Loading...
Structural Clarification letterS TRUCTURAL FIELD REVISION Date: September 25, 2019 Project: New Residences 21164 Lauretta Ave. Cupertino, CA To whom it may concern, This letter is to clarify the revision of foundation detail (2/SD-1). Please refer to attached original (2/SD-1) and new detail showing the as-built condition. Instead of using full width sill plate above concrete stem wall and top-flange hanger, the contractor use a 3x10 P.T. ledger attached to the side of concrete stem wall with 5/8" dia. anchor bolts spaced at 12" c enter-to-center. The floor joists are connected to the ledger with LU26 hanger. This condition occurs along line 2 of foundation plan, sheet S-2. I checked the strength of this connection and found it acceptable. Each bolt carries a floor load of 52 psf x 1' x 4' = 208 pounds and the single shear cross- grain bearing capacity of 3x10 hem-fir is 350 pounds. Please contact me at (510) 996-2704, if you have any question regarding this report. Sincerely, _______________________________________________ Yu-Jar Chen, SE 2762 Arnold Hom 09/26/19