Loading...
ERC 01-21-2021 Approved Minutes Community Development Department Cupertino, CA 95014 (408) 777-3308 APPROVED MINUTES OF MEETING OF THE ENVIRONMENTAL REVIEW COMMITTEE HELD ON January 21, 2021 Committee Members: Kitty Moore,Chair Chad Mosley,Vice Chair Piu Ghosh Dianne Thompson Committee Members absent: Ben Fu David Fung Staff present: Jeff Tsumura,Associate Planner Consultant Presenters: Nick Pappani, Vice President,Raney Planning& Management,Inc. APPROVAL OF MINUTES: 1.April 16, 2020 The minutes of the April 16,2020 were approved as written ORAL COMMUNICATIONS:None (Reserved for persons wishing to address the Committee on issues that are not already included in the regular Order of Business) WRITTEN COMMUNICATIONS: None PUBLIC HEARING: 2. Application No.(s): EA-2018-02,TM-2018-01 Applicant: Ray Chen(Lands of Qi) Location: 11226 Bubb Rd APN#362-06-036 Consider a Mitigated negative Declaration to allow the subdivision of one(1)parcel into three(3) parcels for single residential uses. Recommendation: Conduct the public hearing and recommend that the Environmental Review Committee consider the Mitigated Negative Declaration appropriate for the project. ❑ Geologic/Soils ❑ To remove any contaminated soil from the site, soil be will graded three feet from the building foundations to a depth of 1 foot. ❑ Trees/Landscaping i o No trees will be removed during the nesting season ❑ Air Quality/Greenhouse Gas Emissions o Standard mitigating measures will be uz place during construction to reduce dust and exhaust ❑ Hazardous Materials The removed soil will be disposed in of in accordance with all local,State and Federal requirements. ❑ Utilities and Service Systems o The lots are subject to the State's C3 stormwater requirements, as such the lots will need to retain bioretention basins in a Public Works easement ❑ Traffic o The traffic study indicates that the traffic increase in the area will not have a significant impact ❑ Archeological/Cultural o There will be a Stop Work Order in the construction documents should any remains or artifacts be discovered on site ❑ Noise o Standard mitigating measures will be in place during construction to reduce noise o The noise study indicates that the overall noise generated from the project is less than significant RECOMMENDATION: That the ERC has determined that a Mitigated Negative Declaration is appropriate for the project MOTION: Committee Member Ghosh SECOND: Committee Member Thompson NOES: none VOTE: 4-0-1 (Fung absent) OLD BUSINESS: None NEW BUSINESS: None STAFF AND COMMITTEE REPORTS: Chair Moore commented on how much she liked the format of the Initial Study. FUTURE AGENDA SETTING: None ADJOURNMENT Respectfully submitted, Beth Ebben Deputy Board Clerk