Loading...
B-2018-0463InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 19751 BIXBY DR CUPERTINO, CA 95014-3324 CUPERTINO APN: 369 09 049 PERMIT NO: B-2018-0463 OWNER'S NAME: Huang Chris Chen And Wu Xian Feng Sharon Tr OWNER'S PHONE: 408-666-3382 CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 7/13/2020 11:09:29 AM ISSUED BY:VALUATION: $300000 JOB DESCRIPTION FIRST FLOOR ADDITION (888 SF); REMODEL OTHER (1350 SF); ELEC PANEL UPGRADE (200 AMP); (N) TANK-LESS WATER HEATER. REV # 1 - REMOVE FIREPLACE FROM LIVING ROOM, EXTEND (N) FOOTING AND REPLACE FLOOR FRAMING IN FAMILY RM AND MASTER BATHROOM; RELOCATE AND INSTALL (N) FURNACE; REMOVE TANK-LESS WATER HEATER FROM SCOPE (EXISTING TO REMAIN) - ISSUED 06/14/2019 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2019-05-28 Partial   UNDERFLOOR FRAMING 2019-06-19 Partial   ROOF NAIL 2019-08-09 Failed LARRY SQUARCIA EXTERIOR SHEAR 2019-08-09 Passed LARRY SQUARCIA ROOF NAIL 2019-08-15 Passed James Lee INTERIOR LATH 2019-10-03 Cancelled Jeff Greef EXTERIOR LATH 2019-10-03 Passed Jeff Greef FIRE DEPT - SPRINKLERS - ROUGH 2019-10-25 Passed Santa Clara County Fire ROUGH FRAME 2019-10-29 Failed Jeff Greef ROUGH ELECTRICAL 2019-10-29 Failed Jeff Greef ROUGH MECHANICAL 2019-10-29 Failed Jeff Greef ROUGH PLUMBING 2019-10-29 Passed Jeff Greef ROUGH FRAME 2019-11-07 Passed Jeff Greef INSULATION 2019-11-07 Passed Jeff Greef ROUGH MECHANICAL 2019-11-07 Passed Jeff Greef UNDERFLOOR INSULATION 2019-11-07 Passed Jeff Greef ROUGH ELECTRICAL 2019-11-07 Failed Jeff Greef UNDERGROUND SEWER 2019-11-13 Passed James Lee INTERIOR LATH 2019-11-19 Passed James Lee SHEETROCK 2019-11-19 Passed James Lee SANITARY - VISUAL 2019-11-13 Passed cupsanitary PROPERTY LINE CLEANOUT 2019-11-13 Passed James Lee ROUGH ELECTRICAL 2019-11-19 Passed James Lee GAS TEST 2019-11-19 Passed James Lee SCRATCH COAT 2019-12-03 Passed Jeff Greef FIRE DEPT - FINAL 2020-03-04 Passed Santa Clara County Fire PW - DEPARTMENT FINAL 2020-07-08 Passed Kevin Rieden FINAL BUILDING 2020-07-13 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.