22-012 J.J. R. Construction, for work on the 2022 Reconstruction of Curbs,Gutters and Sidewalks2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form CONTRACT 2022-101 Page 1 Contract This public works contract (“Contract”) is entered into by and between City of Cupertino (“City”) and J.J. R. Construction, Inc. (“Contractor”), for work on the 2022 Reconstruction of Curbs, Gutters and Sidewalks Project (“Project”). The parties agree as follows: 1.Award of Contract. In response to the Notice Inviting Bids, Contractor has submitted a Bid Proposal to perform the Work to construct the Project. On December 21, 2021, City authorized award of this Contract to Contractor for the amount set forth in Section 4, below. 2.Contract Documents. The Contract Documents incorporated into this Contract include and are comprised of all of the documents listed below. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, including this Contract. 2.1 Notice Inviting Bids; 2.2 Instructions to Bidders; 2.3 Addenda, if any; 2.4 Bid Proposal and attachments thereto; 2.5 Contract; 2.6 Payment and Performance Bonds; 2.7 General Conditions; 2.8 Special Conditions; 2.9 Project Plans and Specifications; 2.10 Change Orders, if any; 2.11 Notice of Potential Award; 2.12 Notice to Proceed; and 2.13 The following: Traffic Control Requirements, Cupertino Standard Details, Caltrans Standard Plans 3.Contractor’s Obligations. Contractor will perform all of the Work required for the Project, as specified in the Contract Documents. Contractor must provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including all necessary labor, materials, supplies, tools, equipment, transportation, onsite facilities, and utilities, unless otherwise specified in the Contract Documents. Contractor must use its best efforts to diligently prosecute and complete the Work in a professional and expeditious manner and to meet or exceed the performance standards required by the Contract Documents. 4.Payment. As full and complete compensation for Contractor’s timely performance and completion of the Work in strict accordance with the terms and conditions of the Contract Documents, City will pay Contractor $1,054,968.66 (“Contract Price”) for all of Contractor’s direct and indirect costs to perform the Work, including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, in accordance with the payment provisions in the General Conditions. 5.Time for Completion. Contractor will fully complete the Work for the Project, meeting all requirements for Final Completion, by May 20, 2022. By signing below, Contractor expressly waives any claim for delayed early completion. 6.Liquidated Damages. If Contractor fails to complete the Work within the Contract Time, City will assess liquidated damages in the amount of $500.00 per day for each day of 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form CONTRACT 2022-101 Page 2 unexcused delay in achieving Final Completion, and such liquidated damages may be deducted from City’s payments due or to become due to Contractor under this Contract. 7.Labor Code Compliance. 7.1 General. This Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in Article 9 of the General Conditions . 7.2 Prevailing Wages. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are available online at http://www.dir.ca.gov/DLSR. 7.3 DIR Registration. City may not enter into the Contract with a bidder without proof that the bidder and its Subcontractors are registered with the California Department of Industrial Relations to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions. 8.Workers’ Compensation Certification. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.” 9.Conflicts of Interest. Contractor, its employees, Subcontractors and agents, may not have, maintain or acquire a conflict of interest in relation to this Contract in violation of any City ordinance or requirement, or in violation of any California law, including Government Code § 1090 et seq., or the Political Reform Act, as set forth in Government Code § 81000 et seq. and its accompanying regulations. Any violation of this Section constitutes a material breach of the Contract. 10.Independent Contractor. Contractor is an independent contractor under this Contract and will have control of the Work and the means and methods by which it is performed. Contractor and its Subcontractors are not employees of City and are not entitled to participate in any health, retirement, or any other employee benefits from City. 11.Notice. Any notice, billing, or payment required by or pursuant to the Contract Documents must be made in writing, signed, dated and sent to the other party by personal delivery, U.S. Mail, a reliable overnight delivery service, or by email as a PDF file. Notice is deemed effective upon delivery, except that service by U.S. Mail is deemed effective on the second working day after deposit for delivery. Notice for each party must be given as follows: City: City of Cupertino 10300 Torre Ave Cupertino, CA 95014 408-777-3354 Attn: Director of Public Works joannej@cupertino.org 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form CONTRACT 2022-101 Page 3 Copy to: pwinvoices@cupertino.org Contractor: Name: J.J.R. Construction, Inc. Address:1120 Ninth Avenue City/State/Zip: San Mateo, CA 94402 Phone: 650-343-6109 Attn: Carlos Raposo Email: carlos@jjrconstruction.com Copy to:____________________________________ 12.General Provisions. 