Loading...
20-039 Tucker Construction, Inc., for Homeless Abatement and Removal of DebrisMaster Professional/Specialized Services Agreement/ Rev. April 2020 Page 1 of 9 MASTER PROFESSIONAL/SPECIALIZED SERVICES AGREEMENT WITH 1. PARTIES This Master Agreement is made by and between the City of Cupertino, a municipal corporation (“City”), and (“Contractor”) a for , and is effective on the last date signed below (“Effective Date”). 2. SERVICES 2.1 Scope of Services. Contractor agrees to provide the Services set forth in the Scope of Services, attached and incorporated here as Exhibit A, on an as-needed basis. The Services must comply with this Agreement and with each Service Order issued by the City’s Project Manager or his/her designee, in accordance with the following procedures, unless otherwise specified in Exhibit A. Contractor further agrees to carry out its work in compliance with the City’s Shelter In Place and Social Distancing Requirements, attached here and incorporated as Exhibit A-A. 2.2 Service Orders. Before issuing a Service Order, the City Project Manager will request Services in writing and hold a meeting with Contractor to discuss the Service Order. Contractor will submit a written proposal that includes a specific Scope of Services, Schedule of Performance, and Compensation, which the Parties will discuss. Thereafter, City will execute a Service Order Form for the Services, attached and incorporated here as Exhibit B. The Service Order will specify the Scope of Services, Schedule of Performance, Compensation, and any other conditions applicable to the Service Order. Issuance of a Purchase Order is discretionary. The City Project Manager is authorized to streamline these procedures based on the City’s best interests. Contractor will not be compensated for Services performed without a duly authorized and executed Service Order. 3. TIME OF PERFORMANCE 3.1 Term. This Agreement begins on the Effective Date and ends on (“Contract Time”), unless terminated earlier as provided herein. The City’s appropriate department head or City Manager may extend the Contract Time through a written amendment to this Agreement, provided such extension does not include additional contract funds. Extensions requiring additional contract funds are subject to the City’s purchasing policy. 3.2 Schedule of Performance. Contractor must deliver the Services within the time specified in each Service Order, and under no circumstances should the Services go beyond the Contract Time. Master Professional/Specialized Services Agreement/ Rev. April 2020 Page 2 of 9 3.3 Time is of the essence for the performance of all the Services required in this Agreement and in each Service Order. Contractor must have sufficient time, resources and qualified staff to deliver the Services on time. Contractor must respond promptly to each Service Order request. 4. COMPENSATION 4.1 Maximum Compensation. City will pay Contractor for satisfactory performance of the Services a total amount that will based upon actual costs but that will be capped so as not to exceed $ (“Contract Price”), based upon the Scope of Services in Exhibit A and the budget and rates included. The maximum compensation includes all expenses and reimbursements and will remain in place even if Contractor’s actual costs exceed the capped amount. 4.2 Per Service Order. Compensation for Services provided under a Service Order will be based on the rates set forth in the Service Order, which shall not exceed the capped amount specified in the Service Order. 4.3 Invoices and Payments. Except as otherwise provided in a Purchase Order, monthly invoices must state a description of the deliverables completed and the amount due for the preceding month. Thirty (30) days prior to expiration of the Agreement, Contractor must submit a requisition for final and complete payment of costs and pending claims for City approval. Noncompliance with this requirement relieves City of any further payment or other obligations under the Agreement. 5. INDEPENDENT CONTRACTOR 5.1 Status. Contractor is an independent contractor and not an employee, partner, or joint venture of City. Contractor is solely responsible for the means and methods of performing the Services and for the persons hired to work under this Agreement. Contractor is not entitled to health benefits, worker’s compensation, or other benefits from the City. 5.2 Contractor’s Qualifications. Contractor warrants on behalf of itself and its subcontractors that they have the qualifications and skills to perform the Services in a competent and professional manner and according to the highest standards and best practices in the industry. 5.3 Permits and Licenses. Contractor warrants on behalf of itself and its subcontractors that they are properly licensed, registered, and/or certified to perform the Services as required by law and have procured a City Business License, if required by the Cupertino Municipal Code. 5.4 Subcontractors. Only Contractor’s employees are authorized to work under this Agreement. Prior written approval from City is required for any subcontractor, and the terms and conditions of this Agreement will apply to any approved subcontractor. 5.5 Tools, Materials, and Equipment. Contractor will supply all tools, materials, and equipment required to perform the Services under this Agreement. Master Professional/Specialized Services Agreement/ Rev. April 2020 Page 3 of 9 5.6 Payment of Benefits and Taxes. Contractor is solely responsible for the payment of employment taxes incurred under this Agreement and any similar federal or state taxes. Contractor and any of its employees, agents, and subcontractors shall not have any claim under this Agreement or otherwise against City for seniority, vacation time, vacation pay, sick leave, personal time off, overtime, health insurance, medical care, hospital care, insurance benefits, social security, disability, unemployment, workers compensation or employee benefits of any kind. Contractor shall be solely liable for and obligated to pay directly all applicable taxes, fees, contributions, or charges applicable to Contractor’s business including, but not limited to, federal and state income taxes. City shall have no obligation whatsoever to pay or withhold any taxes or benefits on behalf of Contractor. Should any court, arbitrator, or administrative authority, including but not limited to the California Public Employees Retirement System (PERS), the Internal Revenue Service or the State Employment Development Division, determine that Contractor, or any of its employees, agents, or subcontractors, is an employee for any purpose, then Contractor agrees to a reduction in amounts payable under this Agreement, or to promptly remint to City any payments due by the