Loading...
14060193InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10645 CORDOVA RD CUPERTINO APN: 342 22 099 PERMIT NO: 14060193 OWNER'S NAME: Ogrady Brian J And Theresa M OWNER'S PHONE: (408) 286-1723 CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 9/14/2020 9:58:27 AM ISSUED BY:VALUATION: $500000 JOB DESCRIPTION **LOT C** CONSTRUCT 3 STORY HILLSIDE SFDWL (2712 SQ FT): GARAGE (441 SQ FT); AND PORCH (75 SQ FT); RETAINING WALL(S) ATTACHED/NEAR FOUNDATION (SEE PLN SHT S8.1). REV #7 - MINOR REVISION TO RETAINING WALL DESIGN AND REVISE TYPE OF RETAINING WALL ALONG PROPERTY LINE TO PIER AND CONCRETE WALL - ISSUED 07/10/2019 REV #1 - NECESSARY CHANGES DUE TO GRADING (PIERS, RETAINING WALLS); MINOR FLOOR PLAN CHANGES. ISSUED 6-1-16. REV #2 - MINOR REVISIONS TO FOUNDATION PLANS/DETAILS TO REFLECT SITE CONDITIONS. ISSUED 9-13-16 REV #3 - MINOR REVISIONS TO CIVIL PLAN FOR SITE CONDITIONS. ISSUED 9/30/2016 REV #4 - RECONFIGURE SIDE AND REAR PATIOS, INCLUDING RETAINING WALLS AND STAIR LOCATIONS; RECONFIGURE BEDROOM #2 TO CREATE FORMAL LIVING AREA, ADD (N) WINDOWS, CHANGE ELECTRICAL AND SHEAR WALL; CHANGE WINDOW SIZE AT 1ST FLOOR BEDROOM AND NEW WINDOW 2ND FLOOR; RECONFIGURE KITCHEN LAYOUT; CHANGE CEILING AT FORMAL DINING ROOM FROM VAULTED TO FLAT AND NEW LIGHTING LAYOUT. REV #5 - REVISED SITE WORK TO CREATE PATIOS AND STAIRS WITH CONSTRUCTION OF RETAINING WALLS (252 LF TOTAL)- ISSUED 1/14/19 REV #6 - REVISE RETAINING WALL DESIGN - ISSUED 4/23/19 DEF #1 - ROOF TRUSS CALCULATIONS. ISSUED 8/17/2017 INSPECTION TYPE DATE STATUS INSPECTOR EXTERIOR LATH 2018-01-05 Failed   EXTERIOR LATH 2018-05-02 Passed   EXTERIOR SHEAR 2017-03-08 Passed   FOUNDATION 2016-10-06 Partial   FOUNDATION 2016-09-23 Cancelled   FOUNDATION 2016-11-29 Partial   GAS METER RELEASE 2018-10-31 Passed   GAS TEST 2018-10-31 Passed   INSULATION 2017-10-31 Passed   INSULATION 2017-10-31 Passed   INTERIOR LATH 2016-11-10 Partial   INTERIOR LATH 2018-05-02 Passed   PIERS 2016-09-22 Cancelled   PIERS 2018-10-17 Failed   REINFORCEMENT 2016-10-25 Partial   REINFORCEMENT 2016-10-31 Partial   REINFORCEMENT 2016-11-10 Partial   REINFORCEMENT 2016-11-29 Partial   REINFORCEMENT 2016-12-08 Partial   REINFORCEMENT 2016-12-22 Partial   REINFORCEMENT 2017-01-06 Partial   REINFORCEMENT Pending Passed   ROOF NAIL 2017-03-13 Cancelled   ROOF NAIL Pending Passed   ROUGH ELECTRICAL 2017-08-01 Passed   ROUGH FRAME 2017-08-01 Passed   ROUGH MECHANICAL 2017-08-01 Passed   ROUGH PLUMBING 2017-08-01 Passed   SCRATCH COAT 2018-05-02 Passed   SHEETROCK 2018-01-05 Passed   SHOWER PAN 2018-05-02 Passed   UNDERFLOOR FRAMING 2017-01-03 Partial   UNDERFLOOR INSULATION 2017-10-31 Failed   UNDERFLOOR MECHANICAL 2017-01-03 Partial   UNDERFLOOR PLUMBING 2017-01-03 Partial   UNDERGROUND SEWER 2017-08-10 Passed   UNDERGROUND WATER SERVICE 2016-12-21 Cancelled   UNDERGROUND WATER SERVICE 2017-12-08 Passed   REINFORCEMENT 2019-08-01 Partial Paul O'Sullivan REINFORCEMENT 2019-08-05 Partial Paul O'Sullivan REINFORCEMENT 2019-08-08 Cancelled   UNDERGROUND WATER SERVICE 2019-10-08 Failed Paul O'Sullivan UNDERGROUND SEWER 2019-10-08 Passed Paul O'Sullivan UNDERGROUND WATER SERVICE 2019-10-15 Passed Paul O'Sullivan GAS TEST 2019-10-15 Passed Paul O'Sullivan PIERS Pending Pending   PIERS 2019-10-21 Conditional Antonio Torrez ELECTRIC METER RELEASE 2019-11-07 Cancelled Antonio Torrez ELECTRIC METER RELEASE 2019-11-08 Passed Paul O'Sullivan RETAINING WALL 2019-11-13 Passed Antonio Torrez FIRE DEPT - FINAL 2020-05-27 Passed Santa Clara County Fire FINAL BUILDING 2020-09-14 Passed Antonio Torrez FINAL ELECTRICAL 2020-08-11 Passed Antonio Torrez FINAL MECHANICAL 2020-08-11 Passed Antonio Torrez FINAL PLUMBING 2020-08-11 Passed Antonio Torrez FINAL PLANNING 2020-07-07 Passed Gian Martire PW - DEPARTMENT FINAL 2020-09-04 Passed Kevin Rieden EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.