Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
20-070 Elcor Electric, Inc., Electrical Service at City Facilities
Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 1 of 12 PUBLIC WORKS CONTRACT $60,000 OR LESS 1.PARTIES This public works contract (“Contract”) is made by and between the City of Cupertino (“City”), and , a (“Contractor”) for and is effective on the last date signed below (“Effective Date”). 2.SCOPE OFWORK Contractor will perform and provide all labor, materials, equipment, supplies, transportation and any other items or work necessary to perform and complete the work required for the Project (“Work”), as required in the Scope of Work, attached here and incorporated as Exhibit A, and in accordance with the terms and conditions of this Contract. Contractor further agrees to carry out its work in compliance with the City’s Shelter In Place and Social Distancing Requirements, attached here and incorporated as Exhibit A-A. 3.TIME FOR COMPLETION 3.1 Term. This Contract begins on the Effective Date and ends on (“Contract Time”) unless terminated earlier as provided herein. Contractor’s Work shall begin on the date shown on a written Notice to Proceed (“NTP”) and must be fully completed within the Contract Time or on the date specifically provided in the Notice to Proceed. The City Engineer will not issuea NTP until the Contract is fully executed by both parties and City has received satisfactory proof of insurance and any performance and payment bonds that may be required. The Director of Public Works may authorize the extension of the Contract Time by up to sixty (60) calendar days through a written amendment to this Agreement, provided such extension does not include additional contract funds. 3.2 Time is of the essence for Contractor’s performance and completion of the Work. Contractor must have sufficient time, resources, and qualified staff to deliver the work on time. 3.3 Liquidated damages of $ will be charged for each day of unexcused delay, or City may deduct the amount from Contractor’s payments. Liquidated damages are based on reasonably foreseeable consequences of delay and may include intangible losses which the Parties agree may be difficult to ascertain, such as loss of public confidence in City and its contractors, interference or loss of use of public facilities, and extended disruption to the public. 4.COMPENSATION 4.1 Maximum Compensation. City will pay Contractor for satisfactory performance of the Work an amount that will based on actual costs but that will be capped so as not to exceed $ Elcor Electric Inc.Corporation electrical service at City facilities. May 31, 2021 200.00 60,000.00 Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 2 of 12 (“Contract Price”), for all of Contractor’s direct and indirect costs, including all labor, materials, supplies, equipment, taxes, insurance, bonds, and all overhead costs. 4.2 Invoices and Payments. Contractor must submit an invoice on the first day of each month, describing the Work performed during the preceding month, itemizing labor, materials, equipment and any incidental costs incurred. Contractor will be paid ninety-five percent (95%) of the undisputed amounts billed within thirty (30) days after City receives a properly submitted invoice. Any retained amounts will be included with Contractor’s final payment within sixty (60) days of City’s acceptance of the Work as complete. 5.INDEPENDENTCONTRACTOR 5.1 Status. Contractor is an independent contractor and not an employee of City. Contractor is solely responsible for the means and methods of performing the Work and for the persons under this employment. Contractor is not entitled to worker’s compensation or any other City benefits. 5.2 Contractor’s Qualifications. Contractor warrants on behalf of itself and its subcontractors that they have the qualificationsandskillstoperform the Workin a competentand professional mannerand according to the highest standards and best practices in the industry. 5.3 Permits and Licenses. Contractor warrants on behalf of itself and its subcontractors that they are properly licensed, registered, and/or certified to perform the Work as required by law, and have procured a City Business License, if required by the Cupertino Municipal Code. Contractor shall possess a California Contractor’s License in good standing for the following classification(s): , which must remain valid for the entire Contract Time. 5.4 Subcontractors. Only Contractor’s employees are authorized to work under this Contract. Prior written approval from City is required for any subcontractor, and the terms and conditions of this Contract will apply to any approved subcontractor. 5.5 Tools, Materials, and Equipment. Contractor will supply all tools, materials and equipment required to perform the Work under this Contract. 5.6 Payment of Benefits and Taxes. Contractor is solely responsible for the payment of employment taxes incurred under this Agreement and any similar federal or state taxes. Contractor and any of its employees, agents, and subcontractors shall not have any claim under this Agreement or otherwise against City for seniority, vacation time, vacation pay, sick leave, personal time off, overtime, health insurance, medical care, hospital care, insurance benefits, social security, disability, unemployment, workers compensation or employee benefits of any kind. Contractor shall be solely liable for and obligated to pay directly all applicable taxes, fees, contributions, or charges applicable to Contractor’s business including, but not limited to, federal and state income taxes. City shall have no obligation whatsoever to pay or withhold any taxes or benefits on behalf of Contractor. Should any court, arbitrator, or administrative authority, including but not limited to the California Public Employees Retirement System (PERS), the Internal Revenue Service or the State Employment Development Division, determine that Contractor, or any of its employees, agents, or subcontractors, is an employee for any purpose, then Contractor agrees to a reduction in amounts payable under this C-10 Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 3 of 12 Agreement, or to promptly remint to City any payments due by the City as a result of such determination, so that the City’s total expenses under this Agreement are not greater than they would have been had the determination not been made. 6.CHANGE ORDERS Amendments and change orders must be in writing and signed by City and Contractor. Contractor’s request for a change order must specify the proposed changes in the Work, Contract Price, and Contract Time. Each request must include all the supporting documentation, including but not limited to plans/drawings, detailed cost estimates, and impacts on schedule and completion date. 7.ASSIGNMENTS;SUCCESSORS Contractor shall not assign, hypothecate, or transfer this Contract or any interest therein, directly or indirectly, by operation of law or otherwise, without prior written consent of City. Any attempt to do so will be null and void. Any changes related to the financial control or business nature of Contractor as a legal entity is considered an assignment of the Contract and subject to City approval, which shall not be unreasonably withheld. Control means fifty percent (50%) or more of the voting power of the business entity. This Contract is binding on Contractor, its heirs, successors, and permitted assigns. 8.PUBLICITY / SIGNS Any publicity generated by Contractor for the Project during the Contract Time, and for one (1) year thereafter must credit City contributions to the Project. The words “City of Cupertino” must be displayed in all pieces of publicity, flyers, press releases, posters, brochures, interviews, public service announcements, and newspaper articles. No signs may be posted or displayed on or about City property, except signage required by law or this Contract, without prior written approval from the City. 9.SUBCONTRACTORS 9.1 Contractor must perform all the Work with its own forces, except that Contractor may hire qualified subcontractors to perform up to % of the Work, provided that each subcontractor is required by contract to be bound by the provisions of this Contract. Contractor must provide City with written proof of compliance with this provision upon request. 9.2 City may reject any subcontractor of any tier and bar a subcontractor from performing Work on the Project, if City in its sole discretion determines that subcontractor’s Work falls short of the requirements of this Contract or constitutes grounds for rejection under the Public Contract Code. If City rejects a subcontractor, Contractor at its own expense must perform the subcontractor’s Work or hire a new subcontractor that is acceptable to City. A Notice of Completion must be recorded within fifteen (15) days after City accepts the Work if the Contract involves work by subcontractors. 10.RECORDS AND DAILYREPORTS 10.1 Contractor must maintain daily reports of the Work and submit them to City upon request and at completion of Project. The reports must describe the Work and specific tasks performed, the number of 20 Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 4 of 12 workers, the hours, the equipment, the weather conditions, and any circumstances affecting performance. City will have ownership of the reports, but Contractor will be permitted to retain copies. 10.2 If applicable, Contractor must keep a separate set of as-built drawings showing changes and updates to the Scope of Work or the original drawings as changes occur. Actual locations to scale must be identified for all major components of the Work, including mechanical, electrical and plumbing work; HVAC systems; utilities and utility connections; and any other components City determines should be included in the final drawings of the Project. Deviations from the original drawings must be shown in detail, and the location of all main runs, piping, conduit, ductwork, and drain lines must be shown by dimension and elevation. 10.3 Contractor must maintain complete and accurate accounting records of its Work, in accordance with generally accepted accounting principles, which must be available for City review and audit, kept separate from other records, and maintained for four (4) years from the date of City’s final payment. 11.INDEMNIFICATION 11.1 To the fullest extent allowed by law, and except for losses caused by the sole and active negligence or willful misconduct of City personnel, Contractor shall indemnify, defend, and hold harmless City, its City Council, boards and commissions, officers, officials, employees, agents, servants, volunteers and consultants (“Indemnitees”), through legal counsel acceptable to City, from and against any and all liability, damages, claims, stop notices, actions, causes of action, demands, charges, losses and expenses (including attorney fees, legal costs, and expenses related to litigation and dispute resolution proceedings), of every nature arising directly or indirectly from this Contract or in any manner relating to any of the following: (a)Breach of contract, obligations, representations or warranties; (b)Performance or nonperformance of the Work or of any obligations under the Contract by Contractor, its employees, agents, servants, subcontractors or subcontractors; (c)Payment or nonpayment by Contractor or its subcontractors or sub-subcontractors for Work performed on or off the Project Site; and (d)Personal injury, property damage, or economic loss resulting from the work or performance of Contractor or its subcontractors or sub-subcontractors. 11.2 Contractor must pay the costs City incurs in enforcing this provision. Contractor must accept a tender of defense upon receiving notice from City of a third-party claim, in accordance with California Public Contract Code Section 9201. At City’s request, Contractor will assist City in the defense of a claim, dispute, or lawsuit arising out of this Contract. 11.3 Contractor’s duties under this entire Section 11 are not limited to Contract Price, Workers’ Compensation, or other employee benefits, or the insurance and bond coverage required in this Contract. Nothing in the Contract shall be construed to give rise to any implied right of indemnity in favor of Contractor against City or any other Indemnitee. 11.4 Contractor’s payments may be deducted or offset to cover any money the City lost due to a claim or counterclaim arising out of this Contract, a purchase order or other transaction. Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 5 of 12 11.5 Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 11 from each and every subcontractor, or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. 11.6 This Section 11 shall survive termination of the Contract. 12.INSURANCE Contractor shall comply with the Insurance Requirements, attached and incorporated here as Exhibit B. Contractor must provide satisfactory proof of insurance and maintain it for the Contract Time or longer as required by City. City will not execute the Contract until City has approved receipt of satisfactory certificates of insurance and endorsements evidencing the type, amount, class of operations covered, and the effective and expiration dates of coverage. Failure to comply with this provision may result in City, at its sole discretion and without notice, purchasing insurance at Contractor’s expense, deducting the costs from Contractor’s compensation, or terminating the Contract. 