BLD-2020-1348
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • buildincl(a.cupertino.org
PROJECT ADDRESS
10867 Linda Vista Dr.
owNFR NAMI:
Roy Evulictt
5! RF1:T A1)1)RESS
CONlRAC1ORNAME
Henry Olocki
COMPANY NAME.
Roof Roofing Inc
STRI,FT ADDRESS
5577 Vassar Dr
1 APN
PHONE.
j 405-504-1932
F-MAIL
royangie@sbcglobal.net
C•rZIP[rV.STAEE.I AX
1LIC I•. t. NL.i�1I3L•R LICI.\SI fYPI 13t;S. LIC a
687568 C39 017191
-r
L MAIL
admin@roofroofingsanjose.com
CITY. STATE. ZIP
Saniose, CA 95118
F.�`i
408-622-8105
Pt{ONE
408-265-9270
I UNDERSTAND ANT) AGREE TO THE FOLLOWING:
1. The re -roof project shall comply with all applicable provisions of the 2016 California Codes.
2. An inspection request can be scheduled up to one business day before the requested inspection date.
Please schedule inspections online or call (408) 777-3228 from 7:30-3:30pm (Mon-"hhurs) or 7:30-2:30pm
(Friday) to schedule inspection. For Tear -Off and Nailing Inspections, you must also call on the day of the
inspection only after that phase of the work is completed. The building inspector will be available within
one hour. The hours for this service are: 7:30-10:30am and 12:30-3:30 (Mon-Thurs) and 7:30 10:30am
and 12:30-2:30 (Friday). Final Inspections will be given a two hour window.
3. Tear -Of Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked -down or removed prior to this inspection.
4. If plywood is installed, a plywood Nailing Inspection is required.
5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will require
the removal of all new material down to the sheathing so a proper inspection can be performed.
6. A Final Inspection and approval shall be obtained from the building inspector when the re -roofing is
completed. To receive a final sign -off, the following items will be verified:
a. Flat roofs shall have a minimum of 1/4" per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre -manufactured products used shall be available
on -site to review at the time of the inspection.
c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. CMC
Section 9.18.210 does NOT allow copper rooting or copper architectural materials.
7. NOTE: If you call for a tear -off or plywood nailing inspection and the work is not complete, you will be
charged
Pol rcty_ 2018, doe revised 01/15/18