City as a result of such determination, so that the City’s total expenses under this Agreement are not greater than they would have been had the determination not been made. 6. PROPRIETARY/CONFIDENTIAL INFORMATION In performing this Agreement, Contractor may have access to private or confidential information owned or controlled by the City, which may contain proprietary or confidential details the disclosure of which to third parties may be damaging to City. Contractor shall hold in confidence all City information and use it only to perform this Agreement. Contractor shall exercise the same standard of care to protect City information as a reasonably prudent contractor would use to protect its own proprietary data. 7. OWNERSHIP OF MATERIALS 7.1 Property Rights. Any interest (including copyright interests) of Contractor in any product, memoranda, study, report, map, plan, drawing, specification, data, record, document, or other information or work, in any medium (collectively, “Work Product”), prepared by Contractor in connection with this Agreement will be the exclusive property of the City upon completion of the work to be performed hereunder or upon termination of this Agreement, to the extent requested by City. In any case, no Work Product shall be shown to any third-party without prior written approval of City. 7.2 Copyright. To the extent permitted by Title 17 of the U.S. Code, all Work Product arising out of this Agreement is considered “works for hire” and all copyrights to the Work Product will be the property of City. Alternatively, Contractor assigns to City all Work Product copyrights. Contractor may use copies of the Work Product for promotion only with City’s written approval. 7.3 Patents and Licenses. Contractor must pay royalties or license fees required for authorized use of any third party intellectual property, including but not limited to patented, trademarked, or copyrighted intellectual property if incorporated into the Services or Work Product of this Agreement. Master Professional/Specialized Services Agreement/ Rev. April 2020 Page 4 of 9 7.4 Re-Use of Work Product. Unless prohibited by law and without waiving any rights, City may use or modify the Work Product of Contractor or its sub-Contractors, prepared or created under this Agreement, to execute or implement any of the following: (a) The original Services for which Contractor was hired; (b) Completion of the original Services by others; (c) Subsequent additions to the original Services; and/or (d) Other City projects. 7.5 Deliverables and Format. Contractor must provide electronic and hard copies of the Work Product, on recycled paper and copied on both sides, except for one single-sided original. 8. RECORDS Contractor must maintain complete and accurate accounting records relating to its performance in accordance with generally accepted accounting principles. The records must include detailed information of Contractor’s performance, benchmarks and deliverables, which must be available to City for review and audit. The records and supporting documents must be kept separate from other records and must be maintained for four (4) years from the date of City’s final payment. 9. ASSIGNMENT Contractor shall not assign, sublease, hypothecate, or transfer this Agreement, or any interest therein, directly or indirectly, by operation of law or otherwise, without prior written consent of City. Any attempt to do so will be null and void. Any changes related to the financial control or business nature of Contractor as a legal entity will be considered an assignment of the Agreement and subject to City approval. Control means fifty percent (50%) or more of the voting power of the business entity. 10. PUBLICITY / SIGNS Any publicity generated by Contractor for the project under this Agreement, during the term of this Agreement and for one year thereafter, will reference the City’s contributions in making the project possible. The words “City of Cupertino” will be displayed in all pieces of publicity, including flyers, press releases, posters, brochures, public service announcements, interviews and newspaper articles. No signs may be posted, exhibited or displayed on or about City property, except signage required by law or this Contract, without prior written approval from the City. 11. INDEMNIFICATION 11.1 To the fullest extent allowed by law, and except for losses caused by the sole and active negligence or willful misconduct of City personnel, Contractor shall indemnify, defend, and hold harmless City, its City Council, boards and commissions, officers, officials, employees, agents, servants, volunteers, and Contractors (“Indemnitees”), through legal counsel acceptable to City, from and against any and all liability, damages, claims, actions, causes of action, demands, charges, losses, costs, and expenses (including attorney fees, legal costs, and expenses related to litigation and dispute Master Professional/Specialized Services Agreement/ Rev. April 2020 Page 5 of 9 resolution proceedings), of every nature, arising directly or indirectly from this Agreement or in any manner relating to any of the following: (a) Breach of contract, obligations, representations, or warranties; (b) Negligent or willful acts or omissions committed during performance of the Services; (c) Personal injury, property damage, or economic loss resulting from the work or performance of Contractor or its subcontractors or sub-subcontractors; (d) Unauthorized use or disclosure of City’s confidential and proprietary information; (e) Claim of infringement or violation of a U.S patent or copyright, trade secret, trademark, or service mark or other proprietary or intellectual property rights of any third party. 11.2 Contractor must pay the costs City incurs in enforcing this provision. Contractor must accept a tender of defense upon receiving notice from City of a third-party claim. At City’s request, Contractor will assist City in the defense of a claim, dispute, or lawsuit arising out of this Agreement. 11.3 Contractor’s duties under this section are not limited to the Contract Price, workers’ compensation payments, or the insurance or bond amounts required in the Agreement. Nothing in the Agreement shall be construed to give rise to an implied right of indemnity in favor of Contractor against City or any Indemnitee. 11.4. Contractor’s payments may be deducted or offset to cover any money the City lost due to a claim or counterclaim arising out of this Agreement, a purchase order or other transaction. 11.5. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 11 from each and every subcontractor, or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. 11.6. This Section 11 shall survive termination of the Agreement. 