgesȱ ȱ$ȱȱȱȱȱȱȱȱ15,000ȱȱ GeneralȱFundȱ ȱȱ 829ȱServiceȱCenterȱ Maintenanceȱ StorageȱShedȱReplacementȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ7,000ȱȱ GeneralȱFundȱ ȱȱ 829ȱServiceȱCenterȱ Maintenanceȱ MechanicȱShopȱAsbestosȱRemovalȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ8,000ȱȱ GeneralȱFundȱ ȱȱ 830ȱQuinlanȱCommunityȱ CenterȱMaintenanceȱ RestroomȱPartitionȱReplacementȱ ȱ$ȱȱȱȱȱȱȱȱ10,000ȱȱ GeneralȱFundȱ ȱȱ 830ȱQuinlanȱCommunityȱ CenterȱMaintenanceȱ SecurityȱSystemȱRetrofitȱ ȱ$ȱȱȱȱȱȱȱȱ25,000ȱȱ GeneralȱFundȱ ȱȱ 831ȱSeniorȱCenterȱ Maintenanceȱ DrinkingȱFountainȱReplacementȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ6,000ȱȱ GeneralȱFundȱ ȱȱ 833ȱMontaȱVistaȱ CommunityȱCenterȱ Maintenanceȱ MontaȱVistaȱPartitionȱandȱKeyȱ Replacementȱ ȱ$ȱȱȱȱȱȱȱȱ57,000ȱȱ GeneralȱFundȱ ȱȱ 846ȱSafeȱRoutesȱ2ȱSchoolȱ PedestrianȱEducationȱ ȱ$ȱȱȱȱȱȱȱȱ41,160ȱȱ GeneralȱFundȱ ȱȱ 848ȱStreetȱLightingȱ StreetȱLightȱPoleȱReplacementȱ ȱ$ȱȱȱȱȱȱ161,000ȱȱ GeneralȱFundȱ ȱȱ 848ȱStreetȱLightingȱ DonȱBurnettȱBridgeȱPathwayȱLEDȱ LightȱUpgradeȱ ȱ$ȱȱȱȱȱȱȱȱ47,000ȱȱ GeneralȱFundȱ ȱȱ 848ȱStreetȱLightingȱ LindaȱVistaȱParkȱLEDȱLightȱUpgradeȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ6,000ȱȱ GeneralȱFundȱ ȱȱ 849ȱEquipmentȱ Maintenanceȱ MechanicȱShopȱHoseȱReelsȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ9,000ȱȱ GeneralȱFundȱ ȱȱ 855ȱStormȱDrainȱ Maintenanceȱ ServiceȱCenterȱINDȱInspectionȱ ȱ$ȱȱȱȱȱȱȱȱȱȱ5,000ȱȱ GeneralȱFundȱ ȱȱ 985ȱFixedȱAssetȱ Acquisitionȱ VehicleȱReplacementȱ ȱ$ȱȱȱȱȱȱ959,136ȱȱ GeneralȱFundȱ ȱȱ 986ȱGISȱ IoTȱforȱAnalyticsȱ ȱ$ȱȱȱȱȱȱȱȱ15,000ȱȱ InternalȱServiceȱ Fundȱ ȱȱ ȱȱ TOTALȱNONȬCITYȱCOUNCILȱ WORKȱPROGRAMȱ ȱ$ȱȱȱ6,154,996ȱȱ ȱȱ ȱȱ ȱȱ TOTALȱCITYȱSPECIALȱPROJECTSȱ ȱ$ȱȱȱ6,879,588ȱȱ ȱȱ ȱȱ ȱ ȱ ȱ 33 CurrentȱEconomicȱUpdateȱ NationalȱandȱStateȱEconomicȱConditionsȱȱ Throughȱ theȱ fourthȱ quarterȱ ofȱ 2019,ȱ theȱ U.S.ȱ economyȱ continuedȱ toȱ showȱ steadyȱ growth.ȱ U.S.ȱ Grossȱ Domesticȱ Productȱ (GDP)ȱ increasedȱ byȱ 2.1%ȱ inȱ 2019ȱ accordingȱ toȱ theȱ Bureauȱ ofȱ Economicȱ Analysis,ȱcomparedȱwithȱanȱincreaseȱofȱ2.2%ȱinȱ2018.