13.COMPLIANCE WITHLAWS 13.1 General Laws. Contractor shall comply with all laws and regulations applicable to this Contract. Contractor will promptly notify City of changes in the law or other conditions that may affect the Project or Contractor’s ability to perform. Contractor is responsible for verifying the employment status of employees performing the Work, as required by the Immigration Reform and Control Act 13.2 Labor Laws. (a)The following provisions apply to contracts of $1,000 or more: (i)In General. For purposes of California labor law, this is a public works contract subject to the provisions of Part 7 of Division 2 of the California Labor Code (Sections 1720 et seq.). In accordance with Labor Code Section 1771, Contractor and all subcontractors shall pay not less than current prevailing wage rates as determined by the California Department of Industrial Relations (“DIR”) to all workers employed on this project. In accordance with Labor Code Section 1815, Contractor and all subcontractors shall pay all workers employed on this project 1 ½ the basic rate of pay for work performed in excess specified hour limitations. The work performed pursuant to this Contract is subject to compliance monitoring and enforcement by the Department of Industrial Relations. (ii)Registration. Contractor and all subcontractors shall not engage in the performance of any work under this Contract unless currently registered and qualified to perform public work pursuant to section 1725.5 of the California Labor Code. Contractor represents and warrants that it is registered and qualified to perform public work pursuant to section 1725.5 of the Labor Code and will provide its DIR registration number, along with the registration numbers of any subcontractors as required, to the City. Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 6 of 12 (iii)Posting. Contractor shall post at the job site the determination of the DIR director of the prevailing rate of per diem wages together with all job notices that are required by regulations of the DIR. (iv)Reporting. Contractor and any subcontractors shall keep accurate payroll records in accordance with Section 1776 of the Labor Code and shall furnish the payroll records directly to the Labor Commissioner in accordance with the law. (v)Report on Prevailing Rate of Wages. The City has obtained the general prevailing rate of per diem wages in the vicinity of the project for each type of worker needed, a copy of which is on file at the City of Cupertino City Hall, and shall be made available to any interested party upon request. (vi)Employment of Apprentices. Contractor’s attention is directed to the provisions in Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor. It shall be the responsibility of the Contractor to effectuate compliance on the part of itself and any subcontractors with the requirements of said sections in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. (vii)Penalties. Contractor’s attention is directed to provisions in Labor Code Sections 1775 and 1813. In accordance with Labor Code Section 1775, Contractor and subcontractors may be subject to penalties for Contractor’s and subcontractors’ failure to pay prevailing wage rates. In accordance with Labor Code Section 1813, Contractor or subcontractors may be subject to penalties for Contractor’s or subcontractors’ failure to pay overtime pay rates for hours worked by workers employed on this project in excess specified hour limitations. EContractor must compensate workers who are paid less than prevailing wages or required towork more than a legal day’s work. Contractor will also be required to pay City a penaltyof $ per worker for each day of violation. FAs required by Labor Code Section 1861, by signing this Contract Contractor certifies as follows: “I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance inaccordance with the provisions of that code, and I will comply with such provisions beforecommencing the work of thiscontract.” 13.3 Discrimination Laws. Contractor shall not discriminate on the basis of race, religious creed, color, ancestry, national origin, ethnicity, handicap, disability, marital status, pregnancy, age, sex, gender, sexual orientation, gender identity, Acquired-Immune Deficiency Syndrome (AIDS), or any other protected classification. Contractor shall comply with all anti-discrimination laws, including Government Code Sections 12900 and 11135, and Labor Code Sections 1735, 1777, and 3077.5. Consistent with City policy prohibiting harassment and discrimination, Contractor understands that harassment and discrimination directed toward a job applicant, an employee, a City employee, or any other person, by Contractor or Contractor's employees or sub-contractors will not be tolerated. 200.00 Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 7 of 12 13.4 Conflicts of Interest. Contractor, its employees, subcontractors, servants and agents, may not have, maintain or acquire a conflict of interest in relation to this Contract in violation of law, including Government Code section 1090 and Government Code section 81000 and their accompanying regulations. No officer, official, employee, consultant, or other agent of the City (“City Representative”) may have, maintain, or acquire a “financial interest” in the Contract, as that term is defined by state law, or in violation of a City ordinance or policy while serving as a City Representative or for one year thereafter. Contractor, its employees, subcontractors, servants, and agents warrant they are not employees of City nor do they have any relationship with City officials, officers, or employees that creates a conflict of interest. Contractor may be required to file a conflict of interest form if it makes certain governmental decisions or serves in a staff capacity, as defined in Section 18700 of Title 2 of the California Code of Regulations. Contractor agrees to abide by City rules governing gifts to public officials and employees. 13.5 Remedies. Any violation of Section 13 constitutes a material breach and may result in City suspending payments, requiring reimbursement, or terminating the Contract. City reserves all rights and remedies under the law and this Contract, including seeking indemnification. 14.BONDS For contracts of $25,000 or more, Contractor must obtain a payment bond and a performance bond, each in the penal sum of 100% of the Contract Price, using the Bond Forms attached and incorporated here as Exhibit C. Each bond must be issued by a surety admitted in California, with a financial rating from A.M. Best Company of Class A- or higher, or as otherwise acceptable to City. If an issuing surety cancels a bond or becomes insolvent, Contractor must provide a substitute bond from a surety acceptable to City within seven (7) calendar days after written notice from City. If Contractor fails to do so, City may in its sole discretion and without prior notice, purchase bonds at Contractor’s expense, deduct the cost from payments due Contractor, or terminate the Contract. City will not execute the Contract nor issue the NTP until the required bonds are submitted. 15.UTILITIES, TRENCHING, ANDEXCAVATION 15.1 Contractor must call the Underground Service Alert (“USA”) 811 hotline and request marking of utility locations before digging or commencing Work. For underground service alerts for street lighting and traffic signal conduits, City’s Service Center must be called at (408) 777-3269. Government Code Section 4215 requires Contractor to notify City and Utility in writing if it discovers utilities or utility facilities not identified in theContract. 15.2 Pursuant to Government Code Section 7104, Contractor must stop work, notify City in writing, and wait for instructions if one of the conditions below is found at the worksite. City will work with Contractor to amend the Contract or issue a change order if the discovered conditions materially change the Work/Performance, Contract Time or Contract Price. (a)Material believed to be hazardous waste under Health and Safety Code Section 25117, and which requires removal to a Class I, Class II, or Class III disposal site pursuant to law; (b)Subsurface or latent physical conditions at the Project worksite differing from those indicated by information about the worksite made available to Contractor; and Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO 20 Page 8 of 12 (c)Unknown physical conditions at the Project worksite of any unusual nature, materially different from those ordinarily encountered and from those generally recognized as inherent in the character of the Work. 15.3 For contracts $25,000 or higher that require excavation or involve trenches five feet or more in depth, Contractor must submit a detailed plan for City approval, per Labor Code Section 6705, prior to commencing work. The plan must show the design of shoring, bracing, sloping, and other provisions for worker protection from caving ground and other hazards. The protective system must comply with all Construction Safety Orders. If the plan varies from shoring system standards, it must be prepared by a registered civil or structural engineer. 16.URBAN RUNOFFMANAGEMENT 16.1 All Work must fully comply with federal, state, and local laws and regulations concerning storm water management. Contractor must avoid creating excess dust when breaking asphalt or concrete and during excavation and grading. If water is used for dust control, Contractor will use only the amount of water necessary to dampen the dust. Contractor will take all steps necessary to keep wash water out of the streets, gutters, and storm drains. Prior to the start of the Work, Contractor will implement erosion and sediment controls to prevent pollution of storm drains, and must upgrade and maintain these controls based on weather conditions or as otherwise required by City. These controls must be in place during the entire Contract Time and must be removed at the end of construction and completion of the Work. Such controls must include, but will not be limited to, the followingrequirements: (a)Install storm drain inlet protection devices such as sand bag barriers, filter fabric fences, and block and gravel filters at all drain inlets impacted by construction. During the annual rainy season, October 15 through June 15, storm drain inlets impacted by construction work must be filter-protected from onsite de-watering activities and saw-cutting activities. Shovel or vacuum saw-cut slurry and remove from the Work site; (b)Cover exposed piles of soil or construction material with plastic sheeting. Store all construction materials in containers; (c)Sweep and remove all materials from paved surfaces that drain to streets, gutters and storm drains prior to rain and at the end of each work day. When the Work is completed, wash the streets, collect and dispose of the wash water offsite in lawful manner; (d)After breaking old pavement, remove debris to avoid contact with rainfall/runoff; (e)Maintain a clean work area by removing trash, litter, and debris at the end of each work day and when Work is completed. Clean up any leaks, drips, and other spills as they occur. 16.2 These requirements must be used in conjunction with the California Stormwater Quality Association and California Best Management Practices Municipal and Construction Handbooks, local program guidance materials from municipalities, and any other applicable documents on stormwater quality controls for construction. Contractor’s failure to comply with this Section will result in the issuance of noncompliance notices, citations, Work stop orders and regulatory fines. Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 9 of 12 17.PROJECTCOORDINATION City Project Manager. City assigns as the City representative for all purposes under this Contract, with authority to require compliance with the Scope of Work. City may substitute Project Managers at any time and without prior notice to Contractor. Contractor Project Manager. Subject to City approval, Contractor assigns as its single representative for all purposes under this Contract, with the responsibility to ensure progress with the Work. Contractor’s Project Manager is responsible for coordinating and scheduling the Work and must regularly update the City Project Manager about the status and any delays with the Work, consistent with the Scope of Work. Any substitutions must be approved in writing by City. 18.ABANDONMENT ANDTERMINATION 18.1 City may abandon or postpone the Project or parts therefor at any time. Contractor will be compensated for satisfactory Work performed through the date of abandonment and will be given reasonable time to close out the Work. With City’s pre-approval in writing, the time spent in closing out the Work will be compensated up to ten percent (10%) of the total time expended in performing the Work. 18.2 City may terminate the Contract for cause or without cause at any time. Contractor will be paid for satisfactory Work rendered through the termination date and will be given reasonable time to close out the Work. 18.3 Final payment will not be made until Contractor delivers the Work and provides records documenting the Work, products and deliverables completed. Nothing in the Section below is intended to delay, abridge or bar City’s right under this Section. 