20-146 Encroachment Agreement, GTE Mobilnet of California Limited Partnership, dba Verizon Wireless, R.O.W, 10451 Miller AvenueHeather M. Minner
Kirsten Squarcia 11/12/20
T-1TITLE SHEETDRAWN BY:CHECKED BY:BPMAPEIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENTREVDATEDESCRIPTIONMODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA94108APPROVED BY:LJBCUPERTINO 034(IFO) 10451 MILLER AVECUPERTINO, CA 95014VERIZON WIRELESS2785 MITCHELL DRIVE, SUITE 9WALNUT CREEK, CA94598004/03/20100% CD104/29/20 100% CD PLAN CHECKSITE ID:SITE TYPE:POLE #:COUNTY:616480142LIGHT POLEMCB103SANTA CLARACUPERTINO 034(IFO) 10451 MILLER AVECUPERTINO, CA 95014SITE INFORMATIONSITE ADDRESS:OWNER:APPLICANT:LATITUDE:LONGITUDE:COUNTY:ASSESSORS PARCEL NUMBER:ZONING:ELEVATION:CITY OF CUPERTINO10300 TORRE AVECUPERTINO, CA 95014VERIZON WIRELESS2785 MITCHELL DRIVE, SUITE 9WALNUT CREEK, CA 9459837.31672 NAD83-122.0134 NAD83SANTA CLARAPUBLIC RIGHT OF WAYNEAR 369-15-006CITY OF CUPERTINO±206.86' AMSLVICINITY MAPPOLE PHOTONDRAWING INDEXT-1SHEET NO.TITLE SHEETT-2GENERAL NOTESA-1SITE PLAN & ENLARGED SITE PLANA-3A-4ELEVATIONSCIRCUIT DIAGRAMD-1DETAILSCODE COMPLIANCEALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENTEDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHINGIN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK NOT CONFORMING TO THESE CODES.·2019 CALIFORNIA CODE·2019 CALIFORNIA BUILDING CODE (CBC), BASED ON THE 2018 IBC·2019 CALIFORNIA RESIDENTIAL CODE (CRC), BASED ON THE 2018 IRC·2019 CALIFORNIA ELECTRICAL CODE (CEC), BASED ON THE 2017 NEC·2019 CALIFORNIA MECHANICAL CODE (CMC), BASED ON THE 2018 UMC·2019 CALIFORNIA PLUMBING CODE (CPC), BASED ON THE 2018 UPC·2019 CALIFORNIA GREEN BUILDINGS STANDARDS CODE (CALGREEN)·2019 CALIFORNIA FIRE CODES WITH ALL LOCAL AMENDMENTS·ANY LOCAL BUILDING CODE AMENDMENTS TO THE ABOVE·CITY / COUNTY ORDINANCESSHEET TITLEE-1ELECTRICAL GENERAL NOTESE-2ONE-LINE DIAGRAM & GROUNDING SCHEMATIC E-3ELECTRICAL DETAILSACCESSIBILITY REQUIREMENTS FOR PERSONS WITH DISABILITIES:FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. ACCESSIBILITY ISNOT REQUIRED IN ACCORDANCE WITH CALIFORNIA ADMINISTRATIVE STATECODE PART 2, TITLE 24, CHAPTER 11B, SECTION 1103B.SURVEYPROJECT TEAMPROJECT DESCRIPTIOND-2DETAILSTHE UTILITIES SHOWN HEREIN ARE FOR THE CONTRACTORS CONVENIENCEONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THESE PLANS. THEENGINEER/SURVEYOR ASSUMES NO RESPONSIBILITY FOR THE LOCATIONSSHOWN AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFYALL THE UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE MADE TOTHE (E) UTILITIES BY THE CONTRACTOR SHALL BE THE SOLE RESPONSIBILITYOF THE CONTRACTOR.CALL 811 BEFORE YOU DIGIT'S THE LAWMODUS PROJECT MANAGER:MODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA 94108PHONE: (415) 989.1102EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COMCONSTRUCTION/IMPLEMENTATION MANAGER:MODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA 94108PHONE: (415) 989.1102EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COMA&E PROJECT MANAGER:MODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA 94108PHONE: (415) 989.1102EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COMAPPLICANT:VERIZON WIRELESS2785 MITCHELL DRIVE, SUITE 9WALNUT CREEK, CA 94598CONTACT: CHRIS MOLLERPHONE: (925) 339.2778EMAIL: CHRIS.MOLLER@VERIZONWIRELESS.COMLAND USE PLANNER:MODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA 94108PHONE: (415) 989.1102EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COMSITE ACQUISITION:MODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA 94108PHONE: (415) 989.1102EMAIL: VERIZONPOLYGONTEAM@MODUSLLC.COM(IFO) 10451 MILLER AVECUPERTINO, CA 95014SITED-3POLE SPECSC-1A-2ELEVATIONSVERIZON WIRELESS PROPOSES TO INSTALL A NEW WIRELESS COMMUNICATION SITE ON A LIGHT POLE IN THE PUBLIC RIGHT-OF-WAY.SCOPE:·INSTALL (1) 2' NEW CANISTER ANTENNA INSIDE NEW FRP CONCEALMENT SHROUD ON TOP OF POLE·INSTALL (2) 5G ANTENNA/RADIOS·INSTALL (2) RRUS-32 RADIOS·INSTALL (2) PSU-AC08 BEHIND RADIOS·INSTALL NEW COAX FROM EQUIPMENT TO NEW ANTENNA WITHIN POLE·INSTALL (1) NEW SMART METER / DISCONNECT ON SIDE OF POLE·EXISTING POLE TO BE REMOVED·EXISTING POLE FOUNDATION TO BE ABANDONED. INSTALL NEW POLE AND FOUNATION
S/LFIBERFIBERS/LS/LFIBER FIBER FIBERS/LS/LS/LS/LS/LS/LS/LS/LDRAWN BY:CHECKED BY:BPMAPEIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENTREVDATEDESCRIPTIONMODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA94108APPROVED BY:LJBCUPERTINO 034(IFO) 10451 MILLER AVECUPERTINO, CA 95014VERIZON WIRELESS2785 MITCHELL DRIVE, SUITE 9WALNUT CREEK, CA94598004/03/20100% CD104/29/20 100% CD PLAN CHECK207/22/20 100% CD PLAN CHECKA-1SITE PLAN1ENLARGED SITE PLANNSITE PLAN2N2A-1ENLARGED SITE PLANMILLER AVENUE
1/16"=1'-0"SCALE1/2"=1'-0"SCALE1&2A-31&2A-2(E) LIGHT POLE ANDFOUNDATION TO BE REMOVED.(N) LIGHT POLE & FOUNDATIONTO BE INSTALLED IN PLACE(N) LOCATION OF VERIZONWIRELESS CANISTER ANTENNA IN FRPSHROUD MOUNTED ON LIGHT POLE(N) LOCATION OF VERIZON WIRELESSEQUIPMENT MOUNTED ON LIGHT POLEPROPERTY LINE (E) CURB & GUTTER7'-6"± BACK OFPOLE TO ROW LINE(N) LOCATION OF VERIZONWIRELESS CANISTERANTENNA AND EQUIPMENT(E) DRIVEWAY, TYP.A.P.N.:369-15-006ELECTRICAL LINESTREET LIGHT LINE ES/LFIBER LINE(S)FIBERLEGEND(N) STEEL MAST ARM(N) LUMINAIREE1N1REMOVE & REPLACE CONCRETE(APPROX. 25 SQ. FT.) AT APPROXIMATELIMITS TO MATCH EXISTING ADJACENTELEVATIONS, REPLACE WHOLE FLAGS,NOT PARTIALNC2(E)LANDSCAPING(E)SIDEWALKNC3
EC2EC1NC1(E)LANDSCAPING(E)SIDEWALK AZIMUTH 0°AZIMUTH 180°NOTES:1. OLD FOUNDATION BASE TO BE FILLED WITHCONTROLLED DENSITY FILL TO BOTTOM OFSIDEWALK BASE LAYER2. LANDSCAPE AND IRRIGATION TO BERESTORED TO MATCH EXISTING FINISHELEVATIONS2223'-4"± BACK OF POLE TOEDGE OF SIDEWALK.MIN. 3'-0" CLEARANCEADA COMPLIANCEUPDATED 9-4-2020