ȱTheȱincreaseȱinȱrealȱGDPȱinȱ2019ȱprimarilyȱ reflectedȱ positiveȱ contributionsȱ fromȱ personalȱ consumption,ȱ exports,ȱ residentialȱ fixedȱ investment,ȱ federalȱ governmentȱ spending,ȱ andȱ stateȱ andȱ localȱ governmentȱ spendingȱ thatȱ wereȱ partlyȱ offsetȱ byȱ negativeȱ contributionsȱ fromȱ privateȱ inventoryȱ investmentȱ andȱ nonresidentialȱ fixedȱinvestment.ȱȱ ȱ Throughȱ theȱ firstȱ quarterȱ ofȱ 2020,ȱ financialȱ marketsȱ haveȱ experiencedȱ significantȱ turbulence,ȱ drivenȱ byȱaȱhighȱ levelȱ ofȱuncertaintyȱ aboutȱtheȱimpactȱ ofȱ theȱ COVIDȬ19ȱpandemicȱ onȱtheȱglobalȱ economy.ȱȱUSȱTreasuryȱ yieldsȱhaveȱ declined,ȱamidȱaȱ globalȱflightȱ toȱ quality.ȱȱAtȱ theȱ endȱ ofȱ firstȱ quarter,ȱtheȱyieldȱonȱ2ȬyearȱTreasuriesȱwasȱdownȱ132ȱbasisȱpointsȱyearȬtoȬdate,ȱandȱtheȱyieldȱonȱ 10Ȭyearȱ Treasuriesȱ wasȱ downȱ nearlyȱ 125ȱ basisȱ points.ȱȱTheȱ S&Pȱ 500ȱindexȱ declinedȱ 20.0%ȱ inȱtheȱ firstȱ quarterȱ asȱ well.ȱȱThereȱ areȱ stillȱ manyȱ unknownsȱ aboutȱ theȱ coronavirusȱ includingȱ howȱ widespreadȱ itȱ willȱ become,ȱ howȱ longȱ itȱ willȱ takeȱ toȱ containȱ theȱ virus,ȱ andȱ theȱ actualȱ impactȱ onȱ economicȱ activity.ȱȱDuringȱ thisȱ periodȱ ofȱ uncertainty,ȱ staffȱ believeȱ continuedȱ increasesȱ inȱ unemploymentȱ andȱ deepȱ contractionsȱ inȱ overallȱ economicȱ activityȱ willȱ beȱ experienced.ȱ Financialȱ marketsȱ willȱ likelyȱ remainȱ volatileȱ overȱ theȱ nearȱ term,ȱ thoughȱ largeȬscaleȱ globalȱ monetaryȱ andȱ fiscalȱ stimulusȱ programsȱ willȱ assistȱ inȱ mitigatingȱ theȱ longerȬtermȱ impactȱ ofȱ theȱ pandemic.ȱ Theȱ Fedȱ hasȱ takenȱ aȱ wideȱ rangeȱ ofȱ aggressiveȱ actionsȱ toȱ helpȱ stabilizeȱ andȱ provideȱ liquidityȱ toȱ theȱ financialȱ marketsȱ includingȱ theȱ loweringȱ ofȱ theȱ targetȱ rateȱ toȱ taȱ rangeȱ ofȱ 0.0%Ȭ 0.25%.ȱȱFedȱChairȱ PowellȱhasȱindicatedȱthatȱtheȱFedȱwillȱ continueȱtoȱ actȱ “forcefully,ȱ proactively,ȱ andȱaggressively”ȱuntilȱtheȱeconomyȱisȱsolidlyȱonȱaȱroadȱtoȱrecovery.ȱȱ ȱ COVIDȬ19ȱ isȱ havingȱ significantȱ impactsȱ onȱ theȱ nation’sȱ unemployment.ȱ Theȱ U.S.ȱ unemploymentȱ rateȱ stoodȱ atȱ 4.4%ȱ inȱ Marchȱ 2020,ȱupȱfromȱ3.5%ȱinȱtheȱ previousȱ month.ȱ Theȱ participationȱ rateȱ declineȱ toȱ 62.7%ȱ fromȱ 63.4%.ȱȱ Aȱ broaderȱ measureȱ ofȱ unemploymentȱ calledȱ theȱ UȬ6,ȱ whichȱ includesȱ thoseȱ whoȱ areȱ marginallyȱ attachedȱ toȱ theȱ laborȱ forceȱ andȱ employedȱ partȬtimeȱ forȱ economicȱ reasons,ȱ increasedȱ toȱ 8.7%ȱfromȱ7.0%.ȱAlthoughȱtheȱ unemploymentȱ rateȱ hasȱ improvedȱ significantlyȱ fromȱ aȱ highȱ ofȱ 9.6%ȱ inȱ 2010,ȱ economistsȱ believeȱ thatȱ ifȱ weȱ areȱ notȱ currentlyȱ inȱ aȱ recession,ȱ theȱ chancesȱ ofȱ enteringȱ oneȱ thisȱ yearȱ areȱ certain,ȱ thusȱ markingȱtheȱendȱtoȱtheȱnation’sȱlongestȬrunningȱexpansionaryȱperiod.ȱ  Ϭ ϭ Ϯ ϯ ϰ ϱ ϲ DĂƌͲϭϱ DĂƌͲϭϲ DĂƌͲϭϳ DĂƌͲϭϴ DĂƌͲϭϵ DĂƌͲϮϬhŶĞŵƉůŽLJŵĞŶƚZĂƚĞh^hŶĞŵƉůŽLJŵĞŶƚZĂƚĞ 34 ȱ Consumerȱ confidence,ȱ asȱ reflectedȱ byȱ theȱ Conferenceȱ Boardȱ Consumerȱ Confidenceȱ Index,ȱ decreasedȱ overȱ theȱ previousȱ yearȱ andȱ standsȱ atȱ 120.0ȱ asȱ ofȱ Marchȱ 2020,ȱ includingȱ aȱ 12.6ȱ pointȱ decreaseȱ overȱ theȱ previousȱ month.ȱȱTheȱ yearȬoverȬyearȱ decreaseȱ isȱ theȱ resultȱ ofȱ aȱ deteriorationȱ inȱ theȱ shortȬtermȱ outlook.ȱȱTheȱ Presentȱ Situationȱ Indexȱ remainedȱ relativelyȱ strong,ȱ reflectiveȱ ofȱ anȱ economyȱ thatȱ wasȱ onȱ solidȱ footing,ȱ andȱ priorȱ toȱ theȱ recentȱ surgeȱ inȱ unemploymentȱ claims.ȱȱ However,ȱ theȱ intensificationȱ ofȱ COVIDȬ19ȱ andȱ extremeȱ volatilityȱ inȱ theȱ financialȱ marketsȱ haveȱ increasedȱ uncertaintyȱ aboutȱ theȱ outlookȱ forȱ theȱ economicȱ andȱ jobs.ȱȱMarch’sȱ declineȱ inȱ confidenceȱ isȱ moreȱ inȱ lineȱ withȱ aȱ severeȱ contractionȱ –ȱ ratherȱ thanȱ aȱ temporaryȱ shockȱ –ȱ andȱ furtherȱdeclinesȱareȱsureȱtoȱfollow.ȱȱ ȱ ȱ California’sȱ unemploymentȱ rateȱ roseȱ toȱ 5.3%ȱ inȱ Marchȱ 2020,ȱ anȱ improvementȱ comparedȱ toȱ lastȱ year’sȱ unemploymentȱ rateȱ ofȱ 4.2%.ȱȱ Perȱ capitaȱ personalȱ incomeȱ increasedȱ 4.5%ȱ inȱ 2019ȱ overȱ 2018,ȱ mostlyȱ dueȱ toȱ fasterȱ growthȱ inȱ wages;ȱ however,ȱ itȱ isȱ reasonableȱ toȱ anticipateȱdeclinesȱinȱincomeȱinȱ2020ȱ asȱ aȱ resultȱ ofȱ COVIDȬ19.