19.GOVERNING LAW, VENUE AND DISPUTERESOLUTION This Contract is governed by the laws of State of California. Venue for any legal action shall be the Superior Court of the County of Santa Clara, California. The dispute resolution procedures of Public Contract Code Section 20104, et seq., incorporated here by reference, apply to this Contract and Contractor is required to continue the Work pending resolution of any dispute. Prior to filing a lawsuit, Contractor must comply with the claim filing requirements of the California Government Code. If the Parties elect arbitration, the arbitrator’s award must be supported by law and substantial evidence and include detailed written findings of law and fact. 20.ATTORNEY FEES If City initiates legal action, files a complaint or cross-complaint, or pursues arbitration, appeal, or other proceedings to enforce its rights or a judgment in connection with this Contract, the prevailing party will be entitled to reasonable attorney fees and costs. Ken Tanase Troy Martinez Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 10 of 12 21.SIGNS/ADVERTISEMENT No signs may be displayed on or about City’s property, except signage which is required by law or by the Contract, without City’s prior written approval as to size, design and location. 22.THIRD PARTYBENEFICIARIES There are no intended third party beneficiaries of this Contract. 23.WAIVER Neither acceptance of the Work nor payment thereof shall constitute a waiver of any contract provision. City waiver of any breach shall not constitute waiver of another provision or breach. 24. WARRANTY Contractor warrants that materials and equipment used will be new, of good quality, and free from defective workmanship and materials, and that the Work will be free from material defects not intrinsic in the design or materials. All Work, materials and equipment should pass to City free of claims, liens or encumbrances. Contractor warrants the Work and materials for one year from the date of City’s acceptance of the Work as complete (“Warranty Period”), except when a longer guarantee is provided by a supplier, manufacturer or is required by this Contract. During the Warranty Period, Contractor will repair or replace any Work defects or materials, including damage that arises from Contractor’s Warranty Work, except any wear and tear or damage resulting from improper use or maintenance. 25. ENTIRECONTRACT This Contract and the attachments, documents, and statutes attached, referenced, or expressly incorporated herein, including authorized amendments or change orders constitute the final and complete contract between City and Contractor with respect to the Work and the Project. No oral contract or implied covenant will be enforceable against City. If there is any inconsistency between any term, clause, or provision of the main Contract and any term, clause, or provision of the attachments or exhibits thereto, the terms of the main Contract shall prevail and be controlling. 26. SEVERABILITY/PARTIALINVALIDITY If a court finds any term or provision of this Contract to be illegal, invalid, or unenforceable, the legal portion of said provision and all other contract provisions will remain in full force and effect. 27. SURVIVAL The contract provisions which by their nature should survive the Contract or Completion of Project, including without limitation all provisions regarding warranties, indemnities, payment obligations, insurance, and bonds, shall remain in full force and effect after the Work is completed or Contract ends. Electrical Services 2020-21 at City Facilities Public WorksProject: Public Works Contract $60,000 /Rev.$SULO Page 11 of 12 28. INSERTED PROVISIONS Each provision and clause required by law to be inserted in this Contract will be deemed to be included and will be inferred herein. Either party may request an amendment to cure mistaken insertions or omissions of required provisions. 29. CAPTIONS The captions, titles, and headings in this Contract are for convenience only and may not be used in the construction or interpretation of the Contract or for any other purpose. 30. COUNTERPARTS This Contract may be executed in counterparts, each of which is an original and all of which taken together shall form one single document. 31. NOTICES All notices, requests, and approvals must be sent in writing to the persons below and will be considered effective on the date of personal delivery, the date confirmed by a reputable overnight delivery service, on the fifth (5th) calendar day after deposit in the United States Mail, postage prepaid, registered or certified, or the next business day following electronic submission: To City of Cupertino: $WWHQWLRQ: Email: To Contractor: $WWHQWLRQ: Email: 32. VALIDITY OF CONTRACT This Contract is valid and enforceable only if (a) it complies with the purchasing and contract provisions of Cupertino Municipal Code Chapters 3.22 and 3.23, (b) is signed by the City Manager or an authorized designee, and (c) is approved for form by the City Attorney’s Office. &RS\WR &RS\WR 10300 Torre Ave., Cupertino CA 95014 Elcor Electric Inc. 3310 Bassett St., Santa Clara, CA 95054 Troy Martinez tmartinez@elcorelectric.com Ken Tanase Carl Valdez kent@cupertino.org Electrical Services 2020-21 at City Facilities Public Works Project: Public Works Contract $60,000 /Rev. April 2020 Page 12 of 12 33.EXECUTION The persons signing below warrant they have the authority to enter into this Contract and to legally bind their respective Parties. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporations Code Section 313. IN WITNESS WHEREOF, the parties have caused this Contract to be executed as of the Execution Date first above written. CITY OF CUPERTINO, a Municipal Corporation By: __________________________________ Roger Lee Title: Public Works Director Signature Date: _________________________ CONTRACTOR By: __________________________________ Title: _________________________________ Signature Date: _________________________ APPROVED AS TO FORM: By: HEATHER M. MINNER Cupertino City Attorney ATTEST: By: KIRSTEN SQUARCIA, City Clerk Date: Troy Martinez Project Executive Jun 22, 2020 Heather M. Minner Jun 24, 2020 Jun 24, 2020 June 2, 2020 Mr. Ken Tanase City of Cupertino 21251 Stevens Creek Boulevard Cupertino, CA 95014 RE: Emergency Electrical Support Services City of Cupertino Buildings Electrical Services Dear Mr. Tanase, We are pleased to offer our services for the upcoming City of Cupertino Emergency Electrical service projects. This letter was developed from direction provided by City of Cupertino to be performed by Elcor Electric. Our services for the upcoming projects is as follows: Scope of Work •Provide Elcor Electrician to support City of Cupertino Emergency Electrical service projects. •Provide brief reports, hours worked and track daily tasks performed at each building. •This service will include an Elcor Electric vehicle and tools. •This service assumes all material will be purchased on a T&M basis. •This service assumes all work shall be performed on a T&M basis. Please see our Service Rate sheet attached. If you have any questions regarding these services, please contact the undersigned at your convenience. Sincerely, Troy Martinez Troy Martinez ELCOR ELECTRIC Proposal/City of Cupertino – Emergency Electrical Support Services 6.2.2020 EXHIBIT A June 2, 2020 Mr. Ken Tanase City of Cupertino 21251 Stevens Creek Boulevard Cupertino, CA 95014 Dear Mr. Tanase, Our service rates have changed due to a local IBEW union raise. Please see below for our rates that are in effect from June 1st, 2020 through May 31st, 2021. Rates for City of Cupertino T&M Service through May 31st, 2021 Journeyman Wireman Straight Time $159/hr. (7:00am-3:30pm) Monday-Friday Overtime $211/hr. (3:30pm-5:30pm) Monday-Friday Double Time $266/hr. (After 5:30pm) Monday-Friday/ All day Saturday, Sunday, or Holidays Foreman Straight Time $174/hr. (7:00am-3:30pm) Monday-Friday Overtime $236/hr. (3:30pm-5:30pm) Monday-Friday Double Time $297/hr. (After 5:30pm) Monday-Friday/ All day Saturday, Sunday or Holidays General Foreman Straight Time $191/hr. (7:00am-3:30pm) Monday-Friday Overtime $258/hr. (3:30pm-5:30pm) Monday-Friday Double Time $330/hr. (After 5:30pm) Monday-Friday/ All day Saturday, Sunday or Holidays For work done on a time and material basis, tax, and 15% mark-up will be included for any material provided by Elcor Electric. A 15% mark-up will also be included on any rental equipment such as scissor lifts, test equipment, etc. that are provided by Elcor Electric. A 10% mark-up will also be included on any work performed by subcontractors. A truck charge of $50 per day will be charged for all service calls. If the service call is 4 hours or less the truck charge will be pro-rated to $25. EXHIBIT A There is a minimum 2-hour charge for work performed during normal business hours. For work performed outside of normal business hours, there is a minimum 4-hour charge. An $85 administrative fee will be charged for processing each T&M tag. Sincerely, Troy Martinez Troy Martinez ELCOR ELECTRIC EXHIBIT A Revised: June 5, 2020 – Public Works Contracts 1 Exhibit A-A – SHELTER IN PLACE AND SOCIAL DISTANCING REQUIREMENTS A. Health Laws Acknowledged. It is acknowledged that Consultant’s/Contractor’s (“Contractor”) duty to comply with Laws, as defined in Section 13 of the Contract/Agreement (“Contract”), includes immediate compliance by Contractor and its subcontractors with the restrictions on travel and the Social Distancing Requirements set forth in the most recent health order issued by the County of Santa Clara Health Department in response to the COVID-19 pandemic, and any subsequent amendments or superseding orders thereto (the “Health Order”), and any other local, state, or federal laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”). B. Health Order Compliance. Contractor shall comply with any restrictions on travel and social distancing requirements in the Health Order when preforming work under this Contract. If a scope of work item, notice to proceed, or work order under this Contract specifies work that cannot be performed in compliance with the Health Order or other Health Laws, Contractor shall refrain from conducting the work and immediately inform the City. C. Individuals at High Risk of Severe Illness. Nothing in this Contract shall be interpreted to require any person at high risk of severe illness from COVID-19 to leave their residence to perform work under the Contract. Contractor will inform the City if other arrangements for the work must be made, and City will do so, with no penalty to Contractor, although Contractor will not be compensated for work performed by the City or third parties. Information from the Center for Disease Control ("CDC") on "high risk" categories is available at the CDC's website at: https://www.cdc.gov/coronavirus/2019-ncov/specific-groups/people-at-higher-risk.html. D. Health Order Requirements and Best Practices. Contractor will immediately undertake all appropriate measures to ensure compliance with the Social Distancing Requirements in the Health Order by all individuals on any project site or work area performing work under this Contract, including Contractor's or any subcontractor's workers, employees, representatives, vendors, or suppliers (collectively, "workers"), and shall maintain these measures for as long as required by the Health Order or other Health Laws. In particular, Contractor must comply with the provisions of Appendix B-1 or B-2 (attached hereto) to the Health Order, as applicable. Further, as long as required by the operative Health Order including Appendix B-1 or B-2, or other Health Laws, these measures shall include, but are not limited to, the following best practices: 1. Information. Inform all workers of the Social Distancing Requirements and these best practices, including any updates or modifications, and require compliance as a condition to being present on the project site or work area. 2. Sick Workers. Prohibit any individuals who have been tentatively or conclusively diagnosed with COVID-19 or who have any symptoms of illness, including the following, from entering or remaining on the project site or work area: fever, cough, shortness of Revised: June 5, 2020 – Public Works Contracts 2 breath, sore throat, body aches, chills, sudden loss of smell or taste or other flu-like symptoms. Encourage sick workers to get immediate medical attention. a. Daily Screening. A supervisor must ask the following questions of each worker before the worker is permitted to enter the project site or work area each day, and a worker who responds "yes" to any one of the following questions must be asked to leave immediately and will not be permitted back on the project site or work area until cleared based on meeting the applicable requirements set forth in the CDC's Interim Guidance on Discontinuation of Home Isolation for Persons with COVID-19 (https://www.cdc.gov/coronavirus/2019-ncov/hcp/disposition-in- home-patients.html): (1) Have you had any of the following symptoms within the past 14 days: fever, cough, shortness of breath, sore throat, body aches, chills, sudden loss or smell or taste, or any other flu-like symptoms? (2) Have you or anyone in your household been in contact with a person that has been diagnosed with, has symptoms of, or is being tested for COVID-19? (3) Have you been medically directed to self-quarantine due to possible exposure to COVID-19? 