12. INSURANCE Contractor shall comply with the Insurance Requirements, attached and incorporated here as Exhibit C, and must maintain the insurance for the duration of the Agreement, or longer as required by City. City will not execute the Agreement until City approves receipt of satisfactory certificates of insurance and endorsements evidencing the type, amount, class of operations covered, and the effective and expiration dates of coverage. Failure to comply with this provision may result in City, at its sole discretion and without notice, purchasing insurance for Contractor and deducting the costs from Contractor’s compensation or terminating the Agreement. 13. COMPLIANCE WITH LAWS 13.1 General Laws. Contractor shall comply with all local, state, and federal laws and regulations applicable to this Agreement. Contractor will promptly notify City of changes in the law or other conditions that may affect the Project or Contractor’s ability to perform. Contractor is responsible for verifying the employment authorization of employees performing the Services, as required by the Immigration Reform and Control Act. Master Professional/Specialized Services Agreement/ Rev. April 2020 Page 6 of 9 13.2 Labor Laws. Contractor shall comply with all labor laws applicable to this Agreement. If the Scope of Services includes a “public works” component, Contractor is required to comply with prevailing wage laws under Labor Code Section 1720 and other labor laws. 13.3 Discrimination Laws. Contractor shall not discriminate on the basis of race, religious creed, color, ancestry, national origin, ethnicity, handicap, disability, marital status, pregnancy, age, sex, gender, sexual orientation, gender identity, Acquired-Immune Deficiency Syndrome (AIDS,) or any other protected classification. Contractor shall comply with all anti-discrimination laws, including Government Code Sections 12900 and 11135, and Labor Code Sections 1735, 1777, and 3077.5. Consistent with City policy prohibiting harassment and discrimination, Contractor understands that harassment and discrimination directed toward a job applicant, an employee, a City employee, or any other person, by Contractor or Contractor's employees or sub-contractors will not be tolerated. 13.4 Conflicts of Interest. Contractor shall comply with all conflict of interest laws applicable to this Agreement and must avoid any conflict of interest. Contractor warrants that no public official, employee, or member of a City board or commission who might have been involved in the making of this Agreement, has or will receive a direct or indirect financial interest in this Agreement, in violation of California Government Code Section 1090 et seq. Contractor may be required to file a conflict of interest form if Contractor makes certain governmental decisions or serves in a staff capacity, as defined in Section 18700 of Title 2 of the California Code of Regulations. Contractor agrees to abide by the City’s rules governing gifts to public officials and employees. 13.5 Remedies. Any violation of Section 13 constitutes a material breach and may result in City suspending payments, requiring reimbursements or terminating this Agreement. City reserves all other rights and remedies available under the law and this Agreement, including the right to seek indemnification under Section 11 of this Agreement. 14. PROJECT COORDINATION City Project Manager. The City assigns as the City’s representative for all purposes under this Agreement, with authority to oversee the progress and performance of the Scope of Services. City reserves the right to substitute another Project manager at any time, and without prior notice to Contractor. Contractor Project Manager. Subject to City approval, Contractor assigns as its single Representative for all purposes under this Agreement, with authority to oversee the progress and performance of the Services. Contractor’s Project manager is responsible for coordinating and scheduling the Services in accordance with City instructions, service orders and the Schedule of Performance. Contractor must regularly update the City’s project manager about the status, progress and any delays with the work. City’s written approval is required prior to Contractor substituting a new Representative which shall result in no additional costs to City. 15. ABANDONMENT OF PROJECT City may abandon or postpone the Project or parts thereof at any time. Contractor will be compensated for satisfactory Services performed through the date of abandonment, and will be given reasonable time Master Professional/Specialized Services Agreement/ Rev. April 2020 Page 7 of 9 to assemble the work and close out the Services. With City’s pre-approval in writing, the time spent in closing out the Services will be compensated up to a maximum of ten percent (10%) of the total time expended to date in the performance of the Services. 16. TERMINATION City may terminate this Agreement for cause or without cause at any time. Contractor will be paid for satisfactory Services rendered through the date of termination, but final payment will not be made until Contractor closes out the Services and delivers the Work Product. 17. GOVERNING LAW, VENUE, AND DISPUTE RESOLUTION This Agreement is governed by the laws of the State of California. Any lawsuits filed related to this Agreement must be filed with the Superior Court for the County of Santa Clara, State of California. Contractor must comply with the claims filing requirements under the Government Code prior to filing a civil action in court. If a dispute arises, Contractor must continue to provide the Services pending resolution of the dispute. If the Parties elect arbitration, the arbitrator’s award must be supported by law and substantial evidence and include detailed written findings of law and fact. 18. ATTORNEY FEES If City initiates legal action, files a complaint or cross-complaint, or pursues arbitration, appeal, or other proceedings to enforce its rights or a judgment in connection with this Agreement, the prevailing party will be entitled to reasonable attorney fees and costs. 19. THIRD PARTY BENEFICIARIES There are no intended third party beneficiaries of this Agreement. 20. WAIVER Neither acceptance of the Services nor payment thereof shall constitute a waiver of any contract provision. City’s waiver of a breach shall not constitute waiver of another provision or breach. 21. ENTIRE AGREEMENT This Agreement represents the full and complete understanding of every kind or nature between the Parties, and supersedes any other agreement(s) and understanding(s), either oral or written, between the Parties. Any modification of this Agreement will be effective only if in writing and signed by each Party’s authorized representative. No verbal agreement or implied covenant will be valid to amend or abridge this Agreement. If there is any inconsistency between any term, clause, or provision of the main Agreement and any term, clause, or provision of the attachments or exhibits thereto, the terms of the main Agreement shall prevail and be controlling. 22. INSERTED PROVISIONS Each provision and clause required by law for this Agreement is deemed to be included and will be inferred herein. Either party may request an amendment to cure mistaken insertions or omissions of required provisions. The Parties will collaborate to implement this Section, as appropriate. Master Professional/Specialized Services Agreement/ Rev. April 2020 Page 8 of 9 23.HEADINGS The headings in this Agreement are for convenience only, are not a part of the Agreement and in no way affect, limit, or amplify the terms or provisions of this Agreement. 24.SEVERABILITY/PARTIAL INVALIDITY If any term or provision of this Agreement, or their application to a particular situation, is found by the court to be void, invalid, illegal or unenforceable, such term or provision shall remain in force and effect to the extent allowed by such ruling. All other terms and provisions of this Agreement or their application to specific situations shall remain in full force and effect. The Parties agree to work in good faith to amend this Agreement to carry out its intent. 25.SURVIVAL All provisions which by their nature must continue after the Agreement expires or is terminated, including the Indemnification, Ownership of Materials/Work Product, Records, Governing Law and Attorney Fees, shall survive the Agreement and remain in full force and effect. 26.NOTICES All notices, requests and approvals must be sent in writing to the persons below, which will be considered effective on the date of personal delivery or the date confirmed by a reputable overnight delivery service, on the fifth calendar day after deposit in the United States Mail, postage prepaid, registered or certified, or the next business day following electronic submission: To City of Cupertino Attention: Email: To Contractor: Attention: Email: 27. VALIDITY OF CONTRACT This Agreement is valid and enforceable only if (a) it complies with the purchasing and contract provisions of Cupertino Municipal Code Chapters 3.22 and 3.23, as amended from time to time, (b) is signed by the City Manager or an authorized designee, and (c) is approved for form by the City Attorney’s Office. 28. EXECUTION The person executing this Agreement on behalf of Contractor represents and warrants that Contractor has full right, power, and authority to enter into and carry out all actions contemplated by this Agreement and that he or she is authorized to execute this Agreement, which constitutes a legally binding obligation of Contractor. This Agreement may be executed in counterparts, each one of which is deemed an original and all of which, taken together, constitute a single binding instrument. 4/24/20 March 12, 2020  Jeffrey Trybus Senior Code Enforcement Officer City of Cupertino Dear Jeff, Thank you for the opportunity to work with you and the City of Cupertino. Below are our costs for homeless abatement and removal of debris. This is a description of our scope of work included with pricing. These costs are consistent with what we charge other municipalities in the local area. Please let me know if you have any questions. Pre-Cleanup Posting: done by City of Cupertino Cleanup: Supervision 1 person @ 130.00 (Prevailing Wage) Labor rate with tools 120.00/hour each (Prevailing Wage) (The cleanup crew depends on the size of the encampment(s), usually anywhere from 3 to 8 people) Search for important personal items, save and deliver to our storage unit on site. (Clients are asked to contact HomeFirst for retrieval of their items, 408-510-7600) Dismantle structures. Load trash and debris into dumpster or dump truck. Dump truck – 250.00 per half day, 300.00 whole day Dump fees – cost plus 20% 30 yard dumpster @ 950.00 each or current rate Equipment rental if needed is not included at this time. Hazardous waste disposal – cost plus 20% Small trash will be left behind. These items are generally not cost effective to be removed. Pre and post cleanup pictures taken for documentation. EXHIBIT A Bio: 2 people @ 147.00/hour each (Prevailing Wage) Bio-waste disposal – cost plus 20% There would be additional charge to meet with the Bio Disposal for pickup of bio waste, Post Clean-up: 111.00/hour each (Prevailing Wage) Taking personal items to storage and possible return of items to clients from storage. These, generally, do not take more than an hour or so for each Thank you, Penny Bitcon Revised: April 10, 2020 – Services Agreements 1 Exhibit A-A – SHELTER IN PLACE AND SOCIAL DISTANCING REQUIREMENTS A. Health Laws Acknowledged. It is acknowledged that Consultant’s/Contractor’s (“Contractor”) duty to comply with Laws, as defined in Section 13 of the Contract/Agreement (“Contract”), includes immediate compliance by Contractor and its subcontractors with the restrictions on travel and the Social Distancing Requirements set forth in Section 13.k of the health order issued by the County of Santa Clara Health Department on March 31, 2020, in response to the COVID-19 pandemic, and any subsequent amendments or superseding orders thereto (the “Health Order”), and any other local, state, or federal laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”). B. Health Order Compliance. Pursuant to Section 13.c of the Health Order, individuals may leave their residence only to perform specified “Essential Activities.” Contractor shall comply with these restrictions on travel when preforming work under this Contract. If a scope of work item, notice to proceed, or work order under this Contract specifies work that cannot be performed in compliance with the Health Order or other Health Laws, Contractor shall refrain from conducting the work and immediately inform the City. For Essential Activities, as defined in the Health Order, pursuant to Section 13.k of the Heath Order, “[a]ll individuals must strictly comply with Social Distancing Requirements. . . as necessary to carry out the work of” Essential Activities. C. Individuals at High Risk of Severe Illness. Section 13.a of the Health Order advises that “people at high risk of severe illness from COVID-19 and people who are sick are strongly urged to stay in their residence to the extent possible, except as necessary to seek medical care or provide medical care or Essential Governmental Functions.” Information from the Center for Disease Control (“CDC”) on “high risk” categories is available at the CDC's website at: https://www.cdc.gov/coronavirus/2019-ncov/specific-groups/people-at-higher-risk.html. Nothing