ȱ Growthȱ inȱ theȱ housingȱ marketȱ slowedȱ overȱ theȱ priorȱ yearȱ withȱ theȱ pricesȱ ofȱ singleȬ familyȱ homesȱ upȱ 8.3%ȱ andȱ salesȱ downȱ 6.1%ȱ comparedȱ toȱ Marchȱ ofȱ lastȱ yearȱ accordingȱ toȱ theȱ Californiaȱ Associationȱ ofȱ Realtorsȱ (CAR).ȱȱGrowthȱ inȱ Santaȱ Claraȱ Countyȱ slowedȱ overȱ theȱ priorȱ yearȱ withȱ theȱ pricesȱ ofȱ singleȬfamilyȱ homesȱ upȱ 7.7%ȱ andȱ salesȱ downȱ 19.0%.ȱȱRecognizingȱ thatȱ theȱ Stateȱ hasȱ aȱ chronicȱ housingȱ shortageȱ andȱ understandingȱ thatȱ inadequateȱ housingȱ hasȱ theȱ potentialȱ toȱ impedeȱ economicȱ growth,ȱ stateȱ legislatorsȱ haveȱ succeededȱ inȱ passingȱ aȱ legislativeȱ housingȱpackageȱthatȱhasȱtheȱpotentialȱtoȱmakeȱaȱdifference.ȱ ȱ CupertinoȱEconomicȱConditionsȱ Despiteȱ strongȱ economicȱ performanceȱ continuingȱ inȱ Siliconȱ Valleyȱ andȱ Cupertinoȱ preȬCOVID,ȱ dataȱ fromȱ theȱ Stateȱ ofȱ Californiaȱ Employmentȱ Developmentȱ Departmentȱ indicatesȱ significantȱ impactsȱ asȱ aȱ resultȱ ofȱ theȱ virus.ȱ Employmentȱ inȱ theȱ Sanȱ José/Sunnyvale/Santaȱ Claraȱ Metropolitanȱ Statisticalȱ Areaȱ (MSA)ȱ continuesȱ toȱ increase.ȱ Theȱ preliminaryȱ estimateȱ ofȱ theȱ Marchȱ 2020ȱ employmentȱ levelȱ inȱ theȱ MSAȱ wasȱ 1.03ȱ million,ȱ representingȱ anȱ approximatelyȱ 300,000ȱ dropȱ fromȱ theȱ Marchȱ 2019ȱ level.ȱȱTheȱ Marchȱ 2020ȱ preliminaryȱ unemploymentȱ rateȱ ofȱ 3.4%ȱ hasȱ increasedȱ fromȱ theȱ 2.8%ȱ rateȱ experiencedȱ aȱ yearȱ ago.ȱ Ourȱ localȱ unemploymentȱ rateȱ isȱ lowerȱthanȱtheȱnationalȱunemploymentȱrateȱofȱ4.4%.ȱȱȱ ȱ Housingȱpricesȱremainȱstrongȱcomparedȱtoȱtheȱsameȱperiodȱinȱ2019.ȱAsȱofȱFebruaryȱ2020,ȱsingleȱ familyȱ homesȱ soldȱ forȱ aȱ medianȱ homeȱ priceȱ ofȱ $2.08ȱ million,ȱ aȱ notableȱ increaseȱ overȱ theȱ pastȱ year.ȱ Theȱ increaseȱ inȱ theȱ medianȱ homeȱ pricesȱ correlatesȱ withȱ propertyȱ taxȱ revenueȱ beingȱ expectedȱ toȱ increaseȱ slightlyȱ comparedȱ toȱ lastȱ yearȱ dueȱ toȱ reassessmentsȱ ofȱ developmentȱ Ϭ ϮϬϬ͕ϬϬϬ ϰϬϬ͕ϬϬϬ ϲϬϬ͕ϬϬϬ ϴϬϬ͕ϬϬϬ ϭ͕ϬϬϬ͕ϬϬϬ ϭ͕ϮϬϬ͕ϬϬϬ DĂƌͲϭϱ DĂƌͲϭϲ DĂƌͲϭϳ DĂƌͲϭϴ DĂƌͲϭϵ DĂƌͲϮϬEƵŵďĞƌŽĨ:ŽďƐ;ŶŽƚƐĞĂƐŽŶĂůůLJĂĚũƵƐƚĞĚͿDŽŶƚŚůLJŵƉůŽLJŵĞŶƚͲ ^ĂŶ :ŽƐĞͬ^ĂŶƚĂůĂƌĂD^ 35 projects,ȱ andȱ additionalȱ TEAȱ propertyȱ taxȱ share.