Loading...
B-2018-0029InspectionRecord.pdfINSPECTION RECORD CUPERTINO CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21900 OAKVIEW LN CUPERTINO, CA 95014-1 146 CUPERTINO APN: APN not found on record OWNER'S NAME: HSU TRACY TRUSTEE CONTRACTOR: NO LICENSE INFO, DATE ISSUED 12/23/2020 3:04:41 PM ISSUED BY: PERMIT NO: B-2018-0029 OWNER'S PHONE: Not Provided CONTRACTOR PHONE: VALUATION: $0 JOB DESCRIPTION CONSTRUCT (N) 1 STORY SFD (4044 S.F.); ATTACHED GARAGE (443 S.F.); PORCH (50 S.F.); (N) ATTACHED 2ND UNIT (623 S.F.) REVISION #1 - REDUCE SIZE OF WINDOW IN GARAGE AND CLARIFY/REVISE ELEVATIONS TO MATCH - ISSUED 11/14/2018 REV #2 - REDUCTION IN SHEAR -WALL AT 2ND UNIT BEDROOM AND RELOCATION OF FURNACE FROM GARAGE TO THIS LOCATION - APPROVED 12/23/2020 INSPECTION TYPE DATE STATUS INSPECTOR BLD_RES_ADN Complaint 2018-08-21 Failed EXTERIOR LATH 2019-01-25 Passed EXTERIOR SHEAR 2018-09-18 Failed FOUNDATION 2018-06-21 Cancelled FOUNDATION 2018-06-22 Cancelled FOUNDATION 2018-06-26 Failed FOUNDATION 2018-07-03 Passed INSULATION 2018-12-11 Passed INSULATION 2018-12-11 Passed INTERIOR LATH 2019-01-25 Passed INTERIOR LATH 2019-01-25 Passed ROOF NAIL 2018-09-18 Passed ROUGH ELECTRICAL 2018-11-26 Failed ROUGH ELECTRICAL 2018-11-27 Cancelled ROUGH ELECTRICAL 2018-11-28 Passed _ ROUGH FRAME 2018-11-26 Failed ROUGH FRAME 2018-11-27 Cancelled ROUGH FRAME 2018-11-28 Failed ROUGH FRAME 2018-12-11 Passed ROUGH MECHANICAL 2018-11-26 Passed ROUGH PLUMBING 2018-11-26 Failed ROUGH PLUMBING 2018-11-27 Cancelled ROUGH PLUMBING 2018-11-28 Failed ROUGH PLUMBING 2018-12-11 Passed SCRATCH COAT 2019-02-05 Passed SHEETROCK 2019-01-02 Passed SHOWER PAN 2019-01-25 Passed SLAB 2018-10-05 Passed UNDERFLOOR ELECTRICAL 2018-07-25 Passed UNDERFLOOR FRAMING 2018-07-25 Passed UNDERFLOOR INSULATION 2018-07-30 Passed UNDERFLOOR MECHANICAL 2018-07-25 Passed UNDERFLOOR PLUMBING 2018-07-25 Passed ELECTRIC METER RELEASE 2019-08-13 Passed Bob Sabich GAS METER RELEASE 2019-08-13 Passed Bob Sabich UNDERGROUND SEWER 2019-08-16 Failed Paul O'Sullivan UNDERGROUND WATER SERVICE 2019-08-16 Passed Paul O'Sullivan PROPERTY LINE CLEANOUT 2019-08-19 Passed cupsanitary PROPERTY LINE CLEANOUT 2019-08-20 Passed cupsanitary UNDERGROUND SEWER 2019-08-21 Passed Paul O'Sullivan PW - DEPARTMENT FINAL 2019-12-19 Passed Kevin Rieden FINAL PLANNING 2020-02-06 Passed Ellen Yau FINAL BUILDING 2020-02-28 Failed Bob Sabich FINAL ELECTRICAL 2020-02-28 Passed Bob Sabich ROUGH MECHANICAL 2020-02-28 Cancelled Bob Sabich ROUGH PLUMBING 2020-02-28 Cancelled Bob Sabich FINAL MECHANICAL 2020-02-28 Failed Bob Sabich FINAL PLUMBING 2020-02-28 Failed Bob Sabich FINAL PLUMBING 2020-12-21 Passed Paul O'Sullivan FINAL MECHANICAL 2020-12-21 Passed Paul O'Sullivan FINAL BUILDING 2020-12-21 Passed Paul O'Sullivan FINAL ELECTRICAL FINAL BUILDING 2020-12-21 2021-01-04 Passed , Paul O'Sullivan Scheduled EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.