Loading...
B-2016-3312InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 22045 CREEKSIDE CT CUPERTINO, CA 95014-1103 CUPERTINO APN: 326 39 041 PERMIT NO: B-2016-3312 OWNER'S NAME: OWNER INFO MISSING FROM RECORD OWNER'S PHONE: 408-252-4451 CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 7/8/2020 8:31:36 AM ISSUED BY:VALUATION: $194300 JOB DESCRIPTION ADDITION TO 1ST FLR SFD TO EXTEND KITCHEN & CREATE LAUNDRY RM (184 S.F.); REMODEL KITCHEN (80 S.F.); REMODEL 3 BATHROOMS (253 S.F.); OTHER REMODEL AREA (404 S.F); REPLACE A/C & FURNACE; REPLACE 50 GAL WATER HEATER WITH TANKLESS; (N) COVER PORCH (191 S.F.) INSPECTION TYPE DATE STATUS INSPECTOR EXTERIOR LATH Pending Passed   EXTERIOR SHEAR 2018-01-11 Passed   EXTERIOR SHEAR 2018-09-27 Passed   FOUNDATION 2017-07-05 Failed   FOUNDATION 2017-08-09 Passed   FOUNDATION 2018-08-21 Passed   INSULATION Pending Passed   INSULATION Pending Passed   INTERIOR LATH 2019-01-08 Passed   INTERIOR LATH 2019-01-29 Passed   ROUGH ELECTRICAL 2018-11-06 Failed   ROUGH ELECTRICAL 2018-11-19 Passed   ROUGH FRAME 2018-11-06 Failed   ROUGH FRAME 2018-11-19 Passed   ROUGH MECHANICAL 2018-11-06 Failed   ROUGH MECHANICAL 2018-11-19 Failed   ROUGH PLUMBING 2018-11-06 Failed   ROUGH PLUMBING 2018-11-19 Passed   SHEETROCK 2019-01-08 Passed   SHOWER PAN 2019-01-29 Failed   SHOWER PAN 2019-01-30 Passed   SLAB 2017-08-09 Passed   UNDERFLOOR FRAMING 2017-08-23 Passed   UNDERFLOOR PLUMBING 2017-08-23 Passed   PW - DEPARTMENT FINAL 2020-03-09 Passed Kevin Rieden FINAL PLANNING 2020-06-29 Passed Gian Martire FINAL BUILDING 2020-07-08 Passed Antonio Torrez FINAL ELECTRICAL 2020-07-08 Passed Antonio Torrez FINAL MECHANICAL 2020-07-08 Passed Antonio Torrez FINAL PLUMBING 2020-07-08 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.