ȱ Dueȱ toȱ theȱ timingȱ ofȱ propertyȱ appraisalsȱ enteringȱ theȱ assessor’sȱ role,ȱ theȱ Cityȱ doesȱ notȱ anticipateȱ significantȱ impactsȱ toȱ propertyȱ taxȱ revenuesȱ inȱ FYȱ 20Ȭ21.ȱȱWhenȱ propertyȱ valuesȱ areȱ appraisedȱ againȱ inȱ Januaryȱ 2021ȱ andȱ areȱ includedȱ inȱ theȱ FYȱ 21Ȭ22ȱ roll,ȱ onlyȱ thenȱ willȱ theȱ Cityȱ expectȱ toȱ seeȱ adverseȱ impactsȱ resultingȱ fromȱ COVIDȬ19.ȱ Constructionȱ activity,ȱ althoughȱ strongȱ inȱ previousȱ years,ȱ willȱ continueȱ toȱ flattenȱ outȱ asȱ developmentȱ projects,ȱ particularlyȱ Appleȱ Park,ȱ areȱ completed.ȱȱGivenȱ theȱ levelȱ ofȱ volatilityȱ surroundingȱ COVIDȬ19ȱandȱ theȱ uncertaintyȱofȱ recoveryȱ time,ȱ itȱ isȱ difficultȱ toȱ estimateȱ theȱtimingȱofȱsignificantȱprojectsȱthatȱcouldȱhaveȱaȱpositiveȱimpactȱonȱtheȱCity’sȱgeneralȱrevenueȱ bases.ȱ ȱ KeyȱBudgetȱAssumptionsȱ RevenueȱAssumptionsȱ BecauseȱofȱCOVIDȬ19,ȱtheȱFYȱ2021ȱProposedȱBudgetȱassumesȱsignificantȱdeclinesȱinȱtheȱsalesȱtaxȱ andȱtransientȱoccupancyȱtaxȱcategories.ȱȱOtherȱcategoriesȱconsiderȱassumptionsȱrangingȱfromȱnoȱ growthȱ toȱ conservativeȱ growth.ȱ Asȱ hasȱ beenȱ doneȱ inȱ theȱ past,ȱ revenueȱ projectionsȱ forȱ eachȱ categoryȱ wereȱ basedȱ uponȱ aȱ carefulȱ examinationȱ ofȱ theȱ collectionȱ historyȱ andȱ patternsȱ asȱ theyȱ relateȱtoȱsuchȱfactorsȱasȱseasonalityȱandȱperformanceȱinȱtheȱeconomicȱ environmentȱthatȱtheȱCityȱ isȱ mostȱ likelyȱ toȱ encounterȱ inȱ theȱ comingȱ year.ȱȱWithȱ that,ȱ potentialȱ COVIDȬ19ȱ impactsȱ wereȱ alsoȱ heavilyȱ weighedȱinȱdeterminingȱ theȱ mostȱ reasonableȱ estimatedȱ figures.ȱȱGivenȱ theȱ extremeȱ volatilityȱ andȱ highȱ levelȱ ofȱ uncertainty,ȱ staffȱ areȱ preparedȱ toȱ bringȱ forwardȱ informationȱ andȱ budgetȱ adjustmentsȱ toȱ theȱ Cityȱ Councilȱ throughoutȱ theȱ fiscalȱ yearȱ andȱ asȱ theȱ COVIDȬ19ȱ situationȱ evolves.ȱ Revenueȱ assumptionsȱ areȱ discussedȱ inȱ detailȱ inȱ theȱ Fundȱ Summaryȱ sectionȱ underȱFinancialȱPoliciesȱandȱSchedules.ȱȱ ȱ PersonnelȱAssumptionsȱ Theȱ Cityȱ isȱ enteringȱ theȱ secondȱ yearȱ ofȱ itsȱ currentlyȱ effectiveȱ laborȱ agreementsȱ whichȱ assumeȱ 3.5%ȱ costȱ ofȱ livingȱ adjustmentȱ increases.ȱȱEquityȱ adjustments,ȱ andȱ increasesȱ forȱ retirementȱ andȱ healthȱwereȱalsoȱincludedȱinȱtheȱincreaseȱforȱcompensationȱandȱbenefits.ȱȱ ȱȱ Inȱ addition,ȱ budgetedȱ personnelȱ expendituresȱ factorȱ inȱ salaryȱ stepȱ increasesȱ forȱ approximatelyȱ 54%ȱ ofȱ employeesȱ whoȱ haveȱ yetȱ toȱ reachȱ theȱ topȱ stepȱ inȱ theirȱ classification’sȱ salaryȱ range.ȱ Typically,ȱ aȱ stepȱ increaseȱ isȱ equivalentȱ toȱ aȱ fiveȱ percentȱ increaseȱ inȱ salaryȱ withȱ aȱ rangeȱ ofȱ fiveȱ salaryȱsteps.ȱȱ ȱ NonȬPersonnelȱAssumptionsȱ NonȬPersonnelȱ budgetsȱ wereȱ developedȱ basedȱ onȱ actualȱ expendituresȱ inȱ priorȱ years,ȱ andȱ thenȱ adjustedȱ forȱ FYȱ 2021ȱ fundingȱ needs.ȱ Inȱ addition,ȱ oneȬtimeȱ projectsȱ haveȱ beenȱ separatedȱ outȱ inȱ FYȱ 2021ȱ toȱ ensureȱ thatȱ expenditureȱ trendsȱ reflectȱ ongoingȱ expenditureȱ needs.ȱ Contingencyȱ budgetsȱ areȱ assumedȱ toȱ beȱ reducedȱ byȱ 50%ȱ overȱ theȱ priorȱ year,ȱ representingȱ anȱ approximateȱ $850,000ȱ inȱ savings.ȱ Contingenciesȱ areȱ calculatedȱ atȱ 5%ȱ ofȱ theȱ totalȱ Generalȱ Fundȱ budgetȱ forȱ contractualȱ servicesȱ andȱ suppliesȱ andȱ materialsȱ forȱ operatingȱ programs.ȱ Consistentȱ withȱ pastȱ budgets,ȱ anȱ additionalȱ 5%ȱ isȱ allocatedȱ toȱ theȱ Cityȱ Manager’sȱ discretionaryȱ budgetȱ toȱ coverȱ unanticipatedȱprogramȱexpenses.ȱȱ ȱ ȱ 36 OngoingȱChallengesȱ RetirementȱBenefitsȱȱ Cupertinoȱ providesȱ retirementȱ benefitsȱ forȱ itsȱ employeesȱ throughȱ theȱ Californiaȱ Publicȱ Employee’sȱ Retirementȱ Systemȱ (CalPERS).ȱ Poorȱ investmentȱ returnsȱ duringȱ theȱ Greatȱ Recessionȱ andȱ actuarialȱ assumptionȱ changesȱ haveȱ increasedȱ theȱ gapȱ betweenȱ theȱ pensionȱ system’sȱ assetsȱ andȱ liabilities,ȱ resultingȱ inȱ theȱ overallȱ fundedȱ statusȱ ofȱ theȱ systemȱ fallingȱ significantly.