Loading...
CC 06-01-2021 Item No. 07 Annual Pavement Report_Staff Presentation2021 PAVEMENT MANAGEMENT PROGRAM CC 6/1/2021 Item 7 1 CC 06-01-2021 Item No. 7 Bay Area Pavement Management •Current pavement conditions in Cupertino continues to be among the highest in the Bay Area. Current pavement condition index (PCI) is 84 •In 2019, the average PCI for all bay area Cities was 67 CC 6/1/2021 Item 7 2 Cupertino Pavement Condition Index 2011 -2021 71 64 63 67 70 78 80 85 85 84 84 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 PCI CC 6/1/2021 Item 7 3 Pavement Condition Index Ranges PCI RANGE DESCRIPTION PERCENT OF 2021 STREET NETWORK Very Good –Excellent (PCI = 80-100) Newly constructed or resurfaced pavement with few signs of distress 72% Good (PCI = 70-79 Pavement requiring mostly preventative maintenance and showing only low levels of distress 18% Fair (PCI= 60-69 Pavement at the low end of this range is significantly distressed and may require a combination of rehabilitation and preventative Maintenance 5% At Risk (PCI = 50-59) Deteriorated pavement requiring immediate attention, including rehabilitative work 2% Poor PCI = 25-49 Pavement showing extensive distress and requiring major rehabilitation or reconstruction 3% Failed (PCI = 0-24 Extremely rough pavement that needs complete reconstruction 0% CC 6/1/2021 Item 7 4 Pavement Index Trend by Street Class 88 86 84 83817979 78 85 86 85 85858585 84 50 55 60 65 70 75 80 85 90 95 100 2018 2019 2020 2021PCI Arterial Collector Residential Network PCI CC 6/1/2021 Item 7 5 RECOMMENDED BUDGET •An annual budget of $3M per year is required to maintain a PCI of 84. •Budget was reduced in FY 20/21 due to economic uncertainty of Covid-19 and anticipated reduction in restricted revenues used to fund streets and roads maintenance activities. •As revenue sources stabilize and COVID-19 restrictions ease, the proposed FY21/22 operating budget includes $3M of pavement improvement funding. CC 6/1/2021 Item 7 6 Proposed Projects & Revenue Sources FY Project Name Budget External Funds 20/21 2021 Pavement Maintenance Phase 1 $1,825,000 FY20/21 SB1 Revenue, VRF (VTA), Gas Tax 21/22 2021 Pavement Maintenance Phase 2 $1,000,000 FY 21/22 SB1 Revenue 21/22 2022 Pavement Maintenance Project Phase 1 $2,000,000 Measure B, VRF (VTA) CC 6/1/2021 Item 7 7 Projected Pavement Condition Index 84 83 82 81 80 84 84 84 84 8484 82 80 78 76 2020 2021 2022 2023 2024 1.5M/Yr 3M/Yr Do Nothing2 CC 6/1/2021 Item 7 8 N Portal at Amherst Dr CC 6/1/2021 Item 7 9 Creston Drive CC 6/1/2021 Item 7 10 QUESTIONS CC 6/1/2021 Item 7 11