in this Contract shall be interpreted to require any person at high risk of severe illness from COVID-19 to leave their residence to perform work under the Contract. Contractor will inform the City if other arrangements for the work must be made, and City will do so, with no penalty to Contractor, although Contractor will not be compensated for work performed by the City or third parties. D. Health Order Requirements and Best Practices. Contractor will immediately undertake all appropriate measures to ensure compliance with the Social Distancing Requirements in the Health Order by all individuals performing work under this Contract, including Contractor's or any subcontractor's workers, employees, representatives, vendors, or suppliers (collectively, "workers"), and shall maintain these measures for as long as required by the Health Order or other Health Laws. These measures shall include, but are not limited to, the following: 1. Meetings/Site Access. Use electronic alternatives to in person meetings, e.g., conference calls, video-conferencing, etc., to the greatest extent possible. Limit access to any project site or any work area to workers who are necessary to perform in-person Revised: April 10, 2020 – Services Agreements 2 work. Require non-essential personnel to work from home to the extent possible. Avoid all non-essential travel. 2. Distancing. Where workers perform in-person work at a project site or a work area, prohibit workers from being less than six feet apart, unless and only to the extent that would compromise worker safety or violate safety Laws for specific operations. Prohibit handshaking or any physical contact among workers, with the sole and limited exception of any physical contact required for worker safety or to comply with safety Laws. Prohibit workers from sharing a vehicle. E. Changed Requirements. It is understood and acknowledged that circumstances pertaining to the COVID-19 pandemic are evolving rapidly and that new local, state, or federal requirements may modify the terms of this Exhibit. Contractor agrees to work cooperatively with the City to implement new or changed requirements as quickly as possible. F. Subcontracts. Contractor shall include the terms of this Exhibit in all subcontracts and require any agents, subcontractors, or subconsultants to comply with its provisions. City of Cupertino  Exhibits  Master Agreement – Tucker Construction Page 1 of 3  EXHIBIT B.1   SERVICE ORDER PROCESS    CONTRACTOR shall provide services under this Master Agreement on an “as needed” basis and  only (1) upon written request from the CITY’s Building Official or authorized Agent as defined in  Article 14 of the Master Agreement, Project Coordination, and (2) as defined in a fully executed  Service Order.    SECTION 1 – SERVICE ORDER INITIATION    A. The CITY’s Building Official or his designee shall provide written request for CONTRACTOR  services as defined in this agreement. After which, CONTRACTOR shall provide to CITY a  written proposal including specific scope of services, performance schedule and compensation.   Scope of Services will reference Tasks from Exhibit A where possible.    B. CITY and CONTRACTOR shall discuss the proposal in detail and agree upon the terms of the  Service Order.    C. CITY shall prepare a Project Service Order and Attachment A.  The Service Order shall, at a  minimum, include (1) specific scope of services, deliverables, schedule of performance, and  compensation. An exemplar of the Service Order form follows this Exhibit.    SECTION 2‐ SERVICE ORDER EXECUTION    D. Both parties shall execute the Service Order as evidenced by the signatures of the authorized  representatives defined in Article 14 of the Master Agreement, Project Coordination, and the  date signed.    E. CONTRACTOR shall begin work on the scope of services only after receipt of a fully executed  authorized Service Order defining those services. CONTRACTOR understands and agrees that  work performed before the date of the authorized Service Order or outside the scope of services  once a Service Order is signed and authorized shall be at no cost to the City.    F. The maximum compensation authorized by a single Service Order and/or the aggregate of  Service Orders shall not exceed the maximum compensation set forth in Article 4 of the Master  Agreement.    END OF EXHIBIT  City of Cupertino  Exhibits  Master Agreement – Tucker Construction Page 2 of 3  EXHIBIT B.2  COMPENSATION    CITY shall compensate CONTRACTOR according to the hourly rate(s) stated in this Exhibit which  shall remain in effect for the Master Agreement schedule of performance unless changed by written  amendment to the Master Agreement.    Each authorized Service Order under this Master Agreement shall identify the method of  compensation consistent with the scope of services provided by CONTRACTOR. In any case,  CONTRACTOR’s total payment for each authorized Service Order shall not exceed the maximum  compensation identified in that Service Order, unless authorized by a written amendment executed  by CITY and CONTRACTOR, and the total compensation for all authorized Service Orders shall not  exceed the maximum compensation stated in Article 4, CONTRACTOR Compensation, of the  Master Agreement.      Work exceeding the total authorized amount for a Service Order or the total compensation for the  Master Agreement shall be at no cost to CITY.  25.00     Reimbursable Expenses    Reimbursable expenses represent the acquisition cost of items, other than direct labor, specifically  required to perform the scope of services and beyond normal business operating expenses which  are included in the direct labor rate. Such expenses include, but are not limited to:    Individual or multiple document reproductions that exceed 50 pages;   Drawing or bid set reproductions;   Software required by City other than Microsoft Word, Excel, PowerPoint, and Project;  Adobe Acrobat; and a photo editor program.   Travel expenses to the extent allowed by City policy;   Sub‐CONTRACTORs required by project scope of services;   Safety equipment required by City policy or the project scope of services;   Mass mailing notifications;   Expenses for public meetings, such as refreshments, interpreters, security, valet parking,  facility rental, tents or booths, easels, markers, paper, presentation equipment.    CITY shall compensate CONTRACTOR for such reimbursable expenses only with prior written  authorization by CITY representative designated in Article 14, Project Coordination, of the Master  Agreement. All compensation, including reimbursable expenses, shall not exceed the maximum  compensation for the Service Order.     