Loading...
19-071 Contract Change Order #03 09-23-2019CITY OF McClellan Road Separated Bikeways, Phase lb PROJECT NO.2017-01.06 CONTRACT CHANGE ORDER #3 CUPERTINO DATE: 9/23/2019 CCO# Contractor: Redgwick Construction Company 21 Hegenberger Court Oakland, CA 94621 P.O.# 2019-547 Acct. # 420-99-036-900-905-ST 029-03-01 The following changes are hereby approved, notwithstanding language in any attachment to the contrary, Contractor agrees that the amount paid pursuant hereto is full and complete compensation for the work described herein for each and every entity involved in the project who is being compensated hereunder and that each and every claim for any cost for schedule impact such as a delay, impact, inefficiency, acceleration, extended overhead, increased supervision, compression and all other factors affecting cost arising from the subject of this Change Order is hereby released and waived by all such Subcontractors and suppliers at all tiers. Change No. City Authorization Type and No. Description Compensation Change Revise striping bid items 31, 32 and 33 from thermoplastic to 2 coats of paint. Unit costs are to be revised as indicated on the attached quotation from Sierra Traffic Markings Inc. 3 ATP#4 These revised unit costs shall be applied to Per revised unit costs actual field measured quantities to arrive at the final compensation for these bid items. Page 1 Change Order no. 3 CITY of McClellan Road Separated Bikeways, Phase lb PROJECT NO.2017-01.06 CONTRACT CHANGE ORDER #3 CUPERTINO Total Change Order No.3 Per revised unit costs Total Original Contract $1,365,420.00 Change Order No.1 $1,557.66 Change Order No. 2 $4,950.60 Change Order No. 3 Based on field measured quantities Revised Contract $1,371,928.26 Schedule Impact: 0 calendar days Project Final Completion Date: 9/10/2019 REVIEWED BY: ty of Cuperti o John Raaymakers City Project Manager Date: _ A,. (�a CSG Consultants Michael Ballard Senior Project Manager Date: 71 7,5, 1 I Y Total Change Orders fa Roger Ike Direct r of Public Works Date: Redgwick Construction Travis Miller Project Manager Date: !O Y/1 Page 2 Change Order no. 3 SIERRA TMMIC MMMNBS.INC. SIERRA TRAFFIC MARKINGS, INC. 9725 Del Road Suite B Roseville, Ca. 95747 (916) 774-9080 Office (916) 774-9088 Fax TO Redgwick Construciton Company 21 Hergenberger Court Oakland, CA94621 Attn: Mateen Rooshen Office: 510-792-1727 Fax; 510-792-1728 CustomerE-mail: mateen@redgwick CHANGE ORDER #3 ATTACHMENT ESTIMATE #: 19-351 PROJECT NAME: PROJECT ADDRESS: CITY: CUSTOMER JOB #: AUTHORIZED BY: Date 8/13/2019 McClellan Rd Separated Bikeway Cupertino, CA 2017-01.06 Hunter Davis The original contract agreement between Sierra Traffic Markings, Inc. and the contractor named above is here by modified and amended by the following deviations from the original contract. DESCRIPTION OF CHANGE OR MODIFICATION ITEM CITY DESCRIPTION CONTRACT DEDUCTIVE CHANGE ORDER NO. 1 SCOPE OF WORK REVISION (PAINT IN LIEU OF PRE -FORMED THERMOPLASTIC) 31 2,850 SF - Green Bike Lane (Pre -Formed Thermoplastic) (Deduction of $8.00 Per SF) 32 200 LF - Bike Lane Stripe (Pre -Formed Thermoplastic) (Deduction of $2.00 Per SF) 33 2,110 SF - Pavement Marking (Pre -Formed Thermoplastic) (Deduction of $13.25 Per SF) NEW CONTRACTED ITEMS - PER THIS CHANGE ORDER 31 2,850 SF. Green Bike Lane (2-Coat Paint) @ $8.50 PER SF 32 200 LF. Bike Lane Stripe (2-Coat Paint) @ $7.00 PER LF 33 2,110 SF. Pavement Marking (2-Coat Paint) (Includes Removal of Existing Conflicting Striping) @ $15.75 PER SF NOTE: Final Quantities to be Measured Upon Completion of Striping It is mutually agreed that for such change the contract price is increased by All provisions of the original contract and agreement shall remain in full force and effect, without change because of above deviations. All change orders must be approved before Sierra Traffic Markings can complete any additional work requested or required. Upon approval of all changes above, please sign, date and return back Sierra Traffic Markings, Inc.. Thank You, Sierra Traffic Markings, Inc. Upon Approval Please Sign Below Authorized Name & Signature Date Accepted Redgwick Construciton Company 21 Hergenberger Court Oakland, CA 94621