Loading...
BLD-2020-0593 REV # 2 JOBCARDCUPERTINO CITY OF CUPERTINO - BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 PHONE 408-777-3228 • WWW.CUPERTINO.ORG/ACCELA JOB CARD THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL. A HARD -COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK. Permit No: BLD-2020-0593 Issued Date: 05/04/2020 Building Address: 1 171 CRESTLINE DR Cupertino Contractor: TESLA ENERGY OPERATIONS INC Job Description: INSTALL ENERGY STORAGE SYSTEM (13.5 KWH) (1 POWER WALL); (N) SUB -PANEL (200 AMPS) REV # 1 - GATEWAY SWAP FROM 1.0 TO 2.0 CHANGES SHOWN ON 3-LINE DIAGRAM - APPROVED 08/17/2020 REV # 2 - PER INSPECTOR REVISE SINGLE LINE DIAGRAM TO SHOW 200 AMP SUBPANEL - APPROVED 08/21/2020 EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED. *PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION