B-2016-1762InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 7636 WEST HILL LN CUPERTINO, CA 95014-5057
CUPERTINO APN: 362 27 024 PERMIT NO: B-2016-1762
OWNER'S NAME: Pamu Priyatham And Pitta Himabindu OWNER'S PHONE: Not Provided
CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE:
DATE ISSUED 11/4/2020 8:59:21 AM ISSUED BY:VALUATION: $520000
JOB DESCRIPTION
CONSTRUCT (N) 2 STORY SFD 2514 SQ FT, (N) GARAGE 448 SQ FT, (N) ENTRY PORCH 40 SQ FT, (N) COVERED BALCONY 129 SQ DEF#1-TRUSSES - issued 03-19-2018 REV #1 -
LANDSCAPE CHANGES-ISSUED 5-23-2019 REV #2 LANDSCAPE CHANGES
INSPECTION TYPE DATE STATUS INSPECTOR
ELECTRIC METER RELEASE 2018-08-21 Passed
EXTERIOR LATH 2018-05-25 Failed
EXTERIOR LATH 2018-06-12 Passed
EXTERIOR SHEAR 2018-02-15 Partial
FINAL ELECTRICAL Pending Failed
FINAL ELECTRICAL Pending Passed
FINAL MECHANICAL Pending Failed
FINAL MECHANICAL Pending Passed
FINAL PLUMBING Pending Failed
FINAL PLUMBING Pending Failed
FINAL PLUMBING 2018-10-15 Cancelled
FINAL PLUMBING 2018-10-19 Passed
FOUNDATION 2017-09-18 Failed
FOUNDATION 2017-09-26 Failed
FOUNDATION 2017-10-02 Passed
GAS METER RELEASE 2018-08-21 Passed
INTERIOR LATH 2018-06-22 Passed
ROOF NAIL 2018-02-15 Cancelled
ROOF NAIL 2018-03-20 Passed
ROUGH ELECTRICAL 2018-05-25 Failed
ROUGH FRAME 2018-05-25 Failed
ROUGH FRAME 2018-06-12 Passed
ROUGH MECHANICAL 2018-05-25 Failed
ROUGH PLUMBING 2018-05-25 Failed
SCRATCH COAT 2018-07-03 Passed
SHEETROCK 2018-06-22 Passed
SHOWER PAN 2018-06-22 Passed
SLAB 2017-10-12 Passed
UNDERFLOOR FRAMING 2017-11-02 Failed
UNDERFLOOR FRAMING 2017-11-06 Failed
UNDERFLOOR FRAMING 2017-11-07 Passed
UNDERFLOOR PLUMBING 2017-11-02 Passed
UNDERGROUND SEWER 2018-10-15 Passed
TEMPORARY OCCUPANCY 2019-12-04 Failed Jeff Greef
TEMPORARY OCCUPANCY 2020-02-03 Passed Antonio Torrez
FINAL BUILDING 2020-10-05 Failed James Lee
FINAL PLANNING 2020-05-18 Passed Ellen Yau
FINAL BUILDING 2020-11-04 Passed Bob Sabich
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.