Loading...
B-2017-1130InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10810 WUNDERLICH DR CUPERTINO, CA 95014-3851 CUPERTINO APN: 375 22 014 PERMIT NO: B-2017-1130 OWNER'S NAME: Sridhar Thangapandi And Mabel OWNER'S PHONE: 408-217-8655 CONTRACTOR: NILSENE BUILDER INC, 21060 HOMESTEAD ROAD #216 CUPERTINO CONTRACTOR PHONE: DATE ISSUED 1/15/2021 2:57:24 PM ISSUED BY:VALUATION: $0 JOB DESCRIPTION (N) 2 STORY SFD; 1ST FLOOR (1302 SQ FT); ATTACHED GARAGE (430.72 SQ FT); FRONT COVERED PORCH (71 SQ FT) AND REAR PORCH (200 SQ FT); 2ND FLOOR (1102 SQ FT) WITH (3) BALCONIES (260 SQ FT) REV #2 - UPDATE ELEVATION VIEWS AND LANDSCAPE PLAN - APPROVED 1/14/21 REVISION #1 - FIRST FLOOR: INSTALL ELEC FIREPLACE LIVING RM AND REDUCE SIZE OF (2) WINDOWS; REDUCE SIZE OF (2) WINDOWS IN KITCHEN; RELOCATE ELECTRICAL METER. SECOND FLOOR: INCREASE MASTER BEDROOM BALCONY (10.5 SF) AND INCREASE PLATE HEIGHT AND INSTALL FLAT ROOF; INCREASE SIZE OF BALCONY NEXT TO BEDRM #5 (30 SF). - APPROVED 12/4/2020 DEFERRED SUBMITTAL #1 - ROOF TRUSSES -ISSUED 10-30-2019 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2019-05-10 Passed   PIERS 2019-04-09 Passed   SLAB 2019-05-20 Passed   UNDERFLOOR FRAMING 2019-05-29 Partial   UNDERFLOOR FRAMING 2019-05-30 Partial   UNDERFLOOR INSULATION 2019-05-30 Partial   UNDERFLOOR MECHANICAL 2019-05-29 Passed   UNDERFLOOR PLUMBING 2019-05-29 Passed   ROOF NAIL 2019-10-28 Failed Jeff Greef INTERIOR SHEAR 2019-10-28 Cancelled Jeff Greef ROOF NAIL 2019-10-30 Failed Jeff Greef INTERIOR SHEAR 2019-10-30 Cancelled Jeff Greef EXTERIOR SHEAR 2019-10-30 Failed Jeff Greef EXTERIOR SHEAR 2019-11-01 Conditional Antonio Torrez FIRE DEPT - SPRINKLERS - ROUGH 2019-11-15 Passed Santa Clara County Fire UNDERGROUND SEWER 2019-11-25 Passed James Lee UNDERGROUND WATER SERVICE 2019-11-25 Passed James Lee ROUGH MECHANICAL 2019-12-02 Cancelled Jeff Greef ROUGH ELECTRICAL 2019-12-02 Cancelled Jeff Greef ROUGH PLUMBING 2019-12-02 Cancelled Jeff Greef ROUGH FRAME 2019-12-02 Cancelled Jeff Greef ROUGH ELECTRICAL 2019-12-17 Rescheduled Jeff Greef ROUGH FRAME 2019-12-17 Rescheduled Jeff Greef ROUGH MECHANICAL 2019-12-17 Rescheduled Jeff Greef ROUGH PLUMBING 2019-12-17 Rescheduled Jeff Greef EXTERIOR LATH 2019-12-17 Rescheduled Jeff Greef ROUGH FRAME 2019-12-18 Cancelled Jeff Greef EXTERIOR LATH 2019-12-18 Cancelled Jeff Greef ROUGH PLUMBING 2019-12-18 Cancelled Jeff Greef ROUGH ELECTRICAL 2019-12-18 Cancelled Jeff Greef ROUGH MECHANICAL 2019-12-18 Cancelled Jeff Greef ROUGH MECHANICAL 2019-12-20 Passed Jeff Greef ROUGH ELECTRICAL 2019-12-20 Passed Jeff Greef ROUGH PLUMBING 2019-12-20 Passed Jeff Greef EXTERIOR LATH 2019-12-20 Cancelled Jeff Greef ROUGH FRAME 2019-12-20 Failed Jeff Greef EXTERIOR LATH 2020-01-17 Passed Jeff Greef ROUGH FRAME 2020-01-17 Failed Jeff Greef ROUGH FRAME 2020-01-21 Passed Jeff Greef EXTERIOR LATH 2020-01-21 Passed Jeff Greef EXTERIOR SHEAR 2020-01-21 Passed Jeff Greef ROOF NAIL 2020-01-21 Passed Jeff Greef INSULATION 2020-01-30 Passed Jeff Greef SHEETROCK 2020-02-12 Failed Jeff Greef SHEETROCK 2020-02-18 Passed James Lee SHOWER PAN 2020-02-18 Passed James Lee SCRATCH COAT 2020-03-25 Passed James Lee INTERIOR LATH 2020-04-24 Passed James Lee GAS METER RELEASE 2020-08-14 Failed James Lee ELECTRIC METER RELEASE 2020-08-14 Passed James Lee ELECTRIC METER RELEASE 2020-08-17 Cancelled James Lee GAS METER RELEASE 2020-08-17 Passed James Lee FIRE DEPT - SPRINKLERS - FINAL 2020-10-19 Passed Santa Clara County Fire PW - DEPARTMENT FINAL 2020-11-30 Passed Kevin Rieden FINAL ELECTRICAL 2020-12-17 Failed James Lee FINAL MECHANICAL 2020-12-17 Failed James Lee FINAL PLUMBING 2020-12-17 Passed James Lee FINAL ELECTRICAL 2020-12-18 Cancelled James Lee FINAL MECHANICAL 2020-12-18 Cancelled James Lee FINAL ELECTRICAL 2020-12-22 Passed James Lee FINAL MECHANICAL 2020-12-22 Passed James Lee TCO - PUBLICWORKS Pending Pending   FINAL PLANNING 2021-01-14 Passed Erick Serrano FINAL BUILDING 2021-01-15 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.