12.1 Assignment and Successors. Contractor may not assign its rights or obligations under this Contract, in part or in whole, without City’s written consent. This Contract is binding on Contractor’s and City’s lawful heirs, successors and permitted assigns. 12.2 Third Party Beneficiaries. There are no intended third party beneficiaries to this Contract. 12.3 Governing Law and Venue. This Contract will be governed by California law and venue will be in the Santa Clara County Superior Court, and no other place. Contractor waives any right it may have pursuant to Code of Civil Procedure § 394, to file a motion to transfer any action arising from or relating to this Contract to a venue outside of Santa Clara County, California. 12.4 Amendment. No amendment or modification of this Contract will be binding unless it is in a writing duly authorized and signed by the parties to this Contract. 12.5 Integration. This Contract and the Contract Documents incorporated herein, including authorized amendments or Change Orders thereto, constitute the final, complete, and exclusive terms of the agreement between City and Contractor. 12.6 Severability. If any provision of the Contract Documents is determined to be illegal, invalid, or unenforceable, in whole or in part, the remaining provisions of the Contract Documents will remain in full force and effect. 12.7 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Contractor certifies, by signing below, that it is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act. 12.8 Authorization. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents, and that this Contract is legally binding on that party. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporation Code § 313. 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form CONTRACT 2022-101 Page 4 The parties agree to this Contract as witnessed by the signatures below: CITY: Approved as to form: s/_______________________________ s/__________________________________ ________________________________ ___________________________________ Name, Title Name, Title Date: ___________________________ Date: ______________________________ Attest: s/_______________________________ _________________________________ Name, Title Date: ___________________________ CONTRACTOR: ___________________________________________________ Business Name s/_______________________________ Seal: _________________________________ Name, Title Date: ____________________________ Second Signature (See Section 12.8): s/_______________________________ _________________________________ Name, Title Date: ____________________________ ___________________________________________________ Contractor’s California License Number(s) and Expiration Date(s) END OF CONTRACT Carlos Raposo J.J.R. Construction, Inc Carlos Raposo President Jan 26, 2022 Christopher D. Jensen Christopher D. Jensen City Attorney Jan 26, 2022 Jim Throop Jim Throop City Manager Jan 26, 2022 Kirsten Squarcia City Clerk Jan 26, 2022 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form NOTICE INVITING BIDS 2022-101 Page 1 Notice Inviting Bids 1. Bid Submission. City of Cupertino (“City”) will accept electronically submitted bids for its 2022 Reconstruction of Curbs, Gutters and Sidewalks Project (“Project”), by or before November 30, 2021, at 2:00 p.m., via electronic submission to the City’s “Business Opportunities” online portal in the manner set forth in Section 1 of the Instructions to Bidders, at which time the bids will be opened by the City. 2. Project Information. 2.1 Location and Description. The Project is located at various locations throughout the City and is described as follows: Remove/Replace existing concrete curbs, gutters, and sidewalks at various locations throughout the City. Work also includes installation of ADA ramps, upgrading existing ADA ramps to current standard, removal/replacement of driveway approaches and removal/replacement as asphalt adjacent to curbs. 2.2 Time for Final Completion. The Project must be fully complete by May 1, 2022. City anticipates issuing a notice to proceed on or before December 13. 3. License and Registration Requirements. 3.1 License. This Project requires a valid California contractor’s license for the following classification(s): A-General Engineering, or C-8 Concrete Contractor. 3.2 DIR Registration. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (“DIR”) to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions. 4. Contract Documents. The plans, specifications, bid forms and contract documents for the Project, and any addenda thereto (“Contract Documents”) may be downloaded from City’s website located at: https://apps.cupertino.org/bidmanagement/index.aspx. A printed copy of the Contract Documents are not available. 5. Bid Security. Each bidder must submit bid security equal to ten percent of the maximum bid amount, in the form of a cashier’s or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents, in the manner set forth in Section 4 of the Instructions to Bidders. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award. 