Loading...
BLD-2021-0290BUILDING PERMIT CUPERTINO CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 20705 VALLEY GREEN DR Cupertino APN: 326 10 046 PERMIT NO: BLD-2021-0290 OWNER'S NAME: BERG FAMILY PARTNERS, L.P. OWNER'S PHONE: 408-799-7346 CONTRACTOR: SWINERTON BUILDERS, 2001 CLAYTON RD 7TH FLOOR - CONCORD CONTRACTOR PHONE: DATE ISSUED 4/22/2021 2:01:24 PM ISSUED BY: PhuongD VALUATION: $10000 JOB DESCRIPTION RAMP AND PROVIDE TEMPORARY POWER TO TRAILER. INSTALL TEMPORARY CONSTRUCTION TRAILER (720 SF) WITH ADA LICENSED CONTRACTOR DECLARATION C12 EARTHWORK AND PAVING, C29 MASONRY, C39 ROOFING, C-4 BOILER%2C HOT WATER HEATING AND STEAM FITTING, STEEL%2C REINFORCING, C51 STEEL%2C STRUCTURAL, C-9 DRYWALL, C-2 INSULATION AND ACOUSTICAL, C-6 CABINET%2C DECORATING, C35 LATHING AND PLASTERING, C16 FIRE PROTECTION CONTRACTOR, C36 PLUMBING, C38 REFRIGERATION, C55 C-5 FRAMING AND ROUGH CARPENTRY, D34 PREFABRICATED EQUIPMENT, C46 SOLAR, C1 0 ELECTRICAL, C21 BUILDING 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full CONTRACTOR: LICENSED B GENERAL C20 MILLWORK WATER MOVING%2C LICENSED EXP 08/31/2021 I hereby force I hereby CLASS: BUILDING WARM -AIR AND CONDITIONING, DEMOLITION NO: 92 DATE: affirm and effect. affirm I have and for which I have and I certify that with SWINERTON BUILDERS CONTRACTOR, A GENERAL ENGINEERING CONTRACTOR, HEATING%2C VENTILATING AND AIR-CONDITIONING, C50 FINISH CARPENTRY, C-8 CONCRETE, C33 PAINTING AND C23 ORNAMENTAL METALS, C42 SANITATION SYSTEM, that I am licensed under the provisions of Chapter under penatiy of perjury one of the following three will maintain a certificate of consent to self -insure this permit is issued. will maintain Worker's Compensation Insurance, in the performance of the work for which this laws of California. If, after making this certificate such provisions or this permit shall be deemed revoked. declarations: for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith V issued. Compensation comply HAZARDOUS MATERIALS DISCLOSURE Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance I have read the hazardous materials requirements under the Cupertino Municipal Code. Chapter 9.12 and the Health V with equipment Municipal & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Sections 25505, 25533, and 25534. or devices which emit hazardous air contaminants Code, Chapter 9.12 and the Health & Safety Code, EPA LEAD -SAFE DISCLOSURE for this project. Firm Certification No: An EPA Lead -Safe Certified Renovator will be responsible Firm Name: No EPA Lead -Safe Certified Firm is required for this project. Certified CONSTRUCTION LENDING AGENCY lending agency for the performance of the work which this permit is issued (Section 3097, Civil Code). Lender's Address: I hereby Yes affirm under penalty of perjury that there is a construction No V Lender's Name: APPLICATION CERTIFICATION information is correct. I agree to comply with all city and county ordinances and state laws relating to building to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, source regulations per the Cupertino Municipal Code, Section 9.18. I certify that I have read this application and state that the above construction, and hereby authorize representatives of this city harmless the City of Cupertino against liabilities, judgements, the applicant understands and will comply with all non -point Signature: . is commenced within 365 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 365 days after the time the work is commenced.