B-2017-1078InspectionRecord.pdfINSPECTION RECORD
CUPERTINO
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 20030 FOREST AVE CUPERTINO, CA 95014-2009
CUPERTINO
APN: 316 23 112
PERMIT NO: B 2017 1078
OWNER'S NAME: CHIU RAYMOND K T AND ADELINE Y H TRUSTEE
OWNER'S PHONE: Not Provided
CONTRACTOR: NO LICENSE INFO,
CONTRACTOR PHONE:
DATE ISSUED 10/26/2020 1:55:37 PM
ISSUED BY:
VALUATION: $0
JOB DESCRIPTION
LOT A (N) TWO STORY SFD (4982 SF); ATTACHED GAR (645 SF); PORCH (3) (671 SF); ATTACHED 2ND UNIT (475 S.F.) - ISSUED 5-25-2018 REV # 1 - REVISE STANDARD HVAC SYSTEM AND
IMPLEMENT (3) MULTI -ZONES MINI SPLIT FOR ENTIRE HOUSE-REV#1 ISSUE 9-10-2018 rev # 2 - CHANGES TO MECHANICAL, PLUMBING, ELECTRICAL, NEW SKYLIGHTS; RELOCATE WATER
HEATER - ISSUED 4-5-2019 REV # 3 - ADD NEW GAS LINE, SEWER LINE, AND WATER LINE FOR FUTURE BBQ AND OUTDOOR SINK AT REAR - ISSUED 2/5/2020 REV #4 - CHANGE IN
DRAINAGE PLAN - Approved 07/21/2020
INSPECTION TYPE
DATE
STATUS
INSPECTOR
ELECTRIC METER RELEASE
2019-07-12
Failed
EXTERIOR LATH
2019-06-13
Passed
EXTERIOR SHEAR
Pending
Failed
EXTERIOR SHEAR
2019-01-08
Partial
FOUNDATION
2018-07-18
Partial
FOUNDATION
2018-11-26
Partial
GAS TEST
2018-09-11
Passed
INSULATION
2019-06-06
Partial
INSULATION
2019-06-10
Passed
INSULATION
2019-06-10
Passed
INTERIOR LATH
2019-06-25
Partial
INTERIOR SHEAR
2019-01-08
Partial
REINFORCEMENT
2018-11-20
Cancelled
REINFORCEMENT
2019-03-27
Passed
ROOF NAIL
Pending
Passed
ROUGH ELECTRICAL
2018-09-11
Passed
ROUGH ELECTRICAL
2019-04-05
Failed
ROUGH ELECTRICAL
2019-04-08
Failed
ROUGH ELECTRICAL
2019-05-06
Passed
ROUGH FRAME
2019-04-05
Failed
ROUGH FRAME
2019-04-08
Failed
ROUGH FRAME
2019-05-06
Partial
ROUGH FRAME
2019-05-29
Passed
ROUGH MECHANICAL
2018-09-11
Passed
ROUGH MECHANICAL
2019-04-05
Failed
ROUGH MECHANICAL
2019-04-08
Failed
ROUGH MECHANICAL
2019-05-06
Passed
ROUGH PLUMBING
2018-09-11
Passed
ROUGH PLUMBING
2019-04-05
Failed
ROUGH PLUMBING
2019-04-08
Failed
ROUGH PLUMBING
2019-05-06
Passed
SHEETROCK
2019-05-01
Partial
SHEETROCK
2019-06-25
Passed
SHOWER PAN
2019-06-06
Passed
UFER GROUND
2018-07-18
Passed
UNDERFLOOR FRAMING
2018-09-11
Passed
UNDERFLOOR INSULATION
2018-09-13
Passed
UNDERFLOOR PLUMBING
2018-09-11
Passed
UNDERGROUND SEWER
2018-11-01
Partial
UNDERGROUND WATER SERVICE
2018-11-01
Passed
INTERIOR LATH
2019-08-05
Passed
James Lee
ELECTRIC METER RELEASE
2019-08-28
Passed
Jeff Greef
UNDERGROUND SEWER
2019-09-04
Passed
Jeff Greef
PROPERTY LINE CLEANOUT
2019-09-03
Passed
cupsanitary
ELECTRIC METER RELEASE
2019-09-11
CONDITIONAL
James Lee
PROPERTY LINE CLEANOUT
2019-10-11
Passed
cupsanitary
GAS TEST
2019-11-04
Passed
James Lee
FINAL ELECTRICAL
2019-11-25
Passed
James Lee
FINAL MECHANICAL
2019-11-25
Passed
James Lee
FINAL PLUMBING
2019-11-25
Passed
James Lee
PW - FINAL RIGHT OF WAY
2019-11-24
Cancelled
Kevin Rieden
FINAL ELECTRICAL
FINAL PLUMBING
FINAL PLANNING
PW - DEPARTMENT FINAL
FINAL BUILDING
o I DV DCDRAIT icciicn SHALL BECOME 11\n/A"^'
NL
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPE
2020-02-10
Passed
James Lee
2020-02-10
Passed
James Lee
2020-07-23
Passed
Ellen Yau
2020-10-19
Passed
Kevin Rieden
2020-10-26
Passed
James Lee
—
ESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
WED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.