ȱ Theȱ fundedȱstatusȱasȱofȱJuneȱ30,ȱ2019ȱisȱestimatedȱatȱ69%,ȱdownȱfromȱ71%ȱoverȱtheȱpriorȱyearȱdueȱtoȱ lowerȱthanȱexpectedȱinvestmentȱreturns.ȱ Asȱ aȱ result,ȱ theȱ CalPERSȱ Boardȱ hasȱ adoptedȱ revisedȱ actuarialȱ policiesȱ toȱ improveȱ theȱ financialȱ sustainabilityȱ ofȱ theȱ system.ȱ Inȱ Februaryȱ 2018,ȱ theȱ CalPERSȱ boardȱ votedȱ toȱ decreaseȱ theȱ amortizationȱ periodȱ forȱ newȱ pensionȱ liabilitiesȱ fromȱ 30ȱ yearsȱ toȱ 20ȱ years,ȱ effectiveȱ Julyȱ 1,ȱ 2019.ȱ Inȱ addition,ȱ inȱ Decemberȱ 2016,ȱ theȱ CalPERSȱ Boardȱ votedȱ toȱ reduceȱ theȱ discountȱ rate,ȱ alsoȱ knownȱ asȱ theȱ assumedȱ rateȱ ofȱ returnȱ forȱ investments,ȱ byȱ 0.5ȱ percentageȱ pointsȱ toȱ 7.0%.ȱ Theȱ resultȱ ofȱ thisȱ changeȱ isȱ significantȱ andȱ willȱ resultȱ inȱ considerableȱ increasesȱ inȱ retirementȱ costsȱ wellȱ aboveȱ whatȱ theȱ Cityȱ hadȱ previouslyȱ forecastedȱ forȱ retirementȱ expensesȱ asȱ notedȱ inȱ theȱ tableȱ below.ȱȱAsȱ ofȱ Marchȱ 2020,ȱ CalPERSȱ yearȬtoȬdateȱ earningsȱ onȱ investmentsȱ wereȱ atȱȬ4%.ȱȱ Assumingȱ CalPERSȱ endsȱ theȱ yearȱ inȱ aȱ similarȱ position,ȱ orȱ inȱ aȱ positionȱ belowȱ theȱ 7%ȱ desiredȱ target,ȱ theȱ Cityȱ canȱ expectȱ toȱ seeȱ continuedȱ spikesȱ inȱ annualȱ requiredȱ contributions.ȱȱTheȱ impactsȱ fromȱ CalPERSȱ investmentȱ earningsȱ wouldȱ notȱ beȱ includedȱ inȱ theȱ City’sȱ actuarialȱ reportsȱ untilȱ FYȱ 22Ȭ23ȱ andȱ wouldȱ beȱ smoothedȱ overȱ aȱ fiveȬyearȱ period.ȱȱAsȱ partȱ ofȱ theȱ FYȱ 2019ȱ Adoptedȱ Budget,ȱ Cityȱ Councilȱ approvedȱ theȱ creationȱ ofȱ aȱ Pensionȱ Rateȱ Stabilizationȱ Programȱ (PRSP),ȱ aȱ Sectionȱ 115ȱ Trustȱ thatȱ willȱ actȱ toȱ stabilizeȱ pensionȱ rateȱ volatilityȱ andȱ minimizeȱ theȱ impactȱ onȱ theȱ Generalȱ Fund’sȱ operatingȱ budgetȱ fromȱ yearȱ toȱ year.ȱȱDuringȱ FYȱ 2019,ȱ theȱ Cityȱ contributedȱ anȱ initialȱ investmentȱ ofȱ $8.0ȱ millionȱ toȱ theȱ trust.