3. Signage/Posters. In compliance with the Health Order, post a Social Distancing Protocol, substantially in the form attached to the Health Order as Appendix A, at all project site or work area entry points, and in other areas where they are likely to be seen (e.g., project trailers, sanitary facilities, break areas). The Social Distancing Protocol must explain how Contractor is achieving compliance with social distancing requirements. Resources for this purpose are available from the CDC at: https://www.cdc.gov/coronavirus/2019-ncov/community/guidance-business- response.html A copy of the Social Distancing Protocol must also be provided to each employee performing work at the project site or work area. 4. Sanitary Facilities. Ensure adequate handwashing and/or hand-sanitizing facilities are available at all times and encourage frequent handwashing and/or hand-sanitizing throughout the day as specified below. Portable sanitary facilities must be serviced and cleaned on a daily basis. Provide hand sanitizer in or around all toilet facilities and common areas, including project trailers. a. Handwashing. Wash hands using soap and water for at least 20 seconds. b. Hand-sanitizer. Use a hand sanitizer that contains at least 60-95% alcohol when handwashing is not immediately available. Revised: June 5, 2020 – Public Works Contracts 3 c. Paper Products. Ensure that toilet paper, tissues, and paper towels are available as appropriate, with designated receptacles for disposal. 5. Distancing. Prohibit workers from being less than six feet apart, unless and only to the extent that would compromise worker safety or violate safety Laws for specific operations. Prohibit handshaking or any physical contact among workers, with the sole and limited exception of any physical contact required for worker safety or to comply with safety Laws. Avoid sharing tools to the extent possible. Require workers to provide their own transportation where possible and to avoid having more than two workers in a vehicle. 6. Groups/Meetings/Site Access. Avoid any group gatherings of 10 or more people. Use electronic alternatives to in person meetings, e.g., conference calls, video-conferencing, etc., to the greatest extent possible. Limit access to the project site or any work area to workers who are necessary to perform the work at that time. Allow non-essential personnel to work from home to the extent possible. Avoid all non-essential travel. Do not stack trades if possible. 7. Frequent Cleaning. Provide for regular and appropriate cleaning of all high touch surfaces at a project site or work area, including, but not limited to, shared tools or equipment, doorknobs and handles, toolboxes, sanitary facilities, common break areas, keypads, touch screens, project trailer surfaces and equipment, light or power switches, workstations, countertops, break areas, and the like. Clean and/or disinfect any reusable items or equipment. Clean surfaces of shared vehicles, including steering wheels, gear shifts, handles, instrument panels, etc. Ensure that cleaning products are used correctly and safely, and avoid cleaning techniques, such as use of pressurized air or water sprays, that may generate bioaerosols. 8. Personal Protective Equipment. When workers cannot avoid close proximity or physical contact, e.g., based on applicable safety laws, or are otherwise at risk for exposure to COVID-19, ensure that the affected workers are provided with appropriate personal protective equipment ("PPE"), which may include disposable gloves and/or other PPE. Instruct workers to wash or sanitize hands after removing gloves or other PPE. Ensure that all personal protective equipment is disposed of properly. 9. Water and Food. Prohibit shared or communal food or common water coolers. Provide individual water bottles for workers or instruct workers to bring their own. 10. Enforcement. Immediately eject any worker who fails or refuses to comply with the Health Laws, Social Distancing Requirements, or these best practices from the project site until or unless the Project Manager issues a written authorization for the worker to return, subject to full compliance. Revised: June 5, 2020 – Public Works Contracts 4 F. Proof of Compliance. If Contractor is subject to Appendix B-1 of the Health Order, Contractor must provide to the City the name and contact information for its designated site-specific COVID-19 supervisor(s). If Contractor is subject to Appendix B-2 of the Health Order, Contractor must provide to the City a copy of its Site-Specific Health and Safety Plan. Any changes to the COVID-19 supervisor or the Site-Specific Health and Safety Plan must be reported to the City immediately. E. Oversight. In other to ensure that all workers comply with the Social Distancing Requirements to the extent possible, Contractor shall designate a named individual to have primary responsibility for implementation and enforcement of the Social Distancing Requirements and these best practices, and to serve as the primary point of contact with the City in this regard. Contractor shall promptly inform the City of the name of this individual. F. Changed Requirements. It is understood and acknowledged that circumstances pertaining to the COVID-19 pandemic are evolving rapidly and that new local, state, or federal requirements may modify the requirements under this Exhibit. Contractor agrees to work cooperatively with the City to implement new or changed requirements as quickly as possible. G. Subcontracts. Contractor shall include the terms of this Exhibit in all subcontracts and require any agents, subcontractors, or subconsultants to comply with its provisions. Attachments to Exhibit A-A Appendix B-1 to June 5, 2020 Health Order Appendix B-2 to June 5, 2020 Health Order 1228578.4 Appendix B-1 (Effective June 5, 2020) 1 Small Construction Project Safety Protocol 1. Any construction project meeting any of the following specifications is subject to this Small Construction Project Safety Protocol (“SCP Protocol”), including public works projects unless otherwise specified by the Health Officer: a. For residential projects, any single-family, multi-family, senior, student, or other residential construction, renovation, or remodel project consisting of 10 units or less. This SCP Protocol does not apply to construction projects where a person is performing construction on their current residence either alone or solely with members of their own household. b. For commercial projects, any construction, renovation, or tenant improvement project consisting of 20,000 square feet of floor area or less. c. For mixed-use projects, any project that meets both of the specifications in subsection 1.a and 1.b. d. All other construction projects not subject to the Large Construction Project Safety Protocol set forth in Appendix B-2. 2. The following restrictions and requirements must be in place at all construction job sites subject to this SCP Protocol: a. Comply with all applicable and current laws and regulations including but not limited to OSHA and Cal-OSHA. If there is any conflict, difference, or discrepancy between or among applicable laws and regulations and/or this SCP Protocol, the stricter standard shall apply. b. Designate a site-specific COVID-19 supervisor or supervisors to enforce this guidance. A designated COVID-19 supervisor must be present on the construction site at all times during construction activities. A COVID-19 supervisor may be an on-site worker who is designated to serve in this role. c. The COVID-19 supervisor must review this SCP Protocol with all workers and visitors to the construction site. d. Establish a daily screening protocol for arriving staff to ensure that potentially infected staff do not enter the construction site. If workers leave the jobsite and return the same day, establish a cleaning and decontamination protocol prior to entry and exit of the jobsite. Post the daily screening protocol at all entrances and exits to the jobsite. More information on screening can be found online at: https://www.cdc.gov/coronavirus/2019- ncov/community/index.html. e. Practice social distancing by maintaining a minimum six-foot distance between workers at all times, except as strictly necessary to carry out a task associated with the construction project. Appendix B-1 (Effective June 5, 2020) 2 f. Where construction work occurs within an occupied residential unit, separate work areas must be sealed off from the remainder of the unit with physical barriers such as plastic sheeting or closed doors sealed with tape to the extent feasible. If possible, workers must access the work area from an alternative entry/exit door to the entry/exit door used by residents. Available windows and exhaust fans must be used to ventilate the work area. If residents have access to the work area between workdays, the work area must be cleaned and sanitized at the beginning and at the end of workdays. Every effort must be taken to minimize contact between workers and residents, including maintaining a minimum of six feet of social distancing at all times. g. Where construction work occurs within common areas of an occupied residential or commercial building or a mixed-use building in use by on-site employees or residents, separate work areas must be sealed off from the rest of the common areas with physical barriers such as plastic sheeting or closed doors sealed with tape to the extent feasible. If possible, workers must access the work area from an alternative building entry/exit door to the building entry/exit door used by residents or other users of the building. Every effort must be taken to minimize contact between worker and building residents and users, including maintaining a minimum of six feet of social distancing at all times. h. Prohibit gatherings of any size on the jobsite, including gatherings for breaks or eating, except for meetings regarding compliance with this protocol or as strictly necessary to carry out a task associated with the construction project. i. Cal-OSHA requires employers to provide water, which should be provided in single-serve containers. Sharing of any of any food or beverage is strictly prohibited and if sharing is observed, the worker must be sent home for the day. j. Provide personal protective equipment (PPE) specifically for use in construction, including gloves, goggles, face shields, and face coverings as appropriate for the activity being performed. At no time may a contractor secure or use medical-grade PPE unless required due to the medical nature of a jobsite. Face coverings must be worn in compliance with the April 17, 2020 Guidance from the County of Santa Clara Public Health Department, available at: https://www.sccgov.org/sites/covid19/Pages/learn-what-to-do.aspx#howto. k. Strictly control “choke points” and “high-risk areas” where workers are unable to maintain six-foot social distancing and prohibit or limit use to ensure that six-foot distance can easily be maintained between individuals. l. Minimize interactions and maintain social distancing with all site visitors, including delivery workers, design professional and other project consultants, government agency representatives, including building and fire inspectors, and residents at residential construction sites. m. Stagger trades as necessary to reduce density and allow for easy maintenance of minimum six-foot separation. Appendix B-1 (Effective June 5, 2020) 3 n. Discourage workers from using others’ desks, work tools, and equipment. If more than one worker uses these items, the items must be cleaned and disinfected with disinfectants that are effective against COVID-19 in between use by each new worker. Prohibit sharing of PPE. o. If hand washing facilities are not available at the jobsite, place portable wash stations or hand sanitizers that are effective against COVID-19 at entrances to the jobsite and in multiple locations dispersed throughout the jobsite as warranted. p. Clean and sanitize any hand washing facilities, portable wash stations, jobsite restroom areas, or other enclosed spaces daily with disinfectants that are effective against COVID-19. Frequently clean and disinfect all high touch areas, including entry and exit areas, high traffic areas, rest rooms, hand washing areas, high touch surfaces, tools, and equipment q. Maintain a daily attendance log of all workers and visitors that includes contact information, including name, phone number, address, and email. r. Post a notice in an area visible to all workers and visitors instructing workers and visitors to do the following: i. Do not touch your face with unwashed hands or with gloves. ii. Frequently wash your hands with soap and water for at least 20 seconds or use hand sanitizer with at least 60% alcohol. iii. Clean and disinfect frequently touched objects and surfaces such as work stations, keyboards, telephones, handrails, machines, shared tools, elevator control buttons, and doorknobs. iv. Cover your mouth and nose when coughing or sneezing, or cough or sneeze into the crook of your arm at your elbow/sleeve. v. Do not enter