Loading...
BLD-2021-0314 PlansDRAWING TITLE: DATE: SCALE: SHEET NUMBER: Cover Sheet NTS S0PROJECT:REVISION DATEGEOSTRUCTURALENGINEERING INC7172 Regional Street #440 Dublin CA, 94568Cell: 707-322-3507Email: andre.hawks@geostructuralengineering.comSHEET INDEX S0: COVER SHEET S1: REPAIR PLAN S2-S3: GRIP-TITE CUT SHEETS SCOPE OF WORK: VOLUNTARY FOUNDATION REPAIR GENERAL NOTES 1. DESIGN CRITERIA BUILDING CODE: 2019 CALIFORNIA BUILDING CODE ROOF DEAD LOAD 20 PSF FLOOR DEAD LOAD 20 PSF WALL DEAD LOAD 16 PSF CONCRETE DEAD LOAD 150 PCF ROOF LIVE LOAD 20 PSF FLOOR LIVE LOAD 40 PSF WIND DESIGN PERAMETERS RISK CATEGORY = II WIND VELOCITY = 92 MPH KD = 0.85 EXPOSURE CATEGORY = C KZT = 1.00 G = 0.85 DESIGN WIND PRESSURE = 17.3 PSF SEISMIC DESIGN PERAMETERS RISK CATEGORY = II SEISMIC IMPORTANCE FACTOR = 1.00 SS = 1.946 S1= 0.693 SITE SOIL CLASS= D SDS = 1.3 SD1= 0.78 SEISMIC DESIGN CATEGORY = D SEISMIC RESISTING FORCE = PLYWOOD BASE SHEAR = 8.7 KIPS R= 6.5 ANALYSIS PROCEDURE USED: EQUIVALENT LATERAL FORCE PROCEDURE 2. MATERIALS WALL PLATES - ASTM A1101 PIER TUBE- GRIP TITE FP3T ASTM A513 BRACKET- GRIP TITE FP3B ASTM A36 BOLTS- ASTMB633 COUPLING - AISI 1060 ALL- THREAD ROD - ASTM A449 ESR REPORT LISTING NUMBER: 531 3. FACTORY WELDING NOTES CONFORM TO AWS D1.1 USING WELDERS CERTIFIED IN ACCORDANCE WITH AWS REQUIREMENTS. USE E70XX ELECTRODES OF TYPE REQUIRED FOR MATERIALS TO BE WELDED. 4. CORROSION PROTECTION SACRIFICIAL DESIGN THICKNESS - CAPACITIES INCLUDE A SCHEDULED LOSS IN STEEL THICKNESS DUE TO CORROSION FOR BLACK, UNCOATED STEEL. ANCHORS ARE DESIGNED FOR 50 - YEAR SCHEDULED SACRIFICIAL THICKNESS LOSS IN ACCORDANCE WITH ICC-ES AC358. 5. INSTALLATION PUSH PIER TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS. MINIMUM INSTALLATION TORQUE DETERMINED BY THE FOLLOWING EQUATION AND LIFT PERFORMANCE: PUSH PIER INSTALLATION PRESSURE (PSI): 1,500 PSI [DESIGN WORKING LOAD] X [FS = 2] / [HYDRAULIC RAM AREA = 9.63 SQIN] MINIMUM INSTALLATION DEPTH IS 10'-0" ± UNO. MINIMUM LIFT: 1/8" MAXIMUM LIFT: 8" CONTACT ENGINEER OF RECORD IF FIELD CONDITIONS DIFFER. 6. PUSH PIER SPLICING PIERS ARE TO BE GRAVITY SPLICED WITH FITTING COUPLERS. BUILDING WEIGHT WILL ENSURE JOINTS TO NOT SEPARATE. 7. FULL TIME INSPECTION & LOAD TESTING CONTINUOUS SPECIAL INSPECTION IS REQUIRED DURING INSTALLATION PER 2012 IBC SECTOIN 1810.4.12. BY A GEOSTRUCTURAL REPRESENATIVE. LOAD TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM METHOD D1143 (QUICK METHOD) ON 5-10 PERCENT OF PIERS AND WILL BE SELECTED BY THE SPECIAL INSPECTOR. AN ALIGNMENT LOAD (AL) SHALL BE APPLIED TO THE PILE PRIOR TO SETTING THE DEFLECTION MEASURING EQUIPMENT TO ZERO OR A REFERENCE POSITION. THE AL SHALL BE NO MORE THAN 10% OF THE PUSH PIER DESIGN LOAD WHICH IS 5.9 KIPS. INCREMENTAL LOADING SHALL BE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: TEST LOADING SCHEDULE HOLD TIME MAX DEFLECTION 1.50 DL HOLD FOR CREEP TEST (SEE BELOW) 0.04 INCHES 1.25 DL UNTIL STABLE 1.00 DL UNTIL STABLE 0.75 DL UNTIL STABLE 0.50 DL UNTIL STABLE 0.25 DL UNTIL STABLE LOAD TESTING CREEP ACCEPTANCE CRITERIA SHALL BE NO GREATER THAN 0.04 INCHES WITHIN A 10 MINUTE PERIOD. IF MOVEMENT IS OBSERVED GREATER THAN 0.04 INCHES WITHIN THE 10 MINUTE PERIOD THE LOAD TEST SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES. IF THE LOAD TEST IS TO BE HELD THE PIER MOVEMENTS SHALL BE MEASURED AT 15, 20, 30, 40, 50, AND 60 MINUTES. THE CREEP VERSUS THE LOGARITHM OF TIME SHALL BE PLOTTED. IF THE CREEP RATE IS LESS THAN 0.080 INCHES BETWEEN 6 AND 60 MINUTES, THE LOAD TEST SHALL BE CONSIDERED SUCCESSFUL. EXP: 3-31-22 1-16-2021Khot ResidenceVoluntary FoundationUnderpinning879 Miller AveCupertino CA 950141 1 3-16-21 2 4-20-21 2 Arnold Hom 05/03/21 05/11/21 BLD-2021-0314 Haley McKee 1 2 3 4 5 6 7 8 9 10 12 11 1314 15 16 17 18 19 6'-6" 6'-6" 7' 6' 6' 5' 4' 6'-2" UNIT A ENTRY UNIT B ENTRY 6'-6" 2' 5'-6"5'-6" 5'-6" 2' 6'-6" 6'-6" 2' DRAWING TITLE: DATE: SCALE: SHEET NUMBER: Foundation/Pier Layout Plan 1/4" = 1' S1PROJECT:REVISION DATEGEOSTRUCTURALENGINEERING INC7172 Regional Street #440 Dublin CA, 94568Cell: 707-322-3507Email: andre.hawks@geostructuralengineering.com(E) FOUNDATION/(N) PIER LAYOUT PLAN 24x36 SCALE: 1/4" = 1' 1 (E) FDN / (N) PUSH PIER NOTES: 1. INDICATES LOCATION OF 3" DIA GRIP-TITE FP3BA PUSH PIER W/ 36" LONG GRIP-TITE FP3T PIER TUBES 2. CONTRACTOR TO VERIFY 6" WIDE X 18" DEEP (E) CONC STEMWALL MIN TYP (NOTIFY ENGINEER OF RECORD IF FIELD CONDITIONS DIFFER). 3. MAX PIER SPACING SHALL BE AS INDICATED ON PLAN @ 7'-6" OC MAX +/- 6". 4. CONTRACTOR TO NOTIFY ENGINEER OF RECORD IF (E) FOUNDATION CRACK IS PRESENT IN THE SPAN BETWEEN FOUNDATION BRACKET. 5. SHORING METHODS TO BE DONE BY CONTRACTOR 6. DESIGN LOAD = 5.9 KIPS PER PIER. LOAD NOT TO EXCEED 27.1 KIPS PER PUSH PIER. # N 1-16-2021Khot ResidenceVoluntary FoundationUnderpinning879 Miller AveCupertino CA 95014APPROXIMATE PROPERTY LINE EXP: 3-31-22 ~25' ~20' ~5' ~5' 1 3-16-21 2 4-20-21 2 1 Arnold Hom 05/03/21 DRAWING TITLE: DATE: SCALE: SHEET NUMBER: Cut Sheets NTS S2PROJECT:REVISION DATEGEOSTRUCTURALENGINEERING INC7172 Regional Street #440 Dublin CA, 94568Cell: 707-322-3507Email: andre.hawks@geostructuralengineering.comGRIP-TITE FP3BA BRACKET & FP3T TUBE CUTSHEET 1 SCALE: NTS 1 EXP: 3-31-22 1-16-2021Khot ResidenceVoluntary FoundationUnderpinning879 Miller AveCupertino CA 95014BACK FILL AROUND BRACKET WITH SOILS RETAINED ON SITE. IN 6" LIFTS, COMPACT WITH PORTABLE MECHANIC TAMPERS WITH 4" TAMPER PLATES TO 90% COMPACTION FOR PRECISE COMPACTION AROUND BRACKET AND FOUNDATION. BOLT THE FP3B BRACKET TO THE FOUNDATOIN WITH 2 EACH 1 2" X 5" SIMPSON TITAN HEAVY DUTY SCREW ANCHORS THD50500H. 1 3-16-21 1 1 2 2 4-20-21 6" VIF 18" MIN VIF 2 Arnold Hom 05/03/21 DRAWING TITLE: DATE: SCALE: SHEET NUMBER: Cut Sheets NTS S3PROJECT:REVISION DATEGEOSTRUCTURALENGINEERING INC7172 Regional Street #440 Dublin CA, 94568Cell: 707-322-3507Email: andre.hawks@geostructuralengineering.comGRIP-TITE FP3BA BRACKET CUTSHEET 2 SCALE: NTS 1 1-16-2021Khot ResidenceVoluntary FoundationUnderpinning879 Miller AveCupertino CA 95014EXP: 3-31-22 Arnold Hom 05/03/21