ȱ Theȱ FYȱ 2021ȱ Proposedȱ Budgetȱ includesȱ thisȱ $8.0ȱ millionȱ asȱ wellȱ asȱ anȱ additionalȱ $4Mȱ contributedȱ duringȱ FYȱ 2020ȱ asȱ restrictedȱ fundȱbalanceȱtoȱprovideȱstabilizationȱthroughȱtheȱfollowingȱrampȬupȱperiodȱasȱnecessary:ȱ ȱ ȱ ȱ RevenueȱVolatilityȱ TheȱCity’sȱrevenueȱmixȱisȱheavilyȱreliantȱonȱvolatileȱbusinessȬtoȬbusinessȱsalesȱtax,ȱwhichȱmakesȱ upȱ aȱ largeȱ portionȱ ofȱ theȱ City’sȱ annualȱ Generalȱ Fundȱ revenues.ȱ BusinessȬtoȬbusinessȱ salesȱ taxesȱ areȱ veryȱ sensitiveȱ toȱ economicȱ fluctuationsȱ asȱ evidencedȱ byȱ Cupertino’sȱ experienceȱ duringȱ theȱ dotcomȱ bustȱ fromȱ 2000Ȭ2004.ȱ Ourȱ heavyȱ relianceȱ onȱ theȱ volatileȱ highȱ techȱ industryȱ alsoȱ makesȱ usȱ vulnerable.ȱ Theȱ lossȱ ofȱ oneȱ ofȱ ourȱ topȱ threeȱ salesȱ taxȱ producersȱ inȱ FYȱ 2013Ȭ14ȱ onlyȱ madeȱ theȱ Cityȱ moreȱreliantȱonȱaȱ singleȱ taxȱproducer,ȱ makingȱusȱmoreȱ vulnerableȱ toȱ itsȱbusinessȱvolatility.ȱ COVIDȬ19ȱ inȱ expectedȱ toȱ significantlyȱ increaseȱ theȱ volatilityȱ ofȱ theȱ City’sȱ revenuesȱ inȱ FYȱ 2020Ȭ 21;ȱ particularlyȱ itsȱ salesȱ andȱ transientȱ occupancyȱ taxes.ȱȱWhileȱ theȱ overallȱ reductionsȱ inȱ theseȱ FY20Ȭ21 FY21Ȭ22 FY22Ȭ23 FY23Ȭ24 FY24Ȭ25 FY25Ȭ26 ProjectedȱPayroll 19,490,834$ȱȱȱ 20,026,831$ȱ 20,577,569$ȱ 21,143,452$ȱ 21,724,897$ȱ 22,322,332$ȱ NormalȱCostȱ(%) 11.3% 11.3% 11.3% 11.3% 11.3% 11.3% NormalȱCost 2,203,634$ȱȱȱȱȱ 2,264,234$ȱȱȱ 2,326,500$ȱȱȱ 2,390,479$ȱȱȱ 2,456,217$ȱȱȱ 2,523,763$ȱȱȱ UALȱPayment 3,607,122$ȱȱȱȱȱ 4,056,000$ȱȱȱ 4,448,000$ȱȱȱ 4,724,000$ȱȱȱ 5,001,000$ȱȱȱ 4,775,000$ȱȱȱ TotalȱContribution 5,810,756$ȱȱȱȱȱ 6,320,234$ȱȱȱ 6,774,500$ȱȱȱ 7,114,479$ȱȱȱ 7,457,217$ȱȱȱ 7,298,763$ȱȱȱ TotalȱContributionȱ(%) 29.8% 31.6% 32.9% 33.6% 34.3% 32.7% ProjectedȱEmployerȱContributions 37 twoȱ categoriesȱ ($6.9ȱ million)ȱ isȱ sureȱ toȱ haveȱ aȱ profoundȱ impact,ȱ theȱ Generalȱ Fundȱ isȱ wellȬ positionedȱ toȱ absorbȱ theȱ temporaryȱ declineȱ andȱ withstandȱ theȱ economicȱ recoveryȱ periodȱ intoȱ theȱfuture.ȱ ȱ HealthȱBenefitsȱ ThereȱisȱuncertaintyȱaroundȱpotentialȱrepealȱandȱreplacementȱofȱtheȱAffordableȱCareȱActȱ(ACA)ȱ andȱ howȱ itȱ wouldȱ affectȱ healthȱ careȱ costs.ȱ Rateȱ increasesȱ haveȱ stabilizedȱ withȱ theȱ implementationȱofȱtheȱACA.ȱȱ 38