the jobsite if you have a fever, cough, or other COVID-19 symptoms. If you feel sick, or have been exposed to anyone who is sick, stay at home. vi. Constantly observe your work distances in relation to other staff. Maintain the recommended minimum six feet at all times when not wearing the necessary PPE for working in close proximity to another person. vii. Do not carpool to and from the jobsite with anyone except members of your own household unit, or as necessary for workers who have no alternative means of transportation. viii. Do not share phones or PPE. s. In the event of a confirmed case of COVID-19 at any jobsite, the following must take place: i. Immediately remove the infected individual from the jobsite with directions to seek medical care. ii. Each location the infected worker was at must be decontaminated and sanitized by an outside vendor certified in hazmat clean ups, and work in these locations must cease until decontamination and sanitization is complete. iii. The County Public Health Department must be notified immediately by both telephone (by calling 408.885.4214) and by email (by sending an email to coronavirus@phd.sccgov.org). Any requirements specified by the County health officials must be completed, including full compliance with any tracing efforts by the County. Appendix B-2 (Effective June 5, 2020) 1 Large Construction Project Safety Protocol 1. Any construction project meeting any of the following specifications is subject to this Large Construction Project Safety Protocol (“LCP Protocol”), including public works projects unless otherwise specified by the Health Officer: a. For residential construction projects, any single-family, multi-family, senior, student, or other residential construction, renovation, or remodel project consisting of more than 10 units. b. For commercial construction projects, any construction, renovation, or tenant improvement project consisting of more than 20,000 square feet of floor area. c. For construction of Essential Infrastructure, as defined in section 16.c of the Order, any project that requires 20 or more workers at the jobsite at any one time. 2. The following restrictions and requirements must be in place at all construction job sites subject to this LCP Protocol: a. Comply with all applicable and current laws and regulations including but not limited to OSHA and Cal-OSHA. If there is any conflict, difference or discrepancy between or among applicable laws and regulations and/or this LCP Protocol, the stricter standard will apply. b. Prepare a new or updated Site-Specific Health and Safety Plan to address COVID- 19-related issues, post the Plan on-site at all entrances and exits, and produce a copy of the Plan to County governmental authorities upon request. The Plan must be translated as necessary to ensure that all non-English speaking workers are able to understand the Plan. c. Provide personal protective equipment (PPE) specifically for use in construction, including gloves, goggles, face shields, and face coverings as appropriate for the activity being performed. At no time may a contractor secure or use medical-grade PPE, unless required due to the medical nature of a job site. Face coverings must be worn in compliance with the April 17, 2020 Guidance from the County of Santa Clara Public Health Department, available at: https://www.sccgov.org/sites/covid19/Pages/learn-what-to-do.aspx#howto. d. Ensure that employees are trained in the use of PPE. Maintain and make available a log of all PPE training provided to employees and monitor all employees to ensure proper use of the PPE. e. Prohibit sharing of PPE. Appendix B-2 (Effective June 5, 2020) 2 f. Implement social distancing requirements including, at minimum: i. Stagger stop- and start-times for shift schedules to reduce the quantity of workers at the jobsite at any one time to the extent feasible. ii. Stagger trade-specific work to minimize the quantity of workers at the jobsite at any one time. iii. Require social distancing by maintaining a minimum six-foot distance between workers at all times, except as strictly necessary to carry out a task associated with the project. iv. Prohibit gatherings of any size on the jobsite, except for safety meetings or as strictly necessary to carry out a task associated with the project. v. Strictly control “choke points” and “high-risk areas” where workers are unable to maintain minimum six-foot social distancing and prohibit or limit use to ensure that minimum six-foot distancing can easily be maintained between workers. vi. Minimize interactions and maintain social distancing with all site visitors, including delivery workers, design professional and other project consultants, government agency representatives, including building and fire inspectors, and residents at residential construction sites. vii. Prohibit workers from using others’ phones or desks. Any work tools or equipment that must be used by more than one worker must be cleaned with disinfectants that are effective against COVID-19 before use by a new worker. viii. Place wash stations or hand sanitizers that are effective against COVID-19 at entrances to the jobsite and in multiple locations dispersed throughout the jobsite as warranted. ix. Maintain a daily attendance log of all workers and visitors that includes contact information, including name, address, phone number, and email. x. Post a notice in an area visible to all workers and visitors instructing workers and visitors to do the following: 1. Do not touch your face with unwashed hands or with gloves. 2. Frequently wash your hands with soap and water for at least 20 seconds or use hand sanitizer with at least 60% alcohol. 3. Clean and disinfect frequently touched objects and surfaces such as workstations, keyboards, telephones, handrails, machines, shared tools, elevator control buttons, and doorknobs. 4. Cover your mouth and nose when coughing or sneezing or cough or sneeze into the crook of your arm at your elbow/sleeve. 5. Do not enter the jobsite if you have a fever, cough, or other COVID- 19 symptoms. If you feel sick, or have been exposed to anyone who is sick, stay at home. 6. Constantly observe your work distances in relation to other staff. Maintain the recommended minimum six-feet distancing at all times when not wearing the necessary PPE for working in close proximity to another person. 7. Do not share phones or PPE. Appendix B-2 (Effective June 5, 2020) 3 xi. The notice in section 2.f.x must be translated as necessary to ensure that all non-English speaking workers are able to understand the notice. g. Implement cleaning and sanitization practices in accordance with the following: i. Frequently clean and sanitize, in accordance with CDC guidelines, all high-traffic and high-touch areas including, at a minimum: meeting areas, jobsite lunch and break areas, entrances and exits to the jobsite, jobsite trailers, hand-washing areas, tools, equipment, jobsite restroom areas, stairs, elevators, and lifts. ii. Establish a cleaning and decontamination protocol prior to entry and exit of the jobsite and post the protocol at entrances and exits of jobsite. iii. Supply all personnel performing cleaning and sanitization with proper PPE to prevent them from contracting COVID-19. Employees must not share PPE. iv. Establish adequate time in the workday to allow for proper cleaning and decontamination including prior to starting at or leaving the jobsite for the day. h. Implement a COVID-19 community spread reduction plan as part of the Site-Specific Health and Safety Plan that includes, at minimum, the following restrictions and requirements: i. Prohibit all carpooling to and from the jobsite except by workers living within the same household unit, or as necessary for workers who have no alternative means of transportation. ii. Cal-OSHA requires employers to provide water, which should be provided in single- serve containers. Prohibit any sharing of any food or beverage and if sharing is observed, the worker must be sent home for the day. iii. Prohibit use of microwaves, water coolers, and other similar shared equipment. i. Assign a COVID-19 Safety Compliance Officer (SCO) to the jobsite and ensure the SCO’s name is posted on the Site-Specific Health and Safety Plan. The SCO must: i. Ensure implementation of all recommended safety and sanitation requirements regarding the COVID-19 virus at the jobsite. ii. Compile daily written verification that each jobsite is compliant with the components of this LCP Protocol. Each written verification form must be copied, stored, and made immediately available upon request by any County official. iii. Establish a daily screening protocol for arriving staff, to ensure that potentially infected staff do not enter the construction site. If workers leave the jobsite and return the same day, establish a cleaning and decontamination protocol prior to entry and exit of the jobsite. Post the daily screening protocol at all entrances and exit to the jobsite. More information on screening can be found online at: https://www.cdc.gov/coronavirus/2019-ncov/community/index.html. iv. Conduct daily briefings in person or by teleconference that must cover the following topics: 1. New jobsite rules and pre-job site travel restrictions for the prevention of COVID-19 community spread. 2. Review of sanitation and hygiene procedures. 3. Solicitation of worker feedback on improving safety and sanitation. 4. Coordination of construction site daily cleaning/sanitation requirements. 5. Conveying updated information regarding COVID-19. Appendix B-2 (Effective June 5, 2020) 4 6. Emergency protocols in the event of an exposure or suspected exposure to COVID-19. v. Develop and ensure implementation of a remediation plan to address any non- compliance with this LCP Protocol and post remediation plan at entrance and exit of jobsite during remediation period. The remediation plan must be translated as necessary to ensure that all non-English speaking workers are able to understand the document. vi. The SCO must not permit any construction activity to continue without bringing such activity into compliance with these requirements. vii. Report repeated non-compliance with this LCP Protocol to the appropriate jobsite supervisors and a designated County official. j. Assign a COVID-19 Third-Party Jobsite Safety Accountability Supervisor (JSAS) for the jobsite, who at a minimum holds an OSHA-30 certificate and first-aid training within the past two years, who must be trained in the protocols herein and verify compliance, including by visual inspection and random interviews with workers, with this LCP Protocol. i. Within seven calendar days of each jobsite visit, the JSAS must complete a written assessment identifying any failure to comply with this LCP Protocol. The written assessment must be copied, stored, and, upon request by the County, sent to a designated County official. ii. If the JSAS discovers that a jobsite is not in compliance with this LCP Protocol, the JSAS must work with the SCO to develop and implement a remediation plan. iii. The JSAS must coordinate with the SCO to prohibit continuation of any work activity not in compliance with rules stated herein until addressed and the continuing work is compliant. iv. The remediation plan must be sent to a designated County official within five calendar days of the JSAS’s discovery of the failure to comply. k. In the event of a confirmed case of COVID-19 at any jobsite, the following must take place: i. Immediately remove the infected individual from the jobsite with directions to seek medical care. ii. Each location the infected worker was at must be decontaminated and sanitized by an outside vendor certified in hazmat clean ups, and work in these locations must cease until decontamination and sanitization is complete. iii. The County Public Health Department must be notified immediately by both telephone (by calling 408.885.4214) and by email (by sending an email to coronavirus@phd.sccgov.org). Any requirements specified by the County health officials must be completed, including full compliance with any tracing efforts by the County. l. Where construction work occurs within an occupied residential unit, any separate work area must be sealed off from the remainder of the unit with physical barriers such as plastic sheeting or closed doors sealed with tape to the extent feasible. If possible, workers must access the work area from an alternative entry/exit door to the entry/exit door used by Appendix B-2 (Effective June 5, 2020) 5 residents. Available windows and exhaust fans must be used to ventilate the work area. If residents have access to the work area between workdays, the work area must be cleaned and sanitized at the beginning and at the end of workdays. Every effort must be taken to minimize contact between workers and residents, including maintaining a minimum of six feet of social distancing at all times. m. Where construction work occurs within common areas of an occupied residential or commercial building or a mixed-use building in use by on-site employees or residents, any separate work area must be sealed off from the rest of the common areas with physical barriers such as plastic sheeting or closed doors sealed with tape to the extent feasible. If possible, workers must access the work area from an alternative building entry/exit door to the building entry/exit door used by residents or other users of the building. Every effort must be taken to minimize contact between worker and building residents and users, including maintaining a minimum of six feet of social distancing at all times. Insurance Requirements for Construction Contracts - $60,000 Version: Sept. 2019 1 Contractor shall procure and maintain for the duration of the contract, and for five years following the completion of the Project, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by Contractor, its agents, representatives, employees or subcontractors. MINIMUM SCOPE AND LIMIT OF INSURANCE Coverage shall be at least as broad as: 1. Commercial General Liability (“CGL”): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, written on a comprehensive general liability form, and must include coverage for liability arising from Contractor’s or Subcontractor’s acts or omissions, including Contractor’s protected coverage, blanket contractual, products and completed operations, vehicle coverage and employer’s non-ownership liability coverage, with limits of at least $2,000,000 per occurrence. The CGL policy must protect against any and all liability for personal injury, death, property damage or destruction, and personal and advertising injury. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. a. It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be made available to the Additional Insured and shall be (1) the minimum coverage/limits specified in this agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy, whichever is greater. b. Additional Insured coverage under Contractor's policy shall be "primary and non-contributory," will not seek contribution from City’s insurance/self-insurance, and shall be at least as broad as ISO CG 20 01 04 13 c. The limits of insurance required may be satisfied by a combination of primary and umbrella or excess insurance, provided each policy complies with the requirements set forth in this Contract. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect City as a named insured. 2. Automobile Liability: ISO Form CA 00 01 covering any auto (Code 1), or if Contractor has no owned autos, then hired autos (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage. 3. Workers’ Compensation: As required by the State of California, with Statutory Limits, and Employer’s Liability Insurance of no less than $1,000,000 per accident for bodily injury or disease, or as otherwise required by statute. If Contractor is self-insured, Contractor must provide a Certificate of Permission to Self-Insure, duly authorized by the DIR. N/A if box checked (Contractor provides written verification it has no employees). 4. Professional Liability with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 aggregate. N/A if box checked (Contract is not design/build). 5. Builder’s Risk. Course of Construction insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions. N/A if box checked (Project does not involve construction or improvements/installations to property). PUBLIC WORKS CONSTRUCTION CONTRACTS Small Projects - $60,000 Insurance Requirements: Exhibit B Insurance Requirements for Construction Contracts - $60,000 Version: Sept. 2019 2 6. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate. N/A if box checked (Project does not involve environmental hazards). If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires and shall be entitled to the broader coverage and/or higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. Self-Insured Retentions. Self-insured retentions must be declared to and approved by City. At City’s option, either: (1) Contractor shall cause the insurer to reduce or eliminate self-insured retentions as respects City, its officers, officials, employees, and volunteers; or (2) Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or the City. OTHER INSURANCE PROVISIONS The insurance policies are to contain, or be endorsed to contain, the following provisions: Additional Insured Status The City of Cupertino, its City Council, officers, officials, employees, agents, servants and volunteers are to be covered as additional insureds on the CGL and automobile liability policies with respect to liability arising out of the Services performed by or on behalf of Contractor including materials, parts, or equipment furnished. Endorsement of CGL coverage shall be at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used. Primary Coverage For any claims related to this Project, Contractor’s insurance coverage shall be “primary and non-contributory” and at least as broad as ISO CG 20 01 04 13 with respect to City, its officers, officials, employees and volunteers, and shall not seek contribution from City’s insurance. If the limits of insurance are satisfied in part by Umbrella/Excess Insurance, the Umbrella/Excess Insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a “primary and non-contributory” basis for the benefit of City. Notice of Cancellation Each insurance policy required shall provide that coverage shall not be canceled, except with notice to the City. Each certificate of insurance must state that the coverage afforded by the policy is in force and will not be reduced, cancelled or allowed to expire without at least 30 days advance written notice to City, unless due to non-payment of premiums, in which case ten days advance written notice must be provided to City. Such notice must be sent to City via certified mail and addressed to the attention of the City Manager. Builder’s Risk Contractor may submit Builder’s Risk insurance in the form of Course of Construction coverage, which shall name the City as a loss payee, as its interest may appear. The Builder’s Risk policy must be issued on an occurrence basis, for all-risk coverage on a 100% completed value basis on the insurable portion of the Project, with no coinsurance penalties, and for the benefit of City. If the Project does not involve new or major reconstruction, City may elect, acting in its sole discretion, to accept an Installation Floater policy instead of Builder’s Risk. For such projects, the Property Installation Floater shall include improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment, and shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site. Insurance Requirements for Construction Contracts - $60,000 Version: Sept. 2019 3 Waiver of Subrogation Each required policy must include an endorsement providing that the carrier agrees to waive any right of subrogation it may have against City. Contractor agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors. Acceptability of Insurers Insurance must be issued by insurers acceptable to City and licensed to do business in the State of California, and each insurer must have an A.M. Best’s financial strength rating of “A” or better and a financial size rating of “VII” or better. Verification of Coverage Contractor shall furnish the City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this contract. All certificates and endorsements are to be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time. Subcontractors Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13. Surety Bonds As required by Contract and described in the Contract Documents. The Payment and Performance Bonds shall be in a sum equal to the Contract Price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the Contract is for longer than one year a Maintenance Bond equal to 10% of the Contract Price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California. Special Risks or Circumstances City reserves the right to modify these requirements, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY 6/2/2020 Asero Insurance Services 200 N. Almaden Blvd. 3rd Floor San Jose, CA 95110 866-966-8928 408-271-1802 www.aseroins.com License No. 0A91339 Joe Longwello Asero Insurance Services certs@aseroins.com Elcor Electric, Inc. 3310 Bassett Street Santa Clara CA 95054 55816182 3 3 33 3 All California Operations under written contract by named insured. endorsement attached. City of Cupertino 10555 Mary Ave Cupertino CA 95014 The City of Cupertino, it's City Council, officers, officials, employees, agents, servants and volunteers are named as Additional Insured per Note: 30 Days Notice of Cancellation will be given except 10 days for non-payment A 1,000,000DT22CO5200R796TIL197/25/2019 7/25/2020 300,000 3 10,000 3 1,000,000 2,000,000 2,000,0003 A 8102N6450331926G 7/25/2019 7/25/2020 1,000,000 3 3 3 A CUP6N94923A1926 7/25/2019 7/25/2020 5,000,00033 5,000,000 3 10,000 A UB8K1125291926G 7/25/2019 7/25/2020 3 1,000,000 1,000,000 1,000,000 Deductible: Per Claim $ 25,000 C Third Party Crime 106051978 1/29/2020 1/29/2021 Limit $1,000,000 Travelers Property Casualty Co of Amer 25674 Travelers Casualty and Surety Co America 31194 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 1 of 12 ACORD 101 (2008/01) The ACORD name and logo are registered marks of ACORD © 2008 ACORD CORPORATION. All rights reserved. THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER:FORM TITLE: ADDITIONAL REMARKS ADDITIONAL REMARKS SCHEDULE Page of AGENCY CUSTOMER ID: LOC #: AGENCY CARRIER NAIC CODE POLICY NUMBER NAMED INSURED EFFECTIVE DATE: General Liability Additional Insured / Primary & Non-Contributory as required by written contract per form CG D6 04 08 13 General Liability Waiver of Subrogation as required by written contract per form CG D3 16 11 11, Section L. Commercial Auto Liability Additional Insured / Waiver of Subrogation as required by written contract per form CA T3 53 02 15 Workers’ Compensation Waiver of Subrogation as required by written contract per form WC 99 03 76/a Pollution Liability is Primary and Non-Contributory as required by written contract. Asero Insurance Services Elcor Electric, Inc. 3310 Bassett Street Santa Clara CA 95054 25 Certificate of Liability (03/16) ATTACHMENT HOLDER: ADDRESS: City of Cupertino 10555 Mary Ave Cupertino CA 95014 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 2 of 12 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED – AUTOMATIC STATUS IF REQUIRED BY WRITTEN CONTRACT (CONTRACTORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART 1.The following is added to SECTION II – WHO IS AN INSURED: Any person or organization that: a.You agree in a "written contract requiring in- surance" to include as an additional insured on this Coverage Part; and b.Has not been added as an additional insured for the same project by attachment of an en- dorsement under this Coverage Part which includes such person or organization in the endorsement's schedule; is an insured, but: a.Only with respect to liability for "bodily injury", "property damage" or "personal injury"; and b.Only as described in Paragraph (1),(2)or (3) below, whichever applies: (1)If the "written contract requiring insur- ance" specifically requires you to provide additional insured coverage to that per- son or organization by the use of: (a)The Additional Insured – Owners, Lessees or Contractors – (Form B) endorsement CG 20 10 11 85; or (b)Either or both of the following: the Additional Insured – Owners, Les- sees or Contractors – Scheduled Person Or Organization endorsement CG 20 10 10 01, or the Additional In- sured – Owners, Lessees or Contrac- tors – Completed Operations en- dorsement CG 20 37 10 01; the person or organization is an additional insured only if the injury or damage arises out of "your work" to which the "written contract requiring insurance" applies; (2)If the "written contract requiring insur- ance" specifically requires you to provide additional insured coverage to that per- son or organization by the use of: (a)The Additional Insured – Owners, Lessees or Contractors – Scheduled Person or Organization endorsement CG 20 10 07 04 or CG 20 10 04 13, the Additional Insured – Owners, Lessees or Contractors – Completed Operations endorsement CG 20 37 07 04 or CG 20 37 04 13, or both of such endorsements with either of those edition dates; or (b)Either or both of the following: the Additional Insured – Owners, Les- sees or Contractors – Scheduled Person Or Organization endorsement CG 20 10, or the Additional Insured – Owners, Lessees or Contractors – Completed Operations endorsement CG 20 37, without an edition date of such endorsement specified; the person or organization is an additional insured only if the injury or damage is caused, in whole or in part, by acts or omissions of you or your subcontractor in the performance of "your work" to which the "written contract requiring insurance" applies; or (3)If neither Paragraph (1)nor (2)above ap- plies: (a)The person or organization is an ad- ditional insured only if, and to the ex- tent that, the injury or damage is caused by acts or omissions of you or your subcontractor in the perform- ance of "your work" to which the "writ- ten contract requiring insurance" ap- plies; and (b)The person or organization does not qualify as an additional insured with respect to the independent acts or omissions of such person or organi- zation. CG D6 04 08 13 © 2013 The Travelers Indemnity Company. All rights reserved. Page 1 of 3 Policy No: Insured: Elcor Electric, Inc. DT22CO5200R796TIL19 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 3 of 12 2.The insurance provided to the additional insured by this endorsement is limited as follows: a.If the Limits of Insurance of this Coverage Part shown in the Declarations exceed the minimum limits of liability required by the "written contract requiring insurance", the in- surance provided to the additional insured will be limited to such minimum required limits of liability. For the purposes of determining whether this limitation applies, the minimum limits of liability required by the "written con- tract requiring insurance" will be considered to include the minimum limits of liability of any Umbrella or Excess liability coverage required for the additional insured by that "written con- tract requiring insurance". This endorsement will not increase the limits of insurance de- scribed in Section III – Limits Of Insurance. b.The insurance provided to the additional in- sured does not apply to "bodily injury", "prop- erty damage" or "personal injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or sur- veying services, including: (1)The preparing, approving, or failing to prepare or approve, maps, shop draw- ings, opinions, reports, surveys, field or- ders or change orders, or the preparing, approving, or failing to prepare or ap- prove, drawings and specifications; and (2)Supervisory, inspection, architectural or engineering activities. c.The insurance provided to the additional in- sured does not apply to "bodily injury" or "property damage" caused by "your work" and included in the "products-completed opera- tions hazard" unless the "written contract re- quiring insurance" specifically requires you to provide such coverage for that additional in- sured during the policy period. 