CITY shall compensate CONTRACTOR for reimbursable expenses for the documented actual cost  only, allowing for no surcharge for CONTRACTOR administration. Reimbursable expenses shall be  separately identified on CONTRACTOR’s invoice.    City of Cupertino  Exhibits  Master Agreement – Tucker Construction Page 3 of 3  Method of Payment    CONTRACTOR shall submit an invoice to CITY by the 5th business day of each month that clearly  identifies the work performed in the previous month and authorized reimbursable expenses.   All  invoices from CONTRACTOR shall be sent via email to CITY representative designated in Article  14, Project Coordination, of the Master Agreement.     The invoice shall identify the applicable period of work, a description of the work performed  consistent with the Service Order scope of services, the number of hours, hourly rate, reimbursable  expenses, Service Order maximum compensation, Service Order compensation to date including  invoice number, total invoice amount for current invoice, Service Order maximum compensation  balance remaining.    All payments to CONTRACTOR will be addressed to:    Name  Address  City, State Zip  Email address    END OF EXHIBIT  CITY OF CUPERTINO MASTER AGREEMENT CONSULT ANT SERVICES SERVICE ORDER NO. MASTER AGREEMENT NO.: MA Date: MA Maximum Compensation: MA Term: NTP: MA END DATE: Consultant: Name: Address: Contact: Phone: Project Description: Project Name: 0Description: (simple project description if appropriate) 0Attachment A: Includes Description of Project, Scope of Service, Schedule of Performance and Compensation City Project Management Managing Department: Public Works Project Manager: Fiscal/Budget Amount Master Agreement Maximum Compensation: $0.00 Total Previously Encumbered to Date: $0.00 ------Encumbrance this Service Order: $0.00 ------Total Liquidated Encumbrance: $0.00 ------ Master Agreement Unencumbered Balance: $0.00 Account No.: Project Manager: APPROVALS Consultant: CIP Manager: Date: Date: Date: Appro priation Certification: I hereby certify that an unexpended appro priation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature. City Finance: City of Cupertino Master Agreement Management Analyst Date: Page 1 of 1 Service Order No. Insurance Requirements for Professional/Specialized Services Agreement 1 Version: Sept. 2019 Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance and results of the Services hereunder by the Contractor, his agents, representatives, employees or subcontractors. MINIMUM SCOPE AND LIMIT OF INSURANCE Coverage shall be at least as broad as: 1. Commercial General Liability (CGL): Insurance Services Office (“ISO”) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, contractual liability, property damage, bodily injury, and personal and advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project (ISO CG 25 03 or 25 04) or it shall be twice the required occurrence limit. a. It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be made available to the Additional Insured and shall be (1) the minimum coverage/limits specified in this agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy, whichever is greater. b. Additional Insured coverage under Contractor's policy shall be "primary and non- contributory," will not seek contribution from City’s insurance/self-insurance, and shall be at least as broad as ISO CG 20 01 04 13 c. The limits of insurance required may be satisfied by a combination of primary and umbrella or excess insurance, provided each policy complies with the requirements set forth in this Contract. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect City as a named insured. 2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or, if Contractor has no owned autos, then hired autos (Code 8) and non-owned autos (Code 9), with limits no less than $1,000,000 per accident for bodily injury and property damage. 3. Workers’ Compensation: As required by the State of California, with Statutory Limits, and Employer’s Liability Insurance of no less than $1,000,000 per occurrence for bodily injury or disease. (Not required if Contractor provides written verification it has no employees). 4. Professional Liability. Insurance which includes coverage for professional acts, errors and omissions, with limits no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate (if applicable). If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires and shall be entitled to the broader coverage and higher insurance limits maintained by Contractor. OTHER INSURANCE PROVISIONS The insurance policies are to contain, or be endorsed to contain, the following provisions: Additional Insured Status The City of Cupertino, its City Council, officers, officials, employees, agents, servants and volunteers are to be covered as additional insureds on the CGL and automobile liability policies with respect to liability arising out of the Services performed by or on behalf of Contractor including materials, parts, or equipment furnished. Endorsement of CGL coverage shall be at least as broad as ISO Form CG 20 10 11 85 or if not EXHIBIT C Insurance Requirements Professional/Specialized Services Agreement Insurance Requirements for Professional/Specialized Services Agreement 2 Version: Sept. 2019 available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used. Primary Coverage For any claims related to this Contract, the Contractor’s insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of Contractor’s insurance and shall not contribute to it. Notice of Cancellation Each insurance policy shall state that coverage shall not be canceled or allowed to expire, except with written notice to City 30 days in advance or 10 days in advance if due to non-payment of premiums. Waiver of Subrogation Contractor grants to City a waiver of any right to subrogation which any insurer of said Contractor may acquire against City by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. Self-Insured Retentions City may approve self-insured retentions and require proof of Contractor’s ability to pay losses and related investigations, claim administration and defense expenses within the retention. The policy shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City. Acceptability of Insurers Insurers must be acceptable to City and licensed to do business in California, and each insurer must have an A.M. Best’s financial strength rating of “A” or better and a financial size rating of “VII” or better. Claims Made Policies (applicable only to professional liability) If any of the required policies provide coverage on a claims-made basis: 1. The Retroactive Date must be shown and must be before the Effective Date of the Contract. 2. Insurance must be maintained for at least five (5) years after completion of the Services. 