6. Prevailing Wage Requirements. 6.1 General. Pursuant to California Labor Code § 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. 6.2 Rates. These prevailing rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR. Each Contractor and Subcontractor must pay no less 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form NOTICE INVITING BIDS 2022-101 Page 2 than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. 6.3 Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code § 1771.4. 7.Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. 8.Substitution of Securities. Substitution of appropriate securities in lieu of retention amounts from progress payments is permitted under Public Contract Code § 22300. 9.Subcontractor List. Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed Subcontractor List form with its Bid Proposal, including the name, location of the place of business, California contractor license number, DIR registration number, and percentage of the Work to be performed (based on the base bid price) for each Subcontractor that will perform Work or service or fabricate or install Work for the prime contractor in excess of one-half of 1% of the bid price, using the Subcontractor List form included with the Contract Documents. 10.Instructions to Bidders. All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a Bid Proposal. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids. By: ___________________________________ Date: ________________ Kirsten Squarcia City Clerk Publication Date: 11/12/2021 END OF NOTICE INVITING BIDS 11/12/2021 for 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID PROPOSAL 2022-101 Page 3 Instructions to Bidders Each Bid Proposal submitted to the City of Cupertino (“City”) for its 2022 Reconstruction of Curbs, Gutters and Sidewalks Project (“Project”) must be submitted in accordance with the following instructions and requirements: 1. Bid Submission. 1.1 General. Each Bid Proposal must be signed and submitted to City, using the form provided in the Contract Documents, by or before the date and time set forth in Section 1 of the Notice Inviting Bids, or as amended by subsequent addendum, via electronic submission only as specified below in Section 1.2 . Faxed, hand-delivered, mailed or emailed Bid Proposals will not be accepted, unless otherwise specified. Late submissions will not be considered. City reserves the right to postpone the date or time for receiving or opening bids. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from City. The bid price(s) must include all costs to perform the Work as specified, including all labor, material, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead. 1.2 Electronic Submission. The Bid Proposal and all required forms and attachments must be submitted in PDF format on the City’s “Business Opportunities” portal at https://apps.cupertino.org/bidmanagement/index.aspx. To submit a bid, (1) select the folder icon in the “Actions” column for the Project; (2) select the “Electronic Submission” tab; (3) when the log-in screen appears, enter the log-in credentials used to access the Contract Documents and/or create an account, as appropriate; (4) after logging in, carefully follow all instructions for electronic submission of the Bid Proposal and all required forms and attachments. Each bidder should familiarize itself with the City’s “Business Opportunities” portal before the bid deadline. Electronic submission may take more time than anticipated. Each bidder should plan accordingly and afford itself ample time to upload its bid. Bids that are in the process of uploading but are not completely uploaded by the bid deadline w ill be automatically rejected by the portal. The portal will not allow submission after the bid deadline. On the next Working Day following the bid opening, the City will post the bid results to https://apps.cupertino.org/bidmanagement/index.aspx. 1.3 DIR Registration. Subject to limited legal exceptions for joint venture bids and federally - funded projects, City may not accept a Bid Proposal from a bidder without proof that the bidder is registered with the DIR to perform public work under Labor Code § 1725.5. If City is unable to confirm that the bidder is currently registered with the DIR, City may disqualify the bidder without opening its bid. (Labor Code §§ 1725.5 and 1771.1(a).) 2. Bid Proposal Form and Enclosures. Each Bid Proposal must be completed legibly using the Bid Proposal form included with the Contract Documents. The Bid Proposal form must be fully completed without interlineations, alterations, or erasures. Any necessary corrections must be clear and legible, and must be initialed by the bidder’s authorized representative. A Bid Proposal submitted with exceptions or terms such as “negotiable,” “will negotiate,” or similar, wil l be considered nonresponsive. Each Bid Proposal must be accompanied by a completed Subcontractor List and Non-Collusion Declaration using the forms included with the Contract Documents, a PDF copy of the bid security, and any additional forms required by the Notice Inviting Bids or Instructions to Bidders. In addition to submitting a PDF copy of the bid security, each bidder must also send the original form of bid security to the City, as set forth in Section 4, below. 