Loading...
B-2016-1762InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 7636 WEST HILL LN CUPERTINO, CA 95014-5057 CUPERTINO APN: 362 27 024 PERMIT NO: B-2016-1762 OWNER'S NAME: Pamu Priyatham And Pitta Himabindu OWNER'S PHONE: Not Provided CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 11/4/2020 8:59:21 AM ISSUED BY:VALUATION: $520000 JOB DESCRIPTION CONSTRUCT (N) 2 STORY SFD 2514 SQ FT, (N) GARAGE 448 SQ FT, (N) ENTRY PORCH 40 SQ FT, (N) COVERED BALCONY 129 SQ DEF#1-TRUSSES - issued 03-19-2018 REV #1 - LANDSCAPE CHANGES-ISSUED 5-23-2019 REV #2 LANDSCAPE CHANGES INSPECTION TYPE DATE STATUS INSPECTOR ELECTRIC METER RELEASE 2018-08-21 Passed   EXTERIOR LATH 2018-05-25 Failed   EXTERIOR LATH 2018-06-12 Passed   EXTERIOR SHEAR 2018-02-15 Partial   FINAL ELECTRICAL Pending Failed   FINAL ELECTRICAL Pending Passed   FINAL MECHANICAL Pending Failed   FINAL MECHANICAL Pending Passed   FINAL PLUMBING Pending Failed   FINAL PLUMBING Pending Failed   FINAL PLUMBING 2018-10-15 Cancelled   FINAL PLUMBING 2018-10-19 Passed   FOUNDATION 2017-09-18 Failed   FOUNDATION 2017-09-26 Failed   FOUNDATION 2017-10-02 Passed   GAS METER RELEASE 2018-08-21 Passed   INTERIOR LATH 2018-06-22 Passed   ROOF NAIL 2018-02-15 Cancelled   ROOF NAIL 2018-03-20 Passed   ROUGH ELECTRICAL 2018-05-25 Failed   ROUGH FRAME 2018-05-25 Failed   ROUGH FRAME 2018-06-12 Passed   ROUGH MECHANICAL 2018-05-25 Failed   ROUGH PLUMBING 2018-05-25 Failed   SCRATCH COAT 2018-07-03 Passed   SHEETROCK 2018-06-22 Passed   SHOWER PAN 2018-06-22 Passed   SLAB 2017-10-12 Passed   UNDERFLOOR FRAMING 2017-11-02 Failed   UNDERFLOOR FRAMING 2017-11-06 Failed   UNDERFLOOR FRAMING 2017-11-07 Passed   UNDERFLOOR PLUMBING 2017-11-02 Passed   UNDERGROUND SEWER 2018-10-15 Passed   TEMPORARY OCCUPANCY 2019-12-04 Failed Jeff Greef TEMPORARY OCCUPANCY 2020-02-03 Passed Antonio Torrez FINAL BUILDING 2020-10-05 Failed James Lee FINAL PLANNING 2020-05-18 Passed Ellen Yau FINAL BUILDING 2020-11-04 Passed Bob Sabich EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.