SHUTDOWNDRAWN BY:CHECKED BY:BPMAPEIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENTREVDATEDESCRIPTIONMODUS, LLC240 STOCKTON ST., 3RD FLOORSAN FRANCISCO, CA94108APPROVED BY:LJBCUPERTINO 034(IFO) 10451 MILLER AVECUPERTINO, CA 95014VERIZON WIRELESS2785 MITCHELL DRIVE, SUITE 9WALNUT CREEK, CA94598004/03/20100% CD104/29/20 100% CD PLAN CHECKA-2EXISTING & PROPOSEDELEVATIONS12PROPOSED ELEVATIONEXISTING ELEVATION1/2"=1'-0"SCALE1/2"=1'-0"SCALEEXISTING SURFACE0'-0" AGLEXISTING SURFACE0'-0" AGLT.O. (P) RADIO UNITS15'-0" AGLB.O. (P) CABLE SHROUD12'-1" AGL5D-18D-110D-14D-2(N) FOUNDATION(N) (2) RRUS 32s W/ PSU-08 ANDCABLE SHROUDT.O. (E) STEEL LIGHT POLE30'-3" AGLT.O. (E) LIGHT SENSOR33'-4" AGL(N) LIGHT POLE(N) LUMINAIRE(N) NOTICE SIGNAGEFACING STREETSIDE12D-1(E) FOUNDATION TO BE REPLACED(E) LIGHT POLE TO BE REPLACED(E) LUMINAIRE(N) MAST ARM(E) BIKE LANE SIGNTO BE RELOCATEDT.O. (P) SIGN14'-8" AGLB.O. (P) SIGN13'-2" AGL(E) RELOCATED ROAD SIGNT.O. (E) ROAD SIGN10'-0" AGL5E-37E-3(E) "NO PARKING" SIGNTO BE RELOCATEDT.O. (E) ROAD SIGN8'-6" AGLB.O. (E) ROAD SIGN7'-4" AGLT.O. (E) ROAD SIGN11'-6" AGLB.O. (E) ROAD SIGN10'-4" AGL(E) RELOCATED ROAD SIGN(ON OTHER SIDE)B.O. (P) DISCONNECT / SMART METER7'-0" AGLT.O. (N) STEEL LIGHT POLE30'-0" AGLT.O. (N) LIGHT SENSOR32'-0" AGLRAD CENTER OF (P) 5G ANTENNA31'-7" AGLT.O. (P) CONCEALMENT SHROUD35'-6" AGLRAD CENTER OF (P) CANISTER ANTENNA34'-3" AGL(N) (2) 5G ANTENNASIN FRP SHROUD6D-1(N) VERIZON WIRELESSCANISTER ANTENNA4D-1(N) FRP CONCEALMENTSHROUD1D-1(N) (2) TWIN DIPLEXERSIN FRP SHROUD3D-1T.O. (P) DISCONNECT / SMART METER8'-9" AGLT.O. (N) NOTICE SIGNAGE25'-2" AGLNOTES:1. ALL NEW ANTENNAS, BRACKETS, AND OTHER EQUIPMENT WILL BE PAINTED TO MATCH LIGHT POLE.2. ALL EXISTING SIGNAGE TO BE RELOCATED SHALL BE FASTENED USING STEEL BANDING PER SHEETT-2.(N) RED "BICYCLEWRONG WAY" SIGNAGE7D-110E-311D-1(N) DISCONNECT / SMART METER4E-33E-3PORT HOLE LOCATIONFOR RRUS1D-2PORT HOLE LOCATIONFOR DISCONNECT1D-29D-1
Encroachment Agreement - Cuper 034.planshts
Final Audit Report 2020-11-12
Created:2020-10-29
By:Julia Kinst (juliak@cupertino.org)
Status:Signed
Transaction ID:CBJCHBCAABAAZICQRyjlMOc7F2Lm25jx3ksGNZtNn3re
"Encroachment Agreement - Cuper 034.planshts" History
Document created by Julia Kinst (juliak@cupertino.org)
2020-10-29 - 5:25:03 PM GMT- IP address: 64.165.34.3
Document emailed to Heather M. Minner (minner@smwlaw.com) for signature
2020-10-29 - 5:26:00 PM GMT
Email viewed by Heather M. Minner (minner@smwlaw.com)
2020-11-12 - 5:46:33 PM GMT- IP address: 45.41.142.181
Document e-signed by Heather M. Minner (minner@smwlaw.com)
Signature Date: 2020-11-12 - 5:46:57 PM GMT - Time Source: server- IP address: 52.39.49.65
Document emailed to Chad Mosley (chadm@cupertino.org) for signature
2020-11-12 - 5:46:59 PM GMT
Email viewed by Chad Mosley (chadm@cupertino.org)
2020-11-12 - 7:09:12 PM GMT- IP address: 104.47.44.254
Document e-signed by Chad Mosley (chadm@cupertino.org)
Signature Date: 2020-11-12 - 7:09:20 PM GMT - Time Source: server- IP address: 67.164.60.110
Document emailed to Kirsten Squarcia 11/12/20 (kirstens@cupertino.org) for signature
2020-11-12 - 7:09:22 PM GMT
Email viewed by Kirsten Squarcia 11/12/20 (kirstens@cupertino.org)
2020-11-12 - 7:30:24 PM GMT- IP address: 104.47.74.126
Document e-signed by Kirsten Squarcia 11/12/20 (kirstens@cupertino.org)
Signature Date: 2020-11-12 - 7:30:42 PM GMT - Time Source: server- IP address: 148.64.105.190
Agreement completed.
2020-11-12 - 7:30:42 PM GMT