3. Authorization and Execution. Each Bid Proposal must be signed by the bidder’s authorized representative. A Bid Proposal submitted by a partnership must be signed in the partnership name 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID PROPOSAL 2022-101 Page 4 by a general partner with authority to bind the partnership. A Bid Proposal submitted by a corporation must be signed with the legal name of the corporation, followed by the signature and title of two officers of the corporation with full authority to bind the corporation to the terms of the Bid Proposal, under California Corporation Code § 313. 4. Bid Security. Each bid must be guaranteed by bid security of ten percent of the maximum bid amount, in the form of a cashier’s or certified check made payable to the City, or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California. 4.1 Form of Security and Submission. In addition to submitting a PDF copy of the bid security, the wet-inked original bid bond, cashier’s or certified check, must be sent to the City via U.S. Mail or a reliable overnight delivery service in a sealed envelope addressed to City of Cupertino, Office of the City Clerk, 10300 Torre Avenue, Cupertino, CA 95014 and clearly labeled with the bidder’s legal name and address, the Project title, and date and time of the bid deadline. The envelope containing the original form of bid security must be postmarked or otherwise dated to show that it was submitted to the United States Postal Service or overnight delivery service by or before the date of the bid deadline. 4.2 Bid Guarantee. The bid security must guarantee that, within ten days after issuance of the Notice of Potential Award, the bidder will: execute and submit the enclosed Contract for the bid price; submit payment and performance bonds for 100% of the maximum Contract Price; and submit the insurance certificates and endorsements and any other submittals , if any, required by the Contract Documents or the Notice of Potential Award. A Bid Proposal may not be withdrawn for a period of 60 days after the bid opening without forfeiture of the bid security, except as authorized for material error under P ublic Contract Code § 5100 et seq. 5. Requests for Information. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Jo Anne Johnson, Public Works Project Manager, at joannej@cupertino.org. Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum. 6. Pre-Bid Investigation. 6.1 General. Each bidder is solely responsible at its sole expense for diligent and thorough review of the Contract Documents, examination of the Project site, and reasonable and prudent inquiry concerning known and potential site and area conditions prior to submitting a Bid Proposal. Each bidder is responsible for knowledge of conditions and requirements which reasonable review and investigation would have disclosed. However, except for any areas that are open to the public at large, bidders may not enter property owned or leased by the City or the Project site without prior written authorization from City. 6.2 Document Review. Each bidder is responsible for review of the Contract Documents and any informational documents provided “For Reference Only,” e.g., as -builts, technical reports, test data, and the like. A bidder is responsible for notifying City of any errors, omissions, inconsistencies, or conflicts it discovers in the Contract Documents, acting solely in its capacity as a contractor and subject to the limitations of Public Contrac t Code § 1104. Notification of any such errors, omissions, inconsistencies, or conflicts must be submitted in writing to the City no later than five Working Days before the scheduled bid opening. (See Section 5, above.) City expressly disclaims responsibility for assumptions a bidder might draw from the presence or absence of information provided by City. 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID PROPOSAL 2022-101 Page 5 6.3 Project Site. Questions regarding the availability of soil test data, water table elevations, and the like should be submitted to the City in writing, as specified in Section 5, above. Any subsurface exploration at the Project site must be done at the bidder’s expense , but only with prior written authorization from City. All soil data and analyses available for inspection or provided in the Contract Documents apply only to the test hole locations. Any water table elevation indicated by a soil test report existed on the date the test hole was drilled. The bidder is responsible for determining and allowing for any differing soil or water table conditions during construction. Because groundwater levels may fluctuate, difference(s) in elevation between ground water shown in soil boring logs and ground water actually encountered during Project construction will not be considered changed Project site conditions. Actual locations and depths must be determined by bidder’s field investigation. The bidder may request access to und erlying or background information on the Project site in City’s possession that is necessary for the bidder to form its own conclusions, including, if available, record drawings or other documents indicating the location of subsurface lines, utilities, or other structures. 