3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the Contract Effective Date, the Contractor must purchase “extended reporting” coverage for a minimum of five (5) years after completion of the Services. Verification of Coverage Contractor shall furnish the City with acceptable original certificates and mandatory endorsements (or copies of the policies effecting the coverage required by this Contract), and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City prior to commencing the Services. City retains the right to demand verification of compliance at any time during the Contract. Subcontractors Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. Insurance coverage shall not limit Contractor’s duties to indemnify, defend and hold City harmless. City reserves the right to modify these requirements based on the nature of the risk, prior experience, insurer, coverage or other special circumstances. DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACTPRODUCERNAME:FAXPHONE(A/C, No):(A/C, No, Ext):E-MAILADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ADDL SUBRINSR POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITSPOLICY NUMBERLTR (MM/DD/YYYY) (MM/DD/YYYY)INSD WVD COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGG $JECT $OTHER: COMBINED SINGLE LIMITAUTOMOBILE LIABILITY $(Ea accident) BODILY INJURY (Per person) $ANY AUTO ALL OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS AUTOSNON-OWNED PROPERTY DAMAGE $HIRED AUTOS (Per accident)AUTOS $ UMBRELLA LIAB EACH OCCURRENCE $OCCUR EXCESS LIAB CLAIMS-MADE AGGREGATE $ $DED RETENTION $ PER OTH-WORKERS COMPENSATION STATUTE ERAND EMPLOYERS' LIABILITY Y / NANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $N / AOFFICER/MEMBER EXCLUDED?(Mandatory in NH)E.L. DISEASE - EA EMPLOYEE $If yes, describe under E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE © 1988-2014 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORDACORD 25 (2014/01) TUCKE-1 OP ID: JD 04/14/2020 Jennifer DelarochaBozzuto & Associates Insurance34 S. Second StCampbell, CA 95008Jennifer Anderson 800-989-8712 408-429-8460 jenniferd@dbinsurance.com Navigators Insurance Company 42307 RSUI Indemnity Company 22314Tucker Construction Inc.1725 Little Orchard Street #DSan Jose, CA 95125 Redwood Fire & Casualty Ins 11673 Westchester Surplus Lines 10172 AX 1,000,000 X XXLA19CGL167596IC 08/15/2019 08/15/2020 50,000 5,000 1,000,000 2,000,000 X 2,000,000 X 4,000,000 XB NHA247789 08/15/2019 08/15/2020 4,000,000 0X X CXTUWC119452 01/01/2020 01/01/2021 1,000,000 1,000,000 1,000,000 D Pollution Liab G7091542A 002 08/15/2019 08/15/2020 Limit 1,000,000 Ded 10,000 The City of Cupertino, its City Council, officers, officials, employees, agents, servants and volunteers are listed as additional insured per the attached endorsements on the General Liability policy. Coverage is primary and non-contributory. Waiver of subrogation applies to General Liability and Workers Compensation. CITYCUP City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 2 POLICY NUMBER: LA19CGL167596IC COMMERCIAL GENERAL LIABILITY CG 20 37 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s)Location And Description Of Completed Operations Any person or organization for whom you are performing “commercial construction” during the period of this policy and have agreed in a written contract to add as an additional insured for products-completed operations. “Commercial construction” does not include any habitational or residential construction other than hotels or apartments. . .. .. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II - Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products-completed operations hazard". However: 1.The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are B. With respect to the insurance afforded to these additional insureds, the following is added to Section III - Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1.Required by the contract or agreement; or 2.Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 2 of 2 required by the contract or agreement to provide for such additional insured. CG 20 38 04 13 Page 1 of 2© Insurance Services Office, Inc., 2012 COMMERCIAL GENERAL LIABILITY CG 20 38 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED – OWNERS, LESSEES OR CONTRACTORS – AUTOMATIC STATUS FOR OTHER PARTIES WHEN REQUIRED IN WRITTEN CONSTRUCTION AGREEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II - Who Is An Insured is amended to include as an additional insured: 1.Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and 2.Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: a.Your acts or omissions; or b.The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured. However, the insurance afforded to such additional insured described above: a.Only applies to the extent permitted by law; and b.Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. A person's or organization's status as an additional insured under this endorsement ends when your operations for the person or organization described in Paragraph 1. above are completed. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to: 1."Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: a.The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b.Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of, or the failure to render, any professional architectural, engineering or surveying services. 2."Bodily injury" or "property damage" occurring after: a.All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or Policy Number: LA19CGL167596IC CG 20 38 04 13 Page 2 of 2© Insurance Services Office, Inc., 2012 b. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III - Limits Of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement described in Paragraph A.1.; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 01 04 13 Page 1 of 1© Insurance Services Office, Inc., 2012 COMMERCIAL GENERAL LIABILITY CG 20 01 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY – OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance Condition and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and (2) You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. Policy Number: LA19CGL167596IC COMMERCIAL GENERAL LIABILITY NPC 711 08 11 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NPC 711 08 11 Page 1 of 2 GENERAL AGGREGATE LIMIT PER PROJECT WITH AN OVERALL GENERAL AGGREGATE CAP This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Projects: Overall General Aggregate Cap: $5,000,000 All Projects (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) A. For all sums which the insured becomes legally obligated to pay as damages caused by “occur- rences” under COVERAGE A (SECTION I), and for all medical expenses caused by accidents under COVERAGE C (SECTION I), which can be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1.A separate Designated Construction Project General Aggregate Limit applies to each des- ignated construction project, and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. Subject to the application of the General Aggregate Limit to each of your projects, the maximum amount we will pay under the General Aggre- gate Limit for all claims arising from all projects is the Overall General Aggregate Cap shown in the Schedule above. 