3.The insurance provided to the additional insured by this endorsement is excess over any valid and collectible other insurance, whether primary, ex- cess, contingent or on any other basis, that is available to the additional insured. However, if the "written contract requiring insurance" specifically requires that this insurance apply on a primary basis or a primary and non-contributory basis, this insurance is primary to other insurance available to the additional insured under which that person or organization qualifies as a named insured, and we will not share with that other insurance. But the insurance provided to the additional insured by this endorsement still is excess over any valid and collectible other insurance, whether primary, excess, contingent or on any other basis, that is available to the additional insured when that per- son or organization is an additional insured, or is any other insured that does not qualify as a named insured, under such other insurance. 4.As a condition of coverage provided to the addi- tional insured by this endorsement: a.The additional insured must give us written notice as soon as practicable of an "occur- rence" or an offense which may result in a claim. To the extent possible, such notice should include: (1)How, when and where the "occurrence" or offense took place; (2)The names and addresses of any injured persons and witnesses; and (3)The nature and location of any injury or damage arising out of the "occurrence" or offense. b.If a claim is made or "suit" is brought against the additional insured, the additional insured must: (1)Immediately record the specifics of the claim or "suit" and the date received; and (2)Notify us as soon as practicable. The additional insured must see to it that we receive written notice of the claim or "suit" as soon as practicable. c.The additional insured must immediately send us copies of all legal papers received in con- nection with the claim or "suit", cooperate with us in the investigation or settlement of the claim or defense against the "suit", and oth- erwise comply with all policy conditions. d.The additional insured must tender the de- fense and indemnity of any claim or "suit" to any provider of other insurance which would cover the additional insured for a loss we cover under this endorsement. However, this condition does not affect whether the insur- ance provided to the additional insured by this endorsement is primary to other insurance available to the additional insured which cov- ers that person or organization as a named insured as described in Paragraph 3.above. 5.The following is added to the DEFINITIONS Sec- tion: "Written contract requiring insurance" means that part of any written contract or agreement under which you are required to include a person or or- Page 2 of 3 © 2013 The Travelers Indemnity Company. All rights reserved.CG D6 04 08 13 Policy No:COMMERCIAL GENERAL LIABILITYDT22CO5200R796TIL19 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 4 of 12 COMMERCIAL GENERAL LIABILITY CG D6 04 08 13 © 2013 The Travelers Indemnity Company. All rights reserved. Page 3 of 3 ganization as an additional insured on this Cover- age Part, provided that the "bodily injury" and "property damage" occurs, and the "personal in- jury" is caused by an offense committed, during the policy period and: a.After the signing and execution of the contract or agreement by you; and b.While that part of the contract or agreement is in effect. Policy No:DT22CO5200R796TIL19 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 5 of 12 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTORS XTEND ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART GENERAL DESCRIPTION OF COVERAGE –This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to this Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A.Aircraft Chartered With Pilot B.Damage To Premises Rented To You C.Increased Supplementary Payments D.Incidental Medical Malpractice E.Who Is An Insured –Newly Acquired Or Formed Organizations F.Who Is An Insured –Broadened Named Insured – Unnamed Subsidiaries G.Blanket Additional Insured –Owners, Managers Or Lessors Of Premises PROVISIONS A. AIRCRAFT CHARTERED WITH PILOT The following is added to Exclusion g.,Aircraft, Auto Or Watercraft,in Paragraph 2.of SECTION I – COVERAGES – COVERAGE A BODILY IN- JURY AND PROPERTY DAMAGE LIABILITY: This exclusion does not apply to an aircraft that is: a.Chartered with a pilot to any insured; b.Not owned by any insured; and c.Not being used to carry any person or prop- erty for a charge. B. DAMAGE TO PREMISES RENTED TO YOU 1.The first paragraph of the exceptions in Ex- clusion j.,Damage To Property, in Para- graph 2.of SECTION I – COVERAGES – COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY is deleted. 2.The following replaces the last paragraph of Paragraph 2.,Exclusions, of SECTION I – COVERAGES – COVERAGE A. BODILY H.Blanket Additional Insured –Lessors Of Leased Equipment I.Blanket Additional Insured –States Or Political Subdivisions – Permits J.Knowledge And Notice Of Occurrence Or Offense K.Unintentional Omission L.Blanket Waiver Of Subrogation M.Amended Bodily Injury Definition N.Contractual Liability – Railroads INJURY AND PROPERTY DAMAGE LI- ABILITY: Exclusions c.and g.through n.do not apply to "premises damage". Exclusion f.(1)(a) does not apply to "premises damage" caused by: a.Fire; b.Explosion; c.Lightning; d.Smoke resulting from such fire, explosion, or lightning; or e.Water; unless Exclusion f.of Section I – Coverage A –Bodily Injury And Property Damage Liability is replaced by another endorsement to this Coverage Part that has Exclusion – All Pollu- tion Injury Or Damage or Total Pollution Ex- clusion in its title. A separate limit of insurance applies to "premises damage" as described in Para- graph 6.of SECTION III – LIMITS OF IN- SURANCE. CG D3 16 11 11POLICY #DT22CO5200R796TIL19 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 6 of 12 by any ordinance, law or building code to include as an additional insured on this Coverage Part is an insured, but only with respect to liability for "bodily injury", "property damage", "personal in- jury" or "advertising injury" arising out of such op- erations. The insurance provided to such state or political subdivision does not apply to: a.Any "bodily injury," "property damage," "per- sonal injury" or "advertising injury" arising out of operations performed for that state or po- litical subdivision; or b.Any "bodily injury" or "property damage" in- cluded in the "products-completed operations hazard". J. KNOWLEDGE AND NOTICE OF OCCUR- RENCE OR OFFENSE The following is added to Paragraph 2.,Duties In The Event of Occurrence, Offense, Claim or Suit, of SECTION IV – COMMERCIAL GEN- ERAL LIABILITY CONDITIONS: e.The following provisions apply to Paragraph a.above, but only for the purposes of the in-surance provided under this Coverage Part to you or any insured listed in Paragraph 1.or 2.of Section II – Who Is An Insured: (1)Notice to us of such "occurrence" or offense must be given as soon as practicable only after the "occurrence" or offense is known by you (if you are an individual), any of your partners or members who is an individual (if you are a partnership or joint venture), any of your managers who is an individual (if you are a limited liability company), any of your "executive officers" or directors (if you are an organization other than a partnership, joint venture or limited liability company) or any "em-ployee" authorized by you to give notice of an "occurrence" or offense. (2)If you are a partnership, joint venture or limited liability company, and none of your partners, joint venture members or man-agers are individuals, notice to us of such "occurrence" or offense must be given as soon as practicable only after the "occurrence" or offense is known by: (a)Any individual who is: (i)A partner or member of any partnership or joint venture; ii.A manager of any limited liability company; or i.An executive officer or director of any other organization; that is your partner, joint venture member or manager; or (b)Any "employee" authorized by such partnership, joint venture, limited li-ability company or other organization to give notice of an "occurrence" or offense. (3)Notice to us of such "occurrence" or of an offense will be deemed to be given as soon as practicable if it is given in good faith as soon as practicable to your work- ers' compensation insurer. This applies only if you subsequently give notice to us of the "occurrence" or offense as soon as practicable after any of the persons de- scribed in Paragraphs e. (1)or (2)above discovers that the "occurrence" or offense may result in sums to which the insurance provided under this Coverage Part may apply. However, if this Coverage Part includes an endorsement that provides limited coverage for "bodily injury" or "property damage" or pollution costs arising out of a discharge, release or escape of "pollutants" which contains a requirement that the discharge, release or escape of "pollutants" must be reported to us within a specific number of days after its abrupt commencement, this Paragraph e.does not affect that requirement. K.UNINTENTIONAL OMISSION The following is added to Paragraph 6., Representations, of SECTION IV – COMMERCIAL GENERAL LIABILITY CONDITIONS: The unintentional omission of, or unintentional error in, any information provided by you which we relied upon in issuing this policy will not prejudice your rights under this insurance. However, this provision does not affect our right to collect additional premium or to exercise our rights of cancellation or nonrenewal in accordance with applicable insurance laws or regulations. CG D3 16 11 11 POLICY # DT22CO5200R796TIL19 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 7 of 12 L.BLANKET WAIVER OF SUBROGATION The following is added to Paragraph 8.,Transfer Of Rights Of Recovery Against Others To Us, of SECTION IV – COMMERCIAL GENERAL LI- ABILITY CONDITIONS: If the insured has agreed in a contract or agree-ment to waive that insured's right of recovery against any person or organization, we waive our right of recovery against such person or organiza-tion, but only for payments we make because of: a."Bodily injury" or "property damage" that oc-curs; or b."Personal injury" or "advertising injury" caused by an offense that is committed; subsequent to the execution of that contract or agreement. M. AMENDED BODILY INJURY DEFINITION 3.The following replaces the definition of "bodily injury" in the DEFINITIONS Section "Bodily injury" means bodily injury, mental anguish, mental injury, shock, fright, disability, humiliation, sickness or disease sustained by a person, including death resulting from any of these at any time. N. CONTRACTUAL LIABILITY – RAILROADS 1.The following replaces Paragraph c.of the definition of "insured contract" in the DEFINI- TIONS Section: c.Any easement or license agreement; 2. Paragraph f.(1)of the definition of "insured contract" in the DEFINITIONS Section is de- leted. CG D3 16 11 11 POLICY # DT22CO5200R796TIL19 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 8 of 12 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GENERAL DESCRIPTION OF COVERAGE —This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general coverage description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. BROAD FORM NAMED INSURED B. BLANKET ADDITIONAL INSURED C. EMPLOYEE HIRED AUTO D. EMPLOYEES AS INSURED E. SUPPLEMENTARY PAYMENTS- INCREASED LIMITS F. HIRED AUTO — LIMITED WORLDWIDE COV-ERAGE — INDEMNITY BASIS G. WAIVER OF DEDUCTIBLE — GLASS H. HIRED AUTO PHYSICAL DAMAGE- LOSS OF USE- INCRASED LIMIT I. PHYSICAL DAMAGE TRANSPORTATION EXPENSES- INCREASED LIMIT J. PERSONAL PROPERTY K. AIRBAGS L. NOTICE AND KNOWLEDGE OF ACCIDENT OR LOSS M. BLANKET WAVIER OF SUBROGATION N. UNINTENTIONAL ERRORS OR OMMISIONS PROVISIONS A. BROAD FORM NAMED INSURED The following is added to Paragraph A.1., Who Is An Insured,of SECTION II — COVERED AUTOS LIABILITY COVERAGE:Any organization you newly acquire or form during the policy period over which you maintain 50% or more ownership interest and that is not separately insured for Business Auto Coverage. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, which- ever is earlier B. BLANKET ADDITIONAL INSURED The following is added to Paragraph c.in A.1., Who Is An Insured,of SECTION II — COVERED AUTOS LIABILITY COVERAGE:Any person or organization who is required under a written contract or agreement between you and that person or organization, that is signed and executed by you before the "bodily injury" or "property damage" occurs and that is in effect during the policy period, to be named as an additional insured is an "insured" for Covered Autos Liability Coverage, but only for damages to which this insurance applies and only to the extent that under the Who Is An Insured provision contained in Section II. C. EMPLOYEE HIRED AUTO 1.The following is added to Paragraph A.1., Who Is An Insured,of SECTION II — COV-ERED AUTOS LIABILITY COVERAGE:An "employee" of yours is an "insured" while "auto" hired or rented under a operating an contract or agreement in an "employee's" name, with your permission, while performing duties related to the conduct of your business. 2.The following replaces Paragraph b.in B.5., Other Insurance,of SECTION IV — BUSINESS AUTO CONDITIONS: b.For Hired Auto Physical Damage Cover age, the following are deemed to be covered "autos" you own: (1)Any covered "auto" you lease, hire, rent or borrow; CA T3 53 02 15POLICY # 8102N6450331926G 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 9 of 12 and (2)Any covered "auto" hired or rented by your "employee" under a contract in an “employee’s” name, with your permission, while performing duties related to the conduct of your business. However, any rented or borrowed with a driver is not a covered "auto" D. EMPLOYEES AS INSURED The following is added to Paragraph A.1., Who Is An Insured,of SECTION II — COVERED AUTOS LIABILITY COVERAGE: Any "employee" of yours is an “insured while using a covered "auto" you don't own, hire or borrow in your business or your personal affairs. E. SUPPLEMENTARY PAYMENTS- INCREASED LIMITS 1.The following replaces Paragraph A.2.a.(2),of SECTION II — COVERED AUTOS LIABIL-ITY COVERAGE: (2)Up to $3,000 for cost of bail bonds (including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish these bonds. 2.The following replaces Paragraph A.2.a.(4),of SECTION II — COVERED AUTOS LIABIL-ITY COVERAGE: (4)All reasonable expenses incurred by the "insured" at our request, including actual loss of earnings up to $500 a day be- cause of time off from work. F. HIRED AUTO — LIMITED WORLDWIDE COV- ERAGE — INDEMNITY BASIS The following replaces Subparagraph (5)in Paragraph B.7., Policy Period, Coverage Territory,of SECTION IV BUSINESS AUTO CONDITIONS: (5)Anywhere in the world, except any country or jurisdiction while any trade sanction, embargo, or similar regulation imposed by the United States of America applies to and prohibits the transaction of business with or within such country or jurisdiction, for Covered Autos Liability Coverage for any covered "auto" that you lease, hire, rent or borrow without a driver for a period of 30 days or less or borrow from any of your "employees", partners (if you are a partnership), members (if you are a limited liability company) or members of their households.(a)With respect to any claim made or “suit” brought outside the United States of America, the territories and possessions of the United States of America, Puerto Rico and Canada: (i)You must arrange to defend the "insured" against, and investigate or settle any such claim or “suit” and keep us advised of all proceedings and actions (ii)Neither you nor any other involved "insured" will make any settlement (iii)We may, at our discretion, participate in defending the "insured" against, or in the settlement of, any claim or "suit". (iv)We will reimburse the "insured" for sums that the "insured" legally must pay as damages because of "bodily injury" or "property damage" to which this insurance applies, that the "insured" pays with our consent, but only up to the limit described in Para- graph C.,Limits Of Insurance, of SECTION II- COVERED AUTOS LIABILITY COVERAGE (v)We will reimburse the "insured" for the reasonable expenses incurred with our consent for your investigation of such claims and your defense of the "insured" against any such "suit", but only up to and included within the limit described in Para- graph C.,Limits Of Insurance, of SECTION II COVERED AUTOS LIABILITY COVERAGE and not in addition to such limit. Our duty to make such payments ends when we have used up the applicable limit of insurance in payments for damages, settlements or defense expenses (b)This insurance is excess over any valid and collectible other insurance available to the "insured" whether primary, excess, contingent or on any other basis. (c)This insurance is not a substitute for required or compulsory insurance in any country outside the United States, its territories and possessions, Puerto Rico and Canada. You agree to maintain all required or compulsory insurance in any such country up to the minimum limits required by local law. Your failure to comply with compulsory insurance requirements will not invalidate the coverage afforded by this policy, but we will only be liable to the same extent we would have been liable had you complied with the compulsory insurance requirements. (d)It is understood that we are not an admitted or authorized insurer outside the United States of America, its territories and possessions, Puerto Rico and Canada. We assume no responsibility for the furnishing of certificates of insurance, or for compliance in any way with the laws of other countries relating to insurance. G. WAIVER OF DEDUCTIBLE — GLASS The following is added to Paragraph D., Deductible,of SECTION III COVERAGE: -PHYSICAL DAMAGE COVERAGE:No deductible for a covered "auto" will apply to glass damage if the glass is repaired rather than replaced. H. HIRED AUTO PHYSICAL DAMAGE USE — LOSS OF USE- INCREASED LIMIT The following replaces the last sentence of Para- graph A.4.b., Loss Of Use Expenses,of SECTION III — PHYSICAL DAMAGE COVERAGE:However, the most we will pay for any expenses for loss of use is $65 per day, to a maximum of $750 for any one "accident". I. PHYSICAL DAMAGE- TRANSPORTATION EXPENSES- INCREASED LIMIT CA T3 53 02 15 POLICY # 8102N6450331926G 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 10 of 12 The following replaces the first sentence in Paragraph A.4.a., Transportation Expenses,of SECTION III- PHYSICAL DAMAGE COVERAGE: We will pay up to $50 per day to a maximum of $1,500 for temporary transportation expense incurred by you because of the total theft of a covered "auto" of the private passenger type. J. PERSONAL PROPERTY- The following is added to Paragraph A.4., Cover-age Extensions,of SECTION III — PHYSICAL DAMAGE COVERAGE: Personal Property:We will pay up to $400 for "loss" to wearing apparel! and other personal property which is: (1)Owned by an "insured"; and (2)In or on your covered "auto" This coverage applies only in the event of a total theft of your covered "auto" No deductibles apply to this Personal Property coverage. K. AIRBAGS The following is added to Paragraph B.3., Exclu- sions,of SECTION III — PHYSICAL DAMAGE COVERAGE: Exclusion 3.a.does not apply to "loss" to one or more airbags in a covered "auto" you own that in- flate due to a cause other than a cause of "loss" set forth in Paragraphs A.1.b.and A.1.c.,but only: a.If that "auto" is a covered "auto" for Comprehensive Coverage under this policy; b.The airbags are not covered under any war-ranty; and c.The airbags were not intentionally inflated. We will pay up to a maximum of $1,000 for any one "loss" L. NOTICE AND KNOWLEDGE OF ACCIDENT OR LOSS The following is added to Paragraph A.2.a.,of SECTION IV — BUSINESS AUTO CONDITIONS: Your duty to give us or our authorized representative prompt notice of the "accident" or "loss" ap-plies only when the "accident" or "loss" is known to: (a) You (if you are an individual); (b) A partner (if you are a partnership); (c)A member (if you are a limited liability company) (d)An executive officer, director or insurance manager (if you are a corporation or other organization); or (e)Any "employee" authorized by you to give no-tice of the "accident" or "loss" M. BLANKET WAIVER OF SUBROGATION The following replaces Paragraph A.5., Transfer Of Rights Of Recovery Against Others To Us,of SECTION IV BUSINESS AUTO CONDITIONS 5. Transfer Of Rights Of Recovery Against Others To Us We waive any right of recovery we may have against any person or organization to the extent required of you by a written contract or "loss", provided that the "accident" or "loss" arises out of operations contemplated by such contract. The waiver applies only to the person or organization designated in such contract. N. UNINTENTIONAL ERRORS OR OMISSIONS The following is added to Paragraph B.2., Con- cealment, Misrepresentation, Or Fraud,of SECTION IV — BUSINESS AUTO CONDITIONS: The unintentional omission of, or unintentional error in, any information given by you shall not prejudice your rights under this insurance. How-ever this provision does not affect our right to collect additional premium or exercise our right of cancellation or non- renewal. CA T3 53 02 15 POLICY # 8102N6450331926G 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 11 of 12 TRAVELER S WORKERS COMPENSATION AND EMPLOYERS LIABILITY POLICY ENDORSEMENT WC 99 03 76 ( A) — POLICY NUMBER: UB8K1125291926G WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA (BLANKET WAIVER) We have the right to recover our payments from anyone liable for an injury covered by this policy.W e will not enforce our right against the person or organization named in the Schedule. The additional premium for this endorsement shall be 2.00%of the California workers'compensation pre- mium. Schedule Person or Organization Job Description ANY PERSON OR ORGANIZATION FORWHICH THE INSURED HAS AGREED BY WRITTEN CONTRACT EXECUTED PRIOR TO LOSS TO FURNISH THIS WAIVER This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 07/25/2019 Policy No. UB8K1125291926G Endorsement No. Insured:Elcor Electric,Inc.Premium Insurance Company .Countersigned by 55816182 | 19-20 All Lines w/ Prof & Pollution Liab | Prabhjot Kaur | 6/2/2020 1:40:27 PM (PDT) | Page 12 of 12 Elcor Electric for City of Cupertino Electrical Services at City Facilities Final Audit Report 2020-06-24 Created:2020-06-22 By:Julia Kinst (juliak@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAARdM5zQgE4ReTGJdY4miKY8cDFgB-UCGC "Elcor Electric for City of Cupertino Electrical Services at City Fa cilities" History Document created by Julia Kinst (juliak@cupertino.org) 2020-06-22 - 6:35:38 PM GMT- IP address: 64.178.242.15 Document emailed to Julia Kinst (juliak@cupertino.org) for approval 2020-06-22 - 6:35:49 PM GMT Document approved by Julia Kinst (juliak@cupertino.org) Approval Date: 2020-06-22 - 6:36:25 PM GMT - Time Source: server- IP address: 64.178.242.15 Document emailed to Araceli Alejandre (aracelia@cupertino.org) for approval 2020-06-22 - 6:36:27 PM GMT Document approved by Araceli Alejandre (aracelia@cupertino.org) Approval Date: 2020-06-22 - 8:28:21 PM GMT - Time Source: server- IP address: 24.23.184.82 Document emailed to Troy Martinez (tmartinez@elcorelectric.com) for signature 2020-06-22 - 8:28:22 PM GMT Email viewed by Troy Martinez (tmartinez@elcorelectric.com) 2020-06-22 - 8:29:51 PM GMT- IP address: 96.82.87.241 Document e-signed by Troy Martinez (tmartinez@elcorelectric.com) Signature Date: 2020-06-22 - 8:32:56 PM GMT - Time Source: server- IP address: 96.82.87.241 Document emailed to Heather M. Minner (minner@smwlaw.com) for signature 2020-06-22 - 8:32:58 PM GMT Email viewed by Heather M. Minner (minner@smwlaw.com) 2020-06-24 - 9:13:57 PM GMT- IP address: 45.41.142.177 Document e-signed by Heather M. Minner (minner@smwlaw.com) Signature Date: 2020-06-24 - 9:15:37 PM GMT - Time Source: server- IP address: 52.39.49.65 Document emailed to Chad Mosley (chadm@cupertino.org) for signature 2020-06-24 - 9:15:39 PM GMT Email viewed by Chad Mosley (chadm@cupertino.org) 2020-06-24 - 10:17:05 PM GMT- IP address: 104.47.44.254 Document e-signed by Chad Mosley (chadm@cupertino.org) Signature Date: 2020-06-24 - 10:17:21 PM GMT - Time Source: server- IP address: 67.164.60.41 Document emailed to Kirsten Squarcia (kirstens@cupertino.org) for signature 2020-06-24 - 10:17:22 PM GMT Email viewed by Kirsten Squarcia (kirstens@cupertino.org) 2020-06-24 - 10:19:54 PM GMT- IP address: 104.47.45.254 Document e-signed by Kirsten Squarcia (kirstens@cupertino.org) Signature Date: 2020-06-24 - 10:20:04 PM GMT - Time Source: server- IP address: 148.64.105.190 Signed document emailed to Chad Mosley (chadm@cupertino.org), Troy Martinez (tmartinez@elcorelectric.com), Heather M. Minner (minner@smwlaw.com), cyrahc@cupertino.org, and 3 more 2020-06-24 - 10:20:04 PM GMT