6.4 Utility Company Standards. The Project must be completed in a manner that satisfies the standards and requirements of any affected utility companies or agencies (collectively, “utility owners”). The successful bidder may be required by the third party utility owners to provide detailed plans prepared by a California registered civil engineer showing the necessary temporary support of the utilities during coordinated construction work. Bidders are directed to contact the affected third party utility owners about their requirements bef ore submitting a Bid Proposal. 7. Bidders Interested in More Than One Bid. No person, firm, or corporation may submit or be a party to more than one Bid Proposal unless alternate bids are specifically called for. However, a person, firm, or corporation that has submitted a subcontract proposal or quote to a bidder may submit subcontract proposals or quotes to other bidders. 8. Addenda. Any addenda issued prior to the bid opening are part of the Contract Documents. Subject to the limitations of Public Contract Code § 4104.5, City reserves the right to issue addenda prior to bid time. Each bidder is solely responsible for ensuring it has received and reviewed all addenda prior to submitting its bid. Bidders should check City’s website periodically for any addenda or updates on the Project at: https://apps.cupertino.org/bidmanagement/index.aspx. 9. Brand Designations and “Or Equal” Substitutions. Any specification designating a material, product, thing, or service by specific brand or trade name, followed by the words “or equal,” is intended only to indicate quality and type of item desired, and bidders may request use of any equal material, product, thing, or service. All data substantiating the proposed substitute as an equal item must be submitted with the written request for substitution. A request for substitution must be submitted within 35 days after Notice of Potential Award unless otherwise provided in the Contract Documents. This provision does not apply to materials, products, things, or services that may lawfully be designated by a specific brand or trade name under Public Contract Code § 3400(c). 10. Bid Protest. Any bid protest against another bidder must be submitted in writing and received by City at 10300 Toree Avenue, Cupertino, CA 95014 or sent via email at joannej@cupertino.org before 5:00 p.m. no later than two Working Days following the date upon which the City posts the bid results (“Bid Protest Deadline”) and must comply with the following requirements: 10.1 General. Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. If required by City, the protesting bidder must submit a non-refundable fee in the amount specified by City, based upon City’s reasonable costs to administer the bid 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID PROPOSAL 2022-101 Page 6 protest. Any such fee must be submitted to City no later than the Bid Protest Deadline, unless otherwise specified. For purposes of this Section 10, a “Working Day” means a day that City is open for normal business, and excludes weekends and holidays observed by City. Pursuant to Public Contract Code § 4104, inadvertent omission of a Subcontractor’s DIR registration number on the Subcontractor List form is not grounds for a bid protest, provided it is corrected within 24 hours of the bid opening or as otherwise provided under Labor Code § 1771.1(b). 10.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and must include all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the protesting bidder and any person submitting the protest on behalf of or as an authorized representative of the protesting bidder. 10.3 Copy to Protested Bidder. Upon submission of its bid protest to City, the protesting bidder must also concurrently transmit the protest and all supporting documents to the protested bidder, and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest, by email or hand delivery to ensure delivery before the Bid Protest Deadline. 10.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by City before 5:00 p.m., within two Working Days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must attach all supporting documentat ion. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person responding on behalf of or representing the protested bidder if different from the protested bidder. 10.5 Copy to Protesting Bidder. Upon submission of its response to the bid protest to the City, the protested bidder must also concurrently transmit by email or hand delivery, by or before the Response Deadline, a copy of its response and all supporting documents to the protesting bidder and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest. 10.6 Exclusive Remedy. The procedure and time limits set forth in this Section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings. 10.7 Right to Award. City reserves the right, acting in its sole discretion, to reject any bid protest that it determines lacks merit, to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a Notice to Proceed with the Work notwithstanding any pending or continuing challenge to its determination. 