2.The Designated Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under COVERAGE A, except damages because of “bodily injury” or “property damage” included in the “products- completed operations hazard”, and for medi- cal expenses under COVERAGE C regard- less of the number of: a.Insureds; b.Claims made or “suits” brought; or c.Persons or organizations making claims or bringing “suits”. 3.Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the Designated Con- struction Project General Aggregate Limit for that designated construction project. Such payments shall not reduce the General Ag- gregate Limit shown in the Declarations nor shall they reduce any other Designated Con- struction Project General Aggregate Limit for any other designated construction project shown in the Schedule above. 4.The limits shown in the Declarations for Each Occurrence, Fire Damage and Medical Ex- pense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated Con- struction Project General Aggregate Limit. POLICY NUMBER: LA19CGL167596IC Page 2 of 2 NPC 711 08 11 B.For all sums which the insured becomes legally obligated to pay as damages caused by “occur- rences” under COVERAGE A (SECTION I), and for all medical expenses caused by accidents under COVERAGE C (SECTION I), which cannot be attributed only to ongoing operations at a sin- gle designated construction project shown in the Schedule above: 1.Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products-Completed Operations Aggregate Limit, whichever is applicable; and 2.Such payments shall not reduce any Desig- nated Construction Project General Aggre- gate Limit. C.When coverage for liability arising out of the “products-completed operations hazard” is pro- vided, any payments for damages because of “bodily injury” or “property damage” included in the “products-completed operations hazard” will reduce the Products-Completed Operations Ag- gregate Limit, and not reduce the General Aggre- gate Limit nor the Designated Construction Project General Aggregate Limit. D.If the applicable designated construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contract- ing parties deviate from plans, blueprints, de- signs, specifications or timetables, the project will still be deemed to be the same construction project. E.The provisions of Limits Of Insurance (SECTION III) not otherwise modified by this endorsement shall continue to apply as stipulated. POLICY NUMBER: LA19CGL167596IC COMMERCIAL GENERAL LIABILITY CG 24 04 05 09 CG 24 04 05 09 © Insurance Services Office, Inc., 2008 Page 1 of 1  WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: Any person or organization when you and such person or organization have agreed in writing in a contract or agreement that you will waive any right of recovery against such person or organization. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV – Conditions: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a contract with that person or organization and included in the "products- completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. Tucker Construction. Inc. All CA Operations 01/01/2020 TUWC119452 Redwood Fire & Casualty Ins. Exhibit ___ Labor Code Requirements 1. The following prevailing wage provisions apply to this Agreement. 1.1 In General. For purposes of California labor law, this is a public works contract subject to the provisions of Part 7 of Division 2 of the California Labor Code (Sections 1720 et seq.). In accordance with Labor Code Section 1771, Contractor and all subcontractors shall pay not less than current prevailing wage rates as determined by the California Department of Industrial Relations (“DIR”) to all workers employed on this project as applicable. In accordance with Labor Code Section 1815, Contractor and all subcontractors shall pay all workers employed on this project 1 ½ the basic rate of pay for work performed in excess specified hour limitations. The work performed pursuant to this Agreement is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 1.2 Registration. Contractor and all subcontractors are not qualified to bid on or be listed in a bid proposal, subject to the requirements of section 4104 of the California Public Contract Code, and shall not engage in the performance of any work under this Agreement, unless currently registered and qualified to perform public work pursuant to section 1725.5 of the California Labor Code. Contractor represents and warrants that it is registered and qualified to perform public work pursuant to section 1725.5 of the Labor Code and will provide its DIR registration number, along with the registration numbers of any subcontractors as required, to the City. 1.3 Posting. Contractor shall post at the job site the determination of the DIR director of the prevailing rate of per diem wages together with all job notices that are required by regulations of the DIR. 1.4 Reporting. Contractor and any subcontractors shall keep accurate payroll records in accordance with Section 1776 of the Labor Code and shall furnish the payroll records directly to the Labor Commissioner in accordance with the law. 1.5 Report on Prevailing Rate of Wages. The City has obtained the general prevailing rate of per diem wages in the vicinity of the project for each type of worker needed, a copy of which is on file at the City of Cupertino City Hall, and shall be made available to any interested party upon request. 1.6 Employment of Apprentices. Contractor’s attention is directed to the provisions in Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor. It shall be the responsibility of the Contractor to effectuate compliance on the part of itself and any subcontractors with the requirements of said sections in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. D 1.7 Penalties. Contractor’s attention is directed to provisions in Labor Code Sections 1775 and 1813. In accordance with Labor Code Section 1775, Contractor and subcontractors may be subject to penalties for Contractor’s and subcontractors’ failure to pay prevailing wage rates. In accordance with Labor Code Section 1813, Contractor or subcontractors may be subject to penalties for Contractor’s or subcontractors’ failure to pay overtime pay rates for hours worked by workers employed on this project in excess specified hour limitations. 1090602.1