Loading...
14060191InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10665 CORDOVA RD CUPERTINO APN: 342 22 101 PERMIT NO: 14060191 OWNER'S NAME: KUMAR NIRANJAN AND SINGH SEEMA OWNER'S PHONE: Not Provided CONTRACTOR: JBS GREEN BUILDERS INC, 14233 OLD WOOD RD SARATOGA CONTRACTOR PHONE: 408-390-5577 DATE ISSUED 11/6/2020 10:18:17 AM ISSUED BY:VALUATION: $500000 JOB DESCRIPTION **LOT A** HILLSIDE, CONSTRUCT 2 STORY SFDWL (2572 SQ FT); ATTACHED GARAGE (466 SQ FT); COVERED PORCH (60 SQ FT); SITE RETAINING WALL(S) ATTACHED & NEAR FOUNDATION REV #8 - REVISE PIER LOCATION AND NUMBER AT PATIO AND REVISE RETAINING WALL LAYOUT NEXT TO GARAGE; REMOVE PATIO AND RETAINING WALL ON CORDOVA SIDE FROM THE SCOPE OF WORK (REMOVED PLAN SHEET S-5 FROM PLAN SET) - ISSUED 6/4/2020 REV #7 - ADDING EPOXY SEGMENT TO CONNECT RETAINING WALL TO HOUSE CONCRETE STRUCTURE - ISSUED 4/23/19 REV #6 - REVISE SITE RETAINING WALL LAYOUT AND STRUCTURAL CALCULATIONS AND DETAILS. ISSUED 11/30/18 REV # 5 - 2ND FLOOR 1 (N) WINDOW UPSTAIRS BEDROOM -ISSUED 9-18-2017 REV # 4 - 2ND FLOOR 3 (N) WINDOWS UTILITY RM/MASTER BEDROOM - TO MEET EGRESS - ISSUED 8/3/2017 DEF # 1 - TRUSSES - ISSUED 4/23/19 REV # 1 - CHANGE PATIO LAYOUT TO MATCH GRADING PLAN REVISIONS. ISSUED 6/7/16. REV # 2 - ADD DECK - ISSUED 5/4/2017 REV #3 - REVISE LAUNDRY ON MAIN FLOOR TO A WET BAR; ADD UTILITY ROOM AND CLOSET TO SECOND FLOOR (116 SQ FT); ADD SKYLIGHT. - ISSUED 7/5/2017 INSPECTION TYPE DATE STATUS INSPECTOR ELECTRIC METER RELEASE 2019-01-16 Cancelled   ELECTRIC METER RELEASE Pending Passed   EXTERIOR LATH 2018-01-04 Passed   EXTERIOR SHEAR 2017-08-24 Partial   FINAL ELECTRICAL 2019-04-25 Failed   FINAL ELECTRICAL 2019-04-30 Passed   FINAL MECHANICAL 2019-04-25 Failed   FINAL MECHANICAL 2019-04-30 Passed   FINAL PLUMBING 2019-04-25 Failed   FINAL PLUMBING 2019-04-30 Passed   FOUNDATION 2016-09-26 Passed   FOUNDATION 2016-11-04 Failed   FOUNDATION 2016-11-07 Failed   FOUNDATION 2016-11-08 Partial   FOUNDATION 2016-11-18 Passed   FOUNDATION 2017-09-13 Passed   FOUNDATION 2017-09-13 Passed   GAS METER RELEASE 2019-01-16 Passed   GAS TEST 2019-01-16 Passed   GRADE BEAM 2016-09-21 Failed   GRADE BEAM 2017-09-13 Passed   INSULATION Pending Passed   INSULATION Pending Passed   INTERIOR LATH 2016-12-13 Partial   INTERIOR LATH 2016-12-16 Passed   INTERIOR LATH 2018-03-07 Passed   PIERS 2016-08-18 Failed   PIERS 2016-08-18 Passed   PIERS 2017-06-23 Cancelled   PIERS 2017-06-26 Partial   PIERS 2018-12-04 Cancelled   PIERS 2018-12-06 Cancelled   PIERS 2018-12-10 Partial   REINFORCEMENT 2016-11-04 Failed   REINFORCEMENT 2016-11-07 Failed   REINFORCEMENT 2016-11-08 Partial   REINFORCEMENT Pending Partial   RETAINING WALL Pending Passed   RETAINING WALL 2017-08-09 Failed   RETAINING WALL 2017-09-13 Passed   RETAINING WALL 2017-10-16 Partial   RETAINING WALL Pending Partial   ROOF NAIL 2017-08-21 Passed   ROUGH ELECTRICAL 2017-12-11 Passed   ROUGH FRAME 2017-12-11 Failed   ROUGH FRAME 2018-01-04 Passed   ROUGH MECHANICAL 2017-12-11 Passed   ROUGH PLUMBING 2017-12-11 Passed   SHEETROCK 2017-12-19 Failed   SHEETROCK 2018-01-04 Failed   SHOWER PAN 2018-03-07 Passed   SLAB 2017-03-06 Failed   SLAB 2017-03-07 Passed   UNDERFLOOR FRAMING Pending Failed   UNDERFLOOR INSULATION 2017-04-11 Failed   UNDERFLOOR MECHANICAL Pending Failed   UNDERFLOOR PLUMBING Pending Passed   UNDERGROUND SEWER Pending Passed   UNDERGROUND WATER SERVICE 2017-12-08 Passed   PIERS 2019-10-21 Conditional Antonio Torrez RETAINING WALL 2019-11-13 Passed Antonio Torrez FINAL PLANNING 2020-06-23 Passed Gian Martire PW - DEPARTMENT FINAL 2020-09-04 Passed Kevin Rieden FINAL BUILDING 2020-11-06 Passed Paul O'Sullivan EXTERIOR SHEAR 2020-11-06 Scheduled Paul O'Sullivan EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.