11. Reservation of Rights. City reserves the unfettered right, acting in its sole discretion, to waive or to decline to waive any immaterial bid irregularities; to accept or reject any or all bids; to cancel or reschedule the bid; to postpone or abandon the Project entirely; or to perform all or part of the Work with its own forces. The Contract will be awarded, if at all, within 60 days after opening of bids or as otherwise specified in the Special Conditions, to the responsible bidder that submitted the lowest responsive bid. Any planned start date for the Project represents the City’s expectations at the time the Notice Inviting Bids was first issued. City is not bound to issue a Notice to Proceed by or before such planned start date, and it reserves the right to issue the Notice to Proceed when the City 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID PROPOSAL 2022-101 Page 7 determines, in its sole discretion, the appropriate time for commencing the Work. The City expressly disclaims responsibility for any assumptions a bidder might draw from the presence or absence of information provided by the City in any form. Each bidder is solely responsible for its costs to prepare and submit a bid, including site investigation costs. 12. Bonds. Within ten calendar days following City’s issuance of the Notice of Potential Award to the apparent low bidder, the bidder must submit payment and performance bonds to City as specified in the Contract Documents using the bond forms included in the Contract Documents. All required bonds must be calculated on the maximum total Contract Price as awarded, including additive alternates, if applicable. 13. License(s). The successful bidder and its Subcontractor(s) must possess the California contractor’s license(s) in the classification(s) required by law to perform the Work. The successful bidder must also obtain a City business license within 15 days following City’s issuance of the Notice of Potential Award. Subcontractors must also obtain a City business license before performing any Work. 14. Ineligible Subcontractor. Any Subcontractor who is ineligible to perform work on a public works project under Labor Code §§ 1777.1 or 1777.7 is prohibited from performing work on the Project. 15. Safety Orders. If the Project includes construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet or deeper, each bid must include a bid item for adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which comply with safety orders as required by Labor Code § 6707. 16. Subcontractor Work Limits. The prime contractor must perform at least 50% of the Work on the Project, calculated as a percentage of the base bid price, with its own forces, except for any Work identified as “Specialty Work” in the Contract Documents. The total bid amount for any s uch Specialty Work, as shown on the Bid Schedule, may be deducted from the base bid price before computing the 50% self-performance requirement. The remaining Work may be performed by qualified Subcontractor(s). 17. Bidder’s Questionnaire. A completed, signed Bidder’s Questionnaire using the form provided with the Contract Documents and including all required attachments must be submitted within 48 hours following a request by City. A bid that does not fully comply with this requirement may be rejected as nonresponsive. A bidder who submits a Bidder’s Questionnaire which is subsequently determined to contain false or misleading information, or material omissions, may be disqualified as non-responsible. 18. Bid Schedule. Each bidder must complete the Bid Schedule form with unit prices as indicated, and submit the completed Bid Schedule with its Bid Proposal. 18.1 Incorrect Totals. In the event a computational error for any bid item (base bid or alternate) results in an incorrect extended total for that item, the submitted base bid or bid alternate total will be adjusted to reflect the corrected amount as the product of the estimated quantity and the unit cost. In the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid, and the amount entered as the base bid on the Bid Proposal form, the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid will be deemed the base bid price. Likewise, in the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for any bid alternate, and the amount en tered for the alternate on the Bid Proposal form, the actual total of the itemized prices shown on the Bid Schedule for that alternate will be deemed the alternate price. Nothing in this 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID PROPOSAL 2022-101 Page 8 provision is intended to prevent a bidder from requesting to withdraw its bid for material error under Public Contract Code § 5100 et seq. 18.2 Estimated Quantities. The quantities shown on the Bid Schedule are estimated and the actual quantities required to perform the Work may be greater or less than the estimated amount. The Contract Price will be adjusted to reflect the actual quantities required for the Work based on the itemized or unit prices provided in the Bid Schedule, with no allowance for anticipated profit for quantities that are deleted or decreased , and no increase in the unit price, and without regard to the percentage increase or decrease of the estimated quantity and the actual quantity. END