Loading...
15120161TEMPORARY CERTIFICATE OF OCCUPANCY FORM CUPERTINO COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buildinoaa cupertino.org APN: 316 18-02� BP #' 15120161 DATE: f 12/1 g�17 L VALUATION PRJECT 135,000,000 SITE 10350 N. Tantau Ave, Cupertino CA 95014 ADDRESS: OWNER'S NAME: r Mike Mills l PHONE #: P: 408-593-9597 FAX #: MAILING ADDRESS (if different from site address): f 1 Infinite Loop, Cupertino CA, 95014 L CONTRACTOR/POINT OF CONTACT: Truebeck-Webcor JV / Mike Anderson PHONE #: FAX #: �P: 650-227-1957 P: 650-201-2696 REFUND - CHECK PAYABLE TO: Truebeck-Webcor JV MAILING ADDRESS: 201 Redwood Shores Parkway #125, Redwood City CA, 94065 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑ SURETY BOND 17AMOUNT (1 % VALUATION CODE r ❑CHECK El CASH BOND 10 F BOND: 5K min- 10K max) $ [ N/A 1 [BLDBONDS] EDITION: L 2013 CBC TCO EXPIRATION 6/13/2018 -$ FEE: 82A4Afrwe- TOTAL FEE: $ N/A DATE (6 MONTHS MAX): � �� [1TEMPOCC] USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Offices & MEP Rooms [ Type II B l 70,967 661 Level 1 ] [ Group B Occupancy Classification Offices &MEP Rooms Type II B 70,967 ] 1000 Level 2] Group B Occupancy Classification l 12-8-2018. Below Grade Level 1 is now INCLUDED in this TCO Application OTHER DEPARTMENT / AGENCY APPROVALS: Siiannmp nature:.........................................................Date:...................... ❑ APPROVED ❑ APPROVED WITHCONDITIONS- ire Signature: .................................................... . .. Date:. s. �1.' 1. . ❑ APPROVED ❑ APPROVED WITHCONDITIONS- Fubtic or s Signature: .............................. _._ .................... Date: ❑ APPROVED ❑ APPROVED WITHCONDITIONS` Other: Signature: .......... ...... ................ ...................... Date: ... ❑ APPROVED ❑ APPROVED WITH CONDITIONS' *CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfei d and the non-compliance may result in an enforcement action. Owner (G1 «� Contractor re:......................................................... Date:..,,.,.......,.,.. �... .................. Date: This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emer encie4. BuildinA. Official .I`.-.P.J ._. .....t^.. 0_1._......... Print:_�..L1-'.)....C.Ly._�.:L..._..._.Date:�.�.0.�...... DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file nntp<JccFarnc 1f)l3.dur revised &22117