14060191InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10665 CORDOVA RD CUPERTINO APN: 342 22 101 PERMIT NO: 14060191
OWNER'S NAME: KUMAR NIRANJAN AND SINGH SEEMA OWNER'S PHONE: Not Provided
CONTRACTOR: JBS GREEN BUILDERS INC, 14233 OLD WOOD RD SARATOGA CONTRACTOR PHONE: 408-390-5577
DATE ISSUED 11/6/2020 10:18:17 AM ISSUED BY:VALUATION: $500000
JOB DESCRIPTION
**LOT A** HILLSIDE, CONSTRUCT 2 STORY SFDWL (2572 SQ FT); ATTACHED GARAGE (466 SQ FT); COVERED PORCH (60 SQ FT); SITE RETAINING WALL(S) ATTACHED & NEAR
FOUNDATION REV #8 - REVISE PIER LOCATION AND NUMBER AT PATIO AND REVISE RETAINING WALL LAYOUT NEXT TO GARAGE; REMOVE PATIO AND RETAINING WALL ON
CORDOVA SIDE FROM THE SCOPE OF WORK (REMOVED PLAN SHEET S-5 FROM PLAN SET) - ISSUED 6/4/2020 REV #7 - ADDING EPOXY SEGMENT TO CONNECT RETAINING WALL TO
HOUSE CONCRETE STRUCTURE - ISSUED 4/23/19 REV #6 - REVISE SITE RETAINING WALL LAYOUT AND STRUCTURAL CALCULATIONS AND DETAILS. ISSUED 11/30/18 REV # 5 - 2ND FLOOR
1 (N) WINDOW UPSTAIRS BEDROOM -ISSUED 9-18-2017 REV # 4 - 2ND FLOOR 3 (N) WINDOWS UTILITY RM/MASTER BEDROOM - TO MEET EGRESS - ISSUED 8/3/2017 DEF # 1 - TRUSSES -
ISSUED 4/23/19 REV # 1 - CHANGE PATIO LAYOUT TO MATCH GRADING PLAN REVISIONS. ISSUED 6/7/16. REV # 2 - ADD DECK - ISSUED 5/4/2017 REV #3 - REVISE LAUNDRY ON MAIN
FLOOR TO A WET BAR; ADD UTILITY ROOM AND CLOSET TO SECOND FLOOR (116 SQ FT); ADD SKYLIGHT. - ISSUED 7/5/2017
INSPECTION TYPE DATE STATUS INSPECTOR
ELECTRIC METER RELEASE 2019-01-16 Cancelled
ELECTRIC METER RELEASE Pending Passed
EXTERIOR LATH 2018-01-04 Passed
EXTERIOR SHEAR 2017-08-24 Partial
FINAL ELECTRICAL 2019-04-25 Failed
FINAL ELECTRICAL 2019-04-30 Passed
FINAL MECHANICAL 2019-04-25 Failed
FINAL MECHANICAL 2019-04-30 Passed
FINAL PLUMBING 2019-04-25 Failed
FINAL PLUMBING 2019-04-30 Passed
FOUNDATION 2016-09-26 Passed
FOUNDATION 2016-11-04 Failed
FOUNDATION 2016-11-07 Failed
FOUNDATION 2016-11-08 Partial
FOUNDATION 2016-11-18 Passed
FOUNDATION 2017-09-13 Passed
FOUNDATION 2017-09-13 Passed
GAS METER RELEASE 2019-01-16 Passed
GAS TEST 2019-01-16 Passed
GRADE BEAM 2016-09-21 Failed
GRADE BEAM 2017-09-13 Passed
INSULATION Pending Passed
INSULATION Pending Passed
INTERIOR LATH 2016-12-13 Partial
INTERIOR LATH 2016-12-16 Passed
INTERIOR LATH 2018-03-07 Passed
PIERS 2016-08-18 Failed
PIERS 2016-08-18 Passed
PIERS 2017-06-23 Cancelled
PIERS 2017-06-26 Partial
PIERS 2018-12-04 Cancelled
PIERS 2018-12-06 Cancelled
PIERS 2018-12-10 Partial
REINFORCEMENT 2016-11-04 Failed
REINFORCEMENT 2016-11-07 Failed
REINFORCEMENT 2016-11-08 Partial
REINFORCEMENT Pending Partial
RETAINING WALL Pending Passed
RETAINING WALL 2017-08-09 Failed
RETAINING WALL 2017-09-13 Passed
RETAINING WALL 2017-10-16 Partial
RETAINING WALL Pending Partial
ROOF NAIL 2017-08-21 Passed
ROUGH ELECTRICAL 2017-12-11 Passed
ROUGH FRAME 2017-12-11 Failed
ROUGH FRAME 2018-01-04 Passed
ROUGH MECHANICAL 2017-12-11 Passed
ROUGH PLUMBING 2017-12-11 Passed
SHEETROCK 2017-12-19 Failed
SHEETROCK 2018-01-04 Failed
SHOWER PAN 2018-03-07 Passed
SLAB 2017-03-06 Failed
SLAB 2017-03-07 Passed
UNDERFLOOR FRAMING Pending Failed
UNDERFLOOR INSULATION 2017-04-11 Failed
UNDERFLOOR MECHANICAL Pending Failed
UNDERFLOOR PLUMBING Pending Passed
UNDERGROUND SEWER Pending Passed
UNDERGROUND WATER SERVICE 2017-12-08 Passed
PIERS 2019-10-21 Conditional Antonio Torrez
RETAINING WALL 2019-11-13 Passed Antonio Torrez
FINAL PLANNING 2020-06-23 Passed Gian Martire
PW - DEPARTMENT FINAL 2020-09-04 Passed Kevin Rieden
FINAL BUILDING 2020-11-06 Passed Paul O'Sullivan
EXTERIOR SHEAR 2020-11-06 Scheduled Paul O'Sullivan
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.