OF INSTRUCTIONS TO BIDDERS 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID SCHEDULE 2022-101 Addendum 1 Page 11 Bid Schedule This Bid Schedule must be completed in ink and included with the sealed Bid Proposal. Pricing must be provided for each Bid Item as indicated. Items marked “(SW)” are Specialty Work that must be performed by a qualified Subcontractor. The lump sum or unit cost for each item must be inclusive of all costs, whether direct or indirect, including profit and overhead. The sum of all amounts entered in the “Extended Total Amount” column must be identical to the Base Bid price entered in Section 1 of the Bid Proposal form. AL = Allowance CF = Cubic Feet CY = Cubic Yard EA = Each LB = Pounds LF = Linear Foot LS = Lump Sum SF = Square Feet TON = Ton (2000 lbs) BID ITEM NO. ITEM DESCRIPTION EST. QTY. UNIT UNIT COST EXTENDED TOTAL AMOUNT 1 Remove and Replace Sidewalk 30290 SF $ $ 2 Remove and Replace Driveway Approach 11700 SF $ $ 3 Remove and Replace Curb and Gutter (Detail 1-16 Type A2-6 or Type E) 4360 LF $ $ 4 Remove Park Strip Improvements 4670 SF $ $ 5 Valley Gutter 390 SF $ $ 6A Depressed Curb Ramp (Caltrans Type A) 2 EA $ $ 6B Depressed Curb Ramp (Caltrans Type B 4 EA $ $ 6C Depressed Curb Ramp (Caltrans Type C) 11 EA $ $ 6D Depressed Curb Ramp (Caltrans Type D) 2 EA $ $ 6E Depressed Curb Ramp (Caltrans Type E) 2 EA $ $ 6F Depressed Curb Ramp (Caltrans Type F) 2 EA $ $ 6G Depressed Curb Ramp (Caltrans Type G) 2 EA $ $ 7 Upgrade Existing Ramps 10 EA $ $ 8 Retaining Curb 304 LF $ $ 9 Root Barrier 200 LF $ $ 10 Median Island Curb (City Detail 1-16 95 LF $ $ 11 Reconstruct Catch Basin 2 EA $ $ 12 Remove / Replace Asphalt 450 TON $ $ TOTAL BASE BID: Items 1 through 11 inclusive: $_____________________________________ Note: The amount entered as the “Total Base Bid” should be identical to the Base Bid amount entered in Section 1 of the Bid Proposal form. BIDDER NAME: ________________________________________________________________ 2022 Reconstruction of Curbs, Gutters and Sidewalks 2021 Form BID SCHEDULE 2022-101 Addendum 1 Page 12 END OF BID SCHEDULE CITY OF CUPERTINO PUBLIC WORKS 2022 RECONSTRUCTION OF CURBS, GUTTERS AND SIDEWALKS PARTIAL LOCATION LIST C&G PARKSTRIP RAMPS RETAINING CURB ZONE STREET #LENG WD.SQ.FT.L F Leng WD SQ. FT.SQ.FT.EA LF Barnhart Ave 18941 24 4 96.00 24 0.00 22 Carver Ave 10616 51 4 204.00 86 0.00 1- TYPE C 18 22 Carver Ave 10621 19 4 76.00 18 12 4 48.00 22 Morengo Dr 10609 5 4 20.00 11 15 4 60.00 22 S Tantau Ave 899 13 5 58.50 14 19 14 266.00 22 S Tantau Ave 10348 42 5 189.00 22 4.5 99.00 110 22 S Tantau Ave 10362 8 5 36.00 62 13 7 91.00 22 S Tantau Ave 10660 0.00 52 23 4 92.00 22 S Tantau Ave 10672 24 4 96.00 52 28 4 112.00 22 Sterling Blvd 10200 30 4 120.00 58 28 4 112.00 22 Stern Ave 10057 34 4 136.00 0.00 22 Stern Ave 10069 21 4 84.00 21 0.00 22 Stern Ave 10104 40 4 160.00 34 8 4 32.00 22 Stern Ave 10116 22 4 88.00 62 22 4 88.00 22 Stern Ave 10140 10 4 40.00 10 0.00 22 Stern Ave 10141 13 4 52.00 4 0.00 22 Sutton Park Pl 5999 36 5 162.00 68 0.00 65 22 Tuggle Ave 18816 29 4 116.00 33 4 4 16.00 22 Tuggle Ave 18930 0.00 0.00 1-TYPE C 18 22 Tuggle Ave 18955 33 4 132.00 58 24 4 96.00 22 Tuggle Pl 100' VL 10610 27 4 108.00 33 0.00 1-TYPE C 18 22 Tuggle Pl 100' VL 10611 107 4 428.00 127 20 4 80.00 1-TYPE C 18 22 Bret Ave 10190 10 5 45.00 10 4.5 45.00 22 Sterling Blvd 10210 4 5 18.00 4 4.5 18.00 22 Sterling Blvd 10200 35 4 140.00 25 26 4 104.00 22 Sterling Blvd 10190 0.00 20 4 80.00 22 Stern Ave 10128 10 4 40.00 10 0.00 22 Sterling Blvd 10468 0.00 12 12 4 48.00 22 Minette Dr 10820 29 4 116.00 29 0.00 22 Minette Dr 10830 17 4 68.00 25 9 4 36.00 22 Stern Ave 10151 5 4 20.00 0.00 22 S Tantau Ave 965 26 5 117.00 10 0.00 91 22 S Tantau Ave 957 31 5 139.50 25 0.00 22 S Tantau Ave 947 32 5 144.00 0.00 22 S Tantau Ave 977 39 4 156.00 19 4 76.00 22 Moretti Ave 10300 0.00 5 4 20.00 22 Moretti Dr 10490 34 4 136.00 26 0.00 22 Calvert Dr 10420 4 4 16.00 3 4.5 4 18.00 22 SIDEWALK DRIVEWAY Page 1 C&G PARKSTRIP RAMPS RETAINING CURB ZONE STREET #LENG WD.SQ.FT.L F Leng WD SQ. FT.SQ.FT.EA LF SIDEWALK DRIVEWAY Pendergast Ave 18816 4.5 4 18.00 4.5 12 4 48.00 22 Loree Ave 19040 17 4 68.00 41 0.00 22 Bret Ave 10176 62 4 248.00 13 11 143.00 22 Stern Ave 10211 20 4 80.00 13 20 4 80.00 22 Newsom Ave 18971 48 4 192.00 48 0.00 22 Tuggle Pl 10621 65 4 260.00 86 0.00 22 Tuggle Pl 18881 58 4 232.00 58 21 4 84.00 22 Barnhart Ave 18950 42 4 168.00 50 9 4 36.00 22 Barnhart Ave 18951 24 4 96.00 50 22 4 88.00 22 Barnhart Ave 18961 22 4 88.00 47 25 4 100.00 22 Sterling Blvd 10476 12 4 48.00 12 0.00 22 Sorenson Ave 19349 0.00 5 0.00 22 Stern Ave 10181 14 4 56.00 18 16 4 64.00 22 Calvert Dr 10375 3 4 12.00 21 18 4 72.00 22 Wunderlich Dr 10646 25 4 100.00 42 17 4 68.00 22 Rodriguez Ave 20010 16 4.5 72.00 12 0.00 17 S Blaney Ave 10303 20 4.5 90.00 0.00 17 Stevens Creek Blvd 19999 22 4.5 99.00 0.00 17 Torre Ave 10000 5 5 25.00 6 13 11 143.00 17 Torre Ave 10100 0.00 4 0.00 17 Bollinger Rd 20207 20 4.5 90.00 0.00 18 Bollinger Rd 20221 38 4.5 171.00 0.00 18 Alderbrook Dr 10816 18 4 72.00 12 0.00 19 Glenview Ave 10640 38 4.5 171.00 23 16.5 11.5 189.75 19 Pineville Ave 10390 7 4.5 31.50 0.00 19 Pineville Ave 10400 42 4.5 189.00 8 4.5 36.00 19 Pineville Ave 10410 7.5 4.5 33.75 25 19 11.5 218.50 19 Pineville Ave 10420 8 4.5 36.00 0.00 19 Pineville Ave 10421 16 4.5 72.00 16 20 11.5 230.00 90 19 Pineville Ave 10501 17 4.5 76.50 0.00 19 Pineville Ave 10509 46 4.5 207.00 11 12 132.00 207 19 Pineville Ave 10510 8 4.5 36.00 18 0.00 19 Pineville Ave 10517 17 4.5 76.50 10 19 12 228.00 19 S Blaney Ave 10340 0.00 0.00 76.5 19 Bixby Ave 19711 30 4.5 135.00 0.00 20 Bixby Ave 19722 39 4.5 175.50 11 4.5 49.50 120 20 Bixby Ave 19741 12 4.5 54.00 20 11 7 77.00 166.5 20 Cold Harbor 10138 0.00 7 4.5 31.50 20 Cold Harbor 10158 30 4.5 135.00 7 0.00 4 20 Cold Harbor 10257 44 4.5 198.00 0.00 20 Cold Harbor 10338 8 4.5 36.00 34 0.00 166.5 20 S Portal Ave 10213 7 4.5 31.50 0.00 20 S Portal Ave 10223 25 4.5 112.50 0.00 20 Stevens Creek Blvd 19330 25 5 125.00 0.00 20 Page 2 C&G PARKSTRIP RAMPS RETAINING CURB ZONE STREET #LENG WD.SQ.FT.L F Leng WD SQ. FT.SQ.FT.EA LF SIDEWALK DRIVEWAY Stevens Creek Blvd 19960 41 5 205.00 0.00 60 20 Wintergreen Dr 19733 31 4.5 139.50 20 11 220.00 20 Wintergreen Dr 19743 11 4.5 49.50 20 7 140.00 20 Amherst Dr 19776 11 4.5 49.50 0.00 26 Colby Ave 10304 0.00 0.00 27 26 N Blaney Ave 10140 13 4.5 58.50 47 0.00 58.5 26 N Blaney Ave 10180 12 4.5 54.00 2.5 0.00 27 26 N Blaney Ave 10190 27.5 4.5 123.75 11 0.00 126 26 Whaeaton Dr 19994 26 4.5 117.00 0.00 26 Bixby Ave 19751 20 4.5 90.00 0.00 27 Cherry Tree Ln 10430 55 4.5 247.50 11 11.5 126.50 27 De Anza aBlvd 10110 12 5 60.00 0.00 27 De Anza/Stevens Cr 10050 25 5 125.00 0.00 27 De Anza/Mariani 10500 21 4.5 94.50 0.00 27 De Anza St Joseph Front 10110 12 5 60.00 0.00 27 Greenleaf Dr 20917 14 5 70.00 10 0.00 27 Randy Ln 10740 0.00 0.00 1-TYPE G 16 27 Cranberry Dr 1042 26 4.5 117.00 0.00 3 Cranberry Dr 1046 9 3 22.50 0.00 3 Pennington 1019 0.00 0.00 31.5 3 Pennington 1039 25 4.5 112.50 0.00 3 Pennington Ln 1027 0.00 10 12 120.00 3 Shannon Ct 21484 4 4.5 18.00 0.00 3 Woodlark Way 7941 38 4.5 171.00 57 0.00 3 Woodlark Way 7948 32 4.5 144.00 0.00 3 Woodlark Way 7955 32 4.5 144.00 0.00 3 Woodlark Way 7961 12 4.5 54.00 0.00 3 Woodlark Way 7970 27 4.5 121.50 27 20 13.5 270.00 3 Woodlark Way 7978 12 4.5 54.00 0.00 3 Jamestown Dr 1464 14 4.5 63.00 0.00 8 Leeds Ave 7505 0.00 34 20 11 220.00 149.5 8 S De Anza Blvd/Sherrif Sub 1601 105 5 525.00 0.00 8 S Stelling Rd 1382 18 4.5 81.00 25 20 10 200.00 8 Hollyhead Ln 1119 10 4.5 45.00 0.00 9 Hollyhead Ln 1127 32 4.5 144.00 0.00 9 Bubb Rd 11257 0.00 4 14 11 154.00 10 Bubb Rd 11331 12 4.5 54.00 0.00 10 Bubb Rd 11351 0.00 0.00 81 10 Castleton Dr/Clarkston Ave 21574 39 4.5 175.50 26 0.00 157.5 10 Catalina Ct 11221 0.00 0.00 58.5 10 Catalina Ct 11235 0.00 0.00 36 10 Clarkston Ave 11122 30 4.5 135.00 31 0.00 31.5 10 Clarkston Ave 11132 0.00 25 0.00 10 Clarkston Ave 11137 0.00 16 4.5 72.00 10 Page 3 C&G PARKSTRIP RAMPS RETAINING CURB ZONE STREET #LENG WD.SQ.FT.L F Leng WD SQ. FT.SQ.FT.EA LF SIDEWALK DRIVEWAY Clarkston Ave 11162 7 4.5 31.50 0.00 10 Clarkston Dr 11113 21 5 94.50 10 6 7 42.00 40.5 10 Mt Crest Dr 11215 0.00 22 9 2.5 22.50 10 Mt Crest Dr 11234 0.00 16 2.5 40.00 10 Santa Teresa Dr 10850 32 4.5 144.00 0.00 10 Sutherland Ave 11158 0.00 18 0.00 10 Wilkinson Ave 11102 14 5 63.00 0.00 10 Linda Vista Dr 10886 10 4.5 45.00 0.00 11 Mc Clellan/Monta Vista High 21840 0.00 0.00 11 Wilkinson Ave 10833 0.00 9 0.00 11 Lilac Ct 7811 17 4.5 76.50 0.00 14 Lilac Ct 7814 41 4.5 184.50 0.00 14 Lilac Way 7794 0.00 0.00 143 14 Lilac Way 7799 17 4.5 76.50 0.00 14 Rose Blossom Dr 884 3 4.5 13.50 0.00 14 Bollinger Rd 7585 0.00 14 0.00 15 Bubb Rd 11247 21 4.5 94.50 12 0.00 15 Dumus Ave 7518 23 5 103.50 0.00 91 15 Fallenleaf Dr 7423 13 4.5 58.50 0.00 15 Fallenleaf Dr 7450 8 4.5 36.00 29 0.00 15 Fallenleaf Dr 7464 30 4.5 135.00 22 13.5 297.00 22.75 15 Fallenleaf Dr 7478 12 4.5 54.00 0.00 15 Fallenleaf Dr 7492 0.00 3 0.00 15 Fallenleaf Dr 7523 0.00 0.00 221 15 Fallenleaf Dr 7540 8 4.5 36.00 29 0.00 15 Heatherwood Dr 7505 0.00 10 4.5 45.00 15 Elm Ct 21481 16 4.5 72.00 0.00 1-TYPE B 18 3 Conradia Ct 21504 16 4.5 72.00 0.00 1-TYPE B 18 7 Greenleaf Dr 20931 0.00 1 12.5 11 137.50 1 Mary Ave 10315 31 7 201.50 0.00 1 Mary Ave 10335 12 7 78.00 0.00 1 Mary Ave 10389 35 7 227.50 0.00 1 Mary Ave 10555 48 2 96.00 0.00 1 Mary Ave #1 10100 16 7 104.00 0.00 1 Mary Ave #2 10100 35 7 227.50 0.00 1 Mary Ave #3 10100 15 7 97.50 0.00 1 Mary Ave #4 10100 26 7 169.00 0.00 1 Mary Ave #5 10100 30 7 195.00 0.00 1 Mary Ave #6 10100 10 7 65.00 0.00 1 Millard Ln/Mary Ave 21480 52 7 338.00 3 1.00 1 N Stelling Rd/Quinlin Ctr 10185 0.00 0.00 1-TYPE C 18 1 Stevens Creek Blvd 21251 8 4.5 36.00 0.00 1 Stevens Creek Blvd 21255 95 4.5 427.50 0.00 1 Stevens Creek/Senior Ctr 21251 0.00 28 0.00 1 Page 4 C&G PARKSTRIP RAMPS RETAINING CURB ZONE STREET #LENG WD.SQ.FT.L F Leng WD SQ. FT.SQ.FT.EA LF SIDEWALK DRIVEWAY United Pl/SW Stllg & Alves 10140 0.00 0.00 1-TYPE C 18 1 De Anza Blvd 10591 86 5 430.00 35 24 10.5 252.00 2 N Stelling Rd VG 6 10735 0.00 12 0.00 2 Pasadena Ave 10056 5 6 27.50 0.00 12 Pasadena Ave 10060 0.00 33 18 2.5 45.00 12 Pasadena Ave 10064 0.00 34 0.00 12 Mc Clellan Rd 22057 16 5 72.00 9 0.00 33 Mc Clellan Rd 22059 13 5 58.50 0.00 33 S Foothill Blvd 10460 19 5 85.50 19 0.00 33 Voss Ave/Foothill Blvd 22590 10 5 45.00 0.00 36 Royal Oak Dr 22706 16 5 72.00 0.00 37 TOTALS 15,942.00 2,294.00 6,159.75 2,458.75 9.00 160.00 Page 5