Loading...
B-2018-0369InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10756 CARVER DR CUPERTINO, CA 95014-3609 CUPERTINO APN: 375 32 008 PERMIT NO: B-2018-0369 OWNER'S NAME: Zhou Yonggui And Zhang Hongyu OWNER'S PHONE: 408-886-8783 CONTRACTOR: MUST RETRIEVE DATA.CONTRACTOR PHONE: DATE ISSUED 12/16/2020 9:24:17 AM ISSUED BY:VALUATION: $855300 JOB DESCRIPTION CONSTRUCT (N) 2- STORY SINGLE FAMILY DWELLING - (2411 SF); ATTACHED GARAGE - (440 SF); FRONT AND REAR COVERED PORCHES - (452 SF) REV #1 - MISSING REAR BOTTOM SILL PLATE- ANCHORS ADDED- ISSUED 6/6/19 DEF #1 - TRUSSES - ISSUED 7/29/19 - REV#2 - FRAMING DETAIL CHANGE - ISSUED 8-21-2019 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2019-06-04 Failed   FOUNDATION 2019-06-10 Passed   SLAB 2019-06-26 Partial   SLAB 2019-06-28 Passed   UFER GROUND 2019-06-10 Passed   UNDERFLOOR FRAMING 2019-06-26 Partial   UNDERFLOOR FRAMING 2019-06-27 Partial   UNDERFLOOR FRAMING 2019-06-28 Passed   UNDERFLOOR INSULATION 2019-06-27 Partial   UNDERFLOOR INSULATION 2019-06-28 Passed   UNDERFLOOR MECHANICAL 2019-06-26 Passed   UNDERFLOOR PLUMBING 2019-06-26 Failed   UNDERFLOOR PLUMBING 2019-06-27 Partial   UNDERFLOOR PLUMBING 2019-06-28 Passed   EXTERIOR SHEAR 2019-08-13 Cancelled Jeff Greef INTERIOR SHEAR 2019-08-13 Cancelled Jeff Greef ROOF NAIL 2019-08-13 Cancelled Jeff Greef EXTERIOR SHEAR 2019-08-14 Cancelled Jeff Greef INTERIOR SHEAR 2019-08-14 Cancelled Jeff Greef ROOF NAIL 2019-08-14 Cancelled Jeff Greef EXTERIOR SHEAR 2019-08-23 Failed LARRY SQUARCIA INTERIOR SHEAR 2019-08-23 Failed LARRY SQUARCIA ROOF NAIL 2019-08-23 Failed LARRY SQUARCIA EXTERIOR SHEAR 2019-08-30 Passed Jeff Greef INTERIOR SHEAR 2019-08-30 Cancelled Jeff Greef ROOF NAIL 2019-08-30 Passed Jeff Greef ROUGH FRAME 2019-08-30 Failed Jeff Greef FIRE DEPT - SPRINKLERS - ROUGH 2019-09-25 Passed Santa Clara County Fire ROUGH ELECTRICAL 2019-10-02 Failed Jeff Greef ROUGH MECHANICAL 2019-10-02 Failed Jeff Greef ROUGH PLUMBING 2019-10-02 Failed Jeff Greef ROUGH MECHANICAL 2019-10-09 Passed Jeff Greef ROUGH ELECTRICAL 2019-10-09 Passed Jeff Greef ROUGH FRAME 2019-10-09 Passed Jeff Greef ROUGH PLUMBING 2019-10-09 Passed Jeff Greef UNDERGROUND WATER SERVICE 2019-10-09 Passed Jeff Greef UNDERGROUND SEWER 2019-10-09 Passed Jeff Greef PROPERTY LINE CLEANOUT 2019-10-09 Passed Jeff Greef INSULATION 2019-10-14 Cancelled   INSULATION 2019-10-15 Cancelled Jeff Greef INSULATION 2019-10-17 Passed Jeff Greef INTERIOR SHEAR 2019-10-31 Passed Jeff Greef EXTERIOR LATH 2019-10-31 Passed Jeff Greef INTERIOR LATH 2019-10-31 Passed Jeff Greef SHOWER PAN 2019-10-31 Passed Jeff Greef SHEETROCK 2019-11-13 Passed Jeff Greef GAS METER RELEASE 2019-11-13 Failed Jeff Greef GAS TEST 2019-11-13 Failed Jeff Greef GAS TEST 2019-12-18 Cancelled Jeff Greef SCRATCH COAT 2019-12-18 Cancelled Jeff Greef GAS METER RELEASE 2019-12-18 Cancelled Jeff Greef SCRATCH COAT 2019-12-19 Passed Jeff Greef GAS TEST 2019-12-19 Cancelled Jeff Greef GAS METER RELEASE 2019-12-19 Cancelled Jeff Greef GAS METER RELEASE 2020-01-07 Passed Jeff Greef GAS TEST 2020-01-07 Passed Jeff Greef ELECTRIC METER RELEASE 2020-03-03 Passed James Lee PW - DEPARTMENT FINAL 2020-03-11 Cancelled Kevin Rieden FIRE DEPT - SPRINKLERS - FINAL 2020-05-13 Passed Santa Clara County Fire FIRE DEPT - FINAL 2020-05-13 Passed Santa Clara County Fire FINAL ELECTRICAL 2020-05-21 Failed Jeff Greef FINAL MECHANICAL 2020-05-21 Failed Jeff Greef FINAL PLUMBING 2020-05-21 Failed Jeff Greef FINAL ELECTRICAL 2020-06-01 Passed Jeff Greef FINAL MECHANICAL 2020-06-01 Passed Jeff Greef FINAL PLUMBING 2020-06-01 Passed Jeff Greef PW - DEPARTMENT FINAL 2020-06-03 Cancelled Kevin Rieden PW - DEPARTMENT FINAL 2020-06-09 N/A Kevin Rieden PW - DEPARTMENT FINAL 2020-06-10 Passed Kevin Rieden TCO - PLANNING 2020-06-15 Passed Gian Martire TCO - ENVSERVICES 2020-06-15 Passed Alex Wykoff TEMPORARY OCCUPANCY 2020-06-24 Passed Jeff Greef FINAL BUILDING 2020-12-31 Cancelled Sundari Pilaka FINAL BUILDING 2020